PROJECTS SINCE DEVOLUTION
Projects Total and Fund Summary
Projects Per Department
| Department | Completed | Ongoing | Stalled | Not started | Inprocurement | All projects | Total Budget |
|---|---|---|---|---|---|---|---|
| LIVESTOCK AND FISHERIES | 44 | 1 | 0 | 0 | 0 | 45 | 76,084,119 |
| Agriculture and Irrigation | 202 | 12 | 0 | 0 | 0 | 214 | 1,721,465,274 |
| County Assembly | 25 | 7 | 8 | 0 | 0 | 40 | 436,864,858 |
| County Executive | 16 | 2 | 0 | 0 | 0 | 18 | 168,044,908 |
| CPSM, ICT and Decentralized Units | 30 | 15 | 0 | 0 | 0 | 45 | 474,673,344 |
| Education and Technical Training | 1063 | 34 | 4 | 0 | 0 | 1360 | 1,230,161,770 |
| Finance and Economic Planning | 40 | 3 | 0 | 0 | 0 | 43 | 368,910,534 |
| Health and Sanitation | 623 | 84 | 2 | 0 | 0 | 709 | 1,765,000,101 |
| HEALTH, SANITATION AND EMERGENCY SERVICES | 94 | 8 | 0 | 0 | 0 | 139 | 176,555,643 |
| LANDS, HOUSING AND URBAN DEVELOPMENT | 19 | 0 | 0 | 0 | 0 | 19 | 104,538,677 |
| LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT | 14 | 1 | 0 | 0 | 0 | 23 | 137,068,293 |
| Lands, Housing, Planning and Urban Development | 51 | 11 | 0 | 0 | 0 | 62 | 271,897,246 |
| LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT | 46 | 0 | 0 | 0 | 0 | 46 | 59,942,777 |
| Livestock, Fisheries and Veterinary Services | 177 | 15 | 0 | 0 | 0 | 192 | 369,774,498 |
| PASTORAL ECONOMY | 104 | 9 | 1 | 0 | 0 | 117 | 173,785,128 |
| PUBLIC SERVICE MANAGEMENT, ICT AND DEVOLVED UNITS | 2 | 1 | 0 | 0 | 0 | 4 | 24,442,468 |
| Public Works, Transport and Infrastructure | 875 | 18 | 0 | 0 | 0 | 893 | 1,981,052,132 |
| ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE | 190 | 2 | 0 | 0 | 0 | 204 | 302,718,580 |
| ROADS, PUBLIC WORKS AND TRANSPORT | 152 | 0 | 0 | 0 | 0 | 152 | 231,980,016 |
| Special Programmes | 1 | 1 | 0 | 0 | 0 | 2 | 2,000,000 |
| Tourism, Youths, Culture and Social Services | 69 | 4 | 0 | 0 | 0 | 73 | 239,387,165 |
| TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES | 41 | 0 | 0 | 0 | 0 | 41 | 84,242,256 |
| TOURSIM AND CULTURE | 47 | 0 | 0 | 0 | 0 | 47 | 80,851,468 |
| TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT | 48 | 7 | 0 | 0 | 0 | 55 | 121,787,807 |
| Trade, Industrialization and Cooperative Development | 154 | 20 | 2 | 0 | 0 | 176 | 318,210,710 |
| TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT | 36 | 4 | 0 | 0 | 0 | 40 | 61,695,442 |
| TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT | 20 | 6 | 0 | 0 | 0 | 43 | 64,728,120 |
| WATER, ENVIRONEMNT AND NATURAL RESOURCES | 127 | 0 | 0 | 0 | 0 | 127 | 200,996,155 |
