| 1 |
Chepkechir Dispensary Maternity Wing |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 2 |
Kaiwow Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,100,000 |
Comment
|
| 3 |
Komol Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 4 |
Kapkoris-Kaprom Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 5 |
Chesta TTC Dormitory Block |
Education and Technical Training |
2023-2024 |
Complete
|
Lomut |
Ksh 37,400,536 |
Comment
|
| 6 |
Kapkata-Tippet Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh 4,000,000 |
Comment
|
| 7 |
Kotit-Motolong Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh 2,000,000 |
Comment
|
| 8 |
Canaan-Tamarukwo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh 3,000,000 |
Comment
|
| 9 |
Chemintril-Kapkewa Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kasei |
Ksh 3,000,000 |
Comment
|
| 10 |
Too Sesen-Kamketo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kasei |
Ksh 4,000,000 |
Comment
|
| 11 |
Lomut-Surumben Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lomut |
Ksh 5,000,000 |
Comment
|
| 12 |
Apungura-Rumpot Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 1,000,000 |
Comment
|
| 13 |
Karas-Kakpaw Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 14 |
Chewoyet/Elgon View Estate Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 15 |
Putor-Chepkechir Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 1,000,000 |
Comment
|
| 16 |
Kapenguria Stream-Chesiam-AP Line Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 17 |
Kapkoris Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 18 |
Merur Dispensary (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Endugh |
Ksh 1,494,818 |
Comment
|
| 19 |
Opol Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Kasei |
Ksh 0 |
Comment
|
| 20 |
Kaptolomwo Dispensary Staff House (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Kasei |
Ksh 369,618 |
Comment
|
| 21 |
One ECDE Classroom at Chepoghin |
Education and Technical Training |
2023-2024 |
Complete
|
Kasei |
Ksh 659,580 |
Comment
|
| 22 |
One ECDE Classroom at Kotulpogh |
Education and Technical Training |
2023-2024 |
Complete
|
Kasei |
Ksh 653,796 |
Comment
|
| 23 |
Makutano Street Lights |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Mnagei |
Ksh 621,000 |
Comment
|
| 24 |
Cuban Doctors House - Septic Tank, Pit Latrine and Guard House |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 5,000,000 |
Comment
|
| 25 |
Treasury Building Parking |
Finance and Economic Planning |
2023-2024 |
Complete
|
Kapenguria |
Ksh 700,000 |
Comment
|
| 26 |
Perimeter Wall at County Treasury Headquarters |
Finance and Economic Planning |
2023-2024 |
Complete
|
Kapenguria |
Ksh 5,000,000 |
Comment
|
| 27 |
Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh 15,000,000 |
Comment
|
| 28 |
New Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh 40,000,000 |
Comment
|
| 29 |
New Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh 4,000,000 |
Comment
|
| 30 |
Governors Office Complex Phase (2) |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh 20,000,000 |
Comment
|
| 31 |
New Governors Residence Parking Shed |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,100,000 |
Comment
|
| 32 |
External Water Tanks at Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh 4,000,000 |
Comment
|
| 33 |
Liaison Office Nairobi |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh 5,000,000 |
Comment
|
| 34 |
New Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh 15,000,000 |
Comment
|
| 35 |
Gym for Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh 3,000,000 |
Comment
|
| 36 |
Power Supply at Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 37 |
Road Reserve Boundary Post within the Municipality |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh 1,500,000 |
Comment
|
| 38 |
Talau-Bondeni Box Culvert |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 4,500,000 |
Comment
|
| 39 |
Kalas-Ngaina Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh 2,000,000 |
Comment
|
| 40 |
Sigor-Kadungdung Road (KRB) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Weiwei |
Ksh 3,000,000 |
Comment
|
| 41 |
Chesta TTC-Kosioloi Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lomut |
Ksh 2,000,000 |
Comment
|
| 42 |
Parking slots within Kapenguria Municipality access Roads |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Mnagei |
Ksh 800,000 |
Comment
|
| 43 |
St. Annes ACK-Daraja Mungu-Litole Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 1,500,000 |
Comment
|
| 44 |
Chepnyal-Kola Road (KRB) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sook |
Ksh 1,623,718 |
Comment
|
| 45 |
St. Francis school-Kapenguria Road (KRB) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,500,000 |
Comment
|
| 46 |
Kamelei-Kapusien- Kamolokon Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Tapach |
Ksh 2,000,000 |
Comment
|
| 47 |
County Fire station |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Kapenguria |
Ksh 9,200,000 |
Comment
|
| 48 |
Tukumo- Centre Kwanza Road (KRB) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh 1,500,000 |
Comment
|
| 49 |
Chemeliny- Kaparemba Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Tapach |
Ksh 1,500,000 |
Comment
|
| 50 |
Karon-Kosia Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Suam |
Ksh 2,000,000 |
Comment
|
| 51 |
Kamketo-Kasepa Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kasei |
Ksh 2,000,000 |
Comment
|
| 52 |
Kokwoplekwa -Korengoi Road (3.5KM) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh 2,000,000 |
Comment
|
| 53 |
Iyoon Suspended Footbridge |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Weiwei |
Ksh 1,200,000 |
Comment
|
| 54 |
Shalpogh Footbridge |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh 1,115,837 |
Comment
|
| 55 |
Kalapata-Lodwar-Apuke Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Alale |
Ksh 4,000,000 |
Comment
|
| 56 |
Kacheliba-St. Bakhita Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Suam |
Ksh 4,000,000 |
Comment
|
| 57 |
Kamla-Mbara-Kasei Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh 4,000,000 |
Comment
|
| 58 |
Marich-Akiriamet Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sekerr |
Ksh 4,000,000 |
Comment
|
| 59 |
Kasetiang-Dungdung Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Weiwei |
Ksh 3,000,000 |
Comment
|
| 60 |
Moinoi-Chuwai Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh 4,000,000 |
Comment
|
| 61 |
Seretow-Cheptya-Samor Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh 4,000,000 |
Comment
|
| 62 |
Sebit-Dispensary Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh 1,000,000 |
Comment
|
| 63 |
Kokwotendwo-Nyarpat Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Weiwei |
Ksh 3,000,000 |
Comment
|
| 64 |
Weiwei Irrigation Project Road Network |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Weiwei |
Ksh 3,000,000 |
Comment
|
| 65 |
Empough-Psapai Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh 3,000,000 |
Comment
|
| 66 |
Parua-Chepokoriong Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh 3,000,000 |
Comment
|
| 67 |
Parua-Chepokoriong Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh 3,000,000 |
Comment
|
| 68 |
Kamerum-Kanasat-Kariamawoi Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh 3,000,000 |
Comment
|
| 69 |
Ngotut-Kodera Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh 2,000,000 |
Comment
|
| 70 |
Apuke-Loya Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Alale |
Ksh 3,000,000 |
Comment
|
| 71 |
Kwa Chief-Tartar Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh 1,500,000 |
Comment
|
| 72 |
Ombolion-Nakwomoru Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kasei |
Ksh 4,000,000 |
Comment
|
| 73 |
Kriich-Reres Road - Allowances |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh 1,100,000 |
Comment
|
| 74 |
Katiporot Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 600,000 |
Comment
|
| 75 |
Emboghat Suspended Foot Bridge |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh 500,000 |
Comment
|
| 76 |
AP Highway Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 800,000 |
Comment
|
| 77 |
Cheptongo-Letwa Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sook |
Ksh 999,000 |
Comment
|
| 78 |
Chichia-Lotukum Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Alale |
Ksh 5,000,000 |
Comment
|
| 79 |
Oron-Cherokogh-Lengorok Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Alale |
Ksh 500,000 |
Comment
|
| 80 |
Amakuriat-Otuko-Alale Girls Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Alale |
Ksh 1,000,000 |
Comment
|
| 81 |
Embosekerr-Chemurkai-Kutung Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh 1,000,000 |
Comment
|
| 82 |
Ortum secondary-Marsitot-Muruny Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh 2,500,000 |
Comment
|
| 83 |
Timorwo-Chepokoriong Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh 1,000,000 |
Comment
|
| 84 |
Chepokaratich-Ngasian Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh 1,000,000 |
Comment
|
| 85 |
Chesoton Foot Bridge |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh 2,700,000 |
Comment
|
| 86 |
Kaapoyotwo-Kotulpogh-Kaporo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh 500,000 |
Comment
|
| 87 |
Motokoron-Pusol Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh 600,000 |
Comment
|
| 88 |
Two (2) Ablution blocks in Kacheliba Sub county Hospital |
Health and Sanitation |
2023-2024 |
Complete
|
Suam |
Ksh 2,737,200 |
Comment
|
| 89 |
St. Cecilia-Marsitot-Simat-Kikas-Kashakat Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh 600,000 |
Comment
|
| 90 |
Mongorion-Mokowon-Pserum Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh 1,300,000 |
Comment
|
| 91 |
Toriapkoi-Pusian-Chepkopegh Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh 1,300,000 |
Comment
|
| 92 |
Corner Mbaya-Tirir Primary Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh 1,300,000 |
Comment
|
| 93 |
Chepkorniswo-Mongorion Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh 1,200,000 |
Comment
|
| 94 |
Chepkorniswo-Kaghat Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh 1,500,000 |
Comment
|
| 95 |
Ywalateke-Murombus- Chelakatet Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh 2,400,000 |
Comment
|
| 96 |
Kopono-Tumoon-Tompul-Cheptram Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh 2,000,000 |
Comment
|
| 97 |
Kapenguria County Hospital Water Supply Project/ Borehole Drilling |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 3,500,000 |
Comment
|
| 98 |
Kachaya-Kamokongwo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh 500,000 |
Comment
|
| 99 |
Arkut-Kapsyoyowo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh 2,500,000 |
Comment
|
| 100 |
Incinerator at Kacheliba Sub-County Hospital |
Health and Sanitation |
2023-2024 |
Complete
|
Suam |
Ksh 5,000,000 |
Comment
|
| 101 |
Tunoyo-Kapedo- Lokna Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh 1,000,000 |
Comment
|
| 102 |
Napitiro Dispensary (Painting, Floor tiles, Ceiling and Roof Repair) |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh 630,000 |
Comment
|
| 103 |
Napitiro Dispensary (Fencing) |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh 700,000 |
Comment
|
| 104 |
Pit Latrine Block for patients 4 Doors and Staff 3 Doors at Napitiro Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh 1,000,000 |
Comment
|
| 105 |
Kodera-Nachukul Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh 1,000,000 |
Comment
|
| 106 |
Office at Kacheliba Sub-county Hospital (Rollover) |
Health and Sanitation |
2023-2024 |
Complete
|
Suam |
Ksh 1,598,610 |
Comment
|
| 107 |
Kodera-Makala Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh 2,400,000 |
Comment
|
| 108 |
Tarmac Junction -Napitiro Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh 2,400,000 |
Comment
|
| 109 |
Kopeyon- Kaliokon Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh 1,500,000 |
Comment
|
| 110 |
Napitiro Staff House (Floor tiles, Plaster, Painting, Ceiling, Windows, Doors, Part Roof, Plumbing of Kitchen and Toilets) |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh 999,755 |
Comment
|
| 111 |
Mading Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh 700,000 |
Comment
|
| 112 |
Wasat Dispensary (Pit Latrine Block for Patients 4 Doors and Staff 3 Doors) |
Health and Sanitation |
2023-2024 |
Complete
|
Kiwawa |
Ksh 1,499,671 |
Comment
|
| 113 |
Doctors Lounge at KCRH |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 144,903 |
Comment
|
| 114 |
Dyke at Kodera-Kanyangareng River |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh 2,000,000 |
Comment
|
| 115 |
Rain water at KCRH (Rollover) |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,362,784 |
Comment
|
| 116 |
Kapenguria Ward Town Roads |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 3,000,000 |
Comment
|
| 117 |
Blood Bank Phase I |
Health and Sanitation |
2023-2024 |
Complete
|
Mnagei |
Ksh 113,036 |
Comment
|
| 118 |
Perimeter Wall at KCRH |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 119 |
Kalemngorok Dispensary Staff Houses (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Suam |
Ksh 200,000 |
Comment
|
| 120 |
Road at Roponywo-Kaprom |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 1,000,000 |
Comment
|
| 121 |
Staff House at Konyao Dispensary (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh 402,900 |
Comment
|
| 122 |
Lemu Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 123 |
KFA Roads |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 1,500,000 |
Comment
|
| 124 |
Pusol Dispensary (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Batei |
Ksh 1,266,643 |
Comment
|
| 125 |
Chemurto-Takar Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 126 |
Emboghat Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 127 |
Embough Maternity (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Sook |
Ksh 1,248,370 |
Comment
|
| 128 |
Kasak-Takar Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kasei |
Ksh 2,000,000 |
Comment
|
| 129 |
Kamketo-Kasepa Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 130 |
Four (4) Pit Latrine at Senetwo Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Chepareria |
Ksh 1,500,000 |
Comment
|
| 131 |
Katumale-Turtur Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh 500,000 |
Comment
|
| 132 |
Propoi Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Chepareria |
Ksh 1,000,000 |
Comment
|
| 133 |
Kopol-Chepsepin Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh 500,000 |
Comment
|
| 134 |
Drift at Akiriamet Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh 2,000,000 |
Comment
|
| 135 |
Ywalateke Maternity Ward |
Health and Sanitation |
2023-2024 |
Complete
|
Chepareria |
Ksh 1,000,000 |
Comment
|
| 136 |
Wasat-Lotitien Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh 500,000 |
Comment
|
| 137 |
Two (2) Pit Latrines at Ausukuyon Dispensary (Staff and Outpatient) |
Health and Sanitation |
2023-2024 |
Complete
|
Riwo |
Ksh 1,000,000 |
Comment
|
| 138 |
Katikomor Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Riwo |
Ksh 3,500,000 |
Comment
|
| 139 |
Chemakew Dispensary Staff House |
Health and Sanitation |
2023-2024 |
Complete
|
Riwo |
Ksh 1,000,000 |
Comment
|
| 140 |
Lokna Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Riwo |
Ksh 1,000,000 |
Comment
|
| 141 |
Kongelai Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Riwo |
Ksh 1,000,000 |
Comment
|
| 142 |
Lodupup Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Riwo |
Ksh 1,000,000 |
Comment
|
| 143 |
Akiriamet-Koput Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh 500,000 |
Comment
|
| 144 |
Septic Tank, Installation of Elevated Tank and Plumbing at Paraywa Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Siyoi |
Ksh 2,500,000 |
Comment
|
| 145 |
Nakwapuo-Songolol Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh 2,500,000 |
Comment
|
| 146 |
Kamila-Abur Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh 1,000,000 |
Comment
|
| 147 |
Staff Quarters at Onoch dispensary (Plaster, Flooring and Door/Window Glass) |
Health and Sanitation |
2023-2024 |
Complete
|
Weiwei |
Ksh 800,000 |
Comment
|
| 148 |
Chiroyon-Katuda Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh 500,000 |
Comment
|
| 149 |
Slab at Chemalangkawaw-Chemachor Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kodich |
Ksh 1,000,000 |
Comment
|
| 150 |
Takar Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Weiwei |
Ksh 2,000,000 |
Comment
|
| 151 |
Ngotut Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh 1,000,000 |
Comment
|
| 152 |
Shalpogh Community Dispensary Pit Latrine (Rollover) |
Health and Sanitation |
2023-2024 |
Complete
|
Chepareria |
Ksh 500,000 |
Comment
|
| 153 |
Koishomu-Koruru-Manian Road at Kaalotwari |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh 800,000 |
Comment
|
| 154 |
Akiriamet Dispensary Staff Houses |
Health and Sanitation |
2023-2024 |
Complete
|
Masol |
Ksh 2,000,000 |
Comment
|
| 155 |
Kabichbich-Kadukunya-Ringring Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh 2,000,000 |
Comment
|
| 156 |
Akiriamet Dispensary (Rollover) |
Health and Sanitation |
2023-2024 |
Complete
|
Masol |
Ksh 892,976 |
Comment
|
| 157 |
Daraja Mungu-Lopsimoru Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh 1,000,000 |
Comment
|
| 158 |
Maternity Wing at Parayon Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Tapach |
Ksh 256,084 |
Comment
|
| 159 |
Dispensary at Soka |
Health and Sanitation |
2023-2024 |
Complete
|
Weiwei |
Ksh 5,000,000 |
Comment
|
| 160 |
Kapchemuk Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh 1,000,000 |
Comment
|
| 161 |
Chemworor Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Suam |
Ksh 2,199,990 |
Comment
|
| 162 |
Lopunyale-Kapsait Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh 2,000,000 |
Comment
|
| 163 |
Lotupale-Kamsa-Ywapar-Mukula-Kodek Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh 1,000,000 |
Comment
|
| 164 |
Cheramba-Koruru-Manian-Mnus-Lomuke-ACK Chepkono-Cheptokoghogh-Chepkutuen-Kamoriom Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh 1,300,000 |
Comment
|
| 165 |
5,000 Lts Water Tank each for Tuwit, Ngotut , Napitiro, Losam, Kalukuna and Mading Dispensaries |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh 300,000 |
Comment
|
| 166 |
Chemokol-Kaptum Roads |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh 2,000,000 |
Comment
|
| 167 |
Lomut Primary-Kokwositet Primary-Parkilaw Road (U-Road) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lomut |
Ksh 3,000,000 |
Comment
|
| 168 |
New Road at Maros- Potiew Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lomut |
Ksh 4,000,000 |
Comment
|
| 169 |
Nyangaita-Nangironyang-Sekerot (Kerio river) Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh 1,000,000 |
Comment
|
| 170 |
Laboratory Unit at Tapach Health Facility |
Health and Sanitation |
2023-2024 |
Complete
|
Tapach |
Ksh 500,000 |
Comment
|
| 171 |
Senetwo Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Chepareria |
Ksh 1,000,000 |
Comment
|
| 172 |
Mama Kits for Orolwo Dispensary, Karameri Dispensary and Katopoton Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Kodich |
Ksh 1,400,000 |
Comment
|
| 173 |
Naramam Maternity Wing |
Health and Sanitation |
2023-2024 |
Complete
|
Chepareria |
Ksh 1,000,000 |
Comment
|
| 174 |
Chemaltin Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Lelan |
Ksh 800,000 |
Comment
|
| 175 |
Chepungon Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Lelan |
Ksh 780,000 |
Comment
|
| 176 |
Akiriamet Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Masol |
Ksh 700,000 |
Comment
|
| 177 |
Akiriamet Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Masol |
Ksh 700,000 |
Comment
|
| 178 |
Tartar Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Mnagei |
Ksh 800,000 |
Comment
|
| 179 |
Maternity Ward at Talau Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Siyoi |
Ksh 1,000,000 |
Comment
|
| 180 |
Sorichon-Ngaina-Nyangaita Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh 1,000,000 |
Comment
|
| 181 |
Chirkil-Takaywa-Nyangaita Road at Chepserum Sub-location |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh 2,000,000 |
Comment
|
| 182 |
Tikit-Ngoriakes-Akiriamet Road at Tikit Sub-location |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh 2,000,000 |
Comment
|
| 183 |
Chemwor Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Suam |
Ksh 800,000 |
Comment
|
| 184 |
Chelanket-Chirkil Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh 500,000 |
Comment
|
| 185 |
Patients Bed, Mattresses, Maternity Beds for Napitiro, Kalukuna, Ngotut and Tuwit Dispensaries |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh 1,200,000 |
Comment
|
| 186 |
Cheptamas-Chirkil Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh 500,000 |
Comment
|
| 187 |
Nakipetot-Longuriareng-Chepaiywat Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh 1,000,000 |
Comment
|
| 188 |
Mama Kits |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh 400,000 |
Comment
|
| 189 |
Medical Instruments for Rural Dispensaries (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Kodich |
Ksh 1,999,900 |
Comment
|
| 190 |
Road at Kasangagh-Lemreng Kitalaposho Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh 800,000 |
Comment
|
| 191 |
Kaplelachkoror-Chepunpun Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh 1,000,000 |
Comment
|
| 192 |
Kiwanja Ndege-Masinyang-Kadingding River Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh 1,000,000 |
Comment
|
| 193 |
Nasokol Primary, Nguriareng-Chepkemei Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh 200,000 |
Comment
|
| 194 |
Culverts at Kakisaka along Murkwijit-Moseswo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh 800,000 |
Comment
|
| 195 |
Lityei Centre-Limakori Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh 500,000 |
Comment
|
| 196 |
Kamorow Primary-Dini ya Roho Mafuta Pole-Kangilikwan Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh 2,000,000 |
Comment
|
| 197 |
Kamwotiny Primary-St. Comboni Catholic-Water Supply Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh 1,000,000 |
Comment
|
| 198 |
Recreational Park |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Mnagei |
Ksh 11,712,195 |
Comment
|
| 199 |
Non-Residential Buildings (Renovation of Ardhi House) |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Kapenguria |
Ksh 4,818,756 |
Comment
|
| 200 |
Feeder Road at Mariny-Kapunpun Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sekerr |
Ksh 1,000,000 |
Comment
|
| 201 |
Kaachesoit-Kaachematai Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sekerr |
Ksh 500,000 |
Comment
|
| 202 |
Pit Latrine at Ortum Market |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Batei |
Ksh 1,062,282 |
Comment
|
| 203 |
Chepkoriong Public Toilet |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Batei |
Ksh 599,778 |
Comment
|
| 204 |
Kokwo Masian-Lalwa Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sekerr |
Ksh 300,000 |
Comment
|
| 205 |
Toilets at Makutano Soko |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Mnagei |
Ksh 200,000 |
Comment
|
| 206 |
Feeder Road at Chesito |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sekerr |
Ksh 400,000 |
Comment
|
| 207 |
Box Culverts at Katlal |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 4,700,000 |
Comment
|
| 208 |
Kerengot-Joachim/Singoyei-Kamariny Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sekerr |
Ksh 2,500,000 |
Comment
|
| 209 |
Single Line Culvert at Kamariny-Katlal Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 500,000 |
Comment
|
| 210 |
Street Lights in Town Estates |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Kapenguria |
Ksh 1,000,000 |
Comment
|
| 211 |
Kopoya-Sikinin-Korbun-Sinenden Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 1,500,000 |
Comment
|
| 212 |
Siyoi-Kiptenten Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 1,250,000 |
Comment
|
| 213 |
Kaibos-Kaptoboswo-Kamariny Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 1,250,000 |
Comment
|
| 214 |
AIC Kipkorinya Junction-Kahawa- Prison Bridge Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 1,500,000 |
Comment
|
| 215 |
Kamoriom-Karandili Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 1,000,000 |
Comment
|
| 216 |
Two (2)-Line Culvert on Kipkorinya-Kaptuka Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 700,000 |
Comment
|
| 217 |
Tulwet-Kapsurum-Primary-Talau/Tomena Bridge Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 1,200,000 |
Comment
|
| 218 |
Talau-Tingiket-Chepkoti Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 1,300,000 |
Comment
|
| 219 |
Kipkorinya-Kaptuka Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 1,500,000 |
Comment
|
| 220 |
Kipkorinya Cattle Dip-GG Road-Kipsakas Primary Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh 1,000,000 |
Comment
|
| 221 |
Parmechon-Priro Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sook |
Ksh 1,500,000 |
Comment
|
| 222 |
Kaplelach-Kasilkach-Kadow Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sook |
Ksh 1,500,000 |
Comment
|
| 223 |
Chepnyal-Chepokaliang-Mungit Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sook |
Ksh 1,500,000 |
Comment
|
| 224 |
Partekwo-Chechokis-Pililai Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sook |
Ksh 1,500,000 |
Comment
|
| 225 |
Motany-Losiywat Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Suam |
Ksh 500,000 |
Comment
|
| 226 |
Modern Toilet at Trade HQ Office |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kapenguria |
Ksh 3,000,000 |
Comment
|
| 227 |
Konyao Market Toilet Block |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kapchok |
Ksh 1,000,000 |
Comment
|
| 228 |
West Pokot Milk Processing Plant (Water Supply) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Lelan |
Ksh 3,000,000 |
Comment
|
| 229 |
Trade and Cooperative HQ offices |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kapenguria |
Ksh 1,500,000 |
Comment
|
| 230 |
Motor Vehicle Shade at Cooperative HQ Office |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kapenguria |
Ksh 1,000,000 |
Comment
|
| 231 |
Fencing of Milk Processing Plant at Kabichbich |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Lelan |
Ksh 1,500,000 |
Comment
|
| 232 |
Morwongor-Lokales Security Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Suam |
Ksh 2,000,000 |
Comment
|
| 233 |
Sikowo-Ptop Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Tapach |
Ksh 1,100,000 |
Comment
|
| 234 |
Land for Kacheliba Market (Pending Bill) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kapchok |
Ksh 500,000 |
Comment
|
| 235 |
Feeder Roads in Tapach (Parayon Dispensary-Chelal Road-Mwotot Trading Center) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Tapach |
Ksh 2,950,000 |
Comment
|
| 236 |
Boda Boda Shade at Sigor (Pending Bill) |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
Weiwei |
Ksh 499,999 |
Comment
|
| 237 |
Embolos-Telo-Tondow-Chemolo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Tapach |
Ksh 2,950,000 |
Comment
|
| 238 |
Capital Transfers to Individuals and Households (Support to Kamketo Bee Keepers Cooperative Society Ltd) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kasei |
Ksh 1,000,000 |
Comment
|
| 239 |
Capital Transfers to Siyoi Dairy Cooperative Society Ltd |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Siyoi |
Ksh 500,000 |
Comment
|
| 240 |
Sopowen-Kalitit Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Tapach |
Ksh 2,000,000 |
Comment
|
| 241 |
Maar-Soka Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Weiwei |
Ksh 500,000 |
Comment
|
| 242 |
Bus/Car Shade at Tourism HQ Office |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 243 |
Makutano Stadium |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Mnagei |
Ksh 5,000,000 |
Comment
|
| 244 |
Kaptabuk High Altitude Training Camp |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Lelan |
Ksh 5,000,000 |
Comment
|
| 245 |
St. Catherine Girls Secondary School Chepnyal |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Sook |
Ksh 1,000,000 |
Comment
|
| 246 |
Tamugh Primary School |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Sook |
Ksh 1,000,000 |
Comment
|
| 247 |
Market Shade at Serewo Market (Rolllover) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Riwo |
Ksh 999,943 |
Comment
|
| 248 |
Subukwo Field |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Batei |
Ksh 1,000,000 |
Comment
|
| 249 |
Koposes Cultural Centre |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Lomut |
Ksh 1,000,000 |
Comment
|
| 250 |
Street Lights at Orolwo and Karameri |
Special Programmes |
2023-2024 |
Complete
|
Kodich |
Ksh 1,000,000 |
Comment
|
| 251 |
Beads Shade for Ushanga Women |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Chepareria |
Ksh 500,000 |
Comment
|
| 252 |
Boda Boda Shed at Lowois |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kiwawa |
Ksh 500,000 |
Comment
|
| 253 |
Iron Sheets to support 100 Households |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Alale |
Ksh 2,500,000 |
Comment
|
| 254 |
Boda Boda Shed at Marich |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Sekerr |
Ksh 600,000 |
Comment
|
| 255 |
Traditional Attire to Chipagh |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Batei |
Ksh 300,000 |
Comment
|
| 256 |
Ushanga Initiative to Neema Women Group |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Batei |
Ksh 300,000 |
Comment
|
| 257 |
Boda Boda Shed at Nakuyen Trading Centre |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Suam |
Ksh 500,000 |
Comment
|
| 258 |
Iron Shets for Women Groups |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Kasei |
Ksh 3,000,000 |
Comment
|
| 259 |
Boda Boda Shed at Morwongor Trading Centre |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Suam |
Ksh 500,000 |
Comment
|
| 260 |
Iron Sheets to 150 Households |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Kodich |
Ksh 1,300,000 |
Comment
|
| 261 |
Iron Sheets for Vulnerable Families |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Lomut |
Ksh 1,000,000 |
Comment
|
| 262 |
Three (3) Meter Iron sheets to Residents of Masol |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Masol |
Ksh 3,000,000 |
Comment
|
| 263 |
Iron Sheets to Riwo Residents |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Riwo |
Ksh 500,000 |
Comment
|
| 264 |
Capital Transfers to Non-profit Organizations and Associations (Narii FCS Ltd, Kaporowo Coffee Farmers) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Tapach |
Ksh 500,000 |
Comment
|
| 265 |
Iron Sheets to Sekerr Residents (Ondoa Nyasi Initiative) |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Sekerr |
Ksh 3,000,000 |
Comment
|
| 266 |
Capital Transfers to Non-profit Organizations and Associations (Construction of Milk Cooling Plant at Sondany FCS Ltd) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Tapach |
Ksh 500,000 |
Comment
|
| 267 |
Ushanga Initiative to Sekerr Residents |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Sekerr |
Ksh 1,000,000 |
Comment
|
| 268 |
Capital Transfers to Non-profit Organizations and Associations (Construction of Milk Cooling Plant at Ptop FCS Ltd) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Tapach |
Ksh 500,000 |
Comment
|
| 269 |
Iron Sheets for Kapchok |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Kapchok |
Ksh 1,000,000 |
Comment
|
| 270 |
Capital Transfers to Non-profit Organizations and Associations (Completion of Sokale FCS Ltd Milk Cooling Plant) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Tapach |
Ksh 500,000 |
Comment
|
| 271 |
Lorwas to Women Groups |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Sekerr |
Ksh 1,000,000 |
Comment
|
| 272 |
Tapach FCS Ltd Milk Cooling Plant |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Tapach |
Ksh 500,000 |
Comment
|
| 273 |
Sport Equipments |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Siyoi |
Ksh 2,000,000 |
Comment
|
| 274 |
Iron sheets to Sook Residents |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Sook |
Ksh 1,000,000 |
Comment
|
| 275 |
Iron Sheets for Old Aged and Disadvantaged in the society |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Suam |
Ksh 2,000,000 |
Comment
|
| 276 |
Store at HQ Office |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,500,000 |
Comment
|
| 277 |
Maize Seeds for Distribution throughout the County |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 60,000,000 |
Comment
|
| 278 |
Two (2) ECDE Classrooms and Pit Latrine at Tokos (Pending Bill) |
Education and Technical Training |
2023-2024 |
Complete
|
Kasei |
Ksh 385,131 |
Comment
|
| 279 |
One (1) ECDE Classroom at Katumen (Pending Bill) |
Education and Technical Training |
2023-2024 |
Complete
|
Kasei |
Ksh 627,700 |
Comment
|
| 280 |
Certified Maize Seeds (Pending Bill to Kenya Seed Company part Payment) |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 30,000,000 |
Comment
|
| 281 |
Mango Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 5,400,000 |
Comment
|
| 282 |
Coffee Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 4,500,000 |
Comment
|
| 283 |
Macadamia Nut Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 3,750,000 |
Comment
|
| 284 |
Avocado Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 4,750,000 |
Comment
|
| 285 |
One (1) ECDE Classroom at Otuko (Pending Bill) |
Education and Technical Training |
2023-2024 |
Complete
|
Alale |
Ksh 584,280 |
Comment
|
| 286 |
Seed Nurseries |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 5,600,000 |
Comment
|
| 287 |
Onion Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,500,000 |
Comment
|
| 288 |
Kamwotogh Furrow |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lomut |
Ksh 500,000 |
Comment
|
| 289 |
Apulia Furrow |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lomut |
Ksh 500,000 |
Comment
|
| 290 |
Water Pumps and Pipe for Farmers of Akiriamet along River Malmaltu |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Masol |
Ksh 2,400,000 |
Comment
|
| 291 |
Chain-link Materials for Kitchen Gardens |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Mnagei |
Ksh 3,000,000 |
Comment
|
| 292 |
Chain-link Materials for Vegetable Gardens at Katuperot, Lotelemoi, Cheskirio and Lokarkar |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Suam |
Ksh 700,000 |
Comment
|
| 293 |
Intake at Mrel Water Furrow |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Weiwei |
Ksh 1,000,000 |
Comment
|
| 294 |
Knapsack Spray Pumps to Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Batei |
Ksh 2,000,000 |
Comment
|
| 295 |
Knapsack Sprayers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Riwo |
Ksh 2,000,000 |
Comment
|
| 296 |
Knapsacks |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sook |
Ksh 2,500,000 |
Comment
|
| 297 |
Generators to Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Endugh |
Ksh 2,000,000 |
Comment
|
| 298 |
Generators to Farmers along Suam River |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kodich |
Ksh 1,500,000 |
Comment
|
| 299 |
Generators for Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapchok |
Ksh 2,000,000 |
Comment
|
| 300 |
High-Voltage Generators to Farmers along Kerio River Chepserum Sub-location |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Masol |
Ksh 2,400,000 |
Comment
|
| 301 |
Generators for Farmers at Orwa |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sekerr |
Ksh 500,000 |
Comment
|
| 302 |
Certified Maize Seeds |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Endugh |
Ksh 2,000,000 |
Comment
|
| 303 |
Seeds to Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kasei |
Ksh 2,000,000 |
Comment
|
| 304 |
Certified Maize Seeds for Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kodich |
Ksh 3,000,000 |
Comment
|
| 305 |
Onion Seeds for Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lelan |
Ksh 500,000 |
Comment
|
| 306 |
Certified Seeds (Onions and Tomatoes) |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sekerr |
Ksh 1,000,000 |
Comment
|
| 307 |
Certified Onion Seeds to Farmers Groups |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Tapach |
Ksh 1,500,000 |
Comment
|
| 308 |
Mango Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapchok |
Ksh 1,000,000 |
Comment
|
| 309 |
Mango Seedlings for Chemwochoi Location |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 1,000,000 |
Comment
|
| 310 |
Grants to Kapenguria Vocational Training Centre (VTC) |