| Water, Environment and Natural Resources | 873 | 131 | 5 | 0 | 0 | 1081 | 1,800,981,428 |
| YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES | 14 | 2 | 0 | 0 | 0 | 26 | 68,937,517 |
| Total | 5,197 | 398 | 22 | 0 | 0 | 6,036 | Ksh 13,118,778,435 |
Projects Per Subcounty
| Subcounty | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| All Sub Counties | 1 | 0 | 0 | 0 | 0 | 1 | 0 |
| ALL WARDS | 2 | 0 | 1 | 0 | 0 | 4 | 19,150,000 |
| CENTAL POKOT | 15 | 3 | 0 | 0 | 0 | 18 | 37,200,000 |
| Central Pokot | 796 | 44 | 7 | 0 | 0 | 847 | 1,364,332,664 |
| CENTRALPOKOT | 6 | 0 | 0 | 0 | 0 | 6 | 9,700,000 |
| CHEPARERIA, MNAGEI, SIGOR, ALALE | 0 | 1 | 0 | 0 | 0 | 1 | 6,200,000 |
| COUNTY WIDE | 3 | 0 | 0 | 0 | 0 | 3 | 110,715,200 |
| COUNTYWIDE | 2 | 0 | 0 | 0 | 0 | 2 | 2,895,864 |
| CRNTRAL POKOT | 2 | 0 | 0 | 0 | 0 | 2 | 1,099,999 |
| HEADQUARTERS | 1 | 0 | 0 | 0 | 0 | 1 | 1,570,000 |
| Kacheliba | 543 | 30 | 2 | 0 | 0 | 575 | 928,439,483 |
| KACHELIBA ,POKOT NORTH AND WESTPOKOT | 1 | 0 | 0 | 0 | 0 | 1 | 2,668,035 |
| KAPENGURIA, KAPCHOK, LOMUT AND BATEI | 1 | 0 | 0 | 0 | 0 | 1 | 1,013,478 |
| KAPENGURIA/ MNAGEI | 3 | 0 | 0 | 0 | 0 | 3 | 53,700,000 |
| Kipkomo | 480 | 33 | 0 | 0 | 0 | 541 | 932,067,844 |
| LOMUT AND LELAN | 1 | 0 | 0 | 0 | 0 | 1 | 5,600,000 |
| MASOL/SUAM/RIWO | 0 | 1 | 0 | 0 | 0 | 1 | 27,000,000 |
| North Pokot | 607 | 52 | 0 | 0 | 0 | 659 | 833,229,119 |
| NORTHPOKOT | 11 | 0 | 0 | 0 | 0 | 11 | 15,200,000 |
| POKOT NORTH | 1 | 0 | 0 | 0 | 0 | 1 | 2,929,128 |
| Pokot Central | 146 | 4 | 0 | 0 | 0 | 221 | 305,060,224 |
| POKOT NORTH | 160 | 17 | 0 | 0 | 0 | 310 | 300,438,095 |
| Pokot South | 91 | 6 | 0 | 0 | 0 | 121 | 182,862,921 |
| SOME WARDS | 4 | 0 | 0 | 0 | 0 | 4 | 332,208,459 |
| South Pokot | 502 | 45 | 0 | 0 | 0 | 547 | 711,498,299 |
| SOUTHPOKOT | 3 | 0 | 0 | 0 | 0 | 3 | 3,000,000 |
| SUAM / RIWO | 1 | 0 | 0 | 0 | 0 | 1 | 2,500,000 |
| THREE WARDS | 1 | 0 | 0 | 0 | 0 | 1 | 6,395,000 |
| TWO WARDS | 1 | 0 | 0 | 0 | 0 | 1 | 3,099,670 |
| VARIOUS WARDS | 1 | 0 | 0 | 0 | 0 | 1 | 400,000 |
| WEIWEI, CHEPARERIA | 1 | 0 | 0 | 0 | 0 | 1 | 1,549,398 |
| West Pokot | 1686 | 162 | 12 | 0 | 0 | 2022 | 6,774,792,840 |
| WESTPOKOT | 124 | 0 | 0 | 0 | 0 | 124 | 140,262,715 | Total | 5,197 | 398 | 22 | 0 | 0 | 6,036 | Ksh 13,118,778,435 |
Projects Per Ward
All Sub Counties
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| ALL WARDS | 1 | 0 | 0 | 0 | 0 | 1 | 0 |
| Total | 1 | 0 | 0 | 0 | 0 | 1 | Ksh 0 |
ALL WARDS
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| ALL WARDS | 2 | 0 | 1 | 0 | 0 | 4 | 19,150,000 |
| Total | 2 | 0 | 1 | 0 | 0 | 4 | Ksh 19,150,000 |
CENTAL POKOT
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| LOMUT | 4 | 0 | 0 | 0 | 0 | 4 | 6,000,000 |
| LOMUT, MASOL, SEKERR | 1 | 0 | 0 | 0 | 0 | 1 | 1,500,000 |
| MASOL | 1 | 0 | 0 | 0 | 0 | 1 | 300,000 |
| SEKERR | 5 | 1 | 0 | 0 | 0 | 6 | 7,900,000 |
| WEI WEI | 1 | 1 | 0 | 0 | 0 | 2 | 17,000,000 |
| WEIWEI | 3 | 1 | 0 | 0 | 0 | 4 | 4,500,000 |
| Total | 15 | 3 | 0 | 0 | 0 | 18 | Ksh 37,200,000 |
CENTRAL POKOT
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| MASOL | 2 | 0 | 0 | 0 | 0 | 2 | 2,000,000 |
| SEKERR | 0 | 1 | 0 | 0 | 0 | 1 | 20,000,000 |
| LOMUT,WEI WEI,SEKERR AND MASOL | 1 | 0 | 0 | 0 | 0 | 1 | 2,000,000 |
| MAS0 | 4 | 0 | 0 | 0 | 0 | 4 | 3,200,000 |
| MAS0L | 4 | 0 | 0 | 0 | 0 | 4 | 800,000 |
| SEKEER | 15 | 5 | 0 | 0 | 0 | 20 | 16,059,877 |
| SEKER | 1 | 0 | 0 | 0 | 0 | 1 | 800,000 |
| SEKERRR | 1 | 0 | 0 | 0 | 0 | 1 | 1,500,000 |
| WEI WEI | 53 | 0 | 0 | 0 | 0 | 53 | 54,365,320 |
| Total | 81 | 6 | 0 | 0 | 0 | 87 | Ksh 100,725,197 |
Central Pokot
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| Kasei | 2 | 0 | 0 | 0 | 0 | 2 | 2,159,580 |
| Lomut | 194 | 12 | 3 | 0 | 0 | 209 | 329,101,055 |
| Masol | 183 | 4 | 2 | 0 | 0 | 189 | 344,159,576 |
| Sekerr | 169 | 6 | 1 | 0 | 0 | 176 | 267,158,902 |
| Weiwei | 167 | 16 | 1 | 0 | 0 | 184 | 321,028,354 |
| Total | 715 | 38 | 7 | 0 | 0 | 760 | Ksh 1,263,607,467 |
CENTRALPOKOT
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| MASOL | 1 | 0 | 0 | 0 | 0 | 1 | 500,000 |
| SEKERR | 3 | 0 | 0 | 0 | 0 | 3 | 6,000,000 |
| WEIWEI | 2 | 0 | 0 | 0 | 0 | 2 | 3,200,000 |
| Total | 6 | 0 | 0 | 0 | 0 | 6 | Ksh 9,700,000 |
CHEPARERIA, MNAGEI, SIGOR, ALALE
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| CHEPARERIA, MNAGEI, SIGOR, ALALE | 0 | 1 | 0 | 0 | 0 | 1 | 6,200,000 |
| Total | 0 | 1 | 0 | 0 | 0 | 1 | Ksh 6,200,000 |
COUNTY WIDE
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| ALL THE 20 WARDS | 1 | 0 | 0 | 0 | 0 | 1 | 108,359,200 |
| ALL WARDS | 2 | 0 | 0 | 0 | 0 | 2 | 2,356,000 |
| Total | 3 | 0 | 0 | 0 | 0 | 3 | Ksh 110,715,200 |
COUNTYWIDE
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| COUNTYWIDE | 1 | 0 | 0 | 0 | 0 | 1 | 1,500,000 |
| COUNTYWIDE | 1 | 0 | 0 | 0 | 0 | 1 | 1,395,864 |
| Total | 2 | 0 | 0 | 0 | 0 | 2 | Ksh 2,895,864 |
CRNTRAL POKOT
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| SEKKER | 1 | 0 | 0 | 0 | 0 | 1 | 600,000 |
| WEIWEI | 1 | 0 | 0 | 0 | 0 | 1 | 499,999 |
| Total | 2 | 0 | 0 | 0 | 0 | 2 | Ksh 1,099,999 |
HEADQUARTERS