Education and Technical Training |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 311 |
High-Voltage Generators and Water Pipes to Farmers in Amolem |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Masol |
Ksh 2,400,000 |
Comment
|
| 312 |
Mango Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sook |
Ksh 1,000,000 |
Comment
|
| 313 |
Multipurpose Hall at Chepkukuii |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh 2,000,000 |
Comment
|
| 314 |
Onion Seedlings to Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Weiwei |
Ksh 1,000,000 |
Comment
|
| 315 |
One (1) ECDE Classroom at Solion |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh 1,000,000 |
Comment
|
| 316 |
Pasture Seeds |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,500,000 |
Comment
|
| 317 |
One (1) ECDE Classroom at Kamoiben-Kokwongorwo |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh 1,000,000 |
Comment
|
| 318 |
Vaccines |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 319 |
One (1) Classroom at Muino Youth Polytechnic |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh 1,000,000 |
Comment
|
| 320 |
Range Cubes for Nasukuta Abattoir |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 321 |
Dewormers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 322 |
Assorted Seeds |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh 5,000,000 |
Comment
|
| 323 |
Tombul Cattle Dip (Pending Bill) |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sook |
Ksh 480,000 |
Comment
|
| 324 |
Buildings in Nasukuta LIC |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Chepareria |
Ksh 3,200,000 |
Comment
|
| 325 |
Standard Gate LIC at Nasukuta with Extension of a Wall |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Chepareria |
Ksh 3,000,000 |
Comment
|
| 326 |
An Apiary (Modern Bee Hive Yard) |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Chepareria |
Ksh 2,000,000 |
Comment
|
| 327 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Batei |
Ksh 1,000,000 |
Comment
|
| 328 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapchok |
Ksh 700,000 |
Comment
|
| 329 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kiwawa |
Ksh 1,000,000 |
Comment
|
| 330 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kodich |
Ksh 1,500,000 |
Comment
|
| 331 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lelan |
Ksh 2,200,000 |
Comment
|
| 332 |
Dormitory at Riwo Secondary School |
Education and Technical Training |
2023-2024 |
Complete
|
Riwo |
Ksh 1,000,000 |
Comment
|
| 333 |
Acaricides |
Agriculture and Irrigation |
2024-2025 |
Complete
|
Lomut |
Ksh 1,000,000 |
Comment
|
| 334 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Riwo |
Ksh 2,500,000 |
Comment
|
| 335 |
Vaccines |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Riwo |
Ksh 1,000,000 |
Comment
|
| 336 |
ECDE Toilets at Tukumwok (Mtembur) |
Education and Technical Training |
2023-2024 |
Complete
|
Riwo |
Ksh 500,000 |
Comment
|
| 337 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sook |
Ksh 2,500,000 |
Comment
|
| 338 |
Vaccines |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sook |
Ksh 2,000,000 |
Comment
|
| 339 |
Acaricides for Cattle Dips |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Tapach |
Ksh 1,500,000 |
Comment
|
| 340 |
Latrine at Mochowon ECDE |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh 500,000 |
Comment
|
| 341 |
Mbara Cattle Dip |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sekerr |
Ksh 500,000 |
Comment
|
| 342 |
Chepkondol Cattle Dip |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sekerr |
Ksh 500,000 |
Comment
|
| 343 |
One (1) ECDE Classroom at Chilo |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh 1,000,000 |
Comment
|
| 344 |
Pit Latrine at Chilo ECDE |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh 600,000 |
Comment
|
| 345 |
Two (2) Classrooms at Kaporon Primary School |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh 400,000 |
Comment
|
| 346 |
Perkau ECDE Classrooms |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh 600,000 |
Comment
|
| 347 |
Chepkukuii Multipurpose Hall |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh 3,000,000 |
Comment
|
| 348 |
Ywalateke Cattle Dip |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Chepareria |
Ksh 700,000 |
Comment
|
| 349 |
Furnitures |
Education and Technical Training |
2023-2024 |
Complete
|
Kodich |
Ksh 2,400,000 |
Comment
|
| 350 |
ECDE Tables and Chairs to all ECDES |
Education and Technical Training |
2023-2024 |
Complete
|
Mnagei |
Ksh 600,000 |
Comment
|
| 351 |
Cattle Dip at Rotin |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Chepareria |
Ksh 500,000 |
Comment
|
| 352 |
Galla Goats |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Suam |
Ksh 700,000 |
Comment
|
| 353 |
Karokony Cattle Dip |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lelan |
Ksh 350,000 |
Comment
|
| 354 |
Improved Local Goat Breeds |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Riwo |
Ksh 1,000,000 |
Comment
|
| 355 |
Korosion Cattle Dip |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lelan |
Ksh 350,000 |
Comment
|
| 356 |
Goats to Fifty (50) Households at Lokichar Location |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kodich |
Ksh 2,000,000 |
Comment
|
| 357 |
Artificial Insemination (AI) Materials |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Siyoi |
Ksh 500,000 |
Comment
|
| 358 |
Knapsack Sprayers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lomut |
Ksh 1,000,000 |
Comment
|
| 359 |
Cattle Crush at Kanasat (Rollover) |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapchok |
Ksh 1,200,000 |
Comment
|
| 360 |
Knapsack Spray Pumps |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapchok |
Ksh 1,000,000 |
Comment
|
| 361 |
Cattle Crush at Nasuret |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Alale |
Ksh 1,700,000 |
Comment
|
| 362 |
Spray Pumps and Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Endugh |
Ksh 2,900,000 |
Comment
|
| 363 |
Cattle Crush at Kpomot Village |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Alale |
Ksh 1,700,000 |
Comment
|
| 364 |
Cattle Crush at Shongen Village |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Suam |
Ksh 1,300,000 |
Comment
|
| 365 |
Metallic Crush at Lolepon |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kiwawa |
Ksh 1,300,000 |
Comment
|
| 366 |
Cattle Crush at Kalas in Krimti |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kodich |
Ksh 1,500,000 |
Comment
|
| 367 |
Generator for Modern County Assembly Building |
County Assembly |
2023-2024 |
Complete
|
Kapenguria |
Ksh 9,900,000 |
Comment
|
| 368 |
Lift for Modern County Assembly Building |
County Assembly |
2023-2024 |
Complete
|
Kapenguria |
Ksh 14,147,600 |
Comment
|
| 369 |
New County Assembly Building |
County Assembly |
2023-2024 |
Complete
|
Kapenguria |
Ksh 1,600,000 |
Comment
|
| 370 |
New County Assembly |
County Assembly |
2023-2024 |
Complete
|
Kapenguria |
Ksh 56,442,172 |
Comment
|
| 371 |
One (1) Motor Vehicle |
County Assembly |
2023-2024 |
Complete
|
Kapenguria |
Ksh 11,666,161 |
Comment
|
| 372 |
County Water HQ Office |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapenguria |
Ksh 748,000 |
Comment
|
| 373 |
Alale Gravity Water Supply Project (Rollover) |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Alale |
Ksh 1,406,624 |
Comment
|
| 374 |
Empoghat-Porowo Water Supply Project (Rollover) |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Siyoi |
Ksh 4,997,484 |
Comment
|
| 375 |
Borehole Repair Materials for Sigor Subcounty |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Weiwei |
Ksh 3,000,000 |
Comment
|
| 376 |
Borehole Repair Materials for North Pokot |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Alale |
Ksh 3,000,000 |
Comment
|
| 377 |
Certified Tree Seeds for County Tree Nurseries and Support 100 Youth and Women Groups |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapenguria |
Ksh 200,000 |
Comment
|
| 378 |
Potting Tubes to Support Tree Nurseries and for Youth, Women, & Green Champion Groups |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 379 |
Tree Seedlings to Farmers in West Pokot Subcounty |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapenguria |
Ksh 900,000 |
Comment
|
| 380 |
Borehole at Nagwoilap Village |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Alale |
Ksh 2,000,000 |
Comment
|
| 381 |
Kapanyirit Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapchok |
Ksh 500,000 |
Comment
|
| 382 |
Apliep Solar Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kiwawa |
Ksh 1,000,000 |
Comment
|
| 383 |
County Roads Headquarters Office (Ujenzi House) |
CPSM, ICT and Decentralized Units |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,500,000 |
Comment
|
| 384 |
Cheporon Borehole (Rollover) |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kiwawa |
Ksh 2,000,000 |
Comment
|
| 385 |
Local Area Network (LAN) and Work Station for Kapenguria Youth VTC LAB-Jitume Programme |
CPSM, ICT and Decentralized Units |
2023-2024 |
Complete
|
Kapenguria |
Ksh 2,500,000 |
Comment
|
| 386 |
KDSP Level II Grant-Completion of MRI Unit (Rollover) |
Finance and Economic Planning |
2023-2024 |
Complete
|
Kapenguria |
Ksh 25,377,012 |
Comment
|
| 387 |
Revenue Barriers at Kapsait, Kamelei, Kanyarkwat, Kacheliba Sale Yard, Chorwai and Kanyerus |
Finance and Economic Planning |
2023-2024 |
Complete
|
Kapchok |
Ksh 2,000,000 |
Comment
|
| 388 |
Clamps and Road Spikes for all Revenue Collection Barriers |
Finance and Economic Planning |
2023-2024 |
Complete
|
Mnagei |
Ksh 2,300,000 |
Comment
|
| 389 |
Poghogh Water Point |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Weiwei |
Ksh 500,000 |
Comment
|
| 390 |
Water Trough at Sokopet Water Point |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Weiwei |
Ksh 500,000 |
Comment
|
| 391 |
Lutupoi Water Intake and Water Tank |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lelan |
Ksh 500,000 |
Comment
|
| 392 |
Water Tank for Manian Primary School 10,000 Ltrs (Rolover) |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lelan |
Ksh 100,000 |
Comment
|
| 393 |
Kachambilwa Sub-surface Dam |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Riwo |
Ksh 600,000 |
Comment
|
| 394 |
Katukuri Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Alale |
Ksh 1,200,000 |
Comment
|
| 395 |
Piped Water at Lutupogh-Takar Dispensary |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Weiwei |
Ksh 500,000 |
Comment
|
| 396 |
Water Pipes for Rosoma Water Project, St. Padua Sina Secondary School and Lulwoi ECDE Water Project |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Tapach |
Ksh 2,500,000 |
Comment
|
| 397 |
Tree Seedlings from Chemngoror Tree Nursery |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Batei |
Ksh 500,000 |
Comment
|
| 398 |
Sub-surface Dam at Sukut |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Batei |
Ksh 1,000,000 |
Comment
|
| 399 |
Mading Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapchok |
Ksh 2,000,000 |
Comment
|
| 400 |
Ateker Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapchok |
Ksh 2,000,000 |
Comment
|
| 401 |
Solar Pump and Controllers |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kapchok |
Ksh 1,000,000 |
Comment
|
| 402 |
Borehole at Nasolot |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Sekerr |
Ksh 2,200,000 |
Comment
|
| 403 |
Kasei Borehole to Solar Powered |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kasei |
Ksh 2,000,000 |
Comment
|
| 404 |
Sand Dam at Kaingeny |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kiwawa |
Ksh 500,000 |
Comment
|
| 405 |
Lokichar , Nakwapuo , Lomada, Adadat Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kodich |
Ksh 600,000 |
Comment
|
| 406 |
Orolwo Dam |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kodich |
Ksh 1,500,000 |
Comment
|
| 407 |
Water Intake and Pipping of Plalang Water Project |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lelan |
Ksh 700,000 |
Comment
|
| 408 |
Kachepket Water Supply |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lelan |
Ksh 1,000,000 |
Comment
|
| 409 |
Songwo-Chepaywat-Korora-Chesta-Parkino Water Project |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lomut |
Ksh 2,000,000 |
Comment
|
| 410 |
Water at Maransa-Kauk Water Supply |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lomut |
Ksh 2,000,000 |
Comment
|
| 411 |
Water Project at Empogh-Kasamugh-Sukuk |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Lomut |
Ksh 1,000,000 |
Comment
|
| 412 |
Water Project at Chemurlokotyo-Tanyingwan |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lomut |
Ksh 1,000,000 |
Comment
|
| 413 |
Sunflower(B70) Junction-Water Supply to Airstrip Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Mnagei |
Ksh 4,000,000 |
Comment
|
| 414 |
Kwa Chief-Kamorow-Chemain Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Mnagei |
Ksh 4,000,000 |
Comment
|
| 415 |
Ketiam-Ptoyo Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Endugh |
Ksh 3,500,000 |
Comment
|
| 416 |
Embogh-Kriich Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Endugh |
Ksh 8,000,000 |
Comment
|
| 417 |
Samum-Motogh Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Tapach |
Ksh 1,800,000 |
Comment
|
| 418 |
Reres-Kases Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Endugh |
Ksh 600,000 |
Comment
|
| 419 |
Mariny-Chepkondol Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sekerr |
Ksh 4,000,000 |
Comment
|
| 420 |
Kitalaposho-Kaakisaka-Kangilikwan Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Mnagei |
Ksh 2,000,000 |
Comment
|
| 421 |
Empasoyen-Ketyam Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 500,000 |
Comment
|
| 422 |
Kudungole-Rorach Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Endugh |
Ksh 500,000 |
Comment
|
| 423 |
Kahuruko-Kitalaposho Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Mnagei |
Ksh 1,000,000 |
Comment
|
| 424 |
Kitelakapel-Serewo Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Riwo |
Ksh 4,000,000 |
Comment
|
| 425 |
Tarmac Kaliokon-Lokwaloi-Kopeyon-Pisaa Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapchok |
Ksh 3,000,000 |
Comment
|
| 426 |
Kamatepon-Ion Sobukwo Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Chepareria |
Ksh 4,000,000 |
Comment
|
| 427 |
Kamokongwo-Nangoletaba-Kaat Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapchok |
Ksh 2,000,000 |
Comment
|
| 428 |
Box Culverts at Napitiro and Naduk Streams |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapchok |
Ksh 1,500,000 |
Comment
|
| 429 |
Cheptokol-Poghywoto-Kokworitit Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lomut |
Ksh 5,000,000 |
Comment
|
| 430 |
Echon to Kapolis Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapchok |
Ksh 500,000 |
Comment
|
| 431 |
Kaputor-Emkokon-Kapelinya Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Tapach |
Ksh 2,000,000 |
Comment
|
| 432 |
Tarmack Junction-Napitiro-Longenya-Chemiliot Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapchok |
Ksh 1,414,641 |
Comment
|
| 433 |
Tamkal-Endow Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 5,000,000 |
Comment
|
| 434 |
Chorok-Chepkieny-Ringring Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lelan |
Ksh 5,000,000 |
Comment
|
| 435 |
Chorok-Chepkieny-Ringring Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lelan |
Ksh 5,000,000 |
Comment
|
| 436 |
Culverts at Roponywo-Takar Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 1,000,000 |
Comment
|
| 437 |
Chesor-Kerelwa-Kapchikar Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Batei |
Ksh 5,000,000 |
Comment
|
| 438 |
Tapadany-Cherangany Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kodich |
Ksh 4,000,000 |
Comment
|
| 439 |
Apostolic-Chepkoti-Kipkorinya Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 3,000,000 |
Comment
|
| 440 |
Kalapata-Lodwar Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lomut |
Ksh 5,000,000 |
Comment
|
| 441 |
Kacheliba Kanyerus Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Suam |
Ksh 7,000,000 |
Comment
|
| 442 |
Chemoikut-Amolem Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Masol |
Ksh 4,000,000 |
Comment
|
| 443 |
Akiriamet-Amolem Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Masol |
Ksh 7,000,000 |
Comment
|
| 444 |
Kiwawa-Katumkale-Akorkeya Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kiwawa |
Ksh 4,000,000 |
Comment
|
| 445 |
Lomut-U Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lomut |
Ksh 4,000,000 |
Comment
|
| 446 |
Talau-Kaibos-Kapchila-Paraywa Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Siyoi |
Ksh 8,000,000 |
Comment
|
| 447 |
Lomut-Surumben Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lomut |
Ksh 7,000,000 |
Comment
|
| 448 |
Cheparten-Mokoyon Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lelan |
Ksh 7,000,000 |
Comment
|
| 449 |
Kanisa Mbili-Msalaba-Chepareria Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Chepareria |
Ksh 4,000,000 |
Comment
|
| 450 |
Weiwei-Tamkal Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 4,000,000 |
Comment
|
| 451 |
Kalongar-Kosulol-Ywalateke Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Chepareria |
Ksh 4,000,000 |
Comment
|
| 452 |
Ipeet Road (Civil Works) |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 4,000,000 |
Comment
|
| 453 |
Tuwit-Kalukuna Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapchok |
Ksh 4,000,000 |
Comment
|
| 454 |
Alale-Lengorok Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Alale |
Ksh 4,000,000 |
Comment
|
| 455 |
Kaptabuk-Chemwopepoi-Singorokoi-Soworwo Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lelan |
Ksh 7,000,000 |
Comment
|
| 456 |
Kipomot-Sasak Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Alale |
Ksh 300,000 |
Comment
|
| 457 |
Sigor-Ipeet Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 4,000,000 |
Comment
|
| 458 |
Chepserum-Takaywa Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Masol |
Ksh 4,000,000 |
Comment
|
| 459 |
Timale Junction-Chemalngawaw Borehole |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kodich |
Ksh 3,000,000 |
Comment
|
| 460 |
Morpus-Cheprochpogh-Samor Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Batei |
Ksh 3,000,000 |
Comment
|
| 461 |
Akelin Chepurwo Kongai Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kasei |
Ksh 4,000,000 |
Comment
|
| 462 |
Alkok-Katumkale Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kiwawa |
Ksh 4,000,000 |
Comment
|
| 463 |
Karas-Kalomoiywo Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 4,000,000 |
Comment
|
| 464 |
White House-Kisima Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 200,000 |
Comment
|
| 465 |
Nakuyen-Tandapos Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Suam |
Ksh 4,000,000 |
Comment
|
| 466 |
Kapkata-Chilakou-Tipet Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Endugh |
Ksh 4,000,000 |
Comment
|
| 467 |
Akelin-Takar-Kowur Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kasei |
Ksh 4,000,000 |
Comment
|
| 468 |
Lokwakomor-Lokitedel Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kodich |
Ksh 4,000,000 |
Comment
|
| 469 |
Kowoluk-Mukuri-Cheptkaal-Kotulpogh Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapchok |
Ksh 3,000,000 |
Comment
|
| 470 |
Kaporowo-Sesimwo-Kapkaremba-Tapach Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Tapach |
Ksh 4,000,000 |
Comment
|
| 471 |
Kapkatanyang-Laikong Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Endugh |
Ksh 3,000,000 |
Comment
|
| 472 |
Maintenance of Kamla-Chelopoy Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kiwawa |
Ksh 3,000,000 |
Comment
|
| 473 |
Kamelei-Kapusien-Kamolokon-Security Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Tapach |
Ksh 7,000,000 |
Comment
|
| 474 |
Too Sesen-Kamketo Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kasei |
Ksh 4,000,000 |
Comment
|
| 475 |
Meriese-Simotwo-Kopombich Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Riwo |
Ksh 4,000,000 |
Comment
|
| 476 |
Lomut-Annet-Marus Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lomut |
Ksh 4,000,000 |
Comment
|
| 477 |
Simbol-Kakolimong Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Masol |
Ksh 3,000,000 |
Comment
|
| 478 |
Bendera-Siyoi Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 479 |
AP-Highway Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 800,000 |
Comment
|
| 480 |
St. Marys-KFA Estate Roads |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 2,500,000 |
Comment
|
| 481 |
Kilimanjaro-Mawingo Road Estate Roads |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 482 |
Kapenguria-Bendera Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 1,500,000 |
Comment
|
| 483 |
Governor's Residence-Aramaket Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 1,500,000 |
Comment
|
| 484 |
Kapkoris-Emboasis Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 485 |
Kilimanjaro - Centre K Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 1,000,000 |
Comment
|
| 486 |
Bondeni - Chelewo Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 1,000,000 |
Comment
|
| 487 |
Kamketo - Kamnongowo Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kasei |
Ksh 2,000,000 |
Comment
|
| 488 |
Opol - Klaya Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kasei |
Ksh 600,000 |
Comment
|
| 489 |
Tulelo - Kauriong Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kiwawa |
Ksh 1,500,000 |
Comment
|
| 490 |
Koput - Wasat Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kiwawa |
Ksh 1,500,000 |
Comment
|
| 491 |
Kases - Kaingeny - Kalodekee Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kiwawa |
Ksh 2,500,000 |
Comment
|
| 492 |
Alkok - Kamila Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kiwawa |
Ksh 2,000,000 |
Comment
|
| 493 |
Katamas Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kiwawa |
Ksh 1,000,000 |
Comment
|
| 494 |
Nasolot - Oruro Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sekerr |
Ksh 4,000,000 |
Comment
|
| 495 |
Karameri - Katopeton Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kodich |
Ksh 2,000,000 |
Comment
|
| 496 |
Ngoleyo - Lokwamukei Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 497 |
Kayesoo - Chepserum Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 4,000,000 |
Comment
|
| 498 |
Kaghmu - Pkoroi Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lelan |
Ksh 800,000 |
Comment
|
| 499 |
Parua - Penon Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Batei |
Ksh 4,000,000 |
Comment
|
| 500 |
Chepkono - Ksai - Lomuke - Kapchila Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lelan |
Ksh 4,000,000 |
Comment
|
| 501 |
Ringring - Chepororwo - Paris - Tukumo - Chesilkich Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lelan |
Ksh 1,000,000 |
Comment
|
| 502 |
Mokoyon - Kapchemuk - Kaptum Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lelan |
Ksh 1,000,000 |
Comment
|
| 503 |
Cheptoch - Toptolum - Toyopo Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 4,000,000 |
Comment
|
| 504 |
Kaplima-Simotwo-Mkula-Kodek-Koitumot Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lelan |
Ksh 1,000,000 |
Comment
|
| 505 |
Bendera-Kakurut-Siyoi junction Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Siyoi |
Ksh 2,000,000 |
Comment
|
| 506 |
Kayemit-Korosion-Chemokol-Kaptum Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lelan |
Ksh 2,000,000 |
Comment
|
| 507 |
Daraja Mungu-Lopsimoru Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lelan |
Ksh 1,000,000 |
Comment
|
| 508 |
Tamugh-Miskwony Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 7,000,000 |
Comment
|
| 509 |
Letwa-Kalenga-Chemotong Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 4,000,000 |
Comment
|
| 510 |
Culverts at Daraja-Dip-Chesuswon Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lelan |
Ksh 900,000 |
Comment
|
| 511 |
Roads across the ward |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lelan |
Ksh 400,000 |
Comment
|
| 512 |
Sukuk-Pitpagh Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lomut |
Ksh 5,000,000 |
Comment
|
| 513 |
Identification and Demarcation of Road Boundaries and Road Reserves |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 5,000,000 |
Comment
|
| 514 |
Kitany-Kishorei Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lomut |
Ksh 500,000 |
Comment
|
| 515 |
County Garage |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 5,000,000 |
Comment
|
| 516 |
Marus-Potiew-Kapatet Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lomut |
Ksh 5,000,000 |
Comment
|
| 517 |
Kona-Sapulmoi Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Lomut |
Ksh 1,000,000 |
Comment
|
| 518 |
Ipeet Footbridge |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 12,000,000 |
Comment
|
| 519 |
Ortum Mission Footbridge |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Batei |
Ksh 10,000,000 |
Comment
|
| 520 |
Longenya (Napitiro) Footbridge |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapchok |
Ksh 5,000,000 |
Comment
|
| 521 |
Shalpogh Footbridge |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Chepareria |
Ksh 5,611,021 |
Comment
|
| 522 |
Nyangaita-Takaywa Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Masol |
Ksh 2,500,000 |
Comment
|
| 523 |
Surumben-Akoros Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Masol |
Ksh 2,500,000 |
Comment
|
| 524 |
Arrur-Cheporomwagh Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Masol |
Ksh 2,500,000 |
Comment
|
| 525 |
Prurwok Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Riwo |
Ksh 1,500,000 |
Comment
|
| 526 |
Lokatukoi ECDE-Suam River |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Riwo |
Ksh 450,000 |
Comment
|
| 527 |
Marcha Junction-Prurwok Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Riwo |
Ksh 1,500,000 |
Comment
|
| 528 |
Chemulunjo Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Riwo |
Ksh 300,000 |
Comment
|
| 529 |
Town Roads from Cheposait Water Source-Tamkal Poshomill-River Road, Magal River to Osama Road and Makwany Guest House |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Mnagei |
Ksh 1,500,000 |
Comment
|
| 530 |
Katartar-Kalapat Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Mnagei |
Ksh 1,000,000 |
Comment
|
| 531 |
Nateleng-Show Ground Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Mnagei |
Ksh 1,000,000 |
Comment
|
| 532 |
Culvert at Chepkomeghen River |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Mnagei |
Ksh 2,000,000 |
Comment
|
| 533 |
Box Culvert at Surumben |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Masol |
Ksh 8,000,000 |
Comment
|
| 534 |
Siyoi-Kiptended Box Culvert |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Siyoi |
Ksh 8,000,000 |
Comment
|
| 535 |
Siyoi-Lokapel Box Culvert |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Siyoi |
Ksh 8,000,000 |
Comment
|
| 536 |
Box Culvert at Kapenguria Prisons |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 9,000,000 |
Comment
|
| 537 |
Lityei Centre-Kide-Limakori Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Mnagei |
Ksh 1,000,000 |
Comment
|
| 538 |
Cheptuya-Mortome Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Mnagei |
Ksh 2,000,000 |
Comment
|
| 539 |
Kishaunet-Tartar Road (Pending Bill) |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Mnagei |
Ksh 1,000,000 |
Comment
|
| 540 |
Marich-Chopotwo Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sekerr |
Ksh 2,000,000 |
Comment
|
| 541 |
Emposeker Foot Bridge |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sekerr |
Ksh 500,000 |
Comment
|
| 542 |
Coastal-Kaloyatum-Katemburion Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sekerr |
Ksh 3,000,000 |
Comment
|
| 543 |
Empoghat-Kapechekwa Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sekerr |
Ksh 250,000 |
Comment
|
| 544 |
Chepotwo-Sostin CGWP Dispensary Feeder Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sekerr |
Ksh 200,000 |
Comment
|
| 545 |
Sostin-Chemsar Feeder Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sekerr |
Ksh 300,000 |
Comment
|
| 546 |
Krim-Chemnyarilach Pogh Feeder Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sekerr |
Ksh 200,000 |
Comment
|
| 547 |
Office, Pitlatrine and Fencing at Public Works |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 5,000,000 |
Comment
|
| 548 |
Psiywo-Tukumwok Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Batei |
Ksh 500,000 |
Comment
|
| 549 |
Nawurkul-Tomatangukwo Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Alale |
Ksh 500,000 |
Comment
|
| 550 |
Sengele - Matagh Feeder Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sekerr |
Ksh 203,000 |
Comment
|
| 551 |
Kapkecha - Losiakomol Three (3) Line Culvert |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Siyoi |
Ksh 1,500,000 |
Comment
|
| 552 |
Three (3) Line Culvert at Kipkorinya - Kaptuka Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Siyoi |
Ksh 1,500,000 |
Comment
|
| 553 |
Three (3) Line Culvert at Paraywa - Sindano - Lomuke Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Siyoi |
Ksh 1,500,000 |
Comment
|
| 554 |
Two (2) Line Culvert at Losiakomol - Perii Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Siyoi |
Ksh 800,000 |
Comment
|
| 555 |
Culvert at Chepinyiny - Talau Chiefs Office - Dispensary Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Siyoi |
Ksh 500,000 |
Comment
|
| 556 |
Srkoy - Katonyet - Sokitom Road (5KM) |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 1,500,000 |
Comment
|
| 557 |
Chemulunjo - Kisiamoi Road |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Alale |
Ksh 2,000,000 |
Comment
|
| 558 |
Korpu - Kaptemwo Road (5KM) |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 2,000,000 |
Comment
|
| 559 |
Tamugh - Pcholpogh Road (5KM) |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 3,000,000 |
Comment
|
| 560 |
Jerusalem - Toptolum Road (3KM) |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 2,000,000 |
Comment
|
| 561 |
Dozer works-Chepnyal Cattle Dip-Kosukup Road 3km |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 2,000,000 |
Comment
|
| 562 |
SITOT-JERUSALEM ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 2,500,000 |
Comment
|
| 563 |
SRA - KOKWOCHEPKOYMOT - KATIMORIL ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 2,500,000 |
Comment
|
| 564 |
NAPIZ - ALANY- NAKIROKONY ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Alale |
Ksh 2,000,000 |
Comment
|
| 565 |
KIMPUR-ORON ROAD-ALALE WARD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 466,207 |
Comment
|
| 566 |
MANUAL RESHAPING OF ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Alale |
Ksh 300,000 |
Comment
|
| 567 |
MANUAL RESHAPING OF NAWORKUL-TOMATANCGWPWO ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Alale |
Ksh 400,000 |
Comment
|
| 568 |
DOZER WORKS OF 3KM CHEPTONGO-LETWA PRIMARY ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 1,000,000 |
Comment
|
| 569 |
GRADING, MURRAMING /INSTALATION OF SLAB AND CULVERT AT KARON -KOSIA ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Suam |
Ksh 1,500,000 |
Comment
|
| 570 |
CULVERT INSTALLATION AT TIMBIR FEEDER ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Suam |
Ksh 480,809 |
Comment
|
| 571 |
PATCHING/MURRAMING OF TAPACH-PTOP - SINA ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Tapach |
Ksh 2,000,000 |
Comment
|
| 572 |
MANUAL RESHAPING OF LOSA - CHONGIS ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Tapach |
Ksh 600,000 |
Comment
|
| 573 |
OPENING OF PTIMORWO-CHEPOKORIONG ROAD-BATEI WARD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Batei |
Ksh 1,000,000 |
Comment
|
| 574 |
OPENING OF KANGOTUNY -CHEPNOYO ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Batei |
Ksh 500,000 |
Comment
|
| 575 |
RESHAPING OF FEEDER ROADS AT TELO, CHEBON, TIRPACH, TARAK, PSERO -PTARAKON, KITAKES, KAIPAWIS, NYARKULIAN ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Tapach |
Ksh 2,950,000 |
Comment
|
| 576 |
RESHAPING OF FEEDER ROADS AT KACHEPRIKONG-KONTOPILET, KALTIT -PONOPKAGH, MWOTOT- CHELAL, PSUTONU PRI. SCHOOL ROAD, KAPUSIEN/SEKUTION, KAPCHESICH ROADS |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Tapach |
Ksh 2,950,000 |
Comment
|
| 577 |
OPENING OF STEN-SESIMWO ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Batei |
Ksh 400,000 |
Comment
|
| 578 |
OPENING OF CHEPKUKUI-TAKAR ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 1,000,000 |
Comment
|
| 579 |
CONSTRUCTION OF MOKOWON-KALAS-CHEPTIANGWA ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Chepareria |
Ksh 2,000,000 |
Comment
|
| 580 |
ROAD MAINTENANCE WORKS AT PAROO-KAKACHAWA ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 1,000,000 |
Comment
|
| 581 |
ROAD CONSTRUCTION AND MANTAINANCE WORKS AT KRESWO-KANYARKWAT-KATIKOMOR |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
Riwo |
Ksh 9,200,000 |
Comment
|
| 582 |
OPENING OF MAR-SOKA ROAD-WEIWEI WARD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 1,500,000 |
Comment
|
| 583 |
PROPOSED CABLING INSTALLATION AND INTERNET CONNECTION(FIBRE) AT LAND OFFICE |
Lands, Housing, Planning and Urban Development |
2013-2014 |
Complete
|
Kapenguria |
Ksh 900,000 |
Comment
|
| 584 |
MAINTENANCE WORKS AT KAPORON - IYON ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 500,000 |
Comment
|
| 585 |
ENVIRONMENTAL IMPACT ASSESSMENT FOR INSTALLATIO, COMMISSIONING OF MILK COOLERS AT RINGRING,MURUNY,KAPTABUK, |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
Lelan |
Ksh 750,000 |
Comment
|
| 586 |
MAINTENANCE OF TAMKAL - SOLION ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 983,805 |
Comment
|
| 587 |
REPAIR OF TAMKAL - KOKWOSOSION ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 1,000,000 |
Comment
|
| 588 |
PROPOSED WORKS(LANDSCAPING) AT THE GOVERNORS OFFICE |
County Executive |
2013-2014 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 589 |
REPAIR OF CHEPTESEK - KAPORON ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 1,000,000 |
Comment
|
| 590 |
PROPOSED FENCING TO SIGOR POLYTECHNIC |
Education and Technical Training |
2013-2014 |
Complete
|
Weiwei |
Ksh 1,900,000 |
Comment
|
| 591 |
REPAIR/PROTECTION WORKS OF TAMKAL PRIMARY LAGER ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 500,000 |
Comment
|
| 592 |
PROPOSED REHABILITATION OF RUNO AND KAITAPOS CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
Weiwei |
Ksh 850,000 |
Comment
|
| 593 |
PROPOSED CONSTRUCTION OF ECD CLASSROOM AND PIT LATRINE AT MESHAU IN LELAN WARD |
Education and Technical Training |
2014-2015 |
Complete
|
Lelan |
Ksh 2,000,000 |
Comment
|
| 594 |
PROPOSED CONSTRUCTION OF ECD CLASSROOM AND PIT LATRINE AT PARMATAI IN RIWO WARD |
Education and Technical Training |
2014-2015 |
Complete
|
Riwo |
Ksh 2,200,000 |
Comment
|
| 595 |
PROPOSED IMPROVEMENT AND MANTAINANCE WORKS AT MURKWIJIT-TALAU-SIYOI-CHEPYOMET |
Public Works, Transport and Infrastructure |
2014-2015 |
Complete
|
Siyoi |
Ksh 2,650,000 |
Comment
|
| 596 |
CONSTRUCTION OF KAKAWA-SANGAT ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 400,000 |
Comment
|
| 597 |
GRADING OF RAINBOW - KARAS ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 598 |
PROPOSED CONSTRUCTION OF REVENUE COLLECTION POSTS (BARRIERS) 5 NO IN WEST POKOT SUB COUNTY |
Finance and Economic Planning |
2014-2015 |
Complete
|
Kapenguria |
Ksh 2,500,000 |
Comment
|
| 599 |
GRADING OF KARAS - KAKPAW ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 600 |
GRADING OF KARAS - SIYOI ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 601 |
GRADING OF HABARI NJEMA ROAD - LONGSUKU JUNCTION |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Riwo |
Ksh 1,100,000 |
Comment
|
| 602 |
CONSTRUCTION OF FOOTBRIDGE AT EMBOGHAT |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Batei |
Ksh 1,200,000 |
Comment
|
| 603 |
SUPPLY AND DELIVERY OF OFFICE FURNITURE-COUNTY TREASURY |
Finance and Economic Planning |
2014-2015 |
Complete
|
Kapenguria |
Ksh 8,500,000 |
Comment
|
| 604 |
REPAIR OF CHEPTOT FOOTBRIDGE |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Batei |
Ksh 600,000 |
Comment
|
| 605 |
CONSTRUCTION OF KAIPRA FOOTBRIDGE |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Masol |
Ksh 2,600,000 |
Comment
|
| 606 |
CONSTRUCTION OF FOOTBRIDGE AT EMBOGH |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Sook |
Ksh 2,000,000 |
Comment
|
| 607 |
INSTALLATION OF DEVELOPMENT WORK OF MAKUTANO WATER SUPPLY AND PSER SECONDARY SCHOOL |
Water, Environment and Natural Resources |
2014-2015 |
Complete
|
Mnagei |
Ksh 3,500,000 |
Comment
|
| 608 |
RUONDO -MAINA FOOTBRIDGE - ENDUGH ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 2,000,000 |