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| HEADQUARTERS | 1 | 0 | 0 | 0 | 0 | 1 | 1,570,000 |
| Total | 1 | 0 | 0 | 0 | 0 | 1 | Ksh 1,570,000 |
KACHELIBA
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| KAPCHOK | 4 | 0 | 0 | 0 | 0 | 4 | 7,999,950 |
| KASEI | 1 | 0 | 0 | 0 | 0 | 1 | 2,998,415 |
| KIWAWA | 4 | 0 | 0 | 0 | 0 | 4 | 10,395,158 |
| SUAM WARD | 2 | 0 | 0 | 0 | 0 | 2 | 899,600 |
| Total | 11 | 0 | 0 | 0 | 0 | 11 | Ksh 22,293,123 |
Kacheliba
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| Kapchok | 179 | 8 | 0 | 0 | 0 | 187 | 265,822,756 |
| Kodich | 160 | 13 | 0 | 0 | 0 | 173 | 259,347,348 |
| Suam | 193 | 9 | 2 | 0 | 0 | 204 | 380,976,256 |
| Total | 532 | 30 | 2 | 0 | 0 | 564 | Ksh 906,146,360 |
KACHELIBA ,POKOT NORTH AND WESTPOKOT
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| RIWO,KODICH AND ALALE | 1 | 0 | 0 | 0 | 0 | 1 | 2,668,035 |
| Total | 1 | 0 | 0 | 0 | 0 | 1 | Ksh 2,668,035 |
KAPENGURIA, KAPCHOK, LOMUT AND BATEI
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| KAPENGURIA, KAPCHOK, LOMUT AND BATEI | 1 | 0 | 0 | 0 | 0 | 1 | 1,013,478 |
| Total | 1 | 0 | 0 | 0 | 0 | 1 | Ksh 1,013,478 |
KAPENGURIA/ MNAGEI
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| KAPENGURIA/ MNAGEI | 3 | 0 | 0 | 0 | 0 | 3 | 53,700,000 |
| Total | 3 | 0 | 0 | 0 | 0 | 3 | Ksh 53,700,000 |
KIPKOMO
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| BATEI | 1 | 0 | 0 | 0 | 0 | 1 | 1,994,615 |
| CHEPARERIA AND WEI WEI | 1 | 0 | 0 | 0 | 0 | 1 | 1,549,398 |
| Total | 2 | 0 | 0 | 0 | 0 | 2 | Ksh 3,544,013 |
Kipkomo
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| Batei | 217 | 12 | 0 | 0 | 0 | 246 | 421,628,006 |
| Chepareria | 259 | 21 | 0 | 0 | 0 | 291 | 496,895,825 |
| Endugh | 1 | 0 | 0 | 0 | 0 | 1 | 3,000,000 |
| Tapach | 1 | 0 | 0 | 0 | 0 | 1 | 7,000,000 |
| Total | 478 | 33 | 0 | 0 | 0 | 539 | Ksh 928,523,831 |
LOMUT AND LELAN
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| LOMUT AND LELAN | 1 | 0 | 0 | 0 | 0 | 1 | 5,600,000 |
| Total | 1 | 0 | 0 | 0 | 0 | 1 | Ksh 5,600,000 |
MASOL/SUAM/RIWO
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| MASOL/SUAM/RIWO | 0 | 1 | 0 | 0 | 0 | 1 | 27,000,000 |
| Total | 0 | 1 | 0 | 0 | 0 | 1 | Ksh 27,000,000 |
North Pokot
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| Alale | 232 | 23 | 0 | 0 | 0 | 255 | 288,811,263 |
| Endugh | 1 | 0 | 0 | 0 | 0 | 1 | 4,000,000 |
| Kapenguria | 2 | 0 | 0 | 0 | 0 | 2 | 2,466,207 |
| Kasei | 140 | 8 | 0 | 0 | 0 | 148 | 228,428,071 |
| Kiwawa | 173 | 6 | 0 | 0 | 0 | 179 | 210,774,290 |
| Weiwei | 1 | 0 | 0 | 0 | 0 | 1 | 2,000,000 |
| Total | 549 | 37 | 0 | 0 | 0 | 586 | Ksh 736,479,831 |
NORTH POKOT
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| KAPCHOK | 36 | 10 | 0 | 0 | 0 | 46 | 53,427,559 |
| MNAGEI,RIWO,SUAM,KODICH,KAPCHOK | 1 | 0 | 0 | 0 | 0 | 1 | 11,546,775 |
| SUAM | 21 | 5 | 0 | 0 | 0 | 26 | 31,774,954 |
| Total | 58 | 15 | 0 | 0 | 0 | 73 | Ksh 96,749,288 |
NORTHPOKOT
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| ALALE | 5 | 0 | 0 | 0 | 0 | 5 | 6,500,000 |
| KASEI | 2 | 0 | 0 | 0 | 0 | 2 | 2,400,000 |
| KIWAWA | 4 | 0 | 0 | 0 | 0 | 4 | 6,300,000 |
| Total | 11 | 0 | 0 | 0 | 0 | 11 | Ksh 15,200,000 |
POKOT NORTH
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| KASEI | 1 | 0 | 0 | 0 | 0 | 1 | 2,929,128 |
| Total | 1 | 0 | 0 | 0 | 0 | 1 | Ksh 2,929,128 |
POKOT CENTRAL
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| LOMUT | 4 | 0 | 0 | 0 | 0 | 4 | 14,825,383 |
| MASOL | 1 | 0 | 0 | 0 | 0 | 1 | 4,483,376 |
| WEIWEI | 5 | 0 | 0 | 0 | 0 | 5 | 9,395,884 |
| Masol | 34 | 0 | 0 | 0 | 0 | 42 | 50,631,003 |
| SEKEER | 10 | 0 | 0 | 0 | 0 | 43 | 32,055,349 |
| SEKERR | 12 | 0 | 0 | 0 | 0 | 12 | 47,696,808 |
| Total | 66 | 0 | 0 | 0 | 0 | 107 | Ksh 159,087,804 |
Pokot Central
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| Lomut | 39 | 2 | 0 | 0 | 0 | 53 | 70,557,663 |
| Total | 39 | 2 | 0 | 0 | 0 | 53 | Ksh 70,557,663 |
Pokot Central
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| Weiwei | 41 | 2 | 0 | 0 | 0 | 61 | 75,414,757 |
| Total | 41 | 2 | 0 | 0 | 0 | 61 | Ksh 75,414,757 |
POKOT NORTH
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| KASEI | 1 | 0 | 0 | 0 | 0 | 1 | 3,498,080 |
| KIWAWA | 2 | 0 | 0 | 0 | 0 | 2 | 4,000,000 |
| Alale | 39 | 4 | 0 | 0 | 0 | 62 | 51,460,502 |
| KAPCHOK | 45 | 6 | 0 | 0 | 0 | 87 | 85,213,105 |
| KASEI | 30 | 3 | 0 | 0 | 0 | 57 | 75,533,983 |
| KIWAWA | 21 | 0 | 0 | 0 | 0 | 54 | 37,675,154 |
| SUAM | 22 | 4 | 0 | 0 | 0 | 47 | 43,057,272 |
| Total | 160 | 17 | 0 | 0 | 0 | 310 | Ksh 300,438,095 |
POKOT SOUTH
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| LELAN | 3 | 0 | 0 | 0 | 0 | 3 | 3,499,390 |
| BATEI | 1 | 0 | 0 | 0 | 0 | 1 | 1,000,000 |
| CHEPARERIA | 1 | 0 | 0 | 0 | 0 | 2 | 6,000,000 |
| LELAN AND TAPACH WARDS | 0 | 0 | 0 | 0 | 0 | 1 | 4,000,000 |
| Total | 5 | 0 | 0 | 0 | 0 | 7 | Ksh 14,499,390 |
Pokot South
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| Lelan | 47 | 1 | 0 | 0 | 0 | 60 | 105,204,886 |
| Total | 47 | 1 | 0 | 0 | 0 | 60 | Ksh 105,204,886 |
Pokot South
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| Tapach | 39 | 5 | 0 | 0 | 0 | 54 | 63,158,645 |