Comment
|
| 609 |
CONSTRUCTION OF SOKA FOOTBRIDGE |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Weiwei |
Ksh 2,700,000 |
Comment
|
| 610 |
PROPOSED CONSTRUCTION OF METALLIC CRUSH AT ASILONG IN SUAM WARD |
Livestock, Fisheries and Veterinary Services |
2014-2015 |
Complete
|
Suam |
Ksh 1,300,000 |
Comment
|
| 611 |
PROPOSED EXTENSION TO VERANDAH/WAITING FOR MURKWIJIT DISPENSARY |
Health and Sanitation |
2014-2015 |
Complete
|
Mnagei |
Ksh 3,100,000 |
Comment
|
| 612 |
ELECTRICAL WIRING TO SHOW GROUND IN KISHAUNET |
Agriculture and Irrigation |
2014-2015 |
Complete
|
Mnagei |
Ksh 1,300,000 |
Comment
|
| 613 |
ROAD IMPROVEMENT AND MANTAINANCE WORKS AT PTOYO-NAKWIJIT |
Public Works, Transport and Infrastructure |
2014-2015 |
Complete
|
Endugh |
Ksh 4,000,000 |
Comment
|
| 614 |
ROAD IMPROVEMENT AND MANTAINANCE WORKS AT SARAMEE-CHEPARTEN-MOKOYON |
Public Works, Transport and Infrastructure |
2014-2015 |
Complete
|
Lelan |
Ksh 2,000,000 |
Comment
|
| 615 |
PROPOSED CONSTRUCTION OF 1 ECD CLASSROOM AT KAPTOLOMWO ELCK ECD-KASEI WARD |
Education and Technical Training |
2015-2016 |
Complete
|
Kasei |
Ksh 1,300,000 |
Comment
|
| 616 |
PROPOSED CONSTRUCTION OF 1 CLASSROOM AT KATUMEN ECD -KASEI WARD |
Education and Technical Training |
2015-2016 |
Complete
|
Kasei |
Ksh 1,300,000 |
Comment
|
| 617 |
PROPOSED CONSTRUCTION OF ECD CLASSROOM AT LOKII-SUAM |
Education and Technical Training |
2015-2016 |
Complete
|
Suam |
Ksh 2,100,000 |
Comment
|
| 618 |
PROPOSED CONSTRUCTION OF ECD CLASSROOM AT LOKII-SUAM |
Education and Technical Training |
2015-2016 |
Complete
|
Suam |
Ksh 2,100,000 |
Comment
|
| 619 |
PROPOSED CONSTRUCTION OF ECD CLASSROOMS AT ANGACHA IN ALALE WARD |
Education and Technical Training |
2015-2016 |
Complete
|
Alale |
Ksh 2,300,000 |
Comment
|
| 620 |
PROPOSED CONSTRUCTION OF ECD CLASSROOMS AT ANGACHA IN ALALE WARD |
Education and Technical Training |
2015-2016 |
Complete
|
Alale |
Ksh 2,300,000 |
Comment
|
| 621 |
PROPOSED CONSTRUCTION OF ECD CLASSROOMS AT ANGACHA IN ALALE WARD |
Education and Technical Training |
2015-2016 |
Complete
|
Alale |
Ksh 2,300,000 |
Comment
|
| 622 |
PROPOSED CONSTRUCTION OF CULTURAL CENTER AT SINTAGH |
Tourism, Youths, Culture and Social Services |
2015-2016 |
Complete
|
Weiwei |
Ksh 1,650,000 |
Comment
|
| 623 |
KAPKIMUUNY - KAKRES WATER PROJECT (SPRING PROTECTION) |
Water, Environment and Natural Resources |
2016-2017 |
Complete
|
Tapach |
Ksh 600,000 |
Comment
|
| 624 |
PKONTOL WATER SUPPLIES LTD |
Water, Environment and Natural Resources |
2015-2016 |
Complete
|
Lelan |
Ksh 3,100,000 |
Comment
|
| 625 |
DRILLING OF BOREHOLE AT NAKUYEN |
Water, Environment and Natural Resources |
2016-2017 |
Complete
|
Suam |
Ksh 500,000 |
Comment
|
| 626 |
CONSTRUCTION OF MNCHAS-CHESOTO-KAPTEKEW ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Chepareria |
Ksh 2,000,000 |
Comment
|
| 627 |
DRILLING OF BOREHOLE AT KAPETA |
Water, Environment and Natural Resources |
2016-2017 |
Complete
|
Suam |
Ksh 635,000 |
Comment
|
| 628 |
OPENING OF KOPOMBU-CHEPAKUL-MISTIN ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Chepareria |
Ksh 3,000,000 |
Comment
|
| 629 |
INSTALLATION OF CULVERTS AT PROPOI |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Chepareria |
Ksh 500,000 |
Comment
|
| 630 |
CONSTRUCTION OF EXTENSION LINE TARTAR- KERINGET KAMOINO AREA |
Water, Environment and Natural Resources |
2016-2017 |
Complete
|
Mnagei |
Ksh 2,578,110 |
Comment
|
| 631 |
OPENING OF CHUUWAI ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Chepareria |
Ksh 100,000 |
Comment
|
| 632 |
REHABILITATION OF ARPOLLO DISPENSARY GULLEY |
Water, Environment and Natural Resources |
2016-2017 |
Complete
|
Lomut |
Ksh 1,896,800 |
Comment
|
| 633 |
OPENING OF PTOYO-KAPSYOYOWO ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Endugh |
Ksh 3,000,000 |
Comment
|
| 634 |
REHABILITATION OF KANYALTIN WATER PROJECT |
Water, Environment and Natural Resources |
2016-2017 |
Complete
|
Lelan |
Ksh 2,605,400 |
Comment
|
| 635 |
CONSTRUCTION OF SIYOIWA SAND DAM |
Water, Environment and Natural Resources |
2016-2017 |
Complete
|
Kiwawa |
Ksh 594,964 |
Comment
|
| 636 |
OPENING OF KAPSYOYOWO-EMPOSUT ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Endugh |
Ksh 3,000,000 |
Comment
|
| 637 |
CONSTRUCTION OF BODABODA SHEDS AT AT SIGOR |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
Weiwei |
Ksh 499,999 |
Comment
|
| 638 |
OPENING OF MERUR -KANAAN-TAMARUKWO-KAKACH ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Endugh |
Ksh 3,000,000 |
Comment
|
| 639 |
CONSTRUCTION OF BODABODA SHEDS AT KACHELIBA |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
Suam |
Ksh 499,647 |
Comment
|
| 640 |
OPENING OF SRO-FOREST-KETIAM ROAD |
Public Works, Transport and Infrastructure |
2022-2023 |
Complete
|
Endugh |
Ksh 3,500,000 |
Comment
|
| 641 |
PROPOSED CIVIL WORKS AT MAKUTANO CLOTH MARKET |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
Mnagei |
Ksh 5,959,291 |
Comment
|
| 642 |
CONSTRUCTION OF BODABODA SHEDS AT KABICHBICH |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
Lelan |
Ksh 500,000 |
Comment
|
| 643 |
CONSTRUCTION OF BODABODA SHEDS AT BENDERA |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 644 |
CONSTRUCTION OF BODABODA SHEDS AT CHEPARERIA |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
Chepareria |
Ksh 500,000 |
Comment
|
| 645 |
PROPOSED PERIODIC MAINTENANCE OF KACHELIBA-CHERANGAN- ROAD |
Public Works, Transport and Infrastructure |
2016-2017 |
Complete
|
Suam |
Ksh 2,038,120 |
Comment
|
| 646 |
PROPOSED CONSTRUCTION OF A TWIN BOX CULVERT AT TALAU-BONDENI ROAD |
Public Works, Transport and Infrastructure |
2016-2017 |
Complete
|
Siyoi |
Ksh 11,184,430 |
Comment
|
| 647 |
PROPOSED FITTINGS FOR KITCHEN, CURTAINS AND SHEERS & SPECIALIZED WORKS FOR ELECTRICAL APPLIANCES AND MECHANICAL FOR HOUSE BLOCKS A & B ANND PROVISION OF GARDEN TENTS AND CHAIRS AT GOVERNORS RESIDENCE |
County Executive |
2015-2016 |
Complete
|
Kapenguria |
Ksh 5,150,000 |
Comment
|
| 648 |
DRIFT CONSTRUCTION AT CHESAWACH-ADURUKOIT |
Public Works, Transport and Infrastructure |
2016-2017 |
Complete
|
Riwo |
Ksh 1,480,726 |
Comment
|
| 649 |
PROPOSED OPENING OF KAMITO-KAMAYECH-SEREWO-ROAD(KM0+00+KM-KM-6+000) |
Public Works, Transport and Infrastructure |
2016-2017 |
Complete
|
Mnagei |
Ksh 2,227,780 |
Comment
|
| 650 |
PROPOSED EXPANSION AND GRADING SIMBOL SLAH-ROAD |
Public Works, Transport and Infrastructure |
2016-2017 |
Complete
|
Masol |
Ksh 2,298,822 |
Comment
|
| 651 |
PROPOSED IMPROVEMENT AND MINTENANCE WORKS:CHESTA-CHEMUTLOKOTYO-ROAD |
Public Works, Transport and Infrastructure |
2016-2017 |
Complete
|
Lomut |
Ksh 1,998,680 |
Comment
|
| 652 |
PROPOSED OPENING AND GRADING OF KAYEMIT-CHEPARTEN-SARAMEE-ROAD |
Public Works, Transport and Infrastructure |
2016-2017 |
Complete
|
Lelan |
Ksh 1,498,488 |
Comment
|
| 653 |
PROPOSED OPENING OF KIWAWA-KOMERIMERI-ROAD |
Public Works, Transport and Infrastructure |
2016-2017 |
Complete
|
Kiwawa |
Ksh 2,468,480 |
Comment
|
| 654 |
PROPOSED CONSTRUCTION OF HOSTELS FOR MASOL INTERGRATED PROJECT |
Finance and Economic Planning |
2015-2016 |
Complete
|
Masol |
Ksh 15,000,000 |
Comment
|
| 655 |
PROPOSED PERIODIC MAINTENANCE OF KASEI-CHEBURWO-CHESPENNARWOMORU- ROAD |
Public Works, Transport and Infrastructure |
2016-2017 |
Complete
|
Kasei |
Ksh 2,398,000 |
Comment
|
| 656 |
PROPOSED OPENING AND GRADING OF KARAS-CHEPTAPESHA-KALOMOYWO(KM4+00+KM-6.4+000)ROAD |
Public Works, Transport and Infrastructure |
2016-2017 |
Complete
|
Kapenguria |
Ksh 2,465,000 |
Comment
|
| 657 |
PROPOSED CONSTRUCTION OF ECD CLASSROOMS AT CHEPKONDOL IN SEKERR WARD |
Education and Technical Training |
2014-2015 |
Complete
|
Sekerr |
Ksh 2,000,000 |
Comment
|
| 658 |
CONSTRUCTION OF KAPUSIEN DIP |
Livestock, Fisheries and Veterinary Services |
2016-2017 |
Complete
|
Tapach |
Ksh 2,197,794 |
Comment
|
| 659 |
PROPOSED CONSTRUCTION OF ECD CLASSROOMS AT CHEMAKCHOR IN KODICH WARD |
Education and Technical Training |
2014-2015 |
Complete
|
Kodich |
Ksh 2,000,000 |
Comment
|
| 660 |
CONSTRUCTION OF MORWEBONG METALIC CRUSH |
Livestock, Fisheries and Veterinary Services |
2016-2017 |
Complete
|
Suam |
Ksh 1,228,874 |
Comment
|
| 661 |
CONSTRUCTION OF CLASSROOM,LIBRARY, SKILLS LABORATORY AND ADMINISTRATION BLOCK AT KAPENGURIA MTC |
Health and Sanitation |
2013-2014 |
Complete
|
Kapenguria |
Ksh 33,200,000 |
Comment
|
| 662 |
CONSTRUCTION OF KAPOSES METALIC CRUSH |
Livestock, Fisheries and Veterinary Services |
2016-2017 |
Complete
|
Lomut |
Ksh 1,199,780 |
Comment
|
| 663 |
CONSTRUCTION OF KARAMERI METALIC CRUSH |
Livestock, Fisheries and Veterinary Services |
2016-2017 |
Complete
|
Kodich |
Ksh 1,229,254 |
Comment
|
| 664 |
CONSTRUCTION OF KATUMKALE METALIC CRUSH |
Livestock, Fisheries and Veterinary Services |
2016-2017 |
Complete
|
Kiwawa |
Ksh 1,200,501 |
Comment
|
| 665 |
CONSTRUCTION OF KASITOT METALIC CRUSH |
Livestock, Fisheries and Veterinary Services |
2016-2017 |
Complete
|
Alale |
Ksh 1,229,445 |
Comment
|
| 666 |
PURCHASE OF CHEPARERIA SALE YRD |
Livestock, Fisheries and Veterinary Services |
2016-2017 |
Complete
|
Chepareria |
Ksh 4,500,000 |
Comment
|
| 667 |
PROPOSED CONSTRUCTION CONSTRUCTON OF MAKUTANO PARKING AND STORM WATER DRAINAGE |
Lands, Housing, Planning and Urban Development |
2016-2017 |
Complete
|
Mnagei |
Ksh 29,924,056 |
Comment
|
| 668 |
PROPOSED EXPANSION AND GRADING OF RAINBOW-KARAS ROAD |
Lands, Housing, Planning and Urban Development |
2016-2017 |
Complete
|
Kapenguria |
Ksh 1,998,796 |
Comment
|
| 669 |
CONSTRUCTION OF KOKWO-SOSION DISPENSARY IN WEIWEI WARD |
Health and Sanitation |
2016-2017 |
Complete
|
Weiwei |
Ksh 5,991,504 |
Comment
|
| 670 |
PROPOSED CONSTRUCTION OF PTOP DISPENSARY |
Health and Sanitation |
2016-2017 |
Complete
|
Tapach |
Ksh 5,821,251 |
Comment
|
| 671 |
STAFF HOUSES AT KANYERUS DISPENSARY IN SUAM WARD |
Health and Sanitation |
2016-2017 |
Complete
|
Suam |
Ksh 3,949,138 |
Comment
|
| 672 |
CONSTRUCTION OF PUSOL DISPENSARY |
Health and Sanitation |
2016-2017 |
Complete
|
Sook |
Ksh 5,909,504 |
Comment
|
| 673 |
MATERNITY WING AT TALAU DISPENSARY |
Health and Sanitation |
2016-2017 |
Complete
|
Siyoi |
Ksh 5,720,574 |
Comment
|
| 674 |
CONSTRUCTION OF STAFF HOUSES AT TALON DISPENSARY |
Health and Sanitation |
2016-2017 |
Complete
|
Sekerr |
Ksh 3,757,193 |
Comment
|
| 675 |
PROPOSED CONSTRUCTION OF A PIT LATRINE BLOCK AT KONGELAI MARKET |
Health and Sanitation |
2016-2017 |
Complete
|
Riwo |
Ksh 548,740 |
Comment
|
| 676 |
PROPOSED CONSTRUCTION OF SIMBOL STAFF HOUSE |
Health and Sanitation |
2016-2017 |
Complete
|
Masol |
Ksh 4,000,000 |
Comment
|
| 677 |
PIT LATRINE BLOCK AT LOMUT MARKET |
Health and Sanitation |
2016-2017 |
Complete
|
Lomut |
Ksh 528,353 |
Comment
|
| 678 |
CONSTRUCTION OF KTOMWONY DISPENSARY |
Health and Sanitation |
2016-2017 |
Complete
|
Lelan |
Ksh 6,000,000 |
Comment
|
| 679 |
PURCHASE OF ELECTRICAL CABLE TO CONNECT GENERATOR TO ICU |
Health and Sanitation |
2016-2017 |
Complete
|
Kapenguria |
Ksh 3,991,560 |
Comment
|
| 680 |
CONSTRUCTION OF KOKWO LOLOTWO DISPENSARY |
Health and Sanitation |
2016-2017 |
Complete
|
Kapchok |
Ksh 5,977,500 |
Comment
|
| 681 |
CONSTRUCTION OF PROPOI DISPENSARY |
Health and Sanitation |
2016-2017 |
Complete
|
Chepareria |
Ksh 5,555,455 |
Comment
|
| 682 |
CONSTRUCTION OF SOBUKWO DISPENSARY |
Health and Sanitation |
2016-2017 |
Complete
|
Batei |
Ksh 6,000,000 |
Comment
|
| 683 |
PROPOSED CONSTRUCTION OF TWIN STAFF HOUSE AT TALON DISPENSARY -SEKERR WARD |
Health and Sanitation |
2022-2023 |
Complete
|
Sekerr |
Ksh 384,425 |
Comment
|
| 684 |
EQUIPING KIWAKAN DISPENSARY,GENERAL WARD WITH (BEDS,BENCHES,MATRESSES AND TROLLY-SEKERR WARD |
Health and Sanitation |
2022-2023 |
Complete
|
Sekerr |
Ksh 1,000,000 |
Comment
|
| 685 |
Completion of Laboratory at Sigor Sub-County Hospital |
Health and Sanitation |
2022-2023 |
Complete
|
Weiwei |
Ksh 3,000,000 |
Comment
|
| 686 |
Completion of Peadriatic Ward at Sigor Sub-County Hospital |
Health and Sanitation |
2022-2023 |
Complete
|
Weiwei |
Ksh 3,000,000 |
Comment
|
| 687 |
Completion of Peadriatic Ward at Sigor Sub-County Hospital |
Health and Sanitation |
2022-2023 |
Complete
|
Weiwei |
Ksh 3,000,000 |
Comment
|
| 688 |
CONSTRUCTION OF MALE WARD AT TAMKAL(PENDING BILL)-WEIWEI WARD |
Health and Sanitation |
2022-2023 |
Complete
|
Weiwei |
Ksh 899,836 |
Comment
|
| 689 |
CONSTRUCTION OF MALE WARD AT TAMKAL(PENDING BILL)-WEIWEI WARD |
Health and Sanitation |
2022-2023 |
Complete
|
Weiwei |
Ksh 899,836 |
Comment
|
| 690 |
CONSTRUCTION OF KOKWOSOSION DISPENSARY -WEIWEI WARD |
Health and Sanitation |
2022-2023 |
Complete
|
Weiwei |
Ksh 967,980 |
Comment
|
| 691 |
PROPOSED CONSTRUCTION OF PIT LATRINE BLOCK FOR PATIENTS 4 DOORS AND STAFF 3 DOORS AT KASITOT DISPENSARY IN KASEI WARD |
Health and Sanitation |
2022-2023 |
Complete
|
Kasei |
Ksh 1,500,000 |
Comment
|
| 692 |
PURCHASE OF OFFICE FURNITURE FOR DISPENSARIES ALALE |
Health and Sanitation |
2022-2023 |
Complete
|
Alale |
Ksh 500,000 |
Comment
|
| 693 |
PURCHASE OF OFFICE FURNITURE FOR DISPENSARIES ALALE |
Health and Sanitation |
2022-2023 |
Complete
|
Alale |
Ksh 500,000 |
Comment
|
| 694 |
RENOVATION OF CHEMOTONG DISPENSARY-CHEPARERIA WARD |
Health and Sanitation |
2017-2018 |
Complete
|
Chepareria |
Ksh 500,000 |
Comment
|
| 695 |
CONSTRUCTION OF CATTLE DIP AT KAMUINO |
Agriculture and Irrigation |
2018-2019 |
Complete
|
Mnagei |
Ksh 2,400,000 |
Comment
|
| 696 |
RENOVATION OF NYANGAITA DISPENSARY-MASOL WARD |
Health and Sanitation |
2017-2018 |
Complete
|
Masol |
Ksh 1,000,000 |
Comment
|
| 697 |
CONSTRUCTION OF ROROK CATTLE DIP |
Agriculture and Irrigation |
2018-2019 |
Complete
|
Batei |
Ksh 2,500,000 |
Comment
|
| 698 |
Kochar Irrigation Scheme(SOOK WARD) |
Agriculture and Irrigation |
2017-2018 |
Complete
|
Sook |
Ksh 5,258,073 |
Comment
|
| 699 |
PURCHASE OF GENERATORS FOR SIRRA AND ADIPO FARMERS SEKERR WARD |
Agriculture and Irrigation |
2019-2020 |
Complete
|
Sekerr |
Ksh 500,000 |
Comment
|
| 700 |
PURCHASE OF DESKS FOR TARTAR ST THERESAS MISSION ECDE |
Education and Technical Training |
2018-2019 |
Complete
|
Kapenguria |
Ksh 100,000 |
Comment
|
| 701 |
PURCHASE OF ECDE IRON SHEETS |
Education and Technical Training |
2018-2019 |
Complete
|
Lelan |
Ksh 700,000 |
Comment
|
| 702 |
PURCHASE OF ECDE CHAIRS |
Education and Technical Training |
2018-2019 |
Complete
|
Suam |
Ksh 500,000 |
Comment
|
| 703 |
Construction /Renovation of Chepareria Polytechnic( CJ WORKSHOP) |
Education and Technical Training |
2018-2019 |
Complete
|
Chepareria |
Ksh 1,999,550 |
Comment
|
| 704 |
CONSTRUCTION OF 2 CLASSES AT AKIRIAMET ECDE |
Education and Technical Training |
2018-2019 |
Complete
|
Riwo |
Ksh 500,000 |
Comment
|
| 705 |
KOTIT-CHEPOLET-KESOT-NAKWIJIT ROAD |
Public Works, Transport and Infrastructure |
2018-2019 |
Complete
|
Endugh |
Ksh 2,610,000 |
Comment
|
| 706 |
MAINTENANCE OF KAMATIRA-KORUTIN ROAD |
Public Works, Transport and Infrastructure |
2018-2019 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 707 |
BUSH CLEARING AND GRADING OF MUGHIS-KAPTEMOW ROAD 10KMS |
Public Works, Transport and Infrastructure |
2018-2019 |
Complete
|
Sook |
Ksh 2,000,000 |
Comment
|
| 708 |
CONSTRUCTION OF CHILI FOOTBRIDGE |
County Assembly |
2018-2019 |
Complete
|
Weiwei |
Ksh 2,000,000 |
Comment
|
| 709 |
SUKUT -TANGASIA -PTOP ROAD OPENNING AND BUSH CLEARING |
Public Works, Transport and Infrastructure |
2018-2019 |
Complete
|
Tapach |
Ksh 3,000,000 |
Comment
|
| 710 |
Supply And Delivery Of Pipes And Fittings For Lokitonyala Borehole |
Water, Environment and Natural Resources |
2018-2019 |
Complete
|
Weiwei |
Ksh 2,000,000 |
Comment
|
| 711 |
Construction Of Sub Surface Dam At Amkongis |
Water, Environment and Natural Resources |
2018-2019 |
Complete
|
Riwo |
Ksh 1,000,000 |
Comment
|
| 712 |
PROPOSED LEVELLING OF PLAYINF FIELD OF TAPACH AND SINA |
Tourism, Youths, Culture and Social Services |
2018-2019 |
Complete
|
Tapach |
Ksh 1,500,000 |
Comment
|
| 713 |
LEVELLING OF AMANGORA PLAYING FIELD |
Tourism, Youths, Culture and Social Services |
2018-2019 |
Complete
|
Alale |
Ksh 500,000 |
Comment
|
| 714 |
CONSTRUCTION OF BODA BODA SHED AT TIKIT MARKET |
Trade, Industrialization and Cooperative Development |
2018-2019 |
Complete
|
Masol |
Ksh 500,000 |
Comment
|
| 715 |
PROPOSED BODABODA SHED AT TAPACH |
Trade, Industrialization and Cooperative Development |
2018-2019 |
Complete
|
Tapach |
Ksh 499,729 |
Comment
|
| 716 |
ROAD MAINTENANCE OF TULIAKIN-BENSON ROAD |
Public Works, Transport and Infrastructure |
2020-2021 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 717 |
CONSTRUCTION OF KOMOL- PUTOR ROAD ROAD |
Public Works, Transport and Infrastructure |
2020-2021 |
Complete
|
Kapenguria |
Ksh 1,199,150 |
Comment
|
| 718 |
CONSTRUCTION OF KAARON-MURIOKUPOI |
Public Works, Transport and Infrastructure |
2020-2021 |
Complete
|
Masol |
Ksh 400,000 |
Comment
|
| 719 |
CONSTRUCTION OF AMAKURIAT- LONGOLEMOR ROAD |
Public Works, Transport and Infrastructure |
2020-2021 |
Complete
|
Alale |
Ksh 250,000 |
Comment
|
| 720 |
RENOVATION OF VETERINARY LABORATORY IN WEST POKOT COUNTY |
Livestock, Fisheries and Veterinary Services |
2020-2021 |
Complete
|
Kapenguria |
Ksh 1,389,204 |
Comment
|
| 721 |
PURCHASE OF KNAPSUCK SPRAY PUMPS |
Livestock, Fisheries and Veterinary Services |
2020-2021 |
Complete
|
Suam |
Ksh 500,000 |
Comment
|
| 722 |
PURCHASE OF SPRAY PUMPS |
Livestock, Fisheries and Veterinary Services |
2020-2021 |
Complete
|
Alale |
Ksh 200,000 |
Comment
|
| 723 |
PURCHASE AND SUPPLY OF ACARICIDES |
Livestock, Fisheries and Veterinary Services |
2020-2021 |
Complete
|
Endugh |
Ksh 583,859 |
Comment
|
| 724 |
CONSTRUCTION OF ONE CLASSROOM AT KAPSURUM(BOMA) ECDE |
Education and Technical Training |
2020-2021 |
Complete
|
Siyoi |
Ksh 500,000 |
Comment
|
| 725 |
CONSTRUCTION OF ECDE CLASSROOM AT KSAA( LEBEI) |
Education and Technical Training |
2020-2021 |
Complete
|
Lomut |
Ksh 500,000 |
Comment
|
| 726 |
CONSTRUCTION OF ECDE CLASSROOMS AT KOMOLEE |
Education and Technical Training |
2020-2021 |
Complete
|
Mnagei |
Ksh 1,100,000 |
Comment
|
| 727 |
CONSTRUCTION OF ECDE CLASSROOM AT KERINGET |
Education and Technical Training |
2020-2021 |
Complete
|
Mnagei |
Ksh 600,000 |
Comment
|
| 728 |
CONSTRUCTION AND COMPLETION OF CLASSROOMS AT SIMAT ECDE |
Education and Technical Training |
2020-2021 |
Complete
|
Sook |
Ksh 600,000 |
Comment
|
| 729 |
COMPLETION OF KAKOU ECDE |
Education and Technical Training |
2020-2021 |
Complete
|
Alale |
Ksh 100,000 |
Comment
|
| 730 |
CONSTRUCTION OF KOPOLONGA ECDE |
Education and Technical Training |
2020-2021 |
Complete
|
Chepareria |
Ksh 500,000 |
Comment
|
| 731 |
Construction Of Murkwijit Water Springs |
Water, Environment and Natural Resources |
2020-2021 |
Complete
|
Mnagei |
Ksh 249,995 |
Comment
|
| 732 |
PURCHASE AND INSTALLATION OF WEPESA SYSTEM |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
Kapenguria |
Ksh 4,500,000 |
Comment
|
| 733 |
CONSTRUCTION OF BODA BODA SHED AT KAPSAIT |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
Lelan |
Ksh 500,000 |
Comment
|
| 734 |
Construction of Kases Staff House |
Health and Sanitation |
2020-2021 |
Complete
|
Kiwawa |
Ksh 700,000 |
Comment
|
| 735 |
INSTALLATION OF ELECTRICITY AT KAPRECH DISPENSARY |
Health and Sanitation |
2020-2021 |
Complete
|
Siyoi |
Ksh 50,000 |
Comment
|
| 736 |
CONSTRUCTION OF PTAROKONG PUBLIC PIT LATRINE |
Lands, Housing, Planning and Urban Development |
2020-2021 |
Complete
|
Batei |
Ksh 500,000 |
Comment
|
| 737 |
CONSTRUCTION OF SEROWO MARKET PIT LATRINE |
Lands, Housing, Planning and Urban Development |
2020-2021 |
Complete
|
Riwo |
Ksh 300,000 |
Comment
|
| 738 |
TAMKAL MARKET SOLAR INSTALLATION(NEW) |
Lands, Housing, Planning and Urban Development |
2020-2021 |
Complete
|
Weiwei |
Ksh 500,000 |
Comment
|
| 739 |
CONSTRUCTION OF PIT LATRINE AT MWOTOT MARKET |
Lands, Housing, Planning and Urban Development |
2020-2021 |
Complete
|
Tapach |
Ksh 500,000 |
Comment
|
| 740 |
CONSTRUCTION OF NAKWIJIT MARKET PIT LATRINE |
Lands, Housing, Planning and Urban Development |
2020-2021 |
Complete
|
Kodich |
Ksh 300,000 |
Comment
|
| 741 |
CONSTRUCTION OF PIT LATRINE AT TAMKAL MARKET |
Lands, Housing, Planning and Urban Development |
2020-2021 |
Complete
|
Weiwei |
Ksh 500,000 |
Comment
|
| 742 |
CONSTRUCTION OF BODABODA SHED AT KAIBOS |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
Siyoi |
Ksh 498,180 |
Comment
|
| 743 |
CONSTRUCTION OF MARKET SHED AT SINA MARKET |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
Tapach |
Ksh 1,999,840 |
Comment
|
| 744 |
CONSTRUCTION OF BODABODA SHED AT KERINGET CENTRE |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
Mnagei |
Ksh 500,000 |
Comment
|
| 745 |
CONSTRUCTION OF MARKET SHED AT KAMELEI MARKET |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
Tapach |
Ksh 1,962,569 |
Comment
|
| 746 |
CONSTRUCTION OF BODABODA SHED AT TALAU |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
Siyoi |
Ksh 498,180 |
Comment
|
| 747 |
CONSTRUCTION OF STAFF HOUSE AT EMBOASIS DISPENSARY |
Health and Sanitation |
2020-2021 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 748 |
HEALTH AND SANITATION |
Health and Sanitation |
2020-2021 |
Complete
|
Batei |
Ksh 800,000 |
Comment
|
| 749 |
KACHELIBA PRIMARY BOREHOLE |
Water, Environment and Natural Resources |
2013-2014 |
Complete
|
SUAM |
Ksh 499,500 |
Comment
|
| 750 |
SIYOI WATER PROJECT |
Water, Environment and Natural Resources |
2013-2014 |
Complete
|
SIYOI |
Ksh 2,690,790 |
Comment
|
| 751 |
TIKIT LAND |
Water, Environment and Natural Resources |
2013-2014 |
Complete
|
MASOL |
Ksh 547,800 |
Comment
|
| 752 |
KOKWOKOCHIGH LAND |
Water, Environment and Natural Resources |
2013-2014 |
Complete
|
MASOL |
Ksh 520,000 |
Comment
|
| 753 |
KODICH BOREHOLE |
Water, Environment and Natural Resources |
2013-2014 |
Complete
|
KODICH |
Ksh 999,920 |
Comment
|
| 754 |
KATUMKALE LAND |
Water, Environment and Natural Resources |
2013-2014 |
Complete
|
KIWAWA |
Ksh 1,499,380 |
Comment
|
| 755 |
NARULAM MELE SAND DAM |
Water, Environment and Natural Resources |
2013-2014 |
Complete
|
KIWAWA |
Ksh 507,380 |
Comment
|
| 756 |
KASEI BOREHOLE |
Water, Environment and Natural Resources |
2013-2014 |
Complete
|
KASEI |
Ksh 1,498,500 |
Comment
|
| 757 |
SIGOR MARKET |
Trade, Industrialization and Cooperative Development |
2013-2014 |
Complete
|
WEIWEI |
Ksh 1,909,700 |
Comment
|
| 758 |
TALAU CO-OPERATIVE OFFICES |
Trade, Industrialization and Cooperative Development |
2013-2014 |
Complete
|
SIYOI |
Ksh 1,963,950 |
Comment
|
| 759 |
MAKUTANO MARKET |
Trade, Industrialization and Cooperative Development |
2013-2014 |
Complete
|
MNAGEI |
Ksh 8,900,881 |
Comment
|
| 760 |
TAR TAR COFFEE FACTORY |
Trade, Industrialization and Cooperative Development |
2013-2014 |
Complete
|
MNAGEI |
Ksh 12,205,806 |
Comment
|
| 761 |
MAKUTANO MARKET |
Trade, Industrialization and Cooperative Development |
2013-2014 |
Complete
|
MNAGEI |
Ksh 999,340 |
Comment
|
| 762 |
ENVIRONMENTAL IMPACT ASSESSMENT |
Trade, Industrialization and Cooperative Development |
2013-2014 |
Complete
|
LELAN, CHEPARERIA, TAPACH |
Ksh 750,000 |
Comment
|
| 763 |
KODICH HONEY STORE |
Trade, Industrialization and Cooperative Development |
2013-2014 |
Complete
|
KODICH |
Ksh 3,541,685 |
Comment
|
| 764 |
TRADE OFFICE |
Trade, Industrialization and Cooperative Development |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 6,690,660 |
Comment
|
| 765 |
COUNTY CO-OPORATIVE OFFICE |
Trade, Industrialization and Cooperative Development |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 4,481,625 |
Comment
|
| 766 |
CHEPARERIA MARKET |
Trade, Industrialization and Cooperative Development |
2013-2014 |
Complete
|
CHEPARERIA |
Ksh 1,315,568 |
Comment
|
| 767 |
CHEPARERIA MARKET |
Trade, Industrialization and Cooperative Development |
2013-2014 |
Complete
|
CHEPARERIA |
Ksh 4,608,324 |
Comment
|
| 768 |
ORTUM MARKET |
Trade, Industrialization and Cooperative Development |
2013-2014 |
Complete
|
BATEI |
Ksh 2,131,419 |
Comment
|
| 769 |
ALALE MARKET |
Trade, Industrialization and Cooperative Development |
2013-2014 |
Complete
|
ALALE |
Ksh 940,000 |
Comment
|
| 770 |
MAKUTANO YOUTH EMPOWERMENT CENTRE |
Tourism, Youths, Culture and Social Services |
2013-2014 |
Complete
|
MNAGEI |
Ksh 10,409,144 |
Comment
|
| 771 |
MTELO HALL |
Tourism, Youths, Culture and Social Services |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 19,816,338 |
Comment
|
| 772 |
PURCHASE OF COMPUTERS |
Tourism, Youths, Culture and Social Services |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 1,162,800 |
Comment
|
| 773 |
PURCHASE OF COMPUTERS |
Tourism, Youths, Culture and Social Services |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 694,000 |
Comment
|
| 774 |
PURCHASE OF WORKSHOP EQUIPMENT |
Tourism, Youths, Culture and Social Services |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 691,200 |
Comment
|
| 775 |
IYON FOOTBRIDGES |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
WEIWEI |
Ksh 24,299,355 |
Comment
|
| 776 |
CHEPKORNISWO SINA ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
TAPACH |
Ksh 7,062,220 |
Comment
|
| 777 |
KANYERUS KACHELIBA ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
SUAM |
Ksh 7,307,813 |
Comment
|
| 778 |
MURKWIJIT CHEPYOMET ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
SIYOI |
Ksh 4,755,022 |
Comment
|
| 779 |
CHEPKOTI KIPKORINYA KAIBOS ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
SIYOI |
Ksh 3,733,979 |
Comment
|
| 780 |
MARICH MARENG MBARA |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
SEKERR |
Ksh 3,622,855 |
Comment
|
| 781 |
KRESWO KANYARKWAT KATIKOMOR ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
RIWO |
Ksh 1,120,054 |
Comment
|
| 782 |
KRESWO KANYARKWAT KATIKOMOR ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
RIWO |
Ksh 9,141,145 |
Comment
|
| 783 |
MURKWJIT BOX CULVERT |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
MNAGEI |
Ksh 8,435,644 |
Comment
|
| 784 |
WEIWEI LOTONGOT AKULO ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
MASOL |
Ksh 7,642,124 |
Comment
|
| 785 |
LOMUT ANNET CHESEGON ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
LOMUT |
Ksh 10,300,197 |
Comment
|
| 786 |
KAMATIRA KAPSAIT ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
LELAN |
Ksh 11,605,369 |
Comment
|
| 787 |
KIPAT CHORWAI KAPSAIT ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
LELAN |
Ksh 3,041,560 |
Comment
|
| 788 |
KASEI CHEBURWO OMBOLION TURKWEL ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
KASEI |
Ksh 10,394,183 |
Comment
|
| 789 |
OMBOLION NAKWAMORU APUKE LOYA |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
KASEI |
Ksh 10,170,284 |
Comment
|
| 790 |
DEPARTMENT OF ROADS OFFICE |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 1,940,286 |
Comment
|
| 791 |
ROPONYWO PRIMARY SCHOOL |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 1,205,356 |
Comment
|
| 792 |
KAMARKECH BRIDGE ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 7,516,242 |
Comment
|
| 793 |
LOSAM KAMKETO KASEI ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
KAPCHOK |
Ksh 9,662,824 |
Comment
|
| 794 |
KALUKUNA TUWIT TUWIT KORPU ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
KAPCHOK |
Ksh 5,785,345 |
Comment
|
| 795 |
NGOTUT KARIMAWOI ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
KAPCHOK |
Ksh 4,162,926 |
Comment
|
| 796 |
KONYAO NAPITIRO KARAMERI ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
KAPCHOK |
Ksh 4,588,758 |
Comment
|
| 797 |
KOSULOL TOLKOGHIN ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
CHEPARERIA |
Ksh 6,111,380 |
Comment
|
| 798 |
CHEPARERIA PTOYO ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
CHEPARERIA |
Ksh 4,204,180 |
Comment
|
| 799 |
CHEPKOPEGH NAKWIJIT ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
CHEPARERIA |
Ksh 7,215,525 |
Comment
|
| 800 |
STORE |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 1,805,769 |
Comment
|
| 801 |
MAKUTANO KONYAO ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
MNAGEI,RIWO,SUAM,KODICH,KAPCHOK |
Ksh 11,546,775 |
Comment
|
| 802 |
KASETIAN AKIRIAMET ROAD |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
MASOL |
Ksh 8,106,862 |
Comment
|
| 803 |
OFFICE FURNITURE |
Public Works, Transport and Infrastructure |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 4,006,000 |
Comment
|
| 804 |
POKOT CENTRAL VETERINARY OFFICE |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
WEIWEI |
Ksh 6,080,824 |
Comment
|
| 805 |
TAMKAL CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
WEIWEI |
Ksh 398,400 |
Comment
|
| 806 |
RUNO AND KAITAPOS CATTLE DIPS |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
WEIWEI |
Ksh 819,412 |
Comment
|
| 807 |
TELO KAPOROW SUKUT AND SINA CATTLE DIPS |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
TAPACH |
Ksh 1,452,728 |
Comment
|
| 808 |
KANYERUS CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
SUAM |
Ksh 1,791,390 |
Comment
|
| 809 |
TAMUGH AND CHEPNYAL CATTLE DIPS |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
SOOK |
Ksh 894,916 |
Comment
|
| 810 |
DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
SIYOI |
Ksh 1,144,920 |
Comment
|
| 811 |
CCHEPYOMAT CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
SIYOI |
Ksh 1,699,778 |
Comment
|
| 812 |
MARICH CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
SEKERR |
Ksh 1,877,622 |
Comment
|
| 813 |
TARTAR AND TALAU CATTLE DIPS |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
MNAGEI/SIYOI |
Ksh 799,124 |
Comment
|
| 814 |
LOMUT CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LOMUT |
Ksh 1,820,430 |
Comment
|
| 815 |
CHESTA CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LOMUT |
Ksh 396,581 |
Comment
|
| 816 |
POROWO AND MESHAU CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 398,269 |
Comment
|
| 817 |
KAPKUNYUK CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 390,143 |
Comment
|
| 818 |
KAPTABUK CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 397,109 |
Comment
|
| 819 |
CHEPARTEN CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 398,269 |
Comment
|
| 820 |
KAPSANGAR CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 394,789 |
Comment
|
| 821 |
MOKOYON CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 390,229 |
Comment
|
| 822 |
CHORWAI CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 390,822 |
Comment
|
| 823 |
KAPSAIT CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 357,879 |
Comment
|
| 824 |
CHESUPET CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 390,822 |
Comment
|
| 825 |
IMONPOGHET CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 384,222 |
Comment
|
| 826 |
SARAMEE CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 437,478 |
Comment
|
| 827 |
CHEPINAT CHOROK RINGRING AND SIMOTWO CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 1,560,786 |
Comment
|
| 828 |
TONOYON MANIAN LOYAMUR AND KABICHBICH CATTLE DIPS |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 1,490,541 |
Comment
|
| 829 |
CHESUPET CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 378,300 |
Comment
|
| 830 |
CHORWAI CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 390,822 |
Comment
|
| 831 |
CHORWAI CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 390,822 |
Comment
|
| 832 |
CHESUPET CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 390,822 |
Comment
|
| 833 |
IMONPOGHET CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
LELAN |
Ksh 384,222 |
Comment
|
| 834 |
TILAK CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 1,688,710 |
Comment
|
| 835 |
EMBOASIS CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 392,080 |
Comment
|
| 836 |
KAPKORIS CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 398,947 |
Comment
|
| 837 |
KONYAO CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
KAPCHOK |
Ksh 1,822,747 |
Comment
|
| 838 |
CHEWARANY CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
ENDOUGH |
Ksh 1,891,983 |
Comment
|
| 839 |
CHESRA CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
CHEPARERIA |
Ksh 1,693,345 |
Comment
|
| 840 |
NASUKUTA LIVESTOCK IMPROVEMENT CENTRE |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
CHEPARERIA |
Ksh 5,600,760 |
Comment
|
| 841 |
SENETWO PSERUM AND CHEPKOBEGH CATTLE DIPS |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
CHEPARERIA |
Ksh 1,211,504 |
Comment
|
| 842 |
SEBIT CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
BATEI |
Ksh 378,300 |
Comment
|
| 843 |
MASW SUBUKWO CATTLE DIPA AND |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
BATEI |
Ksh 799,450 |
Comment
|
| 844 |
SUPPLY OF FERTILIZER |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 968,400 |
Comment
|
| 845 |
SUPPLY OF PASTURE SEED |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 1,690,000 |
Comment
|
| 846 |
CHEPSERUM CATTLE CHEPSERUM |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
MASOL |
Ksh 1,884,316 |
Comment
|
| 847 |
KOCHIY CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
BATEI |
Ksh 398,269 |
Comment
|
| 848 |
KITALAKAPEL AND KATUKUMWOK CATTLE DIPS |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
RIWO |
Ksh 815,958 |
Comment
|
| 849 |
CHEPOKORINGU CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
BATEI |
Ksh 1,672,990 |
Comment
|
| 850 |
ENVIRONMENTAL IMPACT ASSESSMENT |
Livestock, Fisheries and Veterinary Services |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 935,000 |
Comment
|
| 851 |
COUNTY LANDS OFFICE |
Lands, Housing, Planning and Urban Development |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 85,941,970 |
Comment
|
| 852 |
COUNTY LANDS OFFICE |
Lands, Housing, Planning and Urban Development |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 897,700 |
Comment
|
| 853 |
COUNTY LANDS OFFICE |
Lands, Housing, Planning and Urban Development |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 1,946,895 |
Comment
|
| 854 |
SURVEY EQUIPMENTS |
Lands, Housing, Planning and Urban Development |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 7,305,054 |
Comment
|
| 855 |
KOKWOTONDWO DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
WEIWEI |
Ksh 3,559,220 |
Comment
|
| 856 |
NYARKULIAN DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
TAPACH |
Ksh 3,599,999 |
Comment
|
| 857 |
MUERBONG DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
SUAM |
Ksh 3,341,513 |
Comment
|
| 858 |
EMBOUGH DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
SOOK |
Ksh 3,972,049 |
Comment
|
| 859 |
PARAYWA DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
SIYOI |
Ksh 3,631,525 |
Comment
|
| 860 |
SARMACH DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
SEKERR |
Ksh 3,516,465 |
Comment
|
| 861 |
RIWO HEALTH CENTRE STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
RIWO |
Ksh 3,668,730 |
Comment
|
| 862 |
KERINGET HEALTH CENTRE STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
MNAGEI |
Ksh 3,620,920 |
Comment
|
| 863 |
PSIGIRIO DISPENSARY |
Health and Sanitation |
2013-2014 |
Complete
|
MNAGEI |
Ksh 1,846,995 |
Comment
|
| 864 |
NYANGAITA DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
MASOL |
Ksh 3,605,843 |
Comment
|
| 865 |
ANNET DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
LOMUT |
Ksh 3,660,936 |
Comment
|
| 866 |
CHESUPET DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
LELAN |
Ksh 3,594,980 |
Comment
|
| 867 |
KAURIONG DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
KIWAWA |
Ksh 3,330,410 |
Comment
|
| 868 |
KAPTOLOMWO DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
KASEI |
Ksh 3,429,990 |
Comment
|
| 869 |
NGOTUT DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
KAPCHOK |
Ksh 3,685,475 |
Comment
|
| 870 |
KRIICH DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
ENDOUGH |
Ksh 3,675,575 |
Comment
|
| 871 |
CHESRA DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
CHEPARERIA |
Ksh 3,522,470 |
Comment
|
| 872 |
MURPUS DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
BATEI |
Ksh 3,289,695 |
Comment
|
| 873 |
LENGOROK DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
ALALE |
Ksh 3,551,490 |
Comment
|
| 874 |
SOLID WASTE COLLECTION EQUIPMENT |
Health and Sanitation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 17,690,000 |
Comment
|
| 875 |
SOLAR FRIDGES |
Health and Sanitation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 10,140,000 |
Comment
|
| 876 |
KOMOL DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 3,330,513 |
Comment
|
| 877 |
KACHELIBA SUB COUNTY HOSPITAL OPERATION THEATRE |
Health and Sanitation |
2013-2014 |
Complete
|
SUAM |
Ksh 29,150,755 |