| Total | 39 | 5 | 0 | 0 | 0 | 54 | Ksh 63,158,645 |
SOME WARDS
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| 20 DISPENSARIES, 3 MAJOR PROJECTS | 1 | 0 | 0 | 0 | 0 | 1 | 8,039 |
| ALALE,KIWAWA,KODICH ,KASEI,SUAM,RIWO,ENDUGH,MASOL,WEIWEI,LOMUT,KAPCHOK,CHEPARERRIA,SEKKER AND SOOK | 1 | 0 | 0 | 0 | 0 | 1 | 7,000,000 |
| ALALE,SIYOI,SOOK,SEKER,ENDOUGH AND LOMUT WARDS | 1 | 0 | 0 | 0 | 0 | 1 | 320,000,420 |
| SIYOI,SOOK,ENDOUGH, SEKER,LOMUT,ALALE | 1 | 0 | 0 | 0 | 0 | 1 | 5,200,000 |
| Total | 4 | 0 | 0 | 0 | 0 | 4 | Ksh 332,208,459 |
SOUTH POKOT
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| LELAN | 3 | 0 | 0 | 0 | 0 | 3 | 4,299,456 |
| TAPACH | 1 | 0 | 0 | 0 | 0 | 1 | 499,999 |
| CHEPARERIA | 1 | 0 | 0 | 0 | 0 | 1 | 500,000 |
| LELAN AND TAPACH | 1 | 0 | 0 | 0 | 0 | 1 | 2,000,000 |
| LELAN, CHEPARERIA, SUAM WEIWEI | 1 | 0 | 0 | 0 | 0 | 1 | 13,488,410 |
| LELAN, CHEPARERIA, TAPACH | 1 | 0 | 0 | 0 | 0 | 1 | 750,000 |
| LELE | 1 | 0 | 0 | 0 | 0 | 1 | 700,000 |
| Total | 9 | 0 | 0 | 0 | 0 | 9 | Ksh 22,237,865 |
South Pokot
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| Lelan | 277 | 25 | 0 | 0 | 0 | 302 | 370,913,347 |
| Siyoi | 1 | 0 | 0 | 0 | 0 | 1 | 11,184,430 |
| Tapach | 215 | 20 | 0 | 0 | 0 | 235 | 307,162,657 |
| Total | 493 | 45 | 0 | 0 | 0 | 538 | Ksh 689,260,434 |
SOUTHPOKOT
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| LELAN | 1 | 0 | 0 | 0 | 0 | 1 | 1,100,000 |
| TAPACH | 2 | 0 | 0 | 0 | 0 | 2 | 1,900,000 |
| Total | 3 | 0 | 0 | 0 | 0 | 3 | Ksh 3,000,000 |
SUAM / RIWO
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| SUAM / RIWO | 1 | 0 | 0 | 0 | 0 | 1 | 2,500,000 |
| Total | 1 | 0 | 0 | 0 | 0 | 1 | Ksh 2,500,000 |
THREE WARDS
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| THREE WARDS (TAPACH,LELAN,SIYOI) | 1 | 0 | 0 | 0 | 0 | 1 | 6,395,000 |
| Total | 1 | 0 | 0 | 0 | 0 | 1 | Ksh 6,395,000 |
TWO WARDS
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| LOMUT AND KABICHBICH | 1 | 0 | 0 | 0 | 0 | 1 | 3,099,670 |
| Total | 1 | 0 | 0 | 0 | 0 | 1 | Ksh 3,099,670 |
VARIOUS WARDS
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| VARIOUS WARDS | 1 | 0 | 0 | 0 | 0 | 1 | 400,000 |
| Total | 1 | 0 | 0 | 0 | 0 | 1 | Ksh 400,000 |
WEIWEI, CHEPARERIA
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| WEIWEI, CHEPARERIA | 1 | 0 | 0 | 0 | 0 | 1 | 1,549,398 |
| Total | 1 | 0 | 0 | 0 | 0 | 1 | Ksh 1,549,398 |
WEST POKOT
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| ENDUGH | 1 | 0 | 0 | 0 | 0 | 1 | 1,498,050 |
| KAPENGURIA | 8 | 0 | 0 | 0 | 0 | 8 | 19,199,823 |