Comment
|
| 878 |
KOPOCH HOLDING GROUND |
Health and Sanitation |
2013-2014 |
Complete
|
RIWO |
Ksh 43,465,925 |
Comment
|
| 879 |
KALEMNGOROK DISPENSARY STAFF HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
KODICH |
Ksh 3,560,035 |
Comment
|
| 880 |
KCRH ICU AND CASUALTY WING |
Health and Sanitation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 44,757,469 |
Comment
|
| 881 |
KAPENGURIA DOCTORS RESIDENTIAL HOUSE |
Health and Sanitation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 41,012,223 |
Comment
|
| 882 |
KMTC CLASSROOM LIBRARY SKILLS LABORATORY AND ADMINISTRATION BLOCK |
Health and Sanitation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 33,167,790 |
Comment
|
| 883 |
KAPENGURIA SUB COUNTY HOSPITAL DRUG STORE |
Health and Sanitation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 30,017,134 |
Comment
|
| 884 |
KCRH PERIMETER WALL |
Health and Sanitation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 23,550,523 |
Comment
|
| 885 |
LAUNDRY MACHINE |
Health and Sanitation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 15,900,000 |
Comment
|
| 886 |
KCRH MEDICAL EQUIPMENT |
Health and Sanitation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 11,276,954 |
Comment
|
| 887 |
ULTRA SOUND MACHINE |
Health and Sanitation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 6,400,000 |
Comment
|
| 888 |
KCRH MEDICAL EQUIPMENT |
Health and Sanitation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 4,516,758 |
Comment
|
| 889 |
KCRH LABORATORY EQUIPMENT |
Health and Sanitation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 4,310,760 |
Comment
|
| 890 |
COUNTY TREASURY |
Finance and Economic Planning |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 72,516,864 |
Comment
|
| 891 |
STAFF UNIFORM |
Finance and Economic Planning |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 3,273,000 |
Comment
|
| 892 |
SIGOR POLYTECHNIC |
Education and Technical Training |
2013-2014 |
Complete
|
WEIWEI |
Ksh 1,850,440 |
Comment
|
| 893 |
ECDE COLLEGE |
Education and Technical Training |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 31,315,614 |
Comment
|
| 894 |
CHEPARERIA YOUTH POLYTECHNIC |
Education and Technical Training |
2013-2014 |
Complete
|
CHEPARERIA |
Ksh 4,778,663 |
Comment
|
| 895 |
ORTUM YOUTH POLYTECHNIC |
Education and Technical Training |
2013-2014 |
Complete
|
BATEI |
Ksh 4,653,421 |
Comment
|
| 896 |
ORTUM YOUTH POLYTECHNIC |
Education and Technical Training |
2013-2014 |
Complete
|
BATEI |
Ksh 1,644,740 |
Comment
|
| 897 |
KASPERSKY ANTI VIRUS AND HP LASERJET |
CPSM, ICT and Decentralized Units |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 217,814 |
Comment
|
| 898 |
ECDE PLASTIC CHIRS |
Education and Technical Training |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 7,139,000 |
Comment
|
| 899 |
MREL IRRIGATION SCHEME |
Agriculture and Irrigation |
2013-2014 |
Complete
|
WEIWEI |
Ksh 4,001,750 |
Comment
|
| 900 |
NGROKAL IRRIGATION SCHEME |
Agriculture and Irrigation |
2013-2014 |
Complete
|
MNAGEI |
Ksh 1,989,000 |
Comment
|
| 901 |
AGRICULTURE OFFICE |
Agriculture and Irrigation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 32,893,814 |
Comment
|
| 902 |
KARIAMANGOL IRRIGATION SCHEME |
Agriculture and Irrigation |
2013-2014 |
Complete
|
BATEI |
Ksh 32,893,814 |
Comment
|
| 903 |
MUKOWO IRRIGATION SCHEME |
Agriculture and Irrigation |
2013-2014 |
Complete
|
BATEI |
Ksh 4,062,760 |
Comment
|
| 904 |
ENVIRONMENTAL IMPACT ASSESSMENT |
Agriculture and Irrigation |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 495,000 |
Comment
|
| 905 |
SIGOR SUB COUNTY OFFICE |
CPSM, ICT and Decentralized Units |
2013-2014 |
Complete
|
WEIWEI |
Ksh 5,910,183 |
Comment
|
| 906 |
MURKUJIT ADVERTISEMENT FRAME |
CPSM, ICT and Decentralized Units |
2013-2014 |
Complete
|
MNAGEI |
Ksh 1,715,000 |
Comment
|
| 907 |
HIGH MAST SECURITY LIGHTS |
CPSM, ICT and Decentralized Units |
2013-2014 |
Complete
|
LELAN, CHEPARERIA, SUAM WEIWEI |
Ksh 13,488,410 |
Comment
|
| 908 |
LAN WIFI AND FIBRE |
CPSM, ICT and Decentralized Units |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 3,600,000 |
Comment
|
| 909 |
GOVERNORS OFFICE |
CPSM, ICT and Decentralized Units |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 494,000 |
Comment
|
| 910 |
CHEPARERIA SUBCOUNTY OFFICE |
CPSM, ICT and Decentralized Units |
2013-2014 |
Complete
|
CHEPARERIA |
Ksh 6,200,716 |
Comment
|
| 911 |
ALALE SUBCOUNTY OFFICE |
CPSM, ICT and Decentralized Units |
2013-2014 |
Complete
|
ALALE |
Ksh 7,204,825 |
Comment
|
| 912 |
SENTRY OFFICES |
CPSM, ICT and Decentralized Units |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 3,179,142 |
Comment
|
| 913 |
DDO OFFICE |
CPSM, ICT and Decentralized Units |
2013-2014 |
Complete
|
KAPENGURIA |
Ksh 4,675,844 |
Comment
|
| 914 |
CONSTRUCTION OF BODABODA SHEDS |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 915 |
PROPOSED CIVIL WORKS AT MAKUTANO CLOTH MARKET |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
MNAGEI |
Ksh 6,768,579 |
Comment
|
| 916 |
CONSTRUCTION OF BODABODA SHEDS |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 917 |
CONSTRUCTION OF BODABODA SHADE |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 918 |
CONSTRUCTION OF BODABODA SHADE |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 919 |
SUPPLY AND DELIVERY OF BEE HIVES |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
RIWO,KODICH AND ALALE |
Ksh 2,668,035 |
Comment
|
| 920 |
SUPPLY AND DELIVERY OF BUILDING MATERIALS |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
TAPACH |
Ksh 824,165 |
Comment
|
| 921 |
ENVIRONMENTAL IMPACT ASSESSMENT FOR RETAIL MARKETS |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
ALL WARDS |
Ksh 0 |
Comment
|
| 922 |
FEASIBILITY STUDY FOR DAIRY PLANT |
Trade, Industrialization and Cooperative Development |
2016-2017 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 923 |
4-PIT LATRINE AT THE TREASURY BUILDING |
Finance and Economic Planning |
2016-2017 |
Complete
|
KAPENGURIA |
Ksh 650,000 |
Comment
|
| 924 |
TOMPUL IRRIGATION SCHEME |
Agriculture and Irrigation |
2016-2017 |
Complete
|
SOOK |
Ksh 6,000,000 |
Comment
|
| 925 |
ORWA, IRRIGATION SCHEME |
Agriculture and Irrigation |
2016-2017 |
Complete
|
SEKERR |
Ksh 5,045,000 |
Comment
|
| 926 |
PROPOSED CONSTRUCTION OF TUITION BLOCK FOR AGRICULTURAL TRAINING CENTRE AT KERINGET PHASE II |
Agriculture and Irrigation |
2016-2017 |
Complete
|
MNAGEI |
Ksh 100,000,000 |
Comment
|
| 927 |
PURCHASE OF CERTIFIED CROP SEEDS |
Agriculture and Irrigation |
2016-2017 |
Complete
|
KAPENGURIA |
Ksh 3,000,000 |
Comment
|
| 928 |
PROVISION OF MEDICAL INSURANCE COVER FOR WEST POKOT COUNTY STAFF |
CPSM, ICT and Decentralized Units |
2016-2017 |
Complete
|
KAPENGURIA |
Ksh 42,500,000 |
Comment
|
| 929 |
SUPPLY AND DELIVERY OF RELIEF OF FOOD PHASE I |
CPSM, ICT and Decentralized Units |
2016-2017 |
Complete
|
KAPENGURIA |
Ksh 0 |
Comment
|
| 930 |
PROPOSED RENOVATION TO HOUSE BLOCK C IN THE GOVERNOR'S RESIDENCE |
CPSM, ICT and Decentralized Units |
2016-2017 |
Complete
|
KAPENGURIA |
Ksh 5,480,575 |
Comment
|
| 931 |
WAKOR IRRIGATION CANAL |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
WEIWEI |
Ksh 499,210 |
Comment
|
| 932 |
MREL IRRIGATION SCHEME |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
WEIWEI |
Ksh 2,606,051 |
Comment
|
| 933 |
CERTIFIED CROP SEEDS |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 62,474,197 |
Comment
|
| 934 |
RIWO FARMERS SUPPORT |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
RIWO |
Ksh 400,000 |
Comment
|
| 935 |
PURCHASE OF GENERATORS SEKEER |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
SEKEER |
Ksh 500,000 |
Comment
|
| 936 |
PURCHASE OF SPRAY PUMPS SUAM |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 937 |
PURCHASE OF ONION SEEDS BATEI |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 938 |
PURCHASE OF ONION SEEDS CHEPARERIA |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 939 |
PURCHASE OF ONION SEEDS LOMUT |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 940 |
PURCHASE OF WATER MELON SEEDS LOMUT |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 941 |
MAIZE SEEDS SUAM |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
SUAM |
Ksh 400,000 |
Comment
|
| 942 |
FARMERS EMPOWERMENT THROUGH SEEDLINGS |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
WEIWEI |
Ksh 3,000,000 |
Comment
|
| 943 |
MASOL IRRIGATION PIPING |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
MASOL |
Ksh 1,999,540 |
Comment
|
| 944 |
PAROO FURROW |
AGRICULTURE AND IRRIGATION |
2019-2020 |
Complete
|
WEIWEI |
Ksh 699,760 |
Comment
|
| 945 |
MAKUTANO PUBLIC TOILET |
FINANCE AND ECONOMIC PLANNING |
2019-2020 |
Complete
|
MNAGEI |
Ksh 3,018,686 |
Comment
|
| 946 |
COUNTY TREASURY PIT LATRINE |
FINANCE AND ECONOMIC PLANNING |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 1,794,253 |
Comment
|
| 947 |
COUNTY TREASURY BUILDING |
FINANCE AND ECONOMIC PLANNING |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 9,147,232 |
Comment
|
| 948 |
COUNTY TREASURY GENERATOR |
FINANCE AND ECONOMIC PLANNING |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 1,996,000 |
Comment
|
| 949 |
LIAISON OFFICE P |
COUNTY EXECUTIVE |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 950,000 |
Comment
|
| 950 |
KCRH ISOLATION WARD |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 2,686,136 |
Comment
|
| 951 |
KACHELIBA DRUG STORE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SUAM |
Ksh 2,798,207 |
Comment
|
| 952 |
KACHELIBA HOSPITAL TOILETS |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SUAM |
Ksh 599,670 |
Comment
|
| 953 |
SIGOR SUBCOUNTY HOSPITAL TOILETS |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
WEIWEI |
Ksh 354,000 |
Comment
|
| 954 |
KCRH PUBLIC TOILET AND WASHROOM |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 300,000 |
Comment
|
| 955 |
KACHELIBA EYE UNIT |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SUAM |
Ksh 1,500,000 |
Comment
|
| 956 |
MATERNITY THEATRE RENOVATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 3,974,021 |
Comment
|
| 957 |
WARD ONE RENOVATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 3,982,512 |
Comment
|
| 958 |
WARD TWO RENOVATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 3,993,899 |
Comment
|
| 959 |
KAPENGURIA WARD 4 REVOVATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 3,581,076 |
Comment
|
| 960 |
DOCTORS LOUNGE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 961 |
EIA |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 2,508,039 |
Comment
|
| 962 |
KCRH BOUNDARY WALL |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 963 |
CASUALITY LEVELLING |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 2,500,000 |
Comment
|
| 964 |
KACHELIBA HOSPITAL PLUMBING |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SUAM |
Ksh 498,452 |
Comment
|
| 965 |
KCRH ELECTRICAL DISTRIBUTION BOARD |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 4,599,400 |
Comment
|
| 966 |
KRURU DISPENSARY PIT LATRINE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 967 |
KAPRECH DISPENSARY |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SIYOI |
Ksh 50,000 |
Comment
|
| 968 |
PTOKOU DISPENSARY |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
WEIWEI |
Ksh 249,650 |
Comment
|
| 969 |
TUWITDISPENSARY TWIN STAFF HOUSE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 219,926 |
Comment
|
| 970 |
KESOT DISPENSARY |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
ENDUGH |
Ksh 406,279 |
Comment
|
| 971 |
TUWIT DISPENSARY |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 972 |
KAPRECH DISPENSARY PIT LATRINE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SIYOI |
Ksh 300,000 |
Comment
|
| 973 |
KANYERUS STAFF HOUSE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SUAM |
Ksh 850,000 |
Comment
|
| 974 |
PROPOI DISPENSARY |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 791,525 |
Comment
|
| 975 |
ANNET MATERNITY WING |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
LOMUT |
Ksh 249,775 |
Comment
|
| 976 |
PARUA MATERNITY WING |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
BATEI |
Ksh 1,016,538 |
Comment
|
| 977 |
SOBUKWO DISPENSARY |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
BATEI |
Ksh 211,090 |
Comment
|
| 978 |
SEBIT DISPENSARY STAFF HOUSES |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
BATEI |
Ksh 2,301,512 |
Comment
|
| 979 |
CHEPOTARAMA DISPENSARY PIT LATRINE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
RIWO |
Ksh 270,000 |
Comment
|
| 980 |
CHEMAKEW DISPENSARY TOILETS |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
RIWO |
Ksh 30,000 |
Comment
|
| 981 |
KONYAO DISPENSARY STAFF HOUSE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 298,500 |
Comment
|
| 982 |
YWALATEKE GENERAL WARD ELECTRICAL WORKS |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 448,235 |
Comment
|
| 983 |
POROWO DISPENSARY |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
LELAN |
Ksh 2,600,584 |
Comment
|
| 984 |
CHEPUNGON DISPENSARY |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
LELAN |
Ksh 4,449,637 |
Comment
|
| 985 |
PTOKOU DISPENSARY PIT LATRINE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
WEIWEI |
Ksh 50,350 |
Comment
|
| 986 |
PTOKOU DISPENSARY EQUPING |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
WEIWEI |
Ksh 700,000 |
Comment
|
| 987 |
TAMKAL DISPENSARY MALE WARD |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
WEIWEI |
Ksh 1,311,364 |
Comment
|
| 988 |
KERINGET DISPENSARY STAFF HOUSES |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
MNAGEI |
Ksh 577,900 |
Comment
|
| 989 |
KAIBOS HEALTH CENTRE MATERNITY WING |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SIYOI |
Ksh 1,783,000 |
Comment
|
| 990 |
KRENGOT DISPENSARY |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SIYOI |
Ksh 1,089,829 |
Comment
|
| 991 |
KASITOT DISPENSARY PIT LATRINES |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
ALALE |
Ksh 395,328 |
Comment
|
| 992 |
NAKWOILAP DISPENSARY PIT LATRINES |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 993 |
MBARU DISPENSARY |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 994 |
KARAMERI DISPENSARY URINAL BLOCK |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 1,200,000 |
Comment
|
| 995 |
KANGLIKWAN DISPENSARY |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 996 |
KALEMREKAI DISPENSARY RENOVATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 997 |
NYANGAITA DISPENSARY FENCING |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
MASOL |
Ksh 150,000 |
Comment
|
| 998 |
KAPRECH DISPENSARY FURNITURE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SIYOI |
Ksh 300,000 |
Comment
|
| 999 |
CHORWA DISPENSARY SOLAR INSTALLATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SEKEER |
Ksh 300,000 |
Comment
|
| 1000 |
ALON DISPENSARY EQUIPPING |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SEKEER |
Ksh 150,000 |
Comment
|
| 1001 |
ORWA DISPENSARYEQUIPING |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SEKEER |
Ksh 350,000 |
Comment
|
| 1002 |
KIWAKAN DISPENSARY EQUIPING |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SEKEER |
Ksh 500,000 |
Comment
|
| 1003 |
KRIICH DISPENSARY SOLAR INSATALLATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
ENDUGH |
Ksh 200,000 |
Comment
|
| 1004 |
TIPET DISPENSARY EQUIPING |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
ENDUGH |
Ksh 200,000 |
Comment
|
| 1005 |
TAMARUKWO DISPENSARY SOLAR INSATALLATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
ENDUGH |
Ksh 200,000 |
Comment
|
| 1006 |
WANYOI DISPENSARY SOLAR INSATALLATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
ENDUGH |
Ksh 200,000 |
Comment
|
| 1007 |
PTOYO HEALTH CENTRE BEDS |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
ENDUGH |
Ksh 200,000 |
Comment
|
| 1008 |
KIWAKAN DISPENSARY FURNITURE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SEKEER |
Ksh 350,000 |
Comment
|
| 1009 |
TALON DISPENSARY PURCHASE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SEKEER |
Ksh 350,000 |
Comment
|
| 1010 |
CHORWA DISPENSARY FURNITURE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SEKEER |
Ksh 350,000 |
Comment
|
| 1011 |
KRENGOT DISPENSARY FURNITURE |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SIYOI |
Ksh 300,000 |
Comment
|
| 1012 |
ORWA DISPENSARY SOLAR INSTALLATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SEKEER |
Ksh 400,000 |
Comment
|
| 1013 |
SARMACH DISPENSARY SOLAR INSTALLATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SEKEER |
Ksh 400,000 |
Comment
|
| 1014 |
KIWAKAN DISPENSARY SOLAR INSTALLATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SEKEER |
Ksh 400,000 |
Comment
|
| 1015 |
TALON DISPENSARY SOLAR INSTALLATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SEKEER |
Ksh 400,000 |
Comment
|
| 1016 |
CHORWA DISPENSARY SOLAR INSTALLATION |
HEALTH AND SANITATION |
2019-2020 |
Complete
|
SEKEER |
Ksh 400,000 |
Comment
|
| 1017 |
KAPERUR RIVER BOX CULVERT |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SIYOI |
Ksh 5,941,900 |
Comment
|
| 1018 |
LOPSIMORU ROAD BACKFILLING AND GRADING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
RIWO |
Ksh 271,001 |
Comment
|
| 1019 |
TALAU BONDENI ROAD TWIN BOX CULVERT |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SIYOI |
Ksh 5,951,815 |
Comment
|
| 1020 |
ORTUM MARR SUSPENDED FOOTBRIDGE |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
BATEI |
Ksh 1,941,167 |
Comment
|
| 1021 |
ONOCH FOOTBRIDGE IMPROVEMENT |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
BATEI |
Ksh 2,003,810 |
Comment
|
| 1022 |
KATIPOROT CULVERTS |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SUAM |
Ksh 299,454 |
Comment
|
| 1023 |
CHEPKOPEGH-NAKWIJIT-KESOT-KAPKATA ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SOOK |
Ksh 1,795,680 |
Comment
|
| 1024 |
CHEPTUYA-CHEPKOGHY-OLOKORNOI ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
RIWO |
Ksh 3,000,000 |
Comment
|
| 1025 |
KAMELEI-KAPUSIEN ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
TAPACH |
Ksh 2,000,000 |
Comment
|
| 1026 |
KOTIT—CHEPNYAL-KOLA-TUNOYO ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SOOK |
Ksh 4,000,000 |
Comment
|
| 1027 |
CHEPTOKOL-KOKWORITIT-KAPATET ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LOMUT |
Ksh 4,000,000 |
Comment
|
| 1028 |
LOMUT-ANNET-KATIUT-CHEPKOKOGH-OTIOT-MARUS ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LOMUT |
Ksh 4,000,000 |
Comment
|
| 1029 |
SHALPOGH-CHEMOTONG |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
BATEI |
Ksh 3,000,000 |
Comment
|
| 1030 |
KABICHBICH-SIMOTWO-MOTPOKOR ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LELAN |
Ksh 5,000,000 |
Comment
|
| 1031 |
WAKOR-KOKWOTENDWO-NYARPAT ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
WEIWEI |
Ksh 8,000,000 |
Comment
|
| 1032 |
SIGOR-AKIRIAMET-AMOLEM ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
WEIWEI |
Ksh 2,000,000 |
Comment
|
| 1033 |
KAMLA-MBARU-KASEI ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KASEI |
Ksh 3,000,000 |
Comment
|
| 1034 |
KIWAWA-KATUMKALE-NANGOLESINYON-KALODEKE ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KIWAWA |
Ksh 3,000,000 |
Comment
|
| 1035 |
KACHELIBA-KANYERUS ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SUAM |
Ksh 2,500,000 |
Comment
|
| 1036 |
NGOTUT-KAMKETO-KASEI ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KASEI |
Ksh 4,000,000 |
Comment
|
| 1037 |
CHEPKOGHIN-SOSTIN-MBARA-KAPORO ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SEKEER |
Ksh 8,000,000 |
Comment
|
| 1038 |
SERETOW-CHEPTYA-SAMOR ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
BATEI |
Ksh 4,000,000 |
Comment
|
| 1039 |
CHEPKECHIR-KOPOCH ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 4,448,180 |
Comment
|
| 1040 |
TRANZOIA BORDER-KARENGER-KANYRKWAT ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 1041 |
ORTUM-SOBUKWO-EMBOUGH-SAPAI-KRIICH-RERES ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
BATEI |
Ksh 8,000,000 |
Comment
|
| 1042 |
KASEI-APETA-KOWUR-OMBOLION ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KASEI |
Ksh 7,000,000 |
Comment
|
| 1043 |
WOYAKOL-KALAPATA-LODWARR-APUKE ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
ALALE |
Ksh 6,000,000 |
Comment
|
| 1044 |
CHEPKONOCHOROKSOWERWO ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LELAN |
Ksh 3,000,000 |
Comment
|
| 1045 |
NAKWAPUOCHERANGANNAKWIJIT ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 3,000,000 |
Comment
|
| 1046 |
CHEPKOBEGH-PONGONG ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 3,000,000 |
Comment
|
| 1047 |
KIPAT-CHORWAI ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LELAN |
Ksh 2,000,000 |
Comment
|
| 1048 |
CHEPARERIA-CHEPTURNGUNY ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 3,000,000 |
Comment
|
| 1049 |
CHEPARERIA BOX CULVERT |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 5,000,000 |
Comment
|
| 1050 |
TIPPET-KUDONGOLE-CHEPOKACHIM ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
ENDUGH |
Ksh 5,000,000 |
Comment
|
| 1051 |
KONA-SAPULMOI-NGOLEKEN-CHEPTULEL PRIMARY CHESEGON ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LOMUT |
Ksh 3,000,000 |
Comment
|
| 1052 |
KANYARKWAT-SUAM-KAPETAKINEI ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
RIWO |
Ksh 3,000,000 |
Comment
|
| 1053 |
KABICHBICH-KAPKUNYUK-LAIN ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LELAN |
Ksh 3,000,000 |
Comment
|
| 1054 |
KIPAT-CHORWAI ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LELAN |
Ksh 2,000,000 |
Comment
|
| 1055 |
SINA-PTOP – TAPACH ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
TAPACH |
Ksh 2,599,000 |
Comment
|
| 1056 |
KACHELIBA-KANYERUS ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SUAM |
Ksh 4,251,539 |
Comment
|
| 1057 |
CHEPOKACHIM ROAD BUSH CLEARING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
ENDUGH |
Ksh 350,000 |
Comment
|
| 1058 |
KASES-CHEPOKACHIM ROAD BUSH CLEARING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
ENDUGH |
Ksh 350,000 |
Comment
|
| 1059 |
RERES-CHEPOKACHIM ROAD BUSH CLEARING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
ENDUGH |
Ksh 350,000 |
Comment
|
| 1060 |
KUDUNGOLE-CHEPOKACHIM ROAD BUSH CLEARING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
ENDUGH |
Ksh 350,000 |
Comment
|
| 1061 |
KAARON-MURIOKUPOI ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
ALALE |
Ksh 400,000 |
Comment
|
| 1062 |
AMAKURIAT-LONGOLEMOR ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
ALALE |
Ksh 250,000 |
Comment
|
| 1063 |
CHEMIYIN-SASAK SLAB |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 1064 |
ORON CHEPSEPIN ROAD BUSH CLEARING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 1065 |
KOCHIY-CHESIMAYA ROAD OPENING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
BATEI |
Ksh 300,000 |
Comment
|
| 1066 |
LULWO-PTARKONG ROAD MAINTENANCE |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
BATEI |
Ksh 260,000 |
Comment
|
| 1067 |
CHEPKARARAT-LULWO CENTRE KWANZA ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
BATEI |
Ksh 400,000 |
Comment
|
| 1068 |
CHIPAGH KUTUNG ROAD BUSH CLEARING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 1069 |
SEBIT-CHEPOKORIONG-KAPKAREMBA ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
BATEI |
Ksh 300,000 |
Comment
|
| 1070 |
PUSIAN-CHEPKOPEGH ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 1,500,000 |
Comment
|
| 1071 |
KAPROMTIN PLELAKAN PSERUMKANYIKENY ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 2,000,000 |
Comment
|
| 1072 |
CHEPARERIA-CHEMARMAR-KORELACH PARAK ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 3,000,000 |
Comment
|
| 1073 |
CHEPTRAM-MOMORO ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
ENDUGH |
Ksh 2,800,000 |
Comment
|
| 1074 |
PSAPAI-KRIICH-MOMOROWO ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
ENDUGH |
Ksh 1,200,000 |
Comment
|
| 1075 |
LOKICHAR RERETIANG ROAD BUSH CLEARING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 1076 |
LOKELIAN LOKITEDEL ROAD BUSH CLEARING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 600,000 |
Comment
|
| 1077 |
CHEPSKIN-KALEMNGOROK ROAD DESTUMPING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 600,000 |
Comment
|
| 1078 |
CHEMATCHOR-KODICH ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 805,000 |
Comment
|
| 1079 |
MARICHORR-CHERANGAN ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 350,000 |
Comment
|
| 1080 |
MITINGI LOSILONG ROAD BUSH CLEARING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 1081 |
APIRKI-CHEPTUYIS ROAD BUSH CLEARING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 1082 |
LOMADA DYKE ROAD BUSH CLEARING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 1083 |
TOPULUL ROAD BUSH CLEARING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 1084 |
BUSH CLEARING OF MADING PRIMARYMAIN ROAD (NEW |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 398,000 |
Comment
|
| 1085 |
BUSH CLEARING AT KODERANGOTUTAMALER ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 1086 |
BUSH CLAERING AT KAA LOTAKA, KASES,MANAKRAR SUAM KAPCHOK ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 394,000 |
Comment
|
| 1087 |
ROAD CLEARING OF LOKITEDELDINGDINGA |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 358,000 |
Comment
|
| 1088 |
REMOVAL OF LOGS IN MOGENNGONGOSOWON ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KIWAWA |
Ksh 500,000 |
Comment
|
| 1089 |
BUSH CLEARING OF LOWOIKATUKURULOKITEDEL ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KIWAWA |
Ksh 900,000 |
Comment
|
| 1090 |
BUSH CLEARING OF PILILLOPET ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KIWAWA |
Ksh 500,000 |
Comment
|
| 1091 |
BUSH CLEARING OF KOSIRMIT SONGOLOL ROAD(ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KIWAWA |
Ksh 550,000 |
Comment
|
| 1092 |
BUSH CLEARING OF NANGOLESINYON AKORKEYA ROAD(ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KIWAWA |
Ksh 600,000 |
Comment
|
| 1093 |
PLALANGLINGAMOI ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LELAN |
Ksh 200,000 |
Comment
|
| 1094 |
KAMONGES KAMURUKU ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LELAN |
Ksh 300,000 |
Comment
|
| 1095 |
MANUAL RESHAPING OF TACHIT KUDOKI ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LELAN |
Ksh 100,000 |
Comment
|
| 1096 |
AUCTIONCHEPKOWOT |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 1097 |
TOROTWO - KAYEMIT ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 1098 |
KAKOKOYOSINGOROKOI ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LELAN |
Ksh 200,000 |
Comment
|
| 1099 |
CHEPYECHMUTPTUNYONY ROAD LELAN ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 1100 |
KTOMWONY DISPCHEPTUPON K ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LELAN |
Ksh 200,000 |
Comment
|
| 1101 |
INSTALLATION OF CULVERTS AT KADEO KAMWINO ROAD (REPAIR) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
MNAGEI |
Ksh 200,000 |
Comment
|
| 1102 |
GRAVELLING CHAPUCHAPUMATHARE ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
MNAGEI |
Ksh 250,000 |
Comment
|
| 1103 |
BUSH CLEARING SURUMBEN KAMARIAN ROAD (ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 1104 |
LORACH KATANGUN BUSH CLEARINGMASOOL WARD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
MASOL |
Ksh 594,000 |
Comment
|
| 1105 |
KIUSONPOTAKAL AKULO BUSH CLEARING MASOOL WARD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
MASOL |
Ksh 300,000 |
Comment
|
| 1106 |
ROAD GRADING ATSIMBOOL SURUMBENMASSOL WARD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 1107 |
BUSH CLEARING RUNOSAMAKITUK MAS0L WARD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
MASOL |
Ksh 540,000 |
Comment
|
| 1108 |
NYANGAITA SEKEROT BUSH CLEARINGMASOOL WARD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 1109 |
BUSH CLEARING CHENAMPAKOSHOLOI ROAD (ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 1110 |
BUSH CLEARING TAKAIYWA(ONGOING ) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 1111 |
TILAKAI - CHEMSTO ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 1112 |
MANUAL & RESHAPING OF KAPKOMOLOITOKWEN ROAD SOOK WARD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SOOK |
Ksh 300,000 |
Comment
|
| 1113 |
COMPLETION OF KAPOROSARMACH ROAD SEKERR WARD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SOOK |
Ksh 300,000 |
Comment
|
| 1114 |
MANUAL RESHAPING OF MARINYRUK ROAD SEKERR WARD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SEKEER |
Ksh 400,000 |
Comment
|
| 1115 |
OPENING OF ARAPMAKETKIPKORINYA ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SIYOI |
Ksh 2,500,000 |
Comment
|
| 1116 |
TALAU CHEPKOTI KAPLAIN TWO LINE CURLVERTS |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 1117 |
TALAU CHEPKOTI KAPLAIN GRAVELLIN |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 1118 |
ROAD MAINTENANCE ENTIRE WARD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SUAM |
Ksh 1,000,000 |
Comment
|
| 1119 |
NAKUYENLOYONG'ONGKOKWOCHAYA ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
SUAM |
Ksh 800,000 |
Comment
|
| 1120 |
RESHAPING OF PCHOTOIPILIL ROAD (ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
TAPACH |
Ksh 400,000 |
Comment
|
| 1121 |
RESHAPING AND BUSH CLEARING OF KAMELEITOMKOSOEAN ROAD (ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
TAPACH |
Ksh 400,000 |
Comment
|
| 1122 |
RESHAPING OF CHELALSAWARITMWOTOT ROAD (ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 1123 |
RESHAPING OF KOKWOPSISMARANGARPTOP ROAD(ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
TAPACH |
Ksh 400,000 |
Comment
|
| 1124 |
RESHAPING OF AMSOSION NYARPAT(ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
TAPACH |
Ksh 200,000 |
Comment
|
| 1125 |
KAIPAWASLOSA CHONGIS |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
TAPACH |
Ksh 400,000 |
Comment
|
| 1126 |
KITAIMA ROAD MAINTENANCE |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
TAPACH |
Ksh 250,000 |
Comment
|
| 1127 |
SANGAT YAN YAN ROAD AT (ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 1128 |
KOKWOTENDWO KOLOU ROAD (ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 1129 |
MAINTANANCE OF MAR SOKA ROAD (ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 1130 |
SOKA IYON ROAD (BUSH CLEARING AND RESHAPING) (ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 1131 |
ONOCH CHEPTONGOGHIO ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 1132 |
KALAM TAKAR ROAD (ONGOING) |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 1133 |
SKAK TOSUKNIO ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 1134 |
MNOKOKOWO NGAROR ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 1135 |
SASACH KOKWOSOSION ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 1136 |
SOLION POITO ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 1137 |
YAN YAN KAKAWA ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 1138 |
BUSH CLEARING OF NARIWOMORU KAPLON ROAD NEWKASE WARD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 1139 |
MAINTENANCE OF KASAKATAKAR ROADKASEI |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KASEI |
Ksh 600,000 |
Comment
|
| 1140 |
ROAD OPENING OF CHEPTADAGH ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KASEI |
Ksh 1,202,282 |
Comment
|
| 1141 |
MISTIN TOO SESSEN ROAD ONGOING |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KASEI |
Ksh 250,000 |
Comment
|
| 1142 |
KAPSINTOI CHEPNYARAT ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KASEI |
Ksh 200,000 |
Comment
|
| 1143 |
KOKWO OROLWOKAMNONGOWO ROAD |
PUBLIC WORKS, TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
Complete
|
KASEI |
Ksh 400,000 |
Comment
|
| 1144 |
TARMACKING OF ORTUM TOWNSHIP ROADS |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
BATEI |
Ksh 14,925,488 |
Comment
|
| 1145 |
PIT LATRINE AT TAPACH |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
TAPACH |
Ksh 249,863 |
Comment
|
| 1146 |
PIT LATRINE AT KERINGET |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
MNAGEI |
Ksh 499,087 |
Comment
|
| 1147 |
PIT LATRINE AT KAMELEI |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
TAPACH |
Ksh 499,237 |
Comment
|
| 1148 |
PIT LATRINE AT CHEPTUYA MARKET |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
MNAGEI |
Ksh 499,904 |
Comment
|
| 1149 |
PIT LATRINE AT KABICHBICH MARKET |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
LELAN |
Ksh 499,999 |
Comment
|
| 1150 |
PIT LATRINE AT KOKWORITIT TRADING CENTRE |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
LOMUT |
Ksh 499,425 |
Comment
|
| 1151 |
PIT LATRINES AT CHESEGON TRADING CENTRE |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 1152 |
PIT LATRINE AT MWOTOT MARKET |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 1153 |
PIT LATRINE AT TIKIT |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
MASOL |
Ksh 509,327 |
Comment
|
| 1154 |
CONTRUCTION OF PUBLIC TOILET AT KABICHBICH MARKET |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
LELAN |
Ksh 499,999 |
Comment
|
| 1155 |
INSTALLATION OF SECURITY LIGHTS AT LOMUT MARKET |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
LOMUT |
Ksh 300,000 |
Comment
|
| 1156 |
PUBLIC TOILETS CHEPARERIA WARD |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 1157 |
TOILET AT KATIKOMOR MARKET |
LANDS, HOUSING, PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 1158 |
VETERINARY LABORATORY REPAIR |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 1,389,204 |
Comment
|
| 1159 |
CHEPNYAL CATTLE DIP REPAIR |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
SOOK |
Ksh 850,000 |
Comment
|
| 1160 |
HATCHERY BUILDING FENCING |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 1,599,634 |
Comment
|
| 1161 |
SAHIWAL BULLS BREEDS |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
ALL WARDS |
Ksh 4,000,000 |
Comment
|
| 1162 |
ENVIROMENTAL IMPACT ACCESSMENT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1163 |
ENVIROMENTAL IMPACT ACCESSMENT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
VARIOUS WARDS |
Ksh 400,000 |
Comment
|
| 1164 |
BOMA RHODES PURCHASE |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 264,000 |
Comment
|
| 1165 |
ANIMALS AND BREEDING STOCK SUPPLY |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
ALL WARDS |
Ksh 5,000,000 |
Comment
|
| 1166 |
ARTIFICIAL INSEMINATION PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
SIYOI |
Ksh 1,195,200 |
Comment
|
| 1167 |
FARM EQUIPMENT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 1168 |
ARCARICIDE PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
TAPACH |
Ksh 250,000 |
Comment
|
| 1169 |
ARCARICIDE PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
LELAN |
Ksh 599,634 |
Comment
|
| 1170 |
ARCARICIDE PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
BATEI |
Ksh 300,000 |
Comment
|
| 1171 |
FARM EQUIPMENT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 400,000 |
Comment
|
| 1172 |
ROROK CATTLE DIP PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
BATEI |
Ksh 2,008,659 |
Comment
|
| 1173 |
NYARKULIAN CATTLE DIP PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
TAPACH |
Ksh 1,014,037 |
Comment
|
| 1174 |
KOKWOPTORIR CATTLE DIP PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
LOMUT |
Ksh 300,000 |
Comment
|
| 1175 |
KOROSWO METTALIC CRUSH PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
LOMUT |
Ksh 1,399,700 |
Comment
|
| 1176 |
ARCARICIDE PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 1177 |
ACARICIDE LAND PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
SIYOI |
Ksh 300,000 |
Comment
|
| 1178 |
KOKWOPSIS CATTLE DIP PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
TAPACH |
Ksh 2,400,000 |
Comment
|
| 1179 |
CHEPSURUM METTALIC CRUSH PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
MASOL |
Ksh 1,200,000 |
Comment
|
| 1180 |
KASITOT METTALIC CATTLE CRUSH PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
ALALE |
Ksh 1,195,038 |
Comment
|
| 1181 |
NAKUYEN CATTLE CRUSH PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
SUAM |
Ksh 400,000 |
Comment
|
| 1182 |
REHABILATION OF TAPADANY CATTLE DIPSUAM WARVD |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
SUAM |
Ksh 90,000 |
Comment
|
| 1183 |
CHOROK,CHEPINAT AND SIMOTWO CATTLE DIPS REHABILATATION |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 201,732 |
Comment
|
| 1184 |
CHEPKECHIR CATTLE DIP PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 426,163 |
Comment
|
| 1185 |
PAROO CATTLE DIP PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
WEIWEI |
Ksh 100,003 |
Comment
|
| 1186 |
CHELOPOY ECDE |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