| MNAGEI | 2 | 0 | 0 | 0 | 0 | 2 | 3,699,991 |
| RIWO | 3 | 0 | 0 | 0 | 0 | 3 | 5,498,854 |
| SIYOI | 1 | 0 | 0 | 0 | 0 | 1 | 3,999,900 |
| SOOK | 1 | 0 | 0 | 0 | 0 | 1 | 8,083,274 |
| ALL WARDS | 6 | 0 | 0 | 0 | 0 | 6 | 76,152,400 |
| ALL WEST POKOT SUB COUNTY WARDS | 1 | 0 | 0 | 0 | 0 | 1 | 2,000,000 |
| CHEPARERIA, MNAGEI, SIGOR, ALALE | 0 | 1 | 0 | 0 | 0 | 1 | 6,200,000 |
| CHEPARERIA, WEIWEI, RIWO,LELAN, ,BATEI,TAPACH, LOMUT,MNAGEI | 0 | 2 | 0 | 0 | 0 | 2 | 6,000,000 |
| COUNTY | 3 | 0 | 0 | 0 | 0 | 3 | 2,184,000 |
| COUNTY WIDE | 1 | 0 | 0 | 0 | 0 | 1 | 35,100,000 |
| ENDOUGH | 4 | 1 | 0 | 0 | 0 | 5 | 7,267,558 |
| KAPENGURIA, KAPCHOK, LOMUT AND BATEI | 1 | 0 | 0 | 0 | 0 | 1 | 1,013,478 |
| LOMUT AND LELAN | 1 | 0 | 0 | 0 | 0 | 1 | 5,600,000 |
| LOMUT,CHEPARERIA,LELAN,RIWO,MNAGEI & BATEI | 1 | 0 | 0 | 0 | 0 | 1 | 2,669,508 |
| MANAGEI WARD | 2 | 0 | 0 | 0 | 0 | 2 | 1,200,000 |
| MNAGEI WARD | 2 | 0 | 0 | 0 | 0 | 2 | 2,400,000 |
| MNAGEI/SIYOI | 1 | 0 | 0 | 0 | 0 | 1 | 799,124 |
| MNANGEI | 8 | 0 | 0 | 0 | 0 | 8 | 67,600,000 |
| MNGAEI | 1 | 0 | 0 | 0 | 0 | 1 | 900,000 |
| SCHOOL | 2 | 0 | 0 | 0 | 0 | 2 | 1,499,525 |
| SIYOI WARD | 4 | 0 | 0 | 0 | 0 | 4 | 1,600,000 |
| SIYOI, SOOK, ENOUGH,LOMUT, ALALE AND SEKER | 1 | 0 | 0 | 0 | 0 | 1 | 353,574,020 |
| SOME WARDS | 1 | 0 | 0 | 0 | 0 | 1 | 4,000,000 |
| VARIOUS WARDS | 2 | 0 | 0 | 0 | 0 | 2 | 5,994,917 |
| WEST POKOT | 1 | 0 | 0 | 0 | 0 | 1 | 799,640 |
| Total | 59 | 4 | 0 | 0 | 0 | 63 | Ksh 626,534,062 |
West Pokot
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| Alale | 2 | 0 | 0 | 0 | 0 | 2 | 6,394,908 |
| Endugh | 161 | 9 | 2 | 0 | 0 | 189 | 302,603,646 |
| Kapenguria | 527 | 52 | 9 | 0 | 0 | 617 | 4,096,907,632 |
| Masol | 1 | 0 | 0 | 0 | 0 | 1 | 1,000,000 |
| Mnagei | 260 | 26 | 0 | 0 | 0 | 324 | 662,147,221 |
| Riwo | 245 | 20 | 1 | 0 | 0 | 300 | 433,940,390 |
| Sekerr | 1 | 0 | 0 | 0 | 0 | 1 | 2,500,000 |
| Siyoi | 251 | 41 | 0 | 0 | 0 | 306 | 375,250,543 |
| Sook | 179 | 10 | 0 | 0 | 0 | 219 | 267,514,437 |
| Total | 1627 | 158 | 12 | 0 | 0 | 1959 | Ksh 6,148,258,778 |
WESTPOKOT
| Ward | Completed | Ongoing | Stalled | Not started | Inprocurement | All Projects | Total Budget |
|---|---|---|---|---|---|---|---|
| ENDUGH | 6 | 0 | 0 | 0 | 0 | 6 | 5,200,000 |
| KAPENGURIA | 40 | 0 | 0 | 0 | 0 | 40 | 43,522,250 |
| MNAGEI | 22 | 0 | 0 | 0 | 0 | 22 | 23,048,209 |
| RIWO | 34 | 0 | 0 | 0 | 0 | 34 | 20,450,000 |
| SIYOI | 15 | 0 | 0 | 0 | 0 | 15 | 35,642,256 |
| SOOK | 7 | 0 | 0 | 0 | 0 | 7 | 12,400,000 |
| Total | 124 | 0 | 0 | 0 | 0 | 124 | Ksh 140,262,715 |