KIWAWA |
Ksh 470,000 |
Comment
|
| 1187 |
AKIRIAMET METALIC CRUSH PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
MASOL |
Ksh 1,119,000 |
Comment
|
| 1188 |
SAMAKITUK CRUSH PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
MASOL |
Ksh 75,000 |
Comment
|
| 1189 |
KAPUSIEN CATTLE DIP PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
TAPACH |
Ksh 1,297,000 |
Comment
|
| 1190 |
SONGOUT METALIC CRUSH PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
RIWO |
Ksh 75,000 |
Comment
|
| 1191 |
CHEPOKORO METALIC CRUSH PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
ALALE |
Ksh 371,748 |
Comment
|
| 1192 |
TAMPALAL CATTLE DIP PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 1193 |
KARAMERI CATTLE CRUSH PROJECT |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 485,000 |
Comment
|
| 1194 |
AKIRIAMET CATTLE DIP RENOVATION |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
BATEI |
Ksh 241,000 |
Comment
|
| 1195 |
CHEPANGANG CATTLE DIP RENOVATION |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
MNAGEI |
Ksh 104,400 |
Comment
|
| 1196 |
LITYEI CATTLE DIP RENOVATION |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
MNAGEI |
Ksh 81,281 |
Comment
|
| 1197 |
BOMA RHODES PURCHASE |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 1198 |
BOMA RHODES PURCHASE |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 1199 |
LACTATING GOATS PURCHASE |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 600,000 |
Comment
|
| 1200 |
GALLA GOATS |
LIVESTOCK, FISHERIES AND VETERINARY SERVICES |
2019-2020 |
Complete
|
SUAM |
Ksh 1,000,000 |
Comment
|
| 1201 |
MASOL WARD OFFICE PROJECT |
CPSM, ICT AND DECENTRALIZED UNITS |
2019-2020 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 1202 |
GOVERNORS OFFICE PUBLIC TOILET PROJECTS |
CPSM, ICT AND DECENTRALIZED UNITS |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 2,099,449 |
Comment
|
| 1203 |
CHEPARERIA TANNERY REFURBISHMENT |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 1,972,028 |
Comment
|
| 1204 |
CHEPARERIA SALE YARD PROJECT |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 657,394 |
Comment
|
| 1205 |
FEASIBILITY AND APPRAISAL STUDIES |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
LOMUT AND LELAN |
Ksh 5,600,000 |
Comment
|
| 1206 |
BENDERA MARKET PROJECT |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 3,415,768 |
Comment
|
| 1207 |
KACHELIBA MARKET PROJECT |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
SUAM |
Ksh 1,822,072 |
Comment
|
| 1208 |
KONYAO MARKET PROJECT |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 146,805 |
Comment
|
| 1209 |
AMAKURIAT MARKET FENCING |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
ALALE |
Ksh 151,000 |
Comment
|
| 1210 |
MAKUTANO CLOTH MARKET PROJECT |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
MNAGEI |
Ksh 5,959,291 |
Comment
|
| 1211 |
KACHELIBA MARKET LAND PURCHASE |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
SUAM |
Ksh 770,000 |
Comment
|
| 1212 |
ENVIRONMENTAL IMPACT ASSESMENT |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
KAPENGURIA, KAPCHOK, LOMUT AND BATEI |
Ksh 1,013,478 |
Comment
|
| 1213 |
KANYARKWAT BODABODA SHADE |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
RIWO |
Ksh 498,916 |
Comment
|
| 1214 |
AMALER MARKET BODABODA SHADE |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
MASOL |
Ksh 499,148 |
Comment
|
| 1215 |
ORTUM BODABODA SHADE |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
BATEI |
Ksh 599,500 |
Comment
|
| 1216 |
KAPSANGAR BODABODA SHADE |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
LELAN |
Ksh 499,450 |
Comment
|
| 1217 |
KONYAO BODABODA SHADE |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 499,954 |
Comment
|
| 1218 |
TIKIT MARKET PROJECT |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
MASOL |
Ksh 3,900,000 |
Comment
|
| 1219 |
AMAKURIAT MARKET FENCING |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
ALALE |
Ksh 151,000 |
Comment
|
| 1220 |
SAFARI HOTEL BODABODA SHADE |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1221 |
CHEPKONO BODABODA SHADE |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 1222 |
CHEPKOPEGH BODA BODA SHED |
Trade, Industrialization and Cooperative Development |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 1223 |
CHEPARERIA YOUTH EMPOWERMENT CENTER PROJECT |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 1,130,677 |
Comment
|
| 1224 |
KAPTABUK ECD CLASSROOM |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
LELAN |
Ksh 891,705 |
Comment
|
| 1225 |
SINTAGH CULTURAL CENTRE PROJECT |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
WEIWEI |
Ksh 159,854 |
Comment
|
| 1226 |
KONYAO SOCIAL HALL RENOVATION |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 200,000 |
Comment
|
| 1227 |
YOUTH EMPOWERMENT CENTRE FENCING |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
MNAGEI |
Ksh 1,889,164 |
Comment
|
| 1228 |
NYARKULIAN PRIMARY SCHOOL FIELD LEVELING |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
TAPACH |
Ksh 2,000,000 |
Comment
|
| 1229 |
MAKUTANO STADIUM(PHASE 11) PROJECT |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
MNAGEI |
Ksh 687,637 |
Comment
|
| 1230 |
TAPACH AND SINA PLAYING FIELD LEVELLING |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
TAPACH |
Ksh 405,079 |
Comment
|
| 1231 |
HEAVY MACHINARY PURCHASE |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 35,100,000 |
Comment
|
| 1232 |
ENVIRONMENTAL IMPACT ASSESSMENT |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
RIWO |
Ksh 1,050,000 |
Comment
|
| 1233 |
TOTUM PRIMARY SCHOOL LEVELLING |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 1234 |
GALIB PRIMARY SCHOOL PLAYGROUND LEVELLING |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 1235 |
AMANGORA PLAYING FIELD LEVELING |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 1236 |
NYARKULIAN PRIMARY AND TANGASIA PRIMARY SPORTS FIELDS GRADING AND LEVELLING |
Tourism, Youths, Culture and Social Services |
2019-2020 |
Complete
|
TAPACH |
Ksh 1,299,200 |
Comment
|
| 1237 |
NAMORU WATER PAN |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 17,000,000 |
Comment
|
| 1238 |
AROR WATER PAN |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
MASOL |
Ksh 17,000,000 |
Comment
|
| 1239 |
KITALAKAPEL BOREHOLE UPGRADING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 1240 |
KAMUNONO GIRLS BOREHAOLE UPGRADING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KASEI |
Ksh 2,000,000 |
Comment
|
| 1241 |
KIWAWA BOYS BOREHAOLE UPGRADING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 1242 |
CHEBONGBONG BOREHAOLE UPGRADING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 1243 |
LOPUNG'O BOREHOLE UPGRADING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 1244 |
CHEBUKAT WATER INTAKE PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
LELAN |
Ksh 1,465,000 |
Comment
|
| 1245 |
TARTAR - KERINGET - KAMOINO EXTENSIONWATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
MNAGEI |
Ksh 2,578,110 |
Comment
|
| 1246 |
MOGHO WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
LOMUT |
Ksh 1,232,790 |
Comment
|
| 1247 |
NASAL WATER PAN DISTILATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
ALALE |
Ksh 1,604,021 |
Comment
|
| 1248 |
BOREHOLE REPAIR MATERIALS |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 1249 |
LOKICHAR AND KOYOLO BOREHOLES REHABILATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 1250 |
CHEPKONO KSAI WATER PROJECT RENOVATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
LELAN |
Ksh 300,000 |
Comment
|
| 1251 |
LOKORNOI WATER SUPPLY PROJECT EXTENSION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
MNAGEI |
Ksh 400,000 |
Comment
|
| 1252 |
MURKWIJIT WATER SPRINGS |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
MNAGEI |
Ksh 250,000 |
Comment
|
| 1253 |
MOSESWO WATER SPRING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
MNAGEI |
Ksh 300,000 |
Comment
|
| 1254 |
SITIT BOREHOLE TO SOLAR POWER UPGRADING PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
SUAM |
Ksh 1,700,000 |
Comment
|
| 1255 |
RUKEI BOREHOLE TO SOLAR UPGRADING PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
ENDUGH |
Ksh 42,000 |
Comment
|
| 1256 |
CHELAGET BOREHOLE PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
MASOL |
Ksh 81,870 |
Comment
|
| 1257 |
LOKITANYALA BOREHOLE TO SOLAR POWERED AND PIPING SYSTEM UPGRADING PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
ALALE |
Ksh 3,000,000 |
Comment
|
| 1258 |
ALALE BOREHALL REPAIR |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
ALALE |
Ksh 599,000 |
Comment
|
| 1259 |
SAND DAM AT SASAK |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
ALALE |
Ksh 699,845 |
Comment
|
| 1260 |
AKWANGA SUBSURFACE DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
ALALE |
Ksh 698,352 |
Comment
|
| 1261 |
LOKITELAUYAN WATER TANKS REPAIR PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
ALALE |
Ksh 495,900 |
Comment
|
| 1262 |
NABWELANGAPERU SAND DAM REHABILITATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
ALALE |
Ksh 399,499 |
Comment
|
| 1263 |
LOWASILE SUBSURFACE DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
ALALE |
Ksh 699,700 |
Comment
|
| 1264 |
SERETOW WATER SUPPLY PROJECT REPAIR |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
ALALE |
Ksh 297,475 |
Comment
|
| 1265 |
CHEPKOTI WATER INTAKE AND PIPING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
SIYOI |
Ksh 849,500 |
Comment
|
| 1266 |
CHEPYOMOT WATER INTAKE PROTECTION PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
SIYOI |
Ksh 199,100 |
Comment
|
| 1267 |
KAPRECH WATER PROJECT RENOVATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
SIYOI |
Ksh 399,930 |
Comment
|
| 1268 |
KONGAI SAND DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KASEI |
Ksh 999,978 |
Comment
|
| 1269 |
NACHECHEYAT RIVER SAND DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KASEI |
Ksh 799,936 |
Comment
|
| 1270 |
MOKONGWO SUB SURFACE DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
SUAM |
Ksh 795,760 |
Comment
|
| 1271 |
KANYALTIN WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
LELAN |
Ksh 1,477,906 |
Comment
|
| 1272 |
REMAA WATER SUPPLY RENOVATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
LELAN |
Ksh 399,120 |
Comment
|
| 1273 |
AMKONGIS SUB SURFACE DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
RIWO |
Ksh 997,000 |
Comment
|
| 1274 |
LOBOK BOREHOLE AND SOLAR PANEL INTSALLATION PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 1,998,000 |
Comment
|
| 1275 |
KODOMUCH BOREHOLE AND SOLAR PANEL PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 1,699,900 |
Comment
|
| 1276 |
NASAKAM BOREHOLE SOLAR PANEL INSTALLATION PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 1,995,000 |
Comment
|
| 1277 |
CHESTA WATER TO CENTRE PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
LOMUT |
Ksh 499,900 |
Comment
|
| 1278 |
MOGHO WATER PIPING AND SUPPLY PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
LOMUT |
Ksh 499,990 |
Comment
|
| 1279 |
KOGHIN WATER INTAKE PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
LOMUT |
Ksh 599,970 |
Comment
|
| 1280 |
ILAKO CHEPOY CHERERIO WATER SUPPLY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
LOMUT |
Ksh 2,500,000 |
Comment
|
| 1281 |
ERELSISIT WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
WEIWEI |
Ksh 1,498,750 |
Comment
|
| 1282 |
NAKWIJIT WATER SUPPLY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 800,000 |
Comment
|
| 1283 |
CHEMAKEU WATER PAN SHALLOW WELL PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 800,000 |
Comment
|
| 1284 |
KOMPAS(TUTURIAMOI)BOREHOLE UPGRADING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 800,000 |
Comment
|
| 1285 |
KRESS SHALLOW DAM PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 829,050 |
Comment
|
| 1286 |
OROLWO WATER SUPPLY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 800,000 |
Comment
|
| 1287 |
CHEPTANY WATER SUPPLY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KAPCHOK |
Ksh 400,000 |
Comment
|
| 1288 |
KAPOROWO WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
TAPACH |
Ksh 499,770 |
Comment
|
| 1289 |
LOKORNOY PIPE EXTENSION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
MNAGEI |
Ksh 497,900 |
Comment
|
| 1290 |
LOMIRO SAND DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KIWAWA |
Ksh 699,927 |
Comment
|
| 1291 |
TILAK/CHEPONGALIT WATER INTAKE WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
KAPENGURIA |
Ksh 499,600 |
Comment
|
| 1292 |
AMKONGIS SUB SURFACE DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 1293 |
MOINO WATER FURROW REHABILITATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
LOMUT |
Ksh 552,130 |
Comment
|
| 1294 |
KALALAKATUT REHABITATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
LOMUT |
Ksh 310,000 |
Comment
|
| 1295 |
CHEMOLO WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
TAPACH |
Ksh 49,500 |
Comment
|
| 1296 |
PTOP WATER SUPPLY PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
TAPACH |
Ksh 221,610 |
Comment
|
| 1297 |
KAMENEYONCHESRA SAND DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
Complete
|
CHEPARERIA |
Ksh 529,540 |
Comment
|
| 1298 |
ORTUM TOWNSHIP ROADS |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
Batei |
Ksh 14,925,488 |
Comment
|
| 1299 |
TAPACH PIT LATRINE |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
Tapach |
Ksh 249,863 |
Comment
|
| 1300 |
CLASSES AT ST.ANTHONY KRIICH BOYS SECONDARY SCHOOL |
Education and Technical Training |
2021-2022 |
Complete
|
Endugh |
Ksh 700,000 |
Comment
|
| 1301 |
CLASSROOM AT TERERO PTOYO GIRLS SECONDARY SCHOOL |
Education and Technical Training |
2021-2022 |
Complete
|
Endugh |
Ksh 500,000 |
Comment
|
| 1302 |
COMPLETION OF SIMAT ECDE |
Education and Technical Training |
2021-2022 |
Complete
|
Sook |
Ksh 600,000 |
Comment
|
| 1303 |
veterinary laboratory in west pokot county |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
Kapenguria |
Ksh 1,389,204 |
Comment
|
| 1304 |
Chepnyal Cattle dip |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
Sook |
Ksh 850,000 |
Comment
|
| 1305 |
COUNTY COMMISIONERS OFFICE |
CPSM, ICT and Decentralized Units |
2021-2022 |
Complete
|
Kapenguria |
Ksh 68,000,000 |
Comment
|
| 1306 |
WARD ADMINISTRATORS OFFICE AT MASOL WARD |
CPSM, ICT and Decentralized Units |
2021-2022 |
Complete
|
Masol |
Ksh 600,000 |
Comment
|
| 1307 |
COOLING PLANT AT MURKWIJIT |
Trade, Industrialization and Cooperative Development |
2021-2022 |
Complete
|
Mnagei |
Ksh 2,887,620 |
Comment
|
| 1308 |
CHEPARERIA TANNERY |
Trade, Industrialization and Cooperative Development |
2021-2022 |
Complete
|
Chepareria |
Ksh 1,972,028 |
Comment
|
| 1309 |
SALE YARD AT CHEPARERIA |
Trade, Industrialization and Cooperative Development |
2021-2022 |
Complete
|
Chepareria |
Ksh 657,394 |
Comment
|
| 1310 |
COTTAGES |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
Kapenguria |
Ksh 8,500,000 |
Comment
|
| 1311 |
CHEPARERIA YOUTH EMPOWERMENT CENTER |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
Chepareria |
Ksh 1,130,678 |
Comment
|
| 1312 |
"ECD CLASSROOM AT KAPTABUK" |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
Lelan |
Ksh 891,698 |
Comment
|
| 1313 |
Proposed Construction of Namoru Water Pan-North pokot Sub -county |
Water, Environment and Natural Resources |
2021-2022 |
Complete
|
Kodich |
Ksh 17,000,000 |
Comment
|
| 1314 |
Proposed Construction Aror water pan-central pokot sub-county |
Water, Environment and Natural Resources |
2021-2022 |
Complete
|
Masol |
Ksh 17,000,000 |
Comment
|
| 1315 |
Construction Of Kemonot Emboasis Mini dam West Pokot sub county |
Water, Environment and Natural Resources |
2021-2022 |
Complete
|
Kapenguria |
Ksh 10,000,000 |
Comment
|
| 1316 |
CONSTRUCTION OF ECDE CLASS ROOMS AT SNUKUR PRIMARY-LOMUT WARD |
Education and Technical Training |
2024-2025 |
Complete
|
Lomut |
Ksh 1,200,000 |
Comment
|
| 1317 |
CONSTRUCTION OF ECDE CLASS ROOMS AT PARASONGA-LOMUT WARD |
Education and Technical Training |
2024-2025 |
Complete
|
Lomut |
Ksh 1,100,000 |
Comment
|
| 1318 |
CONSTRUCTION OF ECDE CLASS ROOMS AT APUK-LELAN WARD |
Education and Technical Training |
2024-2025 |
Complete
|
Lelan |
Ksh 1,000,000 |
Comment
|
| 1319 |
CONSTRUCTION OF SOKA DISPENSARY |
Health and Sanitation |
2024-2025 |
Complete
|
Weiwei |
Ksh 5,000,000 |
Comment
|
| 1320 |
COMPLETION OF STAFF QUATORS AT ONOCH DISPENSARY |
Health and Sanitation |
2024-2025 |
Complete
|
Weiwei |
Ksh 799,977 |
Comment
|
| 1321 |
COMPLETION OF TAKAR DISPENSARY IN WEIWEI WARD |
Health and Sanitation |
2024-2025 |
Complete
|
Weiwei |
Ksh 1,999,950 |
Comment
|
| 1322 |
CONSTRUCTION OF TOILET AT SOKA DISPENSARY WEIWEI WARD |
Health and Sanitation |
2024-2025 |
Complete
|
Weiwei |
Ksh 599,758 |
Comment
|
| 1323 |
MAINTAINANCE OF KAKRESS-PSERO-PTARAKON ROAD- TAPACH WARD |
Public Works, Transport and Infrastructure |
2024-2025 |
Complete
|
Tapach |
Ksh 1,000,000 |
Comment
|
| 1324 |
MAINTENANCE OF SINA -PTOP- TAPACH ROAD IN TAPACH WARD |
Public Works, Transport and Infrastructure |
2024-2025 |
Complete
|
Tapach |
Ksh 1,500,000 |
Comment
|
| 1325 |
MAINTENANCE OF KOKWOPSIS -KAIPAWIS - LOSA ROAD IN TAPACH WARD |
Public Works, Transport and Infrastructure |
2024-2025 |
Complete
|
Tapach |
Ksh 2,000,000 |
Comment
|
| 1326 |
MAINTENANCE OF TAPACH- CHEBON ROAD - TAPACH WARD |
Public Works, Transport and Infrastructure |
2024-2025 |
Complete
|
Tapach |
Ksh 1,950,000 |
Comment
|
| 1327 |
MAINTENANCE OF PARAYON DISPENSARY-CHELAL-KAIPANANER ROAD |
Public Works, Transport and Infrastructure |
2024-2025 |
Complete
|
Tapach |
Ksh 2,949,796 |
Comment
|
| 1328 |
COMPLETTION OF PERIMETER WALL AND GATE |
Finance and Economic Planning |
2024-2025 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 1329 |
KERINGET AGRICULTURAL TRAINING CENTER |
Agriculture and Irrigation |
2017-2018 |
Complete
|
Mnagei |
Ksh 14,678,814 |
Comment
|
| 1330 |
BATEI ONION STORAGE FACILITY |
Agriculture and Irrigation |
2017-2018 |
Complete
|
Batei |
Ksh 5,000,000 |
Comment
|
| 1331 |
Chepareria Sale Yard |
Livestock, Fisheries and Veterinary Services |
2017-2018 |
Complete
|
Chepareria |
Ksh 3,001,800 |
Comment
|
| 1332 |
KACHELIBA SUB COUNTY HOSPITAL |
Health and Sanitation |
2017-2018 |
Complete
|
Suam |
Ksh 5,000,000 |
Comment
|
| 1333 |
COMPLETION OF ICU AND CASUALTY AT KAPENGURIA HOSPITAL |
Health and Sanitation |
2017-2018 |
Complete
|
Kapenguria |
Ksh 44,189,367 |
Comment
|
| 1334 |
KACHELIBA SUB COUNTY HOSPITAL |
Health and Sanitation |
2017-2018 |
Complete
|
Suam |
Ksh 1,000,000 |
Comment
|
| 1335 |
CHEPKACHIM DISPENSARY |
Health and Sanitation |
2017-2018 |
Complete
|
Endugh |
Ksh 2,500,000 |
Comment
|
| 1336 |
SINA-PTOP-TAPACH ROAD |
Public Works, Transport and Infrastructure |
2017-2018 |
Complete
|
Tapach |
Ksh 5,000,000 |
Comment
|
| 1337 |
SIYOI-KAIBOS BRIDGE |
Public Works, Transport and Infrastructure |
2017-2018 |
Complete
|
Siyoi |
Ksh 7,000,000 |
Comment
|
| 1338 |
CHESTA-KOKWORITIT-KAPATET ROAD |
Public Works, Transport and Infrastructure |
2017-2018 |
Complete
|
Lomut |
Ksh 5,000,000 |
Comment
|
| 1339 |
LOMUT-ANNET-KATIUT-CHEPKOKOGH-OTIOT-MARUS ROAD |
Public Works, Transport and Infrastructure |
2017-2018 |
Complete
|
Lomut |
Ksh 5,999,999 |
Comment
|
| 1340 |
NAKWAPUO -CHERANGAN-NAKWIJIT ROAD |
Public Works, Transport and Infrastructure |
2017-2018 |
Complete
|
Kodich |
Ksh 5,000,000 |
Comment
|
| 1341 |
Ministry of Education Administration Block |
Education and Technical Training |
2017-2018 |
Complete
|
Kapenguria |
Ksh 20,000,000 |
Comment
|
| 1342 |
Kanyerus Primary |
Education and Technical Training |
2017-2018 |
Complete
|
Suam |
Ksh 15,000,000 |
Comment
|
| 1343 |
Akulo Border School |
Education and Technical Training |
2017-2018 |
Complete
|
Masol |
Ksh 15,000,000 |
Comment
|
| 1344 |
Katikomor Border School |
Education and Technical Training |
2017-2018 |
Complete
|
Riwo |
Ksh 15,000,000 |
Comment
|
| 1345 |
Construction /Renovation of Ortum Polytechnic(dinning kitchen hall) |
Education and Technical Training |
2017-2018 |
Complete
|
Batei |
Ksh 4,000,000 |
Comment
|
| 1346 |
Chepareria Polytechnic |
Education and Technical Training |
2017-2018 |
Complete
|
Chepareria |
Ksh 2,000,000 |
Comment
|
| 1347 |
AMAKURIAT BODA BODA SHED |
Trade, Industrialization and Cooperative Development |
2017-2018 |
Complete
|
Alale |
Ksh 500,000 |
Comment
|
| 1348 |
PROPOSED CONSTRUCTION OF TOILET AT MORTOME DISPENSARY IN MNAGEI WARD |
Health and Sanitation |
2025-2026 |
Complete
|
MNANGEI |
Ksh 400,000 |
Comment
|
| 1349 |
COMPLETION OF MAKUTANO HEALTH CENTRE PHASE II (ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
MNANGEI |
Ksh 32,000,000 |
Comment
|
| 1350 |
COMPLETION OF RADIOLOGY AT KCRH(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 20,000,000 |
Comment
|
| 1351 |
RENOVATION OF ORWA DISPENSARY-SEKERR WARD |
Health and Sanitation |
2025-2026 |
Complete
|
SEKERR |
Ksh 900,000 |
Comment
|
| 1352 |
CONSTRUCTION OF STAFF QUARTERS AT CHUWAI DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
KIWAWA |
Ksh 1,500,000 |
Comment
|
| 1353 |
COMPLETION OF KAPCHEMOGEN DISPENSARY-BATEI WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
BATEI |
Ksh 3,000,000 |
Comment
|
| 1354 |
PROPOSED FENCING OF KANYERUS DISPENSARY-SUAM WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
SUAM |
Ksh 1,000,000 |
Comment
|
| 1355 |
CONSTRUCTION OF TOILET AT KETIAM DISPENSARY-ENDUGH WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
ENDUGH |
Ksh 700,000 |
Comment
|
| 1356 |
COMPLETION AND OPERALIZATION OF KOCHIY DISPENSARY-BATEI WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
BATEI |
Ksh 2,000,000 |
Comment
|
| 1357 |
COMPLETION OF KASOPIT DISPENSARY -KASEI WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
KASEI |
Ksh 2,000,000 |
Comment
|
| 1358 |
COMPLETION OF KESOT DISPENSARY ENDUGH WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
ENDUGH |
Ksh 300,000 |
Comment
|
| 1359 |
COMPLETION OF OPD AT KETIAM DISPENSARY-ENDUGH WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
ENDUGH |
Ksh 400,000 |
Comment
|
| 1360 |
PROPOSED COMPLETION OF KAMILA GOK KAMILA DISPENSARY MATERNITY WING-KIWAWA WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 1361 |
PROPOSED ACCESS ROAD,DRAINAGE WORKS AND SENTRY BOX AT KCRH IN MODERN MORTUARY |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 5,000,000 |
Comment
|
| 1362 |
PROPOSED SEPTIC TANK,TOILET BLOCK AND RETAINING WALL AT KCRH MODERN MORTUARY |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 5,000,000 |
Comment
|
| 1363 |
PROPOSED CHAPEL,FENCING AND EXTERNAL WORKS AT KCRH MODERN MORTUARY |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 5,000,000 |
Comment
|
| 1364 |
PROPOSED EQUIPPING OF MODERN MORGUE AT KAPENGURIA REFFERAL HOSPITAL |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 20,000,000 |
Comment
|
| 1365 |
EQUIPPING OF SONDANY AND PARAYON MATERNITY WINGS IN TAPACH WARD |
Health and Sanitation |
2025-2026 |
Complete
|
TAPACH |
Ksh 499,500 |
Comment
|
| 1366 |
EQUIPPING OF KAURIONG HEALTH CENTRE IN KIWAWA WARD |
Health and Sanitation |
2025-2026 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 1367 |
EQUIPPING OF KOMOL MATERNITY WING IN KAPENGURIA |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 1368 |
PURCHASE OF MAMA KITS TO KODICH DISPENSARIES IN KODICH WARD |
Health and Sanitation |
2025-2026 |
Complete
|
KODICH |
Ksh 700,000 |
Comment
|
| 1369 |
PURCHASE AND SUPPLY OF MEDICAL EQUIPMENTS TO CHEPKECHIR MATERNITY IN KAPENGURIA |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 1370 |
PURCHASE AND SUPPLY OF MEDICAL EQUIPMENTS TO KAPKORIS MATERNITY IN KAPENGURIA |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 1371 |
EQUIPPING OF MALE WARD AND PAEDIATRIC WARDS AT KACHELIBA SUB-COUNTIES HOSPITAL |
Health and Sanitation |
2025-2026 |
Complete
|
SUAM |
Ksh 3,000,000 |
Comment
|
| 1372 |
EQUIPPING OF CHEPARERIA EYE UNIT |
Health and Sanitation |
2025-2026 |
Complete
|
Chepareria |
Ksh 1,500,000 |
Comment
|
| 1373 |
PROPOSED CONSTRUCTION OF A TWO DOOR PIT LATRINE AND URINAL BLOCK AT OTIOT DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
LOMUT |
Ksh 300,000 |
Comment
|
| 1374 |
PROPOSED CONSTRUCTION OF A TWO DOOR PIT LATRINE AND URINAL BLOCK AT KONA DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
LOMUT |
Ksh 300,000 |
Comment
|
| 1375 |
COMPLETION OF MATERNITY AT KSERA DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,500,000 |
Comment
|
| 1376 |
Completion of Adurkoit Dispensary- Riwo Ward |
Health and Sanitation |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 1377 |
Construction of A Dispensary at Kaitukum- Riwo Ward |
Health and Sanitation |
2025-2026 |
Complete
|
RIWO |
Ksh 3,000,000 |
Comment
|
| 1378 |
Construction of Dispensary at Murian-Batei Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Batei |
Ksh 3,000,000 |
Comment
|
| 1379 |
Completion of Works at Kapara Dispensary-Batei Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Batei |
Ksh 1,000,000 |
Comment
|
| 1380 |
Completion of Maternity Wing at Kapkaremba |
Health and Sanitation |
2025-2026 |
Complete
|
Batei |
Ksh 2,500,000 |
Comment
|
| 1381 |
Completion of Dispensary at Kasesim-Kapenguria Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Chepareria |
Ksh 500,000 |
Comment
|
| 1382 |
Construction Paroo Dispensary Weiwei Ward |
Health and Sanitation |
2025-2026 |
Complete
|
WEIWEI |
Ksh 2,000,000 |
Comment
|
| 1383 |
Fencing of Amoler DispensaryMasol Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Masol |
Ksh 300,000 |
Comment
|
| 1384 |
Construction of 3 Door Toilet at Dungdung Dispensary-Masol Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Masol |
Ksh 400,000 |
Comment
|
| 1385 |
Construction of Dispensary at Amolem -Masol ward |
Health and Sanitation |
2025-2026 |
Complete
|
Masol |
Ksh 1,800,000 |
Comment
|
| 1386 |
Completion of Maternity Wing and Renovation of Septic Tank at Kaibos dispensary Siyoi wrd |
Health and Sanitation |
2025-2026 |
Complete
|
SIYOI |
Ksh 1,300,000 |
Comment
|
| 1387 |
Renovation of Karameri Dispensary -Kodich Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Kodich |
Ksh 800,000 |
Comment
|
| 1388 |
Completion, Equipping, of Chepsukun Dispensary and Construction of Toilet at Chepsukun dispensary in kodich ward |
Health and Sanitation |
2025-2026 |
Complete
|
Kodich |
Ksh 2,500,000 |
Comment
|
| 1389 |
Completion of Maternity Wing at Chesupet Dispensary-Lelan Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Lelan |
Ksh 1,000,000 |
Comment
|
| 1390 |
Completion of pusian dispensary in Shalpogh locatiob |
Health and Sanitation |
2025-2026 |
Complete
|
Chepareria |
Ksh 2,000,000 |
Comment
|
| 1391 |
Construction of Pit Latrine at Senetow in chapareria ward |
Health and Sanitation |
2025-2026 |
Complete
|
Chepareria |
Ksh 1,500,000 |
Comment
|
| 1392 |
Fencing of Mortome Dispensary and Kanglikwan Dispensary Mnagei Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Mnangei |
Ksh 600,000 |
Comment
|
| 1393 |
Completion of Nasuret Dispensary-Alale Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Alale |
Ksh 1,000,000 |
Comment
|
| 1394 |
Construction of Pit Latrine at Lengorok dispensary in alale Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Alale |
Ksh 500,000 |
Comment
|
| 1395 |
Fencing of Ausikuyon Dispensary- Riwo Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Riwo |
Ksh 500,000 |
Comment
|
| 1396 |
Construction of maternity wing at marich health centre |
Health and Sanitation |
2025-2026 |
Complete
|
Sekerr |
Ksh 5,000,000 |
Comment
|
| 1397 |
Completion of Paraywa Dispensary at Siyoi Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Siyoi |
Ksh 1,300,000 |
Comment
|
| 1398 |
Construction of Dispensary at Temo |
Health and Sanitation |
2025-2026 |
Complete
|
Riwo |
Ksh 3,000,000 |
Comment
|
| 1399 |
Replacement of Asbestos at Tamugh dispensary in sook ward |
Health and Sanitation |
2025-2026 |
Complete
|
Sook |
Ksh 1,500,000 |
Comment
|
| 1400 |
Completion of Chepnyal Dispensary-Sook Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Sook |
Ksh 1,000,000 |
Comment
|
| 1401 |
Construction of Staff Quarters at Mungit Dispensary-Sook Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Sook |
Ksh 1,000,000 |
Comment
|
| 1402 |
Renovation of Kamelei Dispensary ,Kamelei sub-location in Tapach ward |
Health and Sanitation |
2025-2026 |
Complete
|
Tapach |
Ksh 800,000 |
Comment
|
| 1403 |
Completion of Lokornoi Dispensary in Mnangei ward |
Health and Sanitation |
2025-2026 |
Complete
|
Mnangei |
Ksh 800,000 |
Comment
|
| 1404 |
Construction of Dispensary at Kopoch-Kapenguria Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 1405 |
Construction of Septic Tank at Kapkoris dispensary in Kapenguria ward |
Health and Sanitation |
2025-2026 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 1406 |
Fencing Alale Health Centre- Alale in Alale ward |
Health and Sanitation |
2025-2026 |
Complete
|
Alale |
Ksh 1,500,000 |
Comment
|
| 1407 |
Construection of dispensary at Temon-Sekerr ward |
Health and Sanitation |
2025-2026 |
Complete
|
Sekerr |
Ksh 5,000,000 |
Comment
|
| 1408 |
Construction of dispensary at Amolem-Sekerr ward |
Health and Sanitation |
2025-2026 |
Complete
|
Sekerr |
Ksh 5,000,000 |
Comment
|
| 1409 |
Construction of 3 door toilet at dungdung -Maol ward |
Health and Sanitation |
2025-2026 |
Complete
|
Masol |
Ksh 400,000 |
Comment
|
| 1410 |
Fencing of amoler dispensary -Masol ward |
Health and Sanitation |
2025-2026 |
Complete
|
Masol |
Ksh 300,000 |
Comment
|
| 1411 |
Construction of dispensary at Marich A 1 -Sekerr ward |
Health and Sanitation |
2025-2026 |
Complete
|
Sekerr |
Ksh 5,000,000 |
Comment
|
| 1412 |
WATER CONNECTIVITY AT TALAU DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
SIYOI WARD |
Ksh 400,000 |
Comment
|
| 1413 |
PROPOSED COMPLETION OF LOKORNOI DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
MNAGEI WARD |
Ksh 1,200,000 |
Comment
|
| 1414 |
PROPOSED COMPLETION OF LOKORNOI DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
MANAGEI WARD |
Ksh 600,000 |
Comment
|
| 1415 |
WATER CONNECTIVITY AT KAIBOS MATERNITY WING |
Health and Sanitation |
2025-2026 |
Complete
|
SIYOI WARD |
Ksh 400,000 |
Comment
|
| 1416 |
PROPOSED CONSTRUCTION OF TOILET AT MORTOME DISPENSARY IN MNAGEI WARD |
Health and Sanitation |
2025-2026 |
Complete
|
MNANGEI |
Ksh 400,000 |
Comment
|
| 1417 |
COMPLETION OF MAKUTANO HEALTH CENTRE PHASE II (ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
MNANGEI |
Ksh 32,000,000 |
Comment
|
| 1418 |
COMPLETION OF RADIOLOGY AT KCRH(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 20,000,000 |
Comment
|
| 1419 |
RENOVATION OF ORWA DISPENSARY-SEKERR WARD |
Health and Sanitation |
2025-2026 |
Complete
|
SEKERR |
Ksh 900,000 |
Comment
|
| 1420 |
CONSTRUCTION OF STAFF QUARTERS AT CHUWAI DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
KIWAWA |
Ksh 1,500,000 |
Comment
|
| 1421 |
COMPLETION OF KAPCHEMOGEN DISPENSARY-BATEI WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
BATEI |
Ksh 3,000,000 |
Comment
|
| 1422 |
PROPOSED FENCING OF KANYERUS DISPENSARY-SUAM WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
SUAM |
Ksh 1,000,000 |
Comment
|
| 1423 |
CONSTRUCTION OF TOILET AT KETIAM DISPENSARY-ENDUGH WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
ENDUGH |
Ksh 700,000 |
Comment
|
| 1424 |
COMPLETION AND OPERALIZATION OF KOCHIY DISPENSARY-BATEI WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
BATEI |
Ksh 2,000,000 |
Comment
|
| 1425 |
COMPLETION OF KASOPIT DISPENSARY -KASEI WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
KASEI |
Ksh 2,000,000 |
Comment
|
| 1426 |
COMPLETION OF KESOT DISPENSARY ENDUGH WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
ENDUGH |
Ksh 300,000 |
Comment
|
| 1427 |
COMPLETION OF OPD AT KETIAM DISPENSARY-ENDUGH WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
ENDUGH |
Ksh 400,000 |
Comment
|
| 1428 |
PROPOSED COMPLETION OF KAMILA GOK KAMILA DISPENSARY MATERNITY WING-KIWAWA WARD(ROLL OVER) |
Health and Sanitation |
2025-2026 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 1429 |
PROPOSED ACCESS ROAD,DRAINAGE WORKS AND SENTRY BOX AT KCRH IN MODERN MORTUARY |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 5,000,000 |
Comment
|
| 1430 |
PROPOSED SEPTIC TANK,TOILET BLOCK AND RETAINING WALL AT KCRH MODERN MORTUARY |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 5,000,000 |
Comment
|
| 1431 |
PROPOSED CHAPEL,FENCING AND EXTERNAL WORKS AT KCRH MODERN MORTUARY |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 5,000,000 |
Comment
|
| 1432 |
PROPOSED EQUIPPING OF MODERN MORGUE AT KAPENGURIA REFFERAL HOSPITAL |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 20,000,000 |
Comment
|
| 1433 |
EQUIPPING OF SONDANY AND PARAYON MATERNITY WINGS IN TAPACH WARD |
Health and Sanitation |
2025-2026 |
Complete
|
TAPACH |
Ksh 499,500 |
Comment
|
| 1434 |
EQUIPPING OF KAURIONG HEALTH CENTRE IN KIWAWA WARD |
Health and Sanitation |
2025-2026 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 1435 |
EQUIPPING OF KOMOL MATERNITY WING IN KAPENGURIA |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 1436 |
PURCHASE OF MAMA KITS TO KODICH DISPENSARIES IN KODICH WARD |
Health and Sanitation |
2025-2026 |
Complete
|
KODICH |
Ksh 700,000 |
Comment
|
| 1437 |
PURCHASE AND SUPPLY OF MEDICAL EQUIPMENTS TO CHEPKECHIR MATERNITY IN KAPENGURIA |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 1438 |
PURCHASE AND SUPPLY OF MEDICAL EQUIPMENTS TO KAPKORIS MATERNITY IN KAPENGURIA |
Health and Sanitation |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 1439 |
EQUIPPING OF MALE WARD AND PAEDIATRIC WARDS AT KACHELIBA SUB-COUNTIES HOSPITAL |
Health and Sanitation |
2025-2026 |
Complete
|
SUAM |
Ksh 3,000,000 |
Comment
|
| 1440 |
EQUIPPING OF CHEPARERIA EYE UNIT |
Health and Sanitation |
2025-2026 |
Complete
|
Chepareria |
Ksh 1,500,000 |
Comment
|
| 1441 |
PROPOSED CONSTRUCTION OF A TWO DOOR PIT LATRINE AND URINAL BLOCK AT OTIOT DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
LOMUT |
Ksh 300,000 |
Comment
|
| 1442 |
PROPOSED CONSTRUCTION OF A TWO DOOR PIT LATRINE AND URINAL BLOCK AT KONA DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
LOMUT |
Ksh 300,000 |
Comment
|
| 1443 |
COMPLETION OF MATERNITY AT KSERA DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,500,000 |
Comment
|
| 1444 |
Completion of Adurkoit Dispensary- Riwo Ward |
Health and Sanitation |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 1445 |
Construction of A Dispensary at Kaitukum- Riwo Ward |
Health and Sanitation |
2025-2026 |
Complete
|
RIWO |
Ksh 3,000,000 |
Comment
|
| 1446 |
Construction of Dispensary at Murian-Batei Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Batei |
Ksh 3,000,000 |
Comment
|
| 1447 |
Completion of Works at Kapara Dispensary-Batei Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Batei |
Ksh 1,000,000 |
Comment
|
| 1448 |
Completion of Maternity Wing at Kapkaremba |
Health and Sanitation |
2025-2026 |
Complete
|
Batei |
Ksh 2,500,000 |
Comment
|
| 1449 |
Completion of Dispensary at Kasesim-Kapenguria Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Chepareria |
Ksh 500,000 |
Comment
|
| 1450 |
Construction Paroo Dispensary Weiwei Ward |
Health and Sanitation |
2025-2026 |
Complete
|
WEIWEI |
Ksh 2,000,000 |
Comment
|
| 1451 |
Fencing of Amoler DispensaryMasol Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Masol |
Ksh 300,000 |
Comment
|
| 1452 |
Construction of 3 Door Toilet at Dungdung Dispensary-Masol Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Masol |
Ksh 400,000 |
Comment
|
| 1453 |
Construction of Dispensary at Amolem -Masol ward |
Health and Sanitation |
2025-2026 |
Complete
|
Masol |
Ksh 1,800,000 |
Comment
|
| 1454 |
Completion of Maternity Wing and Renovation of Septic Tank at Kaibos dispensary Siyoi wrd |
Health and Sanitation |
2025-2026 |
Complete
|
SIYOI |
Ksh 1,300,000 |
Comment
|
| 1455 |
Renovation of Karameri Dispensary -Kodich Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Kodich |
Ksh 800,000 |
Comment
|
| 1456 |
Completion, Equipping, of Chepsukun Dispensary and Construction of Toilet at Chepsukun dispensary in kodich ward |
Health and Sanitation |
2025-2026 |
Complete
|
Kodich |
Ksh 2,500,000 |
Comment
|
| 1457 |
Completion of Maternity Wing at Chesupet Dispensary-Lelan Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Lelan |
Ksh 1,000,000 |
Comment
|
| 1458 |
Completion of pusian dispensary in Shalpogh locatiob |
Health and Sanitation |
2025-2026 |
Complete
|
Chepareria |
Ksh 2,000,000 |
Comment
|
| 1459 |
Construction of Pit Latrine at Senetow in chapareria ward |
Health and Sanitation |
2025-2026 |
Complete
|
Chepareria |
Ksh 1,500,000 |
Comment
|
| 1460 |
Fencing of Mortome Dispensary and Kanglikwan Dispensary Mnagei Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Mnangei |
Ksh 600,000 |
Comment
|
| 1461 |
Completion of Nasuret Dispensary-Alale Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Alale |
Ksh 1,000,000 |
Comment
|
| 1462 |
Construction of Pit Latrine at Lengorok dispensary in alale Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Alale |
Ksh 500,000 |
Comment
|
| 1463 |
Fencing of Ausikuyon Dispensary- Riwo Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Riwo |
Ksh 500,000 |
Comment
|
| 1464 |
Construction of maternity wing at marich health centre |
Health and Sanitation |
2025-2026 |
Complete
|
Sekerr |
Ksh 5,000,000 |
Comment
|
| 1465 |
Completion of Paraywa Dispensary at Siyoi Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Siyoi |
Ksh 1,300,000 |
Comment
|
| 1466 |
Construction of Dispensary at Temo |
Health and Sanitation |
2025-2026 |
Complete
|
Riwo |
Ksh 3,000,000 |
Comment
|
| 1467 |
Replacement of Asbestos at Tamugh dispensary in sook ward |
Health and Sanitation |
2025-2026 |
Complete
|
Sook |
Ksh 1,500,000 |
Comment
|
| 1468 |
Completion of Chepnyal Dispensary-Sook Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Sook |
Ksh 1,000,000 |
Comment
|
| 1469 |
Construction of Staff Quarters at Mungit Dispensary-Sook Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Sook |
Ksh 1,000,000 |
Comment
|
| 1470 |
Renovation of Kamelei Dispensary ,Kamelei sub-location in Tapach ward |
Health and Sanitation |
2025-2026 |
Complete
|
Tapach |
Ksh 800,000 |
Comment
|
| 1471 |
Completion of Lokornoi Dispensary in Mnangei ward |
Health and Sanitation |
2025-2026 |
Complete
|
Mnangei |
Ksh 800,000 |
Comment
|
| 1472 |
Construction of Dispensary at Kopoch-Kapenguria Ward |
Health and Sanitation |
2025-2026 |
Complete
|
Kapenguria |
Ksh 2,000,000 |
Comment
|
| 1473 |
Construction of Septic Tank at Kapkoris dispensary in Kapenguria ward |
Health and Sanitation |
2025-2026 |
Complete
|
Kapenguria |
Ksh 500,000 |
Comment
|
| 1474 |
Fencing Alale Health Centre- Alale in Alale ward |
Health and Sanitation |
2025-2026 |
Complete
|
Alale |
Ksh 1,500,000 |
Comment
|
| 1475 |
CONSTRUCTION OF STAFF HOUSE AT PARUA DISPENSARY IN BATEI WARD |
Health and Sanitation |
2025-2026 |
Complete
|
BATEI |
Ksh 3,000,000 |
Comment
|
| 1476 |
Construection of dispensary at Temon-Sekerr ward |
Health and Sanitation |
2025-2026 |
Complete
|
Sekerr |
Ksh 5,000,000 |
Comment
|
| 1477 |
Construction of dispensary at Amolem-Sekerr ward |
Health and Sanitation |
2025-2026 |
Complete
|
Sekerr |
Ksh 5,000,000 |
Comment
|
| 1478 |
Construction of 3 door toilet at dungdung -Maol ward |
Health and Sanitation |
2025-2026 |
Complete
|
Masol |
Ksh 400,000 |
Comment
|
| 1479 |
Fencing of amoler dispensary -Masol ward |
Health and Sanitation |
2025-2026 |
Complete
|
Masol |
Ksh 300,000 |
Comment
|
| 1480 |
Construction of dispensary at Marich A 1 -Sekerr ward |
Health and Sanitation |
2025-2026 |
Complete
|
Sekerr |
Ksh 5,000,000 |
Comment
|
| 1481 |
WATER CONNECTIVITY AT TALAU DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
SIYOI WARD |
Ksh 400,000 |
Comment
|
| 1482 |
PROPOSED COMPLETION OF LOKORNOI DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
MNAGEI WARD |
Ksh 1,200,000 |
Comment
|
| 1483 |
PROPOSED COMPLETION OF LOKORNOI DISPENSARY |
Health and Sanitation |
2025-2026 |
Complete
|
MANAGEI WARD |
Ksh 600,000 |
Comment
|
| 1484 |
WATER CONNECTIVITY AT KAIBOS MATERNITY WING |
Health and Sanitation |
2025-2026 |
Complete
|
SIYOI WARD |
Ksh 400,000 |
Comment
|
| 1485 |
COMPLETION OF KAPKORIS WATER PROJECT -KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 2,500,000 |
Comment
|
| 1486 |
DISTRIBUTION OF WATER TO MAKUTANO STADIUM, HEALTH CENTRE AND SUB-COUNTY OFFICE-MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 1487 |
COMPLETION OF TORION KAPILAT NYARPAT WATER PROJECT(RESERVOIR TANK AND DISTRIBUTION)-TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
TAPACH |
Ksh 5,000,000 |
Comment
|
| 1488 |
PURCHASE AND DISTRIBUTION OF 40 (10000L)WATER TANKS ACROSS THE COUNTY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
ALL WARDS |
Ksh 2,598,000 |
Comment
|
| 1489 |
PURCHASE OF PIPES FOR REPAIR OF BOREHOLES |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 3,000,000 |
Comment
|
| 1490 |
PIPING OF MBARA WATER GRAVITY PROJECT-SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SEKERR |
Ksh 2,000,000 |
Comment
|
| 1491 |
CONSTRUCTION OF LATRINE AT THE DEPARTMENT HEADQUATERS |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 1492 |
UPGRADING OF KASEI BOREHOLE TO SOLAR POWER (PENDING BILL) -KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KASEI |
Ksh 1,704,985 |
Comment
|
| 1493 |
INTAKE PROTECTION WORKS FOR CHEPOSOIT WATER AT MNAGEI WARD (PENDING BILL) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MNAGEI |
Ksh 499,900 |
Comment
|
| 1494 |
DRILLING OF BOREHOLE AT LOBOT,KASEI WARD(PENDING BILL) (MOKS CONSTRUCTION ENTERPRISE LIMITED) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KASEI |
Ksh 1,999,950 |
Comment
|
| 1495 |
REPAIR OF KATLAL WATER PROJECT AT SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SIYOI |
Ksh 2,000,000 |
Comment
|
| 1496 |
SUPPLY OF RIG ACCESSORIES(PENDING BILL TO PRD) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 1497 |
DRILLING BOREHOLE AT ROROW- KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 1498 |
CONSTRUCTION OF A SAND DAM AT CHEPONYORIO- KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KIWAWA |
Ksh 800,000 |
Comment
|
| 1499 |
CONSTRUCTION OF A SAND DAM AT KAPETA- KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KIWAWA |
Ksh 800,000 |
Comment
|
| 1500 |
CONSTRUCTION OF A SAND DAM AT SIYOYOWO- KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KIWAWA |
Ksh 800,000 |
Comment
|
| 1501 |
CONSTRUCTION OF A SAND DAM AT NAKETIMON- KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KIWAWA |
Ksh 800,000 |
Comment
|
| 1502 |
PURCHASE AND SUPPLY OF BOREHOLE PIPES FOR THE ENTIRE WARD- KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KIWAWA |
Ksh 1,500,000 |
Comment
|
| 1503 |
CONSTRUCTION OF ONE (100,000 LTRS) MASONRY WATER TANKS AT ATANIA NGORIARITA FARM-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 1504 |
CONSTRUCTION OF ONE (100,000 LTRS) MASONRY WATER TANKS AT CHEROPIO FARM-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 1505 |
CONSTRUCTION OF ONE (100,000 LTRS) MASONRY WATER TANKS AT CHEMWOROKOI FARM-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 1506 |
CONSTRUCTION OF ONE (100,000 LTRS) MASONRY WATER TANKS AT TUKUMWOKO MADAM CHEPKITE-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 1507 |
DRILLING OF A BOREHOLE AT CHESUYU- KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 1508 |
SUPPLY OF WATER PIPES ACROSS MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 1509 |
SOLAR INSTALLATION AT CHEPTUYA BOREHOLE-MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 1510 |
PURCHASE AND SUPPLY OF WATER PIPES FOR FARMERS-SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SEKERRR |
Ksh 1,500,000 |
Comment
|
| 1511 |
FENCING BY CONCRETE WALL OF CHESIRON WATER RESERVOIR-SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SOOK |
Ksh 1,500,000 |
Comment
|
| 1512 |
PURCHASE OF BOREHOLE REPAIR MATERIALS ACROSS SOOK WARD-SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SOOK |
Ksh 1,500,000 |
Comment
|
| 1513 |
PURCHASE AND DISTRIBUTION OF TREE SEEDLINGS -SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SOOK |
Ksh 2,000,000 |
Comment
|
| 1514 |
PURCHASE AND SUPPLY OF WATER PIPES-SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SOOK |
Ksh 3,000,000 |
Comment
|
| 1515 |
REHABILITATION OF KUYOGH WATER TANK( SUBUKWO LOCATION)-BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
BATEI |
Ksh 800,000 |
Comment
|
| 1516 |
PIPING OF WATER AT TILAK-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 1517 |
CONSTRUCTION OF WATER PROJECT AT NGOLEYO-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1518 |
PIPING OF KAUK – KSERA DISPENSARY – KSERA CENTER – KOKWOSOYWO ECDE WATER AT MOSOP LOCATION-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LOMUT |
Ksh 700,000 |
Comment
|
| 1519 |
PIPING OF KASAMUGH – SUSUK WATER AT CHEPKOKOGH LOCATION-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LOMUT |
Ksh 800,000 |
Comment
|
| 1520 |
CONSTRUCTION OF AIMAT WATER SUPPLY-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LOMUT |
Ksh 800,000 |
Comment
|
| 1521 |
PIPING OF SAKAT – PONI WATER SUPPLY AT MOSOP LOCATION-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LOMUT |
Ksh 800,000 |
Comment
|
| 1522 |
PIPING OF CHEPEMOI – CHORWA-KUSUPKO CENTER WATER SUPPLY MOSOP LOCATION-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LOMUT |
Ksh 800,000 |
Comment
|
| 1523 |
COMPLETION OF MNOPOI WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LELAN |
Ksh 550,000 |
Comment
|
| 1524 |
PIPING OF WATER FROM YILA KOCHEPOY MAIN TANK – ANTI-MALARIA- KANGALAN WATER POINT LOMUT LOCATION-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 1525 |
PIPING OF KORORA – CHESTA – PARKINO WATER SUPPLY-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,200,000 |
Comment
|
| 1526 |
DRILLING OF BOREHOLE AT CHEPELION-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MASOL |
Ksh 1,200,000 |
Comment
|
| 1527 |
CONSTRUCTION OF WATER PAN AT ORON-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MASOL |
Ksh 2,000,000 |
Comment
|
| 1528 |
DRILLING OF BOREHOLE AT AMOLEM-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MASOL |
Ksh 1,200,000 |
Comment
|
| 1529 |
DRILLING OF BOREHOLE AT CHEPANYINDA-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MASOL |
Ksh 1,200,000 |
Comment
|
| 1530 |
DRILLING OF BOREHOLE AT NARUKUMO-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MASOL |
Ksh 1,200,000 |
Comment
|
| 1531 |
RENOVATION OF SHALLOW WELLS ALONG KANYANGARENG RIVER KAPCHOK |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 1532 |
DRILLING OF BOREHOLE AT SERETION-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MASOL |
Ksh 1,200,000 |
Comment
|
| 1533 |
DRILLING OF A BOREHOLE AT PARAYWA TO SERVE PARAYWA DISPENSARY, PARAYWA PRIMARY SCHOOL, PARAYWA SECONDARY SCHOOL, AND PARAYWA TRADING CENTRE, KAISAKAT LOCATION, SIYOI WARD. |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SIYOI |
Ksh 2,000,000 |
Comment
|
| 1534 |
PIPING OF WATER FROM TARURU WATER SPRING TO THE TANK AT KORPUN AND A TAP AT KORPUN PRIMARY AND KORPUN’S CHIEFS OFFICE, KAISAKAT LOCATION-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 1535 |
RENOVATION OF WATER SOURCE AT PUTEREN, INSTALLATION OF 2 TANKS AND PIPING OF WATER TO TILAK AND PCHAU VILLAGES |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SIYOI |
Ksh 1,250,000 |
Comment
|
| 1536 |
CONSTRUCTION OF 30,0000 LITRES MASONARY TANK AT KATLAL |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 1537 |
CONSTRUCTION OF SAND DAM AT NAMADERA-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SUAM |
Ksh 900,000 |
Comment
|
| 1538 |
DRILLING OF BOREHOLE AT LOTELEMOI-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 1539 |
DRILLING OF BOREHOLE AT NAKERE-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 1540 |
INSTALLATION OF SOLAR AT KASIYOYOWO BOREHOLE-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SUAM |
Ksh 2,300,000 |
Comment
|
| 1541 |
INSTALLATION OF SOLAR AT TAPADANY BOREHOLE-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SUAM |
Ksh 2,300,000 |
Comment
|
| 1542 |
INSTALLATION OF SOLAR AT LAKATET BOREHOLE-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SUAM |
Ksh 2,300,000 |
Comment
|
| 1543 |
DISTILLATION OF LOKICHAR DAM-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KODICH |
Ksh 1,500,000 |
Comment
|
| 1544 |
CONSTRUCTION OF SAND DAM AT KAPRUM KARAMERI-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KODICH |
Ksh 700,000 |
Comment
|
| 1545 |
RENOVATION AND MAINTENANCE OF CHEPANGAU BOREHOLE-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KODICH |
Ksh 800,000 |
Comment
|
| 1546 |
SUPPLY OF 32MM DIAMETER HDPE PIPES-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LELAN |
Ksh 1,500,000 |
Comment
|
| 1547 |
REHABILITATION OF KARORON BOREHOLE SOLAR IN KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KODICH |
Ksh 800,000 |
Comment
|
| 1548 |
REHABILITATION OF SOLAR AT AROL BOREHOLE- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KODICH |
Ksh 800,000 |
Comment
|
| 1549 |
REPAIR OF KAPUL, KAPKOROSIN AND CHEPONGPONG BOREHOE-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KODICH |
Ksh 900,000 |
Comment
|
| 1550 |
REPAIR OF OROLWO AND NAKWAPUO SOLAR-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KODICH |
Ksh 1,000,000 |
Comment
|
| 1551 |
CONSTRUCTION AND PIPING OF INTAKE AT CHEPYEMUT WATER PROJECT-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LELAN |
Ksh 600,000 |
Comment
|
| 1552 |
SUPPLY OF KENTANKS AT KAPTALA-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LELAN |
Ksh 250,000 |
Comment
|
| 1553 |
SUPPLY OF KENTANKS AT MANIAN-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LELAN |
Ksh 250,000 |
Comment
|
| 1554 |
PURCHASE AND SUPPLY OF WATER PIPES FOR TAPACH WARD--TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
TAPACH |
Ksh 1,500,000 |
Comment
|
| 1555 |
PURCHASE AND DISTRIBUTION OF TREE SEEDLINGS IN THE WHOLE WARD-TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
TAPACH |
Ksh 1,500,000 |
Comment
|
| 1556 |
COMPLETION OF KINDO-LIMARENG WATER PROJECT, PSERUM LOCATION-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 1557 |
DRILLING OF BOREHOLE AT KANYIKENY PRIMARY, CHEPKOPEGH LOCATION-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 1,500,000 |
Comment
|
| 1558 |
REPAIR OF POGHOGH SOKA BOREHOLE- WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
WEI WEI |
Ksh 200,000 |
Comment
|
| 1559 |
PURCHASE OF PIPES FOR SUPETOI TRADING CENTRE WATER SUPPLY-WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
WEI WEI |
Ksh 200,000 |
Comment
|
| 1560 |
PIPING OF CHEPLORUK – MURUNY WATER PROJECT, YWALATEKE LOCATION-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 1561 |
DRILLING OF BOREHOLE AT TORIOPKOI, CHEPKOPEGH LOCATION-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 1,500,000 |
Comment
|
| 1562 |
INSTALLATION OF SOLAR AT LOKITEDEL BOREHOLE-KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 1563 |
PURCHASE OF PUMPS, MOTOR AND CONTROLLER-KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 1564 |
INSTALLATION OF HAND PUMP AT MAKALA AND KARIAMAWAOI BOHOLES -KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 1565 |
DRILLING OF A BOREHOLE AT KATICH- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
ALALE |
Ksh 2,000,000 |
Comment
|
| 1566 |
COMPLETION OF SASAK SAND DAM- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
ALALE |
Ksh 800,000 |
Comment
|
| 1567 |
REPAIR OF DAMAGED BOREHOLE AT KASIKIROY -SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
SUAM |
Ksh 400,000 |
Comment
|
| 1568 |
PURCHASE AND SUPPLY OF WATER TANK-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 1569 |
DRILLING OF A BOREHOLE AT NAPIS - ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
ALALE |
Ksh 2,000,000 |
Comment
|
| 1570 |
CHEMWAGH WATER PROJECT CONSTRUCTION OF INTAKE- ENDUGH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
ENDUGH |
Ksh 400,000 |
Comment
|
| 1571 |
CONSTRUCTION OF INTAKE AND PIPING OF TECHAN - WURAR WATER PEOJECT- ENDUGH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
ENDUGH |
Ksh 600,000 |
Comment
|
| 1572 |
KAMKEZA WATER PROJECT SALAWA- ENDUGH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
ENDUGH |
Ksh 600,000 |
Comment
|
| 1573 |
REPAIR OF TULUNGWO PRIMARY BOREHOLE AND TANK INSTALLATION AT LOMUT LOCATION-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LOMUT |
Ksh 300,000 |
Comment
|
| 1574 |
REPAIR OF BOREHOLES-KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
KASEI |
Ksh 800,000 |
Comment
|
| 1575 |
REPAIR OF KOGHIN-KLOLO WATER PROJECT-LOMUT WARD(ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 1576 |
PURCHASE OF WATER DISTRIBUTION PIPES FOR KATUKUMWOK SOLAR WATER SUPPLY TO KATUKUMWO CENTRE |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 1577 |
PURCHASE OF WATER TANK FOR SEREWO COMMUNITY -RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
RIWO |
Ksh 200,000 |
Comment
|
| 1578 |
SUPPLY AND DELIVERY OF WATER CASINGS - MNAGEI WARD(ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,999,900 |
Comment
|
| 1579 |
PIPING OF WATER FROM KITALAKAPEL TTI TO POSHADA VILLAGE-RIWO WARD(ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
RIWO |
Ksh 600,000 |
Comment
|
| 1580 |
PURCHASE OF SOLAR PUMPS FOR REMOI BOREHOLE- ALALE WARD (ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
ALALE |
Ksh 399,272 |
Comment
|
| 1581 |
REPAIR OF KOSITOT PRY SCHOOL BOREHOLE-ALALE WARD (ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
ALALE |
Ksh 999,800 |
Comment
|
| 1582 |
UPGRADING OF KAPLELACHKAROR BOREHOLE TO SOLAR PUMP- MNAGEI WARD (ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 1583 |
CONSTRUCTION OF INTAKE AND PIPING OF WATER AT TRIK PRIMARY SCHOOL WATER PROJECT- LELAN WARD (ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2025-2026 |
Complete
|
LELAN |
Ksh 499,998 |
Comment
|
| 1584 |
RENOVATION AND EQUIPPING OF OLD COUNTY ASSEMBLY BUILDING |
County Assembly |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 15,482,613 |
Comment
|
| 1585 |
EQUIPPING OF NEW COUNTY ASSEMBLY-MULTIMEDIA INSTALLATION |
County Assembly |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 11,566,387 |
Comment
|
| 1586 |
PURCHASE OF CURTAINS FOR THE NEW COUNTY ASSEMBLY BUILDING |
County Assembly |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 2,300,000 |
Comment
|
| 1587 |
ANNUAL ROADS INVENTORY AND CONDITION SURVEY (ARICS) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
COUNTYWIDE |
Ksh 1,395,864 |
Comment
|
| 1588 |
STAFF TRAINING AND CAPACITY BUILDING |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
HEADQUARTERS |
Ksh 1,570,000 |
Comment
|
| 1589 |
OPENING OF KRIICH CENTRE KWANZA TO KOKWOLEKWA-ENDUGH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ENDUGH |
Ksh 2,999,848 |
Comment
|
| 1590 |
OPENING OF KOKWOLEKWA - KOPONOKWENTA - ENDUGH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ENDUGH |
Ksh 2,999,977 |
Comment
|
| 1591 |
OPENING OF KOPONOKWENTA - SAFINA MURMOT ENDUGH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ENDUGH |
Ksh 2,992,150 |
Comment
|
| 1592 |
MAINTENANCE OF KACHELIBA-MORWEBONG ROAD - SUAM WARD (NR_24_152 - 11.04KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SUAM |
Ksh 1,999,144 |
Comment
|
| 1593 |
MAINTENANCE OF KANGOLETIANG-NGOTUT STREET_2 ROAD -KASEI WARD (G_24_N_165 - 4.86KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 2,929,128 |
Comment
|
| 1594 |
MAINTENANCE OF POKOT CENTRAL-POKOT CENTRAL MIXED PRIMARY ROAD -WEIWEI WARD (NR_24_248 - 7.58KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEIWEI |
Ksh 2,999,927 |
Comment
|
| 1595 |
MAINTENANCE KARAPKEL -KANGISHA PRI SCH ROAD -WEIWEI (G99001- 4.86KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEIWEI |
Ksh 1,499,411 |
Comment
|
| 1596 |
MAINTENANCE OF KASES-KAURIONG PRIMARY SCHOOL ROAD-KIWAWA WARD (G82364 - 9.62KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KIWAWA |
Ksh 2,499,983 |
Comment
|
| 1597 |
MAINTENANCE OF KONYAO-KAPYAN ROAD-KAPCHOK WARD (G82346 - 11.89KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 2,993,400 |
Comment
|
| 1598 |
MAINTENANCE OF MASOL-KADUNGDUNG ROAD_R1 -MASOL WARD (G_24_N_68 - 10.45KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MASOL |
Ksh 2,999,354 |
Comment
|
| 1599 |
MAINTENANCE OF LOMUT -ANNET ROAD(F4575-16KM - LOMUT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LOMUT |
Ksh 4,997,906 |
Comment
|
| 1600 |
MAINTENANCE OF CHEPARERIAMOTPOKOR ROAD - LELAN WARD (G_82148 - 7.43KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LELAN |
Ksh 2,499,708 |
Comment
|
| 1601 |
MAINTENANCE OF WAKOR-TOO SIKIRIO PRIMARY SCHOOL ROAD -WEIWEI WARD (G82269 - 11.86KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEIWEI |
Ksh 4,432,131 |
Comment
|
| 1602 |
MAINTENANCE OF TAMUGH-LETWA CENTER - SOOK WARD (G82301-5.56KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SOOK |
Ksh 1,999,845 |
Comment
|
| 1603 |
MAINTENANCE OF GOOD SHEPHERD ECDE-CHESRA ROAD -CHEPARERIA WARD(D1675-18.73KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 2,499,500 |
Comment
|
| 1604 |
MAINTENANCE OF KARAS-CHEPTAPESHAKOLOMOYWO (NEW-5.30KM) WEST POKOT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,999,898 |
Comment
|
| 1605 |
MAINTENANCE OF KASITIT-PTOYO ROAD (NEW - 3.21KM) ENDUGH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ENDUGH |
Ksh 1,998,390 |
Comment
|
| 1606 |
MAINTENANCE OF CHEPKOTI ROAD -SIYOI WARD (NEW - 2.47KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SIYOI |
Ksh 2,499,995 |
Comment
|
| 1607 |
MAINTENANCE OF TARTAR PRI-KISHAUNET ROAD -MNAGEI (F8054 - 8.8KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MNAGEI |
Ksh 2,999,604 |
Comment
|
| 1608 |
MAINTENANCE OF MARICH- ARON PRIMARY SCHOOL ( G99015) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SEKERR |
Ksh 2,897,008 |
Comment
|
| 1609 |
MAINTENANCE OF KOKWOPSIS KAIPAWIS-LOSA-CHONGIS ROAD -TAPACH WARD (G82154 - 1.22KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
TAPACH |
Ksh 2,999,861 |
Comment
|
| 1610 |
MAINTENANCE OF SEBIT -KTAIMA ROAD - BATEI WARD (G82224 - 8.78KM) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
BATEI |
Ksh 1,999,724 |
Comment
|
| 1611 |
MAINTENANCE OF NASOLOT-NASOLOT PRIMARY SCHOOL ROAD SEKERR WARD (G993520-3.44KM ) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SEKERR |
Ksh 2,999,800 |
Comment
|
| 1612 |
REPAIR OF LOKOMOLO FOOTBRIDGE (RIWO WARD) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
RIWO |
Ksh 2,998,873 |
Comment
|
| 1613 |
CONSTRUCTION OF CHEPTOT FOOTBRIDGE(BATEI WARD) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
BATEI |
Ksh 1,994,615 |
Comment
|
| 1614 |
REPAIR OF IPEET FOOT BRIDGET(WEIWEI WARD) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEIWEI |
Ksh 1,999,698 |
Comment
|
| 1615 |
ANNUAL ROADS INVENTORY AND CONDITION SURVEY (ARICS) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
COUNTYWIDE |
Ksh 1,500,000 |
Comment
|
| 1616 |
CULVERT INSTALLATION OF KAPSANGAR-MURKUSIAN- KAPTABUK ROAD -LELAN WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LELAN |
Ksh 999,800 |
Comment
|
| 1617 |
OPENING AND GRADING OF CHERELIO-KASANGACH-PTIOK-NYINYOT ROAD LOMUT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LOMUT |
Ksh 3,999,733 |
Comment
|
| 1618 |
COMPLETION OF NYASI MOJA BOX CULVERT - SIYOI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SIYOI |
Ksh 3,999,900 |
Comment
|
| 1619 |
OPENING IPEET- PERKAW ROAD -WEIWEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEIWEI |
Ksh 2,999,051 |
Comment
|
| 1620 |
OPENING TAMKAL-SINTAGH ROAD WEIWEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEIWEI |
Ksh 999,358 |
Comment
|
| 1621 |
OPENING OF TAMKAL- SASACH ROAD WEIWEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEIWEI |
Ksh 2,997,921 |
Comment
|
| 1622 |
COMPLETION OF SURUMBEN BOX CULVERT -MASOL WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MASOL |
Ksh 4,483,376 |
Comment
|
| 1623 |
OPENING TILAKAI-CHEMSTO ROAD LOMUT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LOMUT |
Ksh 4,325,685 |
Comment
|
| 1624 |
LOT 1 MANUAL RESHAPING FOR ROADS(PORIOROP-MUKULA-KODEP PRIMARY SCHOOL ROAD ,KAPCHEMOK -KAPTUM ROAD)- LELAN WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LELAN |
Ksh 1,499,987 |
Comment
|
| 1625 |
LOT 2 MANUAL RESHAPING FOR ROADS(KISONOWON-MARUS ROAD,CHEPKOKOGH-PKOPOGH-WOKEL ROAD,OTIOT -CHEPTIRAN ROAD,KOMOLWO-PUYUTWO ROAD,OTIOT KLOLO ROAD AND KAKARENI-KREL) LOMUT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LOMUT |
Ksh 2,999,992 |
Comment
|
| 1626 |
LOT 3 MANUAL RESHAPPING FOR ROADS(SAMUM -CHEPTENGAN ROAD,CENTRE KWANZA PTOYO-KESOO ROAD ,YEMT-CHEPTRAM-KAPTEMOW ROAD)- ENDUGH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ENDUGH |
Ksh 1,498,050 |
Comment
|
| 1627 |
ROAD MAINTENANCE OF SAND HARVESTING SITES(KANYARKWATCHEPTUMOT ROAD, RAILA-SEREW,KITALAKAPEL, LIMNGOLE, CHEPKRAM,KOO LEONAD, AND ATTACHA ROAD) (FUEL) -RIWO WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
RIWO |
Ksh 1,999,981 |
Comment
|
| 1628 |
GRADING AND STRUCTURES INSTALLATIONS OF KOSITOT-SAPULMOI ROAD-LOMUT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LOMUT |
Ksh 3,499,973 |
Comment
|
| 1629 |
REPAIR & MAINTENANCE OF SOLION PSAKAS ROAD (PENDING BILL) -WEIWEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEIWEI |
Ksh 399,856 |
Comment
|
| 1630 |
CULVERT INSTALLATION AT LEMLEMCHORWAI ROAD -LELAN WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LELAN |
Ksh 999,602 |
Comment
|
| 1631 |
OPENING ,GRADING, GRAVELLING AND STRUCTURES INSTALLATION OF KAKRUT-CDF OFFICE ROAD -ROAD WEST POKOT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 4,997,146 |
Comment
|
| 1632 |
GRADING OF ELGON VIEW MLIMANI ROAD -WEST POKOT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 399,999 |
Comment
|
| 1633 |
REPAIR AND MAINTENANCE OF LIKAU CHEPOHIN KOROKOU PRIMARY ROAD - KASEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 3,498,080 |
Comment
|
| 1634 |
OPENING ,GRADING AND STRUCTURES INSTALLATION OF KOSURMUT- SONGOLOL ROAD- KIWAWA WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KIWAWA |
Ksh 3,499,427 |
Comment
|
| 1635 |
OPENING ,GRADING AND STRUCTURES INSTALLATION OF SONGOLOL- MARICHOR ROAD- KIWAWA WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KIWAWA |
Ksh 3,395,757 |
Comment
|
| 1636 |
MAINTENANCE OF KAMKETO-KASEPA ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 2,999,689 |
Comment
|
| 1637 |
GRADING OF KAMKETO KOTULBOUGH ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 999,314 |
Comment
|
| 1638 |
GRADING OF KAMKETO KOKWO OROLWO ROAD -KASEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 999,981 |
Comment
|
| 1639 |
GRADING OF KAMARIKET-KOKWOTIL ROAD- KASEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 999,280 |
Comment
|
| 1640 |
GRADING OF K ATOLKOS -KALAM ROAD- KASEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 998,260 |
Comment
|
| 1641 |
GRADING OF KASEI AKILIN ROAD -KASEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 998,526 |
Comment
|
| 1642 |
GRADING OF MKONGIR-KADOKONY ROAD - KASEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 999,968 |
Comment
|
| 1643 |
GRADING AND MURRAMMING OF KASEIKOROKOW ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 2,999,999 |
Comment
|
| 1644 |
MAINTENANCE OF CHEPOGHIN-MKONGIR ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 2,998,324 |
Comment
|
| 1645 |
MAINTENANCE OF TAKAYWA-KOUR ROADKASEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 2,999,999 |
Comment
|
| 1646 |
MAINTENANCE OF TOO-SESSEN-KAMKETO ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 2,999,774 |
Comment
|
| 1647 |
DOZER WORKS AT LODINY -SIRPALKOCHAR ROAD-SOOK WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SOOK |
Ksh 0 |
Comment
|
| 1648 |
DOZER WORKS AT KORPU- KAPTEMOW ROAD 5KM-SOOK WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SOOK |
Ksh 1,999,617 |
Comment
|
| 1649 |
GRADING AND MURRAMING OF MURKOIKOI ROAD-SUAM WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SUAM |
Ksh 1,999,776 |
Comment
|
| 1650 |
GRADING AND MURRAMING OF KARON SHANGER-SUAM WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SUAM |
Ksh 1,994,417 |
Comment
|
| 1651 |
OPENING OF SAMICH – PTIMONUO ROAD ( PUSOL LOCATION)- BATEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
BATEI |
Ksh 1,999,893 |
Comment
|
| 1652 |
GRADING OF CHESIRKEN-MONJORWA ROAD(KERELWA LOCATION)- BATEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
BATEI |
Ksh 2,999,805 |
Comment
|
| 1653 |
OPENING OF SOBUKWO-PTIOS ROAD(SOBUKWO LOCATION)- BATEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
BATEI |
Ksh 999,964 |
Comment
|
| 1654 |
GRADING OF SOBUKWO – KAKEPUT ROAD, SOBUKWO LOCATION- BATEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
BATEI |
Ksh 599,116 |
Comment
|
| 1655 |
GRADING AND CULVERTS INSTALLATION OF U- ROAD AT LOMUT-LOMUT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
BATEI |
Ksh 999,691 |
Comment
|
| 1656 |
OPENING OF KAPATET – POTIEW ROAD AT MOSOP-LOMUT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LOMUT |
Ksh 999,997 |
Comment
|
| 1657 |
OPENING OF CHEPKOROS – CHEMUSERION – KAPARKONG ROAD AT LOMUT-LOMUT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LOMUT |
Ksh 499,992 |
Comment
|
| 1658 |
GRADING OF KATIUT – CHERATAK ROAD AT CHEPKOKOGH-LOMUT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LOMUT |
Ksh 999,990 |
Comment
|
| 1659 |
GRADING OF NGOLEKEL – CHEPTULEL PRIMARY – SOKOTOW – CHEPTULEL BOYS ROAD AT CHEPKOKOGH-LOMUT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LOMUT |
Ksh 496,679 |
Comment
|
| 1660 |
EXPANSION OF MNOKOWOM- KARAPOGH – SASACH ROAD AT KARAPOGH SUB - LOCATION-WEIWEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEIWEI |
Ksh 1,999,965 |
Comment
|
| 1661 |
BUSH CLEARING OF DUNGDUNG-KAITAPOS ROAD-MASOL WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MASOL |
Ksh 197,789 |
Comment
|
| 1662 |
BUSH CLEARING OF CHEPTOCH-PORPORUS ROAD-MASOL WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MASOL |
Ksh 199,998 |
Comment
|
| 1663 |
GRADING OF CHEMURO-KAROSHON ROADMASOL WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MASOL |
Ksh 699,997 |
Comment
|
| 1664 |
MURRAMING OF CHEPTOCH-KAKOKON ROAD-MASOL WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MASOL |
Ksh 499,980 |
Comment
|
| 1665 |
ROAD OPENING ( DOZER WORKS) AT BOMA – KAPSURUM – KAMARKECH BRIDGE ROAD, TALAU LOCATION-SIYOI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SIYOI |
Ksh 1,999,993 |
Comment
|
| 1666 |
ROAD OPENING ( DOZER WORKS) AT MISIKO – KIPSAKAS PRIMARY – CHOKOR- FOREST ROAD, TALAU LOCATION-SIYOI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SIYOI |
Ksh 2,749,966 |
Comment
|
| 1667 |
GRAVELLING OF TINGIKET -CHEPINYINY CHEPKOTI ROAD -SIYOI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SIYOI |
Ksh 1,499,936 |
Comment
|
| 1668 |
SPOT GRAVELLING OF KAIBOS CATTLE DIP – KANYONGI – KAMAKETOI – KAR ANDILI-KAMWORIO – KAMAKETOI – KAPLAIN ROAD, KAIBOS LOCATION-SIYOI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SIYOI |
Ksh 999,948 |
Comment
|
| 1669 |
GRADING AND MURRAMING OF LOKOMOLO ROAD-SUAM WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 1670 |
REPAIR AND MAINTENANCE OF DAMAGED ROAD AT KOSIA-SUAM WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SUAM |
Ksh 499,960 |
Comment
|
| 1671 |
BUSH CLEARING OF LOSIYW AT-NAKWANAMOR ROAD-SUAM WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SUAM |
Ksh 999,850 |
Comment
|
| 1672 |
CONSTRUCTION OF SLAB AT KANGENGECHWO RIVER IN KATOPOTEN KODICH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KODICH |
Ksh 1,399,707 |
Comment
|
| 1673 |
REMOVAL OF LOGS AND GRADING OF KAPUL – TOPULUL – LOKICHAR ROAD KODICH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KODICH |
Ksh 1,299,500 |
Comment
|
| 1674 |
GRADING OF LOTEPES-LOKWAMER ROAD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KODICH |
Ksh 1,699,900 |
Comment
|
| 1675 |
OPENING OF CHERAMBA-MWISHOFARM ROAD-LELAN WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LELAN |
Ksh 699,875 |
Comment
|
| 1676 |
OPENING OF MOKOYON-PLEL-KOROSION ROAD-LELAN WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LELAN |
Ksh 999,761 |
Comment
|
| 1677 |
OPENING OF CCHEPKAWOT-SOWORWO ROAD-LELAN WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LELAN |
Ksh 799,917 |
Comment
|
| 1678 |
OPENING OF LOTUPALE-YWAPAR-MUKULA ROAD-LELAN WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LELAN |
Ksh 799,706 |
Comment
|
| 1679 |
INSTALLATION OF CULVERT AT KAYEMITMOKOYEN C ATTLEDIP-LELAN WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LELAN |
Ksh 799,795 |
Comment
|
| 1680 |
MURRAMING AND INSTALLATION OF CULVERT AT CHEPKONO-MANIAN-MNUS ROAD-LELAN WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LELAN |
Ksh 799,795 |
Comment
|
| 1681 |
GRADING AND MURRAMING OF AMMERENG-KOISHOMU ROAD-LELAN WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LELAN |
Ksh 599,955 |
Comment
|
| 1682 |
GRADING AND MAINTENANCE OF MAIN ROADS- LELAN WARD-LELAN WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LELAN |
Ksh 999,986 |
Comment
|
| 1683 |
OPENING OF KAMASIAN-METERORTONOYON-ROAD-LELAN WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LELAN |
Ksh 599,958 |
Comment
|
| 1684 |
MAINTENANCE OF SINA – PTOP – TAPACH ROAD, TANGASIA LOCATION-TAPACH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
TAPACH |
Ksh 1,499,197 |
Comment
|
| 1685 |
MAINTANNCE OF FEEDER ROADS (FUEL) TAPACH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
TAPACH |
Ksh 2,000,000 |
Comment
|
| 1686 |
MANUAL RESHAPING OF KALITIT – ROSOMA – KAPUSIEN ROAD, KAMELEI SUB LOCATION-TAPACH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
TAPACH |
Ksh 499,691 |
Comment
|
| 1687 |
ROAD MAINTENANCE AT KAPUSIEN – KAMELEI ROAD-TAPACH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
TAPACH |
Ksh 999,819 |
Comment
|
| 1688 |
GRADING AND MURRAMING OF KAPK ATANYANG-LAIKONG GIRLS SECONDARY ROAD-CHEPARERIA WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 1,999,463 |
Comment
|
| 1689 |
CONSTRUCTION OF DRIFT AT ATOT ROAD- KIWAWA WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KIWAWA |
Ksh 999,991 |
Comment
|
| 1690 |
BUSH CLEARING OF KALUKUNA-TUWIT ROAD-KAPCHOK WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 999,514 |
Comment
|
| 1691 |
BUSH CLEARING OF NAPITIRO-LOKITEDEL ROAD-KAPCHOK WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 999,913 |
Comment
|
| 1692 |
BUSH CLEARING OF KOPEYON-LOKASUR ROAD-KAPCHOK WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 999,957 |
Comment
|
| 1693 |
BUSH CLEARING OF NGOTUT-AMALER ROAD-KAPCHOK WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 992,788 |
Comment
|
| 1694 |
PURCHASE OF FUEL FOR GRADING AND MAINTENANCE OF MNAGEI WARD ROADS(NASOKOL-CHEPKEMEI ROAD,HORISON-KAMUINO ROAD,TANG ATANGA -RONEY ROAD AND SUPER FORM ROAD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,600,000 |
Comment
|
| 1695 |
GRADING OF KACHEPKAI - KODONG'OU PRIMARY ROAD-MNAGEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MNAGEI |
Ksh 999,620 |
Comment
|
| 1696 |
CULVERT INSTALLATION AT CHEPTUYA - MORTOME ROAD-MNAGEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MNAGEI |
Ksh 999,982 |
Comment
|
| 1697 |
GRADING AND GRAVELLING OF KWA PAUL KIDE-KWA CHEPTOROK-KOTORUK ROAD-MNAGEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MNAGEI |
Ksh 999,979 |
Comment
|
| 1698 |
ROAD GRADING AT CHEPTRAM ECD - TARTAR ROAD-MNAGEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MNAGEI |
Ksh 999,918 |
Comment
|
| 1699 |
CONSTRUCTION OF A CULVERT ON AMAKUARI AT-LALWAKOR ROAD-ALALE WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ALALE |
Ksh 999,999 |
Comment
|
| 1700 |
CONSTRUCTION OF CHEMIGHIN DRIFT ALALE WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ALALE |
Ksh 999,935 |
Comment
|
| 1701 |
BUSH CLEARING AND RESHAPING OF CHEPOSEKOGH-KOLEWLEW ROAD-ALALE WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ALALE |
Ksh 699,984 |
Comment
|
| 1702 |
OPENING OF CHEWARANY - CHEPTENGAN ROAD, DOZER WORKS- ENDUGH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ENDUGH |
Ksh 3,699,856 |
Comment
|
| 1703 |
BUSH CLEARING OF TIPET - SUAM RIVER ROAD- ENDUGH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ENDUGH |
Ksh 1,996,764 |
Comment
|
| 1704 |
BUSH CLEARING OF CHEMORIL - KORENGER - TAMARUKWO ROAD- ENDUGH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ENDUGH |
Ksh 999,018 |
Comment
|
| 1705 |
MANUAL RESHAPING OF SINJO-TIKORCHEMWAPIT ROAD- ENDUGH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ENDUGH |
Ksh 499,759 |
Comment
|
| 1706 |
MANUAL RESHAPING OF KUDUNGOLE - SALAWA ROAD- ENDUGH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ENDUGH |
Ksh 999,860 |
Comment
|
| 1707 |
OPENING OF PTOYO - MUTPUT ROAD, DOZER WORKS- ENDUGH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ENDUGH |
Ksh 1,999,905 |
Comment
|
| 1708 |
OPENING OF SALAA-KOPOSES ROADLOMUT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LOMUT |
Ksh 199,999 |
Comment
|
| 1709 |
BUSH CLEARING AND RESHAPING OF ODONG-KAGH AT ROAD-ALALE WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ALALE |
Ksh 299,991 |
Comment
|
| 1710 |
BUILDING OF GABIONS AT PTOYO CENTRE DISPENSARY ROAD-ENDUGH WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ENDUGH |
Ksh 899,580 |
Comment
|
| 1711 |
INSTALLATION OF GABIONS AT ARPOLLO DISPENSARY-LOMUT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LOMUT |
Ksh 198,760 |
Comment
|
| 1712 |
BUSH CLEARING AND RESHAPING OF KABULUDIS-AGERA-AYOLPUS ROAD-ALALE WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ALALE |
Ksh 499,993 |
Comment
|
| 1713 |
BUSH CLEARING AND RESHAPING OF KAKOU- KOBUYIN-KAKIR NASURETL ROAD- ALALE WARD(ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ALALE |
Ksh 998,900 |
Comment
|
| 1714 |
MAINTENANCE OF KASAKA - MAYAIPOGH ROAD- KASEI WARD(ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 2,998,415 |
Comment
|
| 1715 |
BUSH CLEARING OF LOKWAMOR- CHEMERTO ROAD- KODICH WARD(ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KODICH |
Ksh 699,978 |
Comment
|
| 1716 |
GRADING AND MURRUAMING OF KARON - MORUEPONG- SUAM WARD(ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SUAM |
Ksh 1,999,817 |
Comment
|
| 1717 |
MAINTENANCE OF K ATUKUMWOK -OPOL ROAD -KASEI WARD(ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 1,998,800 |
Comment
|
| 1718 |
BUSH CLEARING AT OROLWO-KOKRAN ROAD- KODICH WARD(ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KODICH |
Ksh 699,978 |
Comment
|
| 1719 |
MAINTENANCE OF KASEI-KALAM ROAD- - KASEI WARD(ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KASEI |
Ksh 999,800 |
Comment
|
| 1720 |
GRADING OF AKIRIAMET- MBARU ROAD - KIWAWA WARD(ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KIWAWA |
Ksh 800,000 |
Comment
|
| 1721 |
OPENING OF SANG AT-IPET ROAD- WEIWEI WARD(ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEIWEI |
Ksh 4,499,717 |
Comment
|
| 1722 |
MAINTENANCE OF TILAK BONDENI ROADWEST POKOT WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEST POKOT |
Ksh 799,640 |
Comment
|
| 1723 |
MAINTENANCE OF CHEPNYALCHEPKALIANG-MUNGIT ROAD -SOOK WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SOOK |
Ksh 1,499,990 |
Comment
|
| 1724 |
GRADING, GRAVELING AND INSTALLATION OF CULVERTS AT KASANGACH KWA BARAZA KITALAPOSHO ROAD (ROLL OVER) MNAGEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,199,712 |
Comment
|
| 1725 |
OPENING OF KAPARA KAZERO ROAD- BATEI WARD (ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
BATEI |
Ksh 749,950 |
Comment
|
| 1726 |
CONSTRUCTION OF 2 DRIFT ALONG CHEPNYAL TINDAR ROAD-SOOK WARD (ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SOOK |
Ksh 999,938 |
Comment
|
| 1727 |
MAINTENANCE OF KOSUPKO-KAPKOLO ROAD - LOMUT WARD (ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,999,925 |
Comment
|
| 1728 |
RESHAPING OF KAPORON IYON ROAD WEIWEI WARD (ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEIWEI |
Ksh 499,983 |
Comment
|
| 1729 |
OPENING(DOZER WORKS) OF SOKITOM ROAD-SOOK WARD (ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SOOK |
Ksh 1,499,998 |
Comment
|
| 1730 |
GRADING OF ORON-CHEPSEPINYLENGOROK ROAD-ALALE WARD (ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ALALE |
Ksh 996,207 |
Comment
|
| 1731 |
OPENING OF SUKUT KAPKOPOY ROAD- BATEI WARD (ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
BATEI |
Ksh 999,652 |
Comment
|
| 1732 |
GRADING OF MAMA W ATOTO CHEWOYET PRIMARY ROAD (ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 998,600 |
Comment
|
| 1733 |
PROPOSED IMPROVEMENT AND MAINTENANCE WORKS FOR NAUYAPONG-LOTUKUM ALALE WARD (ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
ALALE |
Ksh 2,376,473 |
Comment
|
| 1734 |
COMPLETION OF BOX CULVERT AT KAKISAKA RIVER-MNAGEI WARD (ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 1735 |
GRAVELLING OF AP LINE CHESIAM ROAD WEST POKOT (ROLL OVER) |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 999,682 |
Comment
|
| 1736 |
REINFORCEMENT OF EMPOGH BRIDGE SOOK WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
SOOK |
Ksh 1,999,916 |
Comment
|
| 1737 |
CONSTRUCTION OF FOOTBRIDGE AT PARAA RACHAN -WEIWEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEIWEI |
Ksh 2,887,560 |
Comment
|
| 1738 |
REPAIR OF SKAK FOOT BRIDGE-WEIWEI WARD |
Public Works, Transport and Infrastructure |
2025-2026 |
Complete
|
WEIWEI |
Ksh 999,790 |
Comment
|
| 1739 |
CERTIFIED SEED MAIZE |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 60,000,000 |
Comment
|
| 1740 |
CERTIFIED SEED MAIZE |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
ENDUGH |
Ksh 3,000,000 |
Comment
|
| 1741 |
CERTIFIED SEED MAIZE |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
KODICH |
Ksh 2,000,000 |
Comment
|
| 1742 |
CERTIFIED ONION SEEDS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
TAPACH |
Ksh 1,500,000 |
Comment
|
| 1743 |
GRAFTED MANGO SEEDLINGS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 2,500,000 |
Comment
|
| 1744 |
GRAFTED MANGO SEEDLINGS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 2,500,000 |
Comment
|
| 1745 |
GRAFTED COFFEE SEEDLINGS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 3,000,000 |
Comment
|
| 1746 |
GRAFTED AVOCADO SEEDLINGS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 3,000,000 |
Comment
|
| 1747 |
CERTIFIED ONION SEEDS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 2,500,000 |
Comment
|
| 1748 |
GRAFTED AVOCADO SEEDLINGS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
ENDUGH |
Ksh 3,000,000 |
Comment
|
| 1749 |
CERTIFIED ONION SEEDS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
SEKERR |
Ksh 2,000,000 |
Comment
|
| 1750 |
CERTIFIED ONION SEEDS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 1751 |
GRAFTED MANGO SEEDLINGS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 1752 |
CERTIFIED ONION SEEDS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
WEIWEI |
Ksh 900,000 |
Comment
|
| 1753 |
CASH CROP SEEDLINGS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,500,000 |
Comment
|
| 1754 |
GRAFTED MANGO SEEDLINGS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
WEIWEI |
Ksh 800,000 |
Comment
|
| 1755 |
CASH CROP SEEDLINGS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
MNAGEI |
Ksh 3,000,000 |
Comment
|
| 1756 |
VEGETABLE SEEDS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 1757 |
GENERATORS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
SEKERR |
Ksh 2,000,000 |
Comment
|
| 1758 |
GENERATORS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
SEKERR |
Ksh 4,000,000 |
Comment
|
| 1759 |
SOLAR WATER PUMPS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 1760 |
WATER PUMPS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
RIWO |
Ksh 3,000,000 |
Comment
|
| 1761 |
KNAPSACK SPRAYERS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
RIWO |
Ksh 3,000,000 |
Comment
|
| 1762 |
SOLAR WATER PUMPS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 1763 |
HOES AND PANGAS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 1764 |
D-LIGHTS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 1765 |
CHAIN-LINKS |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 1766 |
KISIRA FURROW |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 1767 |
CHELEKUTA FURROW |
AGRICULTURE AND IRRIGATION |
2025-2026 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 1768 |
PURCHASE OF LAND FOR KAMELEI MARKET-TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
TAPACH |
Ksh 2,500,000 |
Comment
|
| 1769 |
RENOVATION AND MAINTENANCE OF KISHAUNET SALE YARD-MNAGEI WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 800,000 |
Comment
|
| 1770 |
RENOVATION AND MAINTENANCE OF KANYARKWAT SALE YARD-RIWO WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 1771 |
RENOVATION AND MAINTENANCE OF ORTUM SALE YARD-BATEI WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 1772 |
RENOVATION AND MAINTENANCE OF KONYAO SALE YARD-KAPCHOK WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 1773 |
RENOVATION AND MAINTENANCE OF KAMLA SALE YARD-KIWAWA WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
KIWAWA |
Ksh 600,000 |
Comment
|
| 1774 |
RENOVATION AND MAINTENANCE AND GULLY CONTROL OF CHEPARERIA SALEYARD-CHEPARERIA WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 4,866,865 |
Comment
|
| 1775 |
FENCING AND INSTALLATION OF TWO CONTAINERS AT BENDERA FRESH PRODUCE MARKET (ROLLOVER)-KAPENGURIA WARD |
County Executive |
2025-2026 |
Complete
|
Alale |
Ksh 3,194,908 |
Comment
|
| 1776 |
CONSTRUCTION OF PIT LATRINE AT MURKWIJIT COOLING PLANT (ROLLOVER)-MNAGEI WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 1777 |
CONSTRUCTION OF BODA-BODA SHADE AT NASOLOT-SEKERR WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
SEKERR |
Ksh 700,000 |
Comment
|
| 1778 |
CONSTRUCTION OF BODA-BODA SHADE AT KARAYA-SEKERR WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
SEKERR |
Ksh 700,000 |
Comment
|
| 1779 |
INSTALLATION OF STREETLIGHTS AT BENDERA TO KAKRUT AND KAPKORIS CENTER-KAPENGURIA WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 1780 |
STREETLIGHTS INSTALLATION AT CHEPKOTI CENTER, SIYOI LOCATION-SIYOI WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 1781 |
PURCHASE OF UMBRELLA SHADES FOR MAMAMBOGA ACROSS MNAGEI WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 1782 |
INSTALLATION OF STREETLIGHTS AT KAMBI-KARAYA-SEKERR WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
SEKERR |
Ksh 1,500,000 |
Comment
|
| 1783 |
CAPITAL TRANSFER TO NON – PROFIT ORGANIZATION ASSOCIATIONS –SUPPORTING OF SUAM COOPERATIVE SOCIETIES-SUAM WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 1784 |
CAPITAL TRANSFER TO NON – PROFIT ORGANIZATION ASSOCIATIONS –FORMATION AND SUPPORTING OF USHANGA COOPERATIVES-MASOL WARD-MASOL WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 1785 |
CAPITAL TRANSFER TO NON – PROFIT ORGANIZATION ASSOCIATIONS –SUPPORT FOR SIYOI MULTIPURPOSE DAIRY COOPERATIVE SOCIETY, SIYOI LOCATION-SIYOI WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 1786 |
CAPITAL TRANSFER TO NON – PROFIT ORGANIZATION ASSOCIATIONS – SUPPORT TO SONDANY FCS LTD MILK COOLING PLANT, NYARKULIAN SUB LOCATION-TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 1787 |
CAPITAL TRANSFER TO NON – PROFIT ORGANIZATION ASSOCIATIONS – SUPPORT TO PTOP FCS LTD MILK COOLING PLANT, TANGASIA SUB LOCATION-TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 1788 |
CAPITAL TRANSFER TO NON – PROFIT ORGANIZATION ASSOCIATIONS – SUPPORT TO KOKWOPSIS FCS LTD MILK COOLING PLANT, KOKWOPSIS SUB LOCATION-TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 1789 |
CAPITAL TRANSFER TO KOO LOSAM WOMEN GROUP-KAPCHOK WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 1790 |
CAPITAL TRANSFER TO ACHEY YOUTH GROUP-KAPCHOK WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 1791 |
CAPITAL TRANSFER TO NON – PROFIT ORGANIZATION ASSOCIATIONS – SUPPORT TO TULWET COOPERATIVE SOCIETY-SIYOI WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 1792 |
CAPITAL TRANSFER TO NON – PROFIT ORGANIZATION ASSOCIATIONS – SUPPORT TO SOKALE FARMERS’ COOPERATIVE SOCIETY LIMITED, KALE SUB-LOCATION -TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2025-2026 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 1793 |
PURCHASE OF VACCINES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 2,499,550 |
Comment
|
| 1794 |
PURCHASE OF VACCINES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 2,499,750 |
Comment
|
| 1795 |
VACCINES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 2,999,900 |
Comment
|
| 1796 |
ACARICIDES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 2,499,750 |
Comment
|
| 1797 |
VACCINES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 2,998,900 |
Comment
|
| 1798 |
VACCINES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KASEI |
Ksh 2,997,900 |
Comment
|
| 1799 |
VACCINES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
MASOL |
Ksh 2,997,900 |
Comment
|
| 1800 |
ACARICIDES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
TAPACH |
Ksh 1,499,950 |
Comment
|
| 1801 |
DEWORMERS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KODICH |
Ksh 2,999,500 |
Comment
|
| 1802 |
DEWORMERS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
ENDUGH |
Ksh 2,899,870 |
Comment
|
| 1803 |
SPRAY PUMPS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 1804 |
MOCHOWON CATTLE DIP |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
BATEI |
Ksh 1,999,778 |
Comment
|
| 1805 |
KAPKRES CATTLE DIP |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
BATEI |
Ksh 2,999,963 |
Comment
|
| 1806 |
PASTURE SEEDS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 2,999,800 |
Comment
|
| 1807 |
KALAPATA METALLIC CRUSH |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
ALALE |
Ksh 1,700,000 |
Comment
|
| 1808 |
NAGWOILAP METALLIC CRUSH- |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
ALALE |
Ksh 1,696,347 |
Comment
|
| 1809 |
KALEMREKAI METALLIC CRUSH |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
RIWO |
Ksh 1,199,956 |
Comment
|
| 1810 |
ACARICIDES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
ALALE |
Ksh 799,940 |
Comment
|
| 1811 |
DAIRY COWS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 599,200 |
Comment
|
| 1812 |
NASUKUTA ABATTOIR |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 2,999,400 |
Comment
|
| 1813 |
DEWORMERS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
LELAN |
Ksh 2,997,899 |
Comment
|
| 1814 |
DEWORMERS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 2,997,899 |
Comment
|
| 1815 |
DEWORMERS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
WEIWEI |
Ksh 1,955,386 |
Comment
|
| 1816 |
KAPSAIT HOLDING RAM |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
LELAN |
Ksh 1,499,972 |
Comment
|
| 1817 |
VACCINES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KIWAWA |
Ksh 1,499,650 |
Comment
|
| 1818 |
VACCINES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
WEIWEI |
Ksh 899,870 |
Comment
|
| 1819 |
DEWORMERS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
WEIWEI |
Ksh 1,199,360 |
Comment
|
| 1820 |
VACCINES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KODICH |
Ksh 2,499,650 |
Comment
|
| 1821 |
ACARICIDES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
LELAN |
Ksh 199,800 |
Comment
|
| 1822 |
ACARICIDES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 1823 |
ACARICIDES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
WEIWEI |
Ksh 599,800 |
Comment
|
| 1824 |
ACARICIDES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
RIWO |
Ksh 2,999,800 |
Comment
|
| 1825 |
KNAPSACK SPRAY PUMPS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
WEIWEI |
Ksh 699,760 |
Comment
|
| 1826 |
INCUBATORS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 499,900 |
Comment
|
| 1827 |
INCUBATORS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 1,999,600 |
Comment
|
| 1828 |
KNAPSACK SPRAY PUMPS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 999,948 |
Comment
|
| 1829 |
KARAKONG CATTLE DIP |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
LELAN |
Ksh 299,962 |
Comment
|
| 1830 |
LOMUKE CATTLE DIP |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
LELAN |
Ksh 449,983 |
Comment
|
| 1831 |
KAPTUM CATTLE DIP |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
LELAN |
Ksh 499,878 |
Comment
|
| 1832 |
KAMUINO CATTLE DIP |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
MNAGEI |
Ksh 999,907 |
Comment
|
| 1833 |
PARAYWA CATLE DIP |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
SIYOI |
Ksh 999,931 |
Comment
|
| 1834 |
GOATS |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 2,999,900 |
Comment
|
| 1835 |
POULTRY |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 498,950 |
Comment
|
| 1836 |
VACCINES |
LIVESTOCK AND FISHERIES |
2025-2026 |
Complete
|
LELAN |
Ksh 699,960 |
Comment
|
| 1837 |
COMPLETION OF PERIMETER WALL AND GATE (ROLL OVER) |
FINANCE AND ECONOMIC PLANNING |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 620,660 |
Comment
|
| 1838 |
REPAIR OF DORMITORY AT SURUMBEN MIP (PENDING BILL) |
FINANCE AND ECONOMIC PLANNING |
2025-2026 |
Complete
|
MASOL |
Ksh 800,000 |
Comment
|
| 1839 |
REVENUE SYSTEM PENDING BILL |
FINANCE AND ECONOMIC PLANNING |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 3,300,000 |
Comment
|
| 1840 |
PURCHASE OF MOTOR VEHICLES |
FINANCE AND ECONOMIC PLANNING |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 25,000,000 |
Comment
|
| 1841 |
INFRASTRUCTURE DEVELOPMENT OF SCHO0S THROUGHOUT THE COUNTY |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 0 |
Comment
|
| 1842 |
INFRASTRUCTURE SUPPORT FOR CONSTRUCTION OF ABLUTION BLOCK AT CHEWOYET |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 5,000,000 |
Comment
|
| 1843 |
INFRASTRUCTURE SUPPORT FOR CONSTRUCTION OF MAS0 ADMINISTRATION BLOCK |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 5,000,000 |
Comment
|
| 1844 |
INFRASTRUCTURE SUPPORT FOR CONSTRUCTION OF CLASSROOM AT CHEPUMPUN PRIMARY |
Education and Technical Training |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,200,000 |
Comment
|
| 1845 |
PROPOSED COMPLETION OF ECDE COLLEGE KAPENGURIA STAFF HOUSES(PENDING BILL) |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1846 |
PROPOSED CONSTRUCTION OF MULTI-PURPOSE HALL AND KITCHEN FOR ECDE C0EGE KAPENGURIA(PENDING BILL) |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 806,249 |
Comment
|
| 1847 |
COMPLETION OF EDUCATION ADMINISTRATION BLOCK(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 21,765,066 |
Comment
|
| 1848 |
OPERATIONALIZATION OF MUINO (WEIWEI WARD)AND TAMUGH (SOOK WARD) |
Education and Technical Training |
2025-2026 |
Complete
|
SOOK |
Ksh 5,000,000 |
Comment
|
| 1849 |
COMPLETION OF ALALE (ALALE WARD)AND CHESUBET(TAPACH) VTC |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 8,200,000 |
Comment
|
| 1850 |
CONSTRUCTION OF A ECDE PIT LATRINE FOR KALODEKE ECDE- KIWAWA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KIWAWA |
Ksh 300,000 |
Comment
|
| 1851 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT KWIRIR ECDE- ECDE |
Education and Technical Training |
2025-2026 |
Complete
|
KIWAWA |
Ksh 800,000 |
Comment
|
| 1852 |
CONSTRUCTION OF A ECDE PIT LATRINE FOR NAKUSE ECDE- KIWAWA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KIWAWA |
Ksh 300,000 |
Comment
|
| 1853 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT NANGOSINYON-KIWAWA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 1854 |
CONSTRUCTION OF A ECDE PIT LATRIN FOR KAKOPON ECDE- KIWAWA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KIWAWA |
Ksh 400,000 |
Comment
|
| 1855 |
CONSTRUCTION OF A ECDE CLASSROOM AT SEKONION- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 1856 |
CONSTRUCTION OF A ECDE CLASSROOM AT LOTUNALE- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 1857 |
CONSTRUCTION OF A ECDE CLASSROOM AT KANYARKWAT- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 1858 |
CONSTRUCTION OF A ECDE CLASSROOM AT CHEPKRAM- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 1859 |
CONSTRUCTION OF A ECDE CLASSROOM AT LOPEU- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 1860 |
CONSTRUCTION OF A ECDE CLASSROOM AT KONGELAI- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 1861 |
CONSTRUCTION OF A ECDE CLASSROOM AT PARASINTA- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 1862 |
COMPLETION OF A ECDE CLASSROOM AT CHEPKEMEI- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 1863 |
COMPLETION OF A ECDE CLASSROOM AT KAPTARIN- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 200,000 |
Comment
|
| 1864 |
COMPLETION OF ECDE CLASSROOM AT LOMUKEKOM0- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 200,000 |
Comment
|
| 1865 |
COMPLETION OF A ECDE CLASSROOM AT KACHAMBILWA- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 400,000 |
Comment
|
| 1866 |
COMPLETION OF A ECDE CLASSROOM AT CHEPRUPROKO- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 100,000 |
Comment
|
| 1867 |
CONSTRUCTION OF ECDE CLASSROOM AT KAPERUR ECDE CHEPKORIONG LOCATION-BATEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 1868 |
CONSTRUCTION OF ECDE CLASSROOM AT KALOPOT SOBUKWO-BATEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 900,000 |
Comment
|
| 1869 |
CONSTRUCTION OF DORMITORY AT KERELWA MIXED SECONDARY SCHO0 KERELWA LOCATION-BATEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 2,000,000 |
Comment
|
| 1870 |
CONSTRUCTION OF ECDE CLASSROOM AT SAMOR PARAK-BATEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 1871 |
COMPLETION OF ECDE CLASSROOM AT SITOT(CHEPKORIONG SUB LOCATION)-BATEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 400,000 |
Comment
|
| 1872 |
COMPLETION OF MOTOKORON ECDE CLASSROOM (CHEPKORIONG)-BATEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 1873 |
COMPLETION OF ECDE CLASSROOMS AT LOTAKANY PRIMARY MORPUS LOCATION-BATEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 1874 |
CONSTRUCTION OF CHEPROPOGH ECDE AT MORPUS LOCATION-BATEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 1875 |
CONSTRUCTION OF ECDE AT BENDERA-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 1876 |
CONSTRUCTION OF ECDE AT P0ET-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1877 |
CONSTRUCTION OF PIT LATRINE AT KALAIN-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 300,000 |
Comment
|
| 1878 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPKOCHIR-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1879 |
CONSTRUCTION OF ECDE CLASSROOM AT AKIMULTIN-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1880 |
CONSTRUCTION OF PIT LATRINE AT CHELOWO-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 300,000 |
Comment
|
| 1881 |
CONSTRUCTION OF ECDE CLASSROOM AT LATAKOWO-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1882 |
CONSTRUCTION OF ECDE CLASSROOM AT KACHIKORKOR-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1883 |
CONSTRUCTION OF PIT LATRINE-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 300,000 |
Comment
|
| 1884 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPKAPCHAK-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1885 |
CONSTRUCTION OF ECDE CLASSROOM AT KAARENJA-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1886 |
CONSTRUCTION OF ECDE CLASSROOM AT KAMARKECH-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1887 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPINYINY-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1888 |
CONSTRUCTION OF ECDE CLASSROOM AT SAKAT-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1889 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPOYO-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1890 |
CONSTRUCTION OF ECDE CLASSROOM AT RCEA CHEWOYET-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1891 |
CONSTRUCTION OF ECDE CLASSROOM AT BAPTIST-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 700,000 |
Comment
|
| 1892 |
CONSTRUCTION OF ECDE CLASSROOM AT SAKAT-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1893 |
CONSTRUCTION OF ECDE CLASSROOM AT KILIMANJARO-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 1894 |
CONSTRUCTION OF ECDE CLASSROOM AT KOTORUK-KAPENGURIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 700,000 |
Comment
|
| 1895 |
CONSTRUCTION OF TWO ECDE CLASSROOMS AT LOMUT WEST – CHERELIO LOMUT LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 1896 |
CONSTRUCTION OF TWO ECDE CLASSROOMS AT CHEPTOK0 PRIMARY AT LOMUT LOACTION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 1897 |
CONSTRUCTION OF ECDE CLASSROOM AT SAKATA PRIMARY LOMUT LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,100,000 |
Comment
|
| 1898 |
CONSTRUCTION OF ECDE CLASSROOM AT SPO LOMUT LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 1899 |
CONSTRUCTION OF ECDE CLASSROOM AT SENGEKO MOSOP LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,200,000 |
Comment
|
| 1900 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPTUYA MOSOP LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,200,000 |
Comment
|
| 1901 |
CONSTRUCTION OF ECDE CLASSROOM AT M0OS LOMUT LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,200,000 |
Comment
|
| 1902 |
CONSTRUCTION OF ECDE CLASSROOM AT SORORO MOSOP LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,200,000 |
Comment
|
| 1903 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEMNYAKAU CHEPTULEL LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 1904 |
CONSTRUCTION OF ECDE CLASSROOM AT PKARIAL LOMUT LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 1905 |
COMPLETION OF ECDE CLASSROOM AT TILAKAI PRIMARY CHEPKOKOGH LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 1906 |
COMPLETION OF ECDE CLASSROOM AT ANNET PRIMARY CHEPKOKOGH LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 400,000 |
Comment
|
| 1907 |
CONSTRUCTION OF ECDE AT MOMORO PRIMARY(ROLL OVER)-ENDUGH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ENDUGH |
Ksh 1,000,000 |
Comment
|
| 1908 |
CONSTRUCTION OF YWOPIT ECDE CLASSROOM (ROLL OVER)-ENDUGH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ENDUGH |
Ksh 800,000 |
Comment
|
| 1909 |
COMPLETION OF ECDE CLASSROOM AT CHEMUSERIA MOSOP LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 1910 |
COMPLETION OF ECDE CLASSROOM AT CHEPAR-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 1911 |
COMPLETION OF ECDE CLASSROOM AT KORORA LOMUT LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 600,000 |
Comment
|
| 1912 |
COMPLETION OF ECDE CLASSROOM AT KAPTLEL MOSOP LOCATION-LOMUT WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 800,000 |
Comment
|
| 1913 |
CONSTRUCTION OF TENOI ECDE CLASS AT PTALAM SUB – LOCATION-WEIWEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 800,000 |
Comment
|
| 1914 |
COMPLETION OF SUPETOI ECDE CLASS AT PTALAM SUB – LOCATION-WEIWEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 1915 |
CONSTRUCTION OF MARICH ECDE CLASS AT MARICH SUB - LOCATION-WEIWEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 700,000 |
Comment
|
| 1916 |
CONSTRUCTION OF SOGHU ECDE CLASS AT KOKWOTENDWO SUB - LOCATION-WEIWEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 800,000 |
Comment
|
| 1917 |
CONSTRUCTION OF TWO ECDE CLASSES AT SIGOR MIX WEIWEI SUB - LOCATION-WEIWEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 1,000,000 |
Comment
|
| 1918 |
CONSTRUCTION OF ONOCH ECDE CLASS AT KOPRO LOCATION-WEIWEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 800,000 |
Comment
|
| 1919 |
CONSTRUCTION OF PIKOS ECDE |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 700,000 |
Comment
|
| 1920 |
CONSTRUCTION OF KATUGH ECDE-WEIWEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 800,000 |
Comment
|
| 1921 |
CONSTRUCTION OF KAMOI ECDE CLASS AT KOPRO LOCATION-WEIWEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 800,000 |
Comment
|
| 1922 |
CONSTRUCTION OF TAKARAI ECDE CLASS AT KOPRO LOCATION-WEIWEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 800,000 |
Comment
|
| 1923 |
COMPLETION OF KALE ECDE CLASS AT SOLION LOCATION-WEIWEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 800,000 |
Comment
|
| 1924 |
CONSTRUCTION OF TWO DOOR TOILET AT AMOLEM-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MAS0L |
Ksh 200,000 |
Comment
|
| 1925 |
CONSTRUCTION OF A TWO DOOR TOILET AT CHEPANYMIDA-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MAS0L |
Ksh 200,000 |
Comment
|
| 1926 |
CONSTRUCTION OF TWO DOOR TOILET AT SERETION-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MAS0L |
Ksh 200,000 |
Comment
|
| 1927 |
CONSTRUCTION OF TWO DOOR TOILET AT KOKOCHA ECDE -MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MAS0L |
Ksh 200,000 |
Comment
|
| 1928 |
CONSTRUCTION OF A TWO DOOR TOILET AT NAURIEN-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 1929 |
CONSTRUCTION OF ECDE CLASSROOM AT NAURIEN -MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 1930 |
CONSTRUCTION OF TWO DOOR TOILET AT PACHU ECDE-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 1931 |
CONSTRUCTION OF A TWO DOOR TOILET AT CHEPORUGUT ECDE-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 1932 |
CONSTRUCTION OF A TWO DOOR TOILET AT TUMEGHIO ECDE- MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 1933 |
CONSTRUCTION OF A TWO DOOR TOILET AT KAISA ECDE-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 1934 |
CONSTRUCTION OF ECDE CLASSROOM AT AMOLEM-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 1935 |
REPAIR AND MAINTENANCE OF ECDE CLASSROOM AT KOPENU-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 300,000 |
Comment
|
| 1936 |
CONSTRUCTION OF ECDE CLASSROOM AT AMOLER-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 1937 |
CONSTRUCTION OF ECDE CLASSROOM AT KAISA-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 1938 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPTOCH-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 1939 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPANYINDA-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 1940 |
CONSTRUCTION OF ECDE CLASSROOM AT TUMEGHIO-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 1941 |
CONSTRUCTION OF ECDE CLASSROOM AT SERETION-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 1942 |
CONSTRUCTION OF TOILET AT KARIA ECDE-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 1943 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPORUNGUT-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 1944 |
CONSTRUCTION OF ECDE CLASSROOM AT KOKOCHA-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 1945 |
CONSTRUCTION OF TOILET AT KATINOT ECDE-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 1946 |
CONSTRUCTION OF TOILET AT CHEPTOCH ECDE-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 1947 |
CONSTRUCTION OF TOILET AT KARIA ECDE-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 1948 |
CONSTRUCTION OF TOILET AT DUNGDUNG ECDE-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 1949 |
CONSTRUCTION OF ECDE CLASSROOM AT PACHU-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MAS0 |
Ksh 600,000 |
Comment
|
| 1950 |
CONSTRUCTION OF ECDE CLASSROOM AT DUNGDUNG-MASOL WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MAS0 |
Ksh 600,000 |
Comment
|
| 1951 |
COMPLETION OF ECDE CLASSROOM AT KAPCHILA, KAISAKAT LOCATION-SIYOI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 1952 |
COMPLETION OF ECDE CLASSROOM AT KAIBOS ECDE-SIYOI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 1953 |
COMPLETION OF ECDE CLASSROOM AT KIPKORINYA ECDE-SIYOI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 1954 |
COMPLETION OF ECDE CLASSROOM AT SINENDEN, SIYOI LOCATION-SIYOI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 1955 |
COMPLETION OF ECDE CLASSROOM AT KAMWORIO, KAIBOS LOCATION-SIYOI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 1956 |
CONSTRUCTION OF PIT LATRINE AT KAMARINY ‘B’ ECDE, SIYOI LOCATION-SIYOI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 1957 |
CONSTRUCTION OF PIT LATRINE AT TECLA LOROUPE ECDE, SIYOI LOCATION-SIYOI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 1958 |
CONSTRUCTION OF TWO ECDE CLASSROOMS AT KACHELIBA MIX-SUAM WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SUAM |
Ksh 1,400,000 |
Comment
|
| 1959 |
CONSTRUCTION OF ONE ECDE CLASSROOM AND A TOILET AT KATUPEROT-SUAM WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SUAM |
Ksh 1,400,000 |
Comment
|
| 1960 |
COMPLETION OF ECDE AT NAMUTON-KODICH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KODICH |
Ksh 300,000 |
Comment
|
| 1961 |
CONSTRUCTION OF TOILETS AT KRES ECDE-KODICH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KODICH |
Ksh 400,000 |
Comment
|
| 1962 |
CONSTRUCTION OF ECDE CLASSROOM AT CHERANGAN-KODICH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 1963 |
CONSTRUCTION OF ECDE CLASSROOM AT MBAYAI-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 1964 |
CONSTRUCTION OF ECDE CLASSROOM AT MURKUSIAN-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 1965 |
CONSTRUCTION OF ECDE CLASSROOM AT LOPUSIMORU-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 780,000 |
Comment
|
| 1966 |
CONSTRUCTION OF ECDE CLASSROOM AT MANIAN-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 780,000 |
Comment
|
| 1967 |
CONSTRUCTION OF ECDE CLASSROOM AT KACHEPOTOK-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 980,000 |
Comment
|
| 1968 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPKIENY-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 780,000 |
Comment
|
| 1969 |
CONSTRUCTION OF ECDE CLASSROOM AT KOROPOPELOW-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 780,000 |
Comment
|
| 1970 |
COMPLETION OF ECDE CLASSROOM AT YARANGIRO-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 600,000 |
Comment
|
| 1971 |
COMPLETION OF ECDE CLASSROOM AT MNUS-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 350,000 |
Comment
|
| 1972 |
COMPLETION OF TWO ECDE CLASSROOM AT TRIK-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 350,000 |
Comment
|
| 1973 |
CONSTRUCTION OF ECDE CLASSROOM AT MUMUCH, KIPKOMO LOCATION-CHEPARERIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 700,000 |
Comment
|
| 1974 |
CONSTRUCTION OF ECDE CLASSROOM AT MARSITOT, KIPKOMO LOCATION-CHEPARERIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 700,000 |
Comment
|
| 1975 |
CONSTRUCTION OF CLASSROOM AT KORELLACH PARAK ECDE-CHEPARERIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 700,000 |
Comment
|
| 1976 |
COMPLETION OF SAKALE ECDE-CHEPARERIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 1977 |
CONSTRUCTION OF TOO MOI ECDE-CHEPARERIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 700,000 |
Comment
|
| 1978 |
CONSTRUCTION OF ECDE CLASSROOM AT PSERUM-CHEPARERIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 700,000 |
Comment
|
| 1979 |
CONSTRUCTION OF ECDE CLASSROOM AT KOLION, CHEPKOPEGH LOCATION --CHEPARERIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 700,000 |
Comment
|
| 1980 |
COMPLETION OF CHEPAKUL ECDE CLASSROOM, SHALPOGH LOCATION-CHEPARERIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 1981 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPOKUMUT, SENETWO LOCATION-CHEPARERIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 700,000 |
Comment
|
| 1982 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEMWONO, SENETWO LOCATION-CHEPARERIA WARD |
Education and Technical Training |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 700,000 |
Comment
|
| 1983 |
COMPELETION OF KAMKET ECDE-SEKERR WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 1984 |
COMPLETION OF LAM ECDE-SEKERR WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SEKERR |
Ksh 600,000 |
Comment
|
| 1985 |
COMPLETION OF KAPECHOKWO ECDE-SEKERR WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SEKERR |
Ksh 500,000 |
Comment
|
| 1986 |
CONSTRUCTION OF ECDE CLASSROOM AT PORIOKRUT-SEKERR WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 1987 |
CONSTRUCTION OF ECDE CLASSROOM AT NACHUKUT-MNAGEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MNAGEI |
Ksh 800,000 |
Comment
|
| 1988 |
CONSTRUCTION OF ONE CLASSROOM AT KOKWOKWONTA ECDE, TIPET- ENDUGH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ENDUGH |
Ksh 700,000 |
Comment
|
| 1989 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT KRIICH PRIMARY SCHOOL- ENDUGH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ENDUGH |
Ksh 800,000 |
Comment
|
| 1990 |
CONSTRUCTION OF ONE CLASSROOM AT KORENGER ECDE- |
Education and Technical Training |
2025-2026 |
Complete
|
ENDUGH |
Ksh 700,000 |
Comment
|
| 1991 |
CONSTRUCTION OF ECDE CLASSROOM AT EMBOGHAT- |
Education and Technical Training |
2025-2026 |
Complete
|
MNAGEI |
Ksh 800,000 |
Comment
|
| 1992 |
COMPLETION OF CHEPKOGHYO ECDE-MNAGEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MNAGEI |
Ksh 300,000 |
Comment
|
| 1993 |
CONSTRUCTION OF A ECDE CLASSROOM AT KOKWOATEKER- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 1994 |
CONSTRUCTION OF CLASSROOM AT TAMUGH POLYTECHNIC-SOOK WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SOOK |
Ksh 600,000 |
Comment
|
| 1995 |
CONSTRUCTION OF CLASSROOM AT KAPKIMER ECDE-SOOK WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SOOK |
Ksh 700,000 |
Comment
|
| 1996 |
COMPLETION OF ECDE CLASSROOM AT LOPIROI- ALALE WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 1997 |
CONTSRUCTION OF PITLATRINE AT NAPODO ECDE-ALALE WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 1998 |
COMPLETION OF ECDE CLASSROOM AT ALANY- ALALE WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 1999 |
CONSTRUCTION OF ECDE CLASS ROOM AT EMBORUKUT -WEIWEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 800,000 |
Comment
|
| 2000 |
CONSTRUCTION OF A ECDE CLASSROOM AT KADONGEN- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2001 |
CONSTRUCTION OF A ECDE CLASSROOM AT KRESWO- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2002 |
CONSTRUCTION OF A ECDE CLASSROOM AT NAPAWAOI- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2003 |
CONSTRUCTION OF A ECDE CLASSROOM AT KOKWOKALESI- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2004 |
CONSTRUCTION OF A ECDE CLASSROOM AT SIMATWA- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2005 |
CONSTRUCTION OF A ECDE CLASSROOM AT LOKNA- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2006 |
CONSTRUCTION OF A ECDE CLASSROOM AT KRURU- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2007 |
COMPLETION OF LOKUYI FENCE ECDE-RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 2008 |
CONSTRUCTION OF A ECDE CLASSROOM AT LOCHIYO- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2009 |
CONSTRUCTION OF A ECDE CLASSROOM AT MISKWONY- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2010 |
CONSTRUCTION OF A ECDE CLASSROOM AT KRURU- RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2011 |
CONSTRUCTION OF AN ECDE CLASSROOM AT KAMONO- CHEPARERIA WARD(ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 2012 |
COMPLETION OF PARASANTE ECDE- (ROLL OVER) RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 600,000 |
Comment
|
| 2013 |
COMPLETION OF 3 CLASSROOMS TOPTOTUM PRY SCHO0 -SOOK WARD(ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 2014 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT KAMOL- BATEI WARD(ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 750,000 |
Comment
|
| 2015 |
CONSTRUCTION OF ECDE CLASSROOM AT EMBOASIS - KAPENGURIA WARD(ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 2016 |
COMPLETION OF KARKAR ECDE CLASS ROOMS - KAPENGURIA WARD(ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 2017 |
COMPLETION OF ECDE CLASSROOM(PAINTING WORKS AND FISHER BOARD) AT AKIRIA - LELAN WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 750,000 |
Comment
|
| 2018 |
COMPLETION OF AN ECDE CLASSROOM AT PSPEN (PAINTING WORKS AND FISHER BOARD)- LELAN WARD(ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2019 |
CONSTRUCTION OF AN ECDE CLASSROOM AT KRONGON-LOMUT WARD(ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,200,000 |
Comment
|
| 2020 |
CONSTRUCTION OF AN ECDE CLASSROOM AT MURTANY-LOMUT WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 2021 |
CONSTRUCTION OF ECDE CLASS ROOM AT CHEPKOROK-LELAN WARD(ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2022 |
PURCHASE OF ECDE LAND AT KAMITO-MNAGEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MNAGEI |
Ksh 800,000 |
Comment
|
| 2023 |
PURCHASE OF LAND FOR CHEMOKOL ECDE-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2024 |
PURCHASE OF LAND FOR KAMORION ECDE-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 550,000 |
Comment
|
| 2025 |
PURCHASE OF LAND FOR LOYAMRUK ECDE-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELE |
Ksh 700,000 |
Comment
|
| 2026 |
CONSTRUCTION OF ECDE CLASS AT KOKPECH ECDE - KAPENGURIA WARD(ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 2027 |
RENOVATION OF ROROK ECDE- MNAGEI WARD(ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
MNAGEI |
Ksh 300,000 |
Comment
|
| 2028 |
PURCHASE OF LAND FOR CONSTRUCTION OF ECDE CLASS ROOMS AT KATUGH-WEIWEI WARD(ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 250,000 |
Comment
|
| 2029 |
PURCHASE OF LAND FOR CONSTRUCTION OF ECDE CLASS ROOM AT SANGAKAI-KACHELIBA- SUAM WARD(ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
SUAM |
Ksh 1,200,000 |
Comment
|
| 2030 |
COMPLETION OF PUSOL ECDE CLASSROOM -BATEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 2031 |
COMPLETION OF FIELD LEVELING AT KERELWA-BATEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 2032 |
COMPLETION OF TOMNYER ECDE CLASSROOM-BATEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 400,000 |
Comment
|
| 2033 |
COMPLETION OF MONJORWA ECDE CLASSROOM-BATEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 400,000 |
Comment
|
| 2034 |
SUPPLY AND PURCHASE OF ECDE CHAIRS-LELAN WARD |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2035 |
COMPLETION OF SUKONU ECDE, CHEBON SUB LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 800,000 |
Comment
|
| 2036 |
COMPLETION OF SESSIMWO ECDE, SINA SUB LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 800,000 |
Comment
|
| 2037 |
COMPLETION OF PSERO ECDE, TANGASIA LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 800,000 |
Comment
|
| 2038 |
COMPLETION OF SIKOWO ECDE, TANGASIA LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 800,000 |
Comment
|
| 2039 |
COMPLETION OF KAGHOT ECDE, TANGASIA LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 775,308 |
Comment
|
| 2040 |
COMPLETION OF CHEPKOTIT ECDE, KAMELEI SUB LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 800,000 |
Comment
|
| 2041 |
COMPLETION OF KATIAN ECDE, KAMELEI SUB LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 800,000 |
Comment
|
| 2042 |
COMPLETION OF SENGERERWO ECDE, TAPACH SUB LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 800,000 |
Comment
|
| 2043 |
COMPLETION OF SOPOWEN ECDE, TAPACH SUB LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 800,000 |
Comment
|
| 2044 |
COMPLETION OF KAIPAWIS ECDE, NYERKULIAN SUB LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 800,000 |
Comment
|
| 2045 |
COMPLETION OF LOSA ECDE, NYERKULIAN SUB LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 800,000 |
Comment
|
| 2046 |
COMPLETION OF CHEMORIL ECDE, KALE SUB LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 800,000 |
Comment
|
| 2047 |
COMPLETION OF KAPOMO ECDE, KALE SUB LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 850,000 |
Comment
|
| 2048 |
ROOFING AND FIXING OF DOORS AND WINDOWS AT NYARPAT ECDE, NYARPAT SUB LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 2049 |
COMPLETION OF TORION ECDE, NYARPAT SUB LOCATION-TAPACH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 850,000 |
Comment
|
| 2050 |
SUPPLY OF ECDE LEARNING MATERIALS KASEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KASEI |
Ksh 3,000,000 |
Comment
|
| 2051 |
CONSTRUCTION OF ECDE CLASSROOM AT KOKWO TEDE-SEKERR WARD |
Education and Technical Training |
2025-2026 |
Complete
|
SEKERR |
Ksh 1,500,000 |
Comment
|
| 2052 |
CONSTRUCTION OF ONE CLASSROOM AT LOKEKE ECDE, TURKWEL- ENDUGH WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ENDUGH |
Ksh 1,200,000 |
Comment
|
| 2053 |
CONSTRUCTION OF A ECDE CLASSROOM AT MATIL SIRAN- ALALE WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 1,300,000 |
Comment
|
| 2054 |
CONSTRUCTION OF A ECDE CLASSROOM AT KAAGHAT- ALALE WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 1,200,000 |
Comment
|
| 2055 |
CONSTRUCTION OF A ECDE PIT -LATRINE AT NATAPAR ECDE- ALALE WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 2056 |
CONSTRUCTION OF PIT LATRINE AT KPONOT ECDE - ALALE WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 2057 |
CONSTRUCTION OF A ECDE CLASSROOM AT MORON- ALALE WARD |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 1,300,000 |
Comment
|
| 2058 |
CONSTRUCTION OFPITLATRINE AT SECS ECDE - RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2059 |
CONSTRUCTION OF PITLATRINE AT AUSUKUYON - RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2060 |
CONSTRUCTION OF PITLATRINE AT LOKATUKOI) - RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2061 |
CONSTRUCTION OF PITLATRINE AT KATUKUMWOK(LIMANG0E) - RIWO WARD |
Education and Technical Training |
2025-2026 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2062 |
CONSTRUCTION OF PIT LATRINE AT KOMOLWOWO ECDE- ALALE WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 2063 |
PROPOSED CONSTRUCTION OF ONE ECDE CLASSROOM AT OTUKO -ALALE WARD (PENDING BILL)(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 500,280 |
Comment
|
| 2064 |
COMPLETION OF ECD CLASSROOM AT ELCK NAPIZ ECDE CENTRE- ALALE WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 2065 |
CONSTRUCTION OF ECDE CLASSROOM AT NASURET -ALALE WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 299,694 |
Comment
|
| 2066 |
COMPLETION OF SITOT ECDE CLASSROOM- BATEI WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 2067 |
CONSTRUCTION OF ONE ECDE CLASSROOM PUSOL- BATEI WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 900,000 |
Comment
|
| 2068 |
CONSTRUCTION OF DORMITORY AT KOPOROCH GIRLS - BATEI WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 3,000,000 |
Comment
|
| 2069 |
CONSTRUCTION OF ECDE CLASSROOM AT KAPROM- KAPENGURIA WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 2070 |
CONSTRUCTION OF NGOLEYO ECDE - KAPENGURIA WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 2071 |
COMPLETION OF KALEMNGOROK ECDE CLASS ROOM -KODICH WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
KODICH |
Ksh 300,000 |
Comment
|
| 2072 |
CONSTRUCTION OF ECDE CLASSROOM AT RINGRING- LELAN WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2073 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPKUTWEN - LELAN WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2074 |
CONSTRUCTION OF AN ECDE CLASSROOM AT TOROTWO- LELAN WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2075 |
CONSTRUCTION OF ECDE CLASS ROOMS AT KAPSEBEI-LELAN WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2076 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT CHEPOSAIT ECDE - LELAN WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2077 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT TUKUMO ECDE MBAYAI-LELAN WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2078 |
CONSTRUCTION OF ECDE CLASS ROOMS AT CHEPKATA-LELAN WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2079 |
CONSTRUCTION OF ECDE CLASS ROOMS AT PORIROP-LELAN WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2080 |
COMPLETION OF AN ECDE CLASSROOM AT CHEMAIN-LOMUT WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 2081 |
CONSTRUCTION OF A PIT-LATRINE AT KISHOREI-LOMUT WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 2082 |
CONSTRUCTION OF TWO ECDE CLASSROOM AT CHEPELION ECDE.- MAS0 WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
MAS0 |
Ksh 1,400,000 |
Comment
|
| 2083 |
COMPLETION OF ORON ECDE CLASSROOMS- MAS0 WARD- MAS0 WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
MAS0 |
Ksh 600,000 |
Comment
|
| 2084 |
CONSTRUCTION OF TOILET AT KORPUN ECDE-SIYOI WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2085 |
CONSTRUCTION OF ECDE CLASSROOM AT ARAP MAINA PRIMARY SCHO0-SIYOI WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
SIYOI |
Ksh 800,000 |
Comment
|
| 2086 |
ROOFING AND FIXING OF DOORS AND WINDOWS AT SENGERERWO ECDE -TAPACH WARD (R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2087 |
COMPLETION OF SANGAT ECDE CLASS ROOMS-WEIWEI WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 700,000 |
Comment
|
| 2088 |
COMPLETION OF ENDOW ECDE CLASS ROOMS-WEIWEI WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 400,000 |
Comment
|
| 2089 |
COMPLETION OF CHEPTESOK ECDE CLASS ROOMS-WEIWEI WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 400,000 |
Comment
|
| 2090 |
PURCHASE AND SUPPLY OF ECDE CHAIRS- TAPACH WARD(R0 OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2091 |
COMPLETION OF ECDE CLASSROOM AT NAPODO ECDE CENTER- ALALE WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
ALALE |
Ksh 499,995 |
Comment
|
| 2092 |
CONSTRUCTION OF ECDE AT KAPROMTIN - BATEI WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
BATEI |
Ksh 998,252 |
Comment
|
| 2093 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPKENEROI- KAPENGURIA WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 50,935 |
Comment
|
| 2094 |
CONSTRUCTION OF A PIT- LATRINE AT NAMUTON ECDE - KODICH WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
KODICH |
Ksh 499,900 |
Comment
|
| 2095 |
COMPLETION OF AN ECDE CLASSROOM AT PTULUNGWO-LOMUT WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 199,991 |
Comment
|
| 2096 |
CONSTRUCTION OF AN ECDE CLASSROOM AT KAKITONGIN-LOMUT WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 99,961 |
Comment
|
| 2097 |
CONSTRUCTION OF ECDE CLASS ROOM AT PARASONGA-LOMUT WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
LOMUT |
Ksh 54,991 |
Comment
|
| 2098 |
CONSTRUCTION OF TWO ECDE CLASSROOM AT NARUKUMO- MASOL WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 1,399,919 |
Comment
|
| 2099 |
CONSTRUCTION OF ECDE TWO CLASSROOM AT CHELANGET- MASOL WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 1,399,802 |
Comment
|
| 2100 |
CONSTRUCTION OF TWO NEW ECDE CLASSROOM AT AMUTO ECDE- MASOL WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
MASOL |
Ksh 1,398,570 |
Comment
|
| 2101 |
ROOFING AND FIXING OF DOORS AND WINDOWS AT KAIPAWIS ECDE CLASSROOMS - TAPACH WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 499,889 |
Comment
|
| 2102 |
ROOFING AND FIXING OF DOORS AND WINDOWS AT KAAPOMO ECDE CLASSROOMS - TAPACH WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 24,970 |
Comment
|
| 2103 |
ROOFING AND FIXING OF DOORS AND WINDOWS AT PSERO ECDE -TAPACH WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 499,820 |
Comment
|
| 2104 |
ROOFING AND FIXING OF DOORS AND WINDOWS AT LOSA ECDE - TAPACH WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 499,989 |
Comment
|
| 2105 |
ROOFING AND FIXING OF DOORS AND WINDOWS AT SIKOWO ECDE- TAPACH WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 499,877 |
Comment
|
| 2106 |
ROOFING AND FIXING OF DOORS AND WINDOWS AT KAGHOOT ECDE -TAPACH WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 24,692 |
Comment
|
| 2107 |
ROOFING AND FIXING OF DOORS AND WINDOWS AT SUKONU ECDE -TAPACH WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 499,692 |
Comment
|
| 2108 |
ROOFING AND FIXING OF DOORS AND WINDOWS AT CHEPKOTIT ECDE -TAPACH WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 499,738 |
Comment
|
| 2109 |
ROOFING AND FIXING OF DOORS AND WINDOWS AT SOPOWEN ECDE -TAPACH WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
TAPACH |
Ksh 499,853 |
Comment
|
| 2110 |
CONSTRUCTION OF ECDE CLASSROOM AT MTOL -WEIWEI WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 1,199,800 |
Comment
|
| 2111 |
CONSTRUCTION OF ECDE CLASSROOM AT TINWA- WEIWEI WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 1,199,900 |
Comment
|
| 2112 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT PLOMBA -WEIWEI WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 999,620 |
Comment
|
| 2113 |
CONSTRUCTION OF PIT LATRINE AT PSIMAT ECDE-WEIWEI WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 549,950 |
Comment
|
| 2114 |
PURCHASE OF ECDE TABLES AND CHAIRS-MNAGEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 2115 |
COMPLETION OF IYOON ECDE CLASS ROOMS-WEIWEI WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
WEIWEI |
Ksh 399,980 |
Comment
|
| 2116 |
SUPPLY AND PURCHASE OF ECDE CHAIRS - KASEI WARD |
Education and Technical Training |
2025-2026 |
Complete
|
KASEI |
Ksh 700,000 |
Comment
|
| 2117 |
PURCHASE AND SUPPLY OF ECDE TABLES AND CHAIRS ACROSS THE WARD- MNAGEI WARD (ROLL OVER) |
Education and Technical Training |
2025-2026 |
Complete
|
MNAGEI |
Ksh 698,209 |
Comment
|
| 2118 |
MODERN ASSEMBLY PORCH AND INTALLATION OF NEW ENTRY/EXIT GATE |
County Assembly |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 5,000,000 |
Comment
|
| 2119 |
STEEL WATER TANK AND PLUMBING |
County Assembly |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 3,900,000 |
Comment
|
| 2120 |
CCTV CAMERAS |
County Assembly |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 7,895,000 |
Comment
|
| 2121 |
PURCHASE OF OFFICE FURNITURE AND FITTINGS WINDOW BLINDS |
County Assembly |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 2,500,000 |
Comment
|
| 2122 |
PURCHASE OF LIFTS |
County Assembly |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 1,414,760 |
Comment
|
| 2123 |
CONSTRUCTION OF GUARD HOUSE AT BENDERA FRESH PRODUCE MARKET |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 700,000 |
Comment
|
| 2124 |
RENOVATION OF KATIKOMOR FRESH PRODUCE MARKET |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2125 |
CONSTRUCTION OF BODABODA SHADE AT NYARKULIAN TRADING CENTER(ROLL OVER) |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh 499,999 |
Comment
|
| 2126 |
RENOVATION OF TRADE AND COOPERATIVE OFFICES |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 1,499,938 |
Comment
|
| 2127 |
CONSTRUCTION OF MOTOR VEHICLE SHADE AT COOPERATIVE OFFICE |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 999,963 |
Comment
|
| 2128 |
CONSTRUCTION OF MODERN TOILET AT TRADE OFFICE |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 2,999,922 |
Comment
|
| 2129 |
COMPLETION OF WEST POKOT MILK PROCESSING PLANT - WATER SUPPLY |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
LELAN |
Ksh 2,999,506 |
Comment
|
| 2130 |
CONSTRUCTION OF KONYAO MARKET TOILET BLOCK |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 999,950 |
Comment
|
| 2131 |
PROPOSED RENOVATION OF MAKUTANO MARKET |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
MNAGEI |
Ksh 2,999,991 |
Comment
|
| 2132 |
RENOVATION OF KONYAO MARKET |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2133 |
COMPLETION OF SARAMEE COOLING PLANT |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2134 |
FENCING AND INSTALLATION OF TWO CONTAINERS AT BENDERA FRESH PRODUCE MARKET |
County Executive |
2024-2025 |
Complete
|
Alale |
Ksh 3,200,000 |
Comment
|
| 2135 |
CONSTRUCTION OF PIT LATRINE AT MURKWIJIT COOLING PLANT |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
MNAGEI |
Ksh 700,000 |
Comment
|
| 2136 |
INSTALLATION OF STREETLIGHTS AT MAKUTANO-MNAGEI WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
MNAGEI |
Ksh 618,976 |
Comment
|
| 2137 |
CONSTRUCTION OF BODA BODA SHADE AT CHEPKONDOL TRADING CENTRE- SEKERR WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
SEKERR |
Ksh 700,000 |
Comment
|
| 2138 |
CAPITAL TRANSFERS TO NON-PROFIT ORGANIZATIONS AND ASSOCIATIONS - KOKWOPSIS FCS LTD MILK COOLING PLANT- TAPACH WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2139 |
CAPITAL TRANSFERS TO NON - PROFIT ORGANIZATIONS AND ASSOCIATIONS COMPLETION OF SOKALE FCS LTD MILK COOLING PLANT- TAPACH WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2140 |
CAPITAL TRANSFERS TO NON - PROFIT ORGANIZATIONS AND ASSOCIATIONS OPERATIONALIZATION OF TAPACH FCS LTD MILK COOLING PLANT- TAPACH WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2141 |
CAPITAL TRANSFERS TO NON-PROFIT ORGANIZATIONS AND ASSOCIA TIONS - COMPLETION OF PTOP FCS LTD MILK COOLING PLANT- TAPACH WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2142 |
CAPITAL TRANFERS TO NON - PROFIT ORGANATIONS AND ASSOCIATIONS- COMPLETION OF SONDANY FCS LTD MILK COOLIN G PLANT- TAPACH WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2143 |
CAPITAL TRANSFER TO NON PROFIT ORGANIZATIONS ANDASSOCIATIONS-KARAS COOPERATIVE SOCIETY- KAPENGURIA- WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 2144 |
CAPITAL TRANSFER OF FUNDS TO NON PROFIT ORGANIZATION AND ASSOCIATIONS - SONDANY FARMERS COOPERATIVE MILK COOLING PLANT |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2145 |
CONSTRUCTION OF BODABODA SHADE AT WAKOR CENTRE-WEIWEI WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
WEIWEI |
Ksh 700,000 |
Comment
|
| 2146 |
PURCHASE OF POTTING TUBES AND OTHER TREE NURSERIES MATERIALS TO SUPPORT YOUTH GROUPS WITHIN KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 700,000 |
Comment
|
| 2147 |
PURCHASE AND DISTRIBUTION OF TREE SEEDLINGS TO FARMERS- TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
TAPACH |
Ksh 1,500,000 |
Comment
|
| 2148 |
PURCHASE OF TREE SEEDLINGS FOR SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SOOK |
Ksh 2,500,000 |
Comment
|
| 2149 |
INSTALLATION OF 10,000LTRS TANK,STRUCTURE,PIPING,MOTOR PUMP AND SOLAR WITH THREE WATER POINTS AT MADING BOREHOLE - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 3,000,000 |
Comment
|
| 2150 |
REPAIR OF NYANG’AITA BOYS SEC. SCH. BOREHOLE- MASOL WARD- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 2151 |
PURCHASE OF SOLAR PUMPS FOR REMOI BOREHOLE - ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 400,000 |
Comment
|
| 2152 |
CONSTRUCTION OF A SAND DAM AT LOESEMUNY- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 1,500,000 |
Comment
|
| 2153 |
COMPLETION OF OMORWO SAND DAM- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 800,000 |
Comment
|
| 2154 |
PURCHASE OF WATER TANKS FOR HOUSEHOLDS ACROSS ENTIRE WARD - ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 1,200,000 |
Comment
|
| 2155 |
REPAIR OF KOSITOT PRIMARY SCHOOL BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 1,000,000 |
Comment
|
| 2156 |
REPAIR OF LOYEMAMOSIN, LODONY, KAPTUKEN, NAUYAPONG A AND B,ORON AND LOLEPON BOREHOLES- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 2157 |
PURCHASE AND SUPPLY OF BORE HOLE REPAIR MATERIALS- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 1,500,000 |
Comment
|
| 2158 |
REHABILITATION OF KATICH BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 840,500 |
Comment
|
| 2159 |
REPAIR OF KAMURUNYANG SOLAR BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 699,800 |
Comment
|
| 2160 |
COMPLETION OF LOTUPOGH – EMPOSIMOSTWO - GHAT WATER PROJECT- BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 2161 |
PIPING OF KACHEPTARINY- SONGOWOT WATER SUPPLY-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2162 |
CONSTRUCTION OF WATER TANK AND PIPING OF KASONGWOR WATER SUPPLY- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 2163 |
MAINTENANCE OF TIRKEN SAFE WATER PROJECT- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2164 |
SUPPLY OF WATER TANK AT LOKWAPUO- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2165 |
CONSTRUCTION AND FENCING OF RIRIMPOI WATER INTAKE - CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 2166 |
CONSTRUCTION OF INTAKE AND PIPING OF CHEMGHACH WATER PROJECT-ENDOUGH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ENDOUGH |
Ksh 600,000 |
Comment
|
| 2167 |
DRILLING OF BOREHOLE AT TUWIT -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2168 |
DRILLING OF BOREHOLE AT LOKITEDEL -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2169 |
DRILLING OF BOREHOLE AT CHEPTOKOL -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2170 |
PURCHASE AND SUPPLY OF BORE REPAIR MATERIALS -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2171 |
PURCHASE OF SOLAR PUMPS GUNFOS,6 SOLARS OF 275WATTS AND 3 CONTROLLERS LOBOK AND KARON - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 2172 |
HAMDPUMBS INSTALLATION TO BOREHOLES IN ATEKER, CHEPTUMOT AND KOPEYON- KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2173 |
CONSTRUCTION OF ABEYON WATER PROJECT AND PIPING TO NAPITIRO DISPENSARY AND NAPITIRO PRIMARY SCHOOL- KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 1,999,999 |
Comment
|
| 2174 |
RENOVATION AND PIPPING OF KOITOMO WATER PROJECT- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 2175 |
UPGRADING OF KOMOL BOREHOLE TO SOLAR POWERED-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 2176 |
PURCHASE OF WATER PIPES FOR BENDERA AND SAKAS-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 800,000 |
Comment
|
| 2177 |
DRILLING OF BOREHOLE AT KALAS- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 2178 |
PURCHASE AND SUPPLY OF WATER PIPES TANTANA AND SAKAS- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 2179 |
PROTECTION OF BENDERA SPRING-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 2180 |
PROTECTION OF CHEWOYET SPRING-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 2181 |
DRILLING AND EQUIPING KONGAI BOREHOLE -KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KASEI |
Ksh 2,000,000 |
Comment
|
| 2182 |
PURCHASE AND SUPPLY OF BORE HOLE REPAIR MATERIALS - KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 2183 |
DRILLING OF BOREHOLE AT NAPEYELEL - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 2184 |
DRILLING OF BOREHOLE AT NATIMERI - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 2185 |
PURCHASE AND SUPPLY OF ASSORTED WATER PIPES - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 1,500,000 |
Comment
|
| 2186 |
CONSTRUCTION OF SAND DAM AT KETII - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2187 |
CONSTRUCTION OF SAND DAM AT MORIONGWO - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2188 |
CONSTRUCTION OF SAND DAM AT LOMIROO - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2189 |
CONSTRUCTION OF SAND DAM AT NGORIAKAMAR - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2190 |
CONSTRUCTION OF SAND DAM AT EMPOGHAT - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2191 |
UPGRADING OF NAKWAPUO BOREHOLE TO SOLAR SYSTEM AND PIPING TO AMANI CENTRE- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh 2,500,000 |
Comment
|
| 2192 |
UPGRADING OF CHERANGAN BOREHOLE TO SOLAR SYSTEM- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh 2,000,000 |
Comment
|
| 2193 |
UPGRADING OF MOKONGWO TO SOLAR SYSTEM-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh 2,000,000 |
Comment
|
| 2194 |
DRILLING AND EQUIPING OF KADEKO- APONGOI BORE HOLE- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh 2,500,000 |
Comment
|
| 2195 |
SUPPLY OF BOREHOLE REPAIR MATERIALS AND REPAIR OF SOLAR POWERED AND HANDPUMPS ACROSS KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh 900,000 |
Comment
|
| 2196 |
CONSTRUCTION OF INTAKE AND PIPING OF WATER AT TRIK PRIMARY SCHOOL WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2197 |
CONSTRUCTION OF INTAKE AND PIPING OF MNOPOI WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 600,000 |
Comment
|
| 2198 |
CONSTRUCTION INTAKE AND PIPING OF WATER AT MURUNY PRIMARY AND SECONDARY- LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2199 |
PURCHASE AND SUPPLY OF WATER TANKS TO KIPAT, LOYAMURUK,LOMUKE PRI. AND RING RING COMMUNITY WATER POINTS - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2200 |
CONSTRUCTION OF INTAKE AND PIPING OF WATER AT CHEPARTEN-MURKISIAN WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 832,000 |
Comment
|
| 2201 |
RENOVATION OF INTAKE AND PIPPING KSAI WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2202 |
RENOVATION OF INTAKE AND PIPING OF LUTIPOI-SIMOTWO WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 600,000 |
Comment
|
| 2203 |
CHEPTORUK PYARUS KAPAKAI WATER SUPPLY-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 599,910 |
Comment
|
| 2204 |
PIPING OF WUMBOGH-PITPAGH-WIYAN WATER PROJECT -LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LOMUT |
Ksh 4,000,000 |
Comment
|
| 2205 |
PIPING OF MALOS WATER PROJECT - LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 2206 |
REPAIR OF KOGHIN-KLOLO WATER PROJECT-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 2207 |
DE-SILTING OF CHEMURO WATER PAN.- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh 3,000,000 |
Comment
|
| 2208 |
DE-SILTING OF LOMORTOM WATER PAN.- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh 3,000,000 |
Comment
|
| 2209 |
DE-SILTING OF LOTULIANGIRO WATER PAN.- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh 3,000,000 |
Comment
|
| 2210 |
DRILLING A BORE HOLE AT CHELANGET- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh 2,000,000 |
Comment
|
| 2211 |
PURCHASE AND SUPPLY OF BOREHOLE MATERIALS- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 2212 |
PURCHASE OF WATER PIPES FOR MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 2213 |
MESHACK-FACTORY WATER SUPPLY- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 2214 |
PROTECTION OF SPRING WATER AT MBOGHOU IN KANGILIKWAN- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh 399,580 |
Comment
|
| 2215 |
SUPPLY AND DELIVERYOF WATER CASINGS FORBMNAGEI WARD-MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh 1,999,900 |
Comment
|
| 2216 |
DRILLING OF BOREHOLE AT NAKTOPAR-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 2217 |
DRILLING OF BOREHOLE AT LOKITEDEL- RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 2218 |
DRILLING OF BOREHOLE AT KOPEMOI-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 2219 |
DRILLING OF BOREHOLE AT SIMATWA - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 2220 |
PURCHASE AND SUPPLY OF BORE-HOLE REPAIR MATERIAL ENTIRE WARD-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 1,500,000 |
Comment
|
| 2221 |
WATER PIPING OF WATER FROM HILL TO VILLAGE POOLE - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 999,989 |
Comment
|
| 2222 |
PROPOSED PIPING OF WATER FROM MAIN BOREHOLE- CENTRE KAITUKUM-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 999,920 |
Comment
|
| 2223 |
PURCHASE AND SUPPLY OF WATER PIPES TO FARMERS - SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh 800,000 |
Comment
|
| 2224 |
PIPPING OF CHEPKOLOL-3G VILLAGE WATER PROJECT- SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh 900,000 |
Comment
|
| 2225 |
REPAIR OF PIPES OF SIMBOIYWO- CHOPOTWO WATER- SEKER WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh 1,500,000 |
Comment
|
| 2226 |
PURCHASE OF WATER BOOSTER- SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 2227 |
PIPING OF MTELO- KACHESOIT WATER PROJECT- SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh 2,000,000 |
Comment
|
| 2228 |
COMPLETION OF MTELO KACHESOIT WATER PROJECT-SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh 999,920 |
Comment
|
| 2229 |
PIPING OF WATER FROM KAPCHILA TO THE TANK AT ASIWARENG, KAPCHILA CENTRE AND AIOC KAPCHILA-SIYOI |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 800,000 |
Comment
|
| 2230 |
RENOVATION OF KAPKATET WATER SOURCE AND PIPPING TOKAPTOBOSWA,LOKAPEL PRIMARY ,KIPTENTEN AND KAP-NDEGE VILLAGE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 2231 |
SPRING PROTECTION AT TENDWO IN ROROKET VILLAGE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2232 |
CONSTRUCTION OF WATER INTAKE AND PIPING AT KAPSIRPEI WATER PROJECT TO SERVE KAPRECH PRIMARY, SECONDARY AND ADJACENT VILLAGE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 2233 |
DRILLING OF A BORE HOLE AT SIYOI CENTRE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 2,000,000 |
Comment
|
| 2234 |
SOLAR INSTALLATION AND PIPING OF SIYOI CENTER BOREHOLE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 2,500,000 |
Comment
|
| 2235 |
DRILLING OF A BORE HOLE AT TALAU CENTER- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 2,000,000 |
Comment
|
| 2236 |
SOLAR INSTALLATION AND PIPING OF TALAU CENTER BOREHOLE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 2,500,000 |
Comment
|
| 2237 |
WATER PIPING FROM KAIBOS WATER TANK TO JUNCTION WATER TANK, KIPKORINYA PRIMARY AND CATTLE DIP, KAIBOS PRIMARY AND SECONDARY SCHOOL, MOYAKIT AND KIWANJA VILLAGES.- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 1,500,000 |
Comment
|
| 2238 |
SPRING PROTECTION AT KAPSOKWO VILLAGE IN TALAU- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2239 |
SPRING PROTECTION AT TULWET VILLAGE IN TALAU- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2240 |
SPRING PROTECTION AT CHEMOSI VILLAGE IN TALAU- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2241 |
PURCHASE AND SUPPLY OF ASSORTED WATER PIPES TO KAPKECHA AND,CHEPORIOT VILLAGE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 700,000 |
Comment
|
| 2242 |
RENOVATION OF WATER INTAKE AT KAPLAIN AND PIPPING TO KAPLAIN CENTER, KIPSAKAS PRI. SCHOOL AND ADJACENT VILLAGE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 2243 |
INSTALLATION OF SOLAR AT CHEPO- ASACHA BOREHOLE - SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,300,000 |
Comment
|
| 2244 |
CONSTRUCTION OF SUB-SURFACE DAM AT NAKARUKAI- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 2245 |
CONSTRUCTION OF SUB-SURFACE DAM AT ANGAMIT- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 2246 |
INSTALLATION OF SOLAR AT NAKUYEN BORE HOLE- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,300,000 |
Comment
|
| 2247 |
DRILLING OF BORE HOLE AT TEPANYANG-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 2248 |
DRILLING OF BORE HOLE AT KASIYOYOWO-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 2249 |
DRILLING OF BORE HOLE AT NAUYAYELEL-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 2250 |
CONSTRUCTION OF SAND DAM AT KALAS- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 2251 |
UPGRADING OF KINGISIA- KOPULIO WARD BOREHOLE TO SOLAR POWERED-SUAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,299,990 |
Comment
|
| 2252 |
UPGRADING OF KOKWOLIKWON- KARON BOREHOLE TO SOLAR POWERED-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,299,900 |
Comment
|
| 2253 |
PURCHASE AND SUPPLY OF WATER PIPES - TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
TAPACH |
Ksh 2,000,000 |
Comment
|
| 2254 |
CONSTRUCTION OF FURROW AT SANGAT, OROLWO-WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
WEIWEI |
Ksh 1,000,000 |
Comment
|
| 2255 |
CONSTRUCTION OF KEWAMUNY – PAROO FURROW- WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
WEIWEI |
Ksh 1,500,000 |
Comment
|
| 2256 |
PURCHASE AND SUPPLY OF WATER PIPES FOR TANTAI WATER PROJECT- WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
WEIWEI |
Ksh 1,200,000 |
Comment
|
| 2257 |
PURCHASE OF PIPES AND POTTING TUBES FOR SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SOOK |
Ksh 2,500,000 |
Comment
|
| 2258 |
CONSTRUCTION OF WATER INTAKE AT KAPSAMBUL - SUKUT WATER PROJECT IN TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2259 |
PURCHASE OF POTTING TUBES AND OTHER TREE NURSERIES MATERIALS TO SUPPORT YOUTH GROUPS WITHIN KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 700,000 |
Comment
|
| 2260 |
PURCHASE AND DISTRIBUTION OF TREE SEEDLINGS TO FARMERS- TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
TAPACH |
Ksh 1,500,000 |
Comment
|
| 2261 |
PURCHASE OF TREE SEEDLINGS FOR SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SOOK |
Ksh 2,500,000 |
Comment
|
| 2262 |
INSTALLATION OF 10,000LTRS TANK,STRUCTURE,PIPING,MOTOR PUMP AND SOLAR WITH THREE WATER POINTS AT MADING BOREHOLE - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 3,000,000 |
Comment
|
| 2263 |
REPAIR OF NYANG’AITA BOYS SEC. SCH. BOREHOLE- MASOL WARD- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 2264 |
PURCHASE OF SOLAR PUMPS FOR REMOI BOREHOLE - ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 400,000 |
Comment
|
| 2265 |
CONSTRUCTION OF A SAND DAM AT LOESEMUNY- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 1,500,000 |
Comment
|
| 2266 |
COMPLETION OF OMORWO SAND DAM- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 800,000 |
Comment
|
| 2267 |
PURCHASE OF WATER TANKS FOR HOUSEHOLDS ACROSS ENTIRE WARD - ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 1,200,000 |
Comment
|
| 2268 |
REPAIR OF KOSITOT PRIMARY SCHOOL BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 1,000,000 |
Comment
|
| 2269 |
REPAIR OF LOYEMAMOSIN, LODONY, KAPTUKEN, NAUYAPONG A AND B,ORON AND LOLEPON BOREHOLES- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 2270 |
PURCHASE AND SUPPLY OF BORE HOLE REPAIR MATERIALS- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 1,500,000 |
Comment
|
| 2271 |
REHABILITATION OF KATICH BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 840,500 |
Comment
|
| 2272 |
REPAIR OF KAMURUNYANG SOLAR BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh 699,800 |
Comment
|
| 2273 |
COMPLETION OF LOTUPOGH – EMPOSIMOSTWO - GHAT WATER PROJECT- BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 2274 |
PIPING OF KACHEPTARINY- SONGOWOT WATER SUPPLY-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2275 |
CONSTRUCTION OF WATER TANK AND PIPING OF KASONGWOR WATER SUPPLY- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 2276 |
MAINTENANCE OF TIRKEN SAFE WATER PROJECT- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2277 |
SUPPLY OF WATER TANK AT LOKWAPUO- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2278 |
CONSTRUCTION AND FENCING OF RIRIMPOI WATER INTAKE - CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 2279 |
CONSTRUCTION OF INTAKE AND PIPING OF CHEMGHACH WATER PROJECT-ENDOUGH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ENDOUGH |
Ksh 600,000 |
Comment
|
| 2280 |
DRILLING OF BOREHOLE AT TUWIT -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2281 |
DRILLING OF BOREHOLE AT LOKITEDEL -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2282 |
DRILLING OF BOREHOLE AT CHEPTOKOL -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2283 |
PURCHASE AND SUPPLY OF BORE REPAIR MATERIALS -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2284 |
PURCHASE OF SOLAR PUMPS GUNFOS,6 SOLARS OF 275WATTS AND 3 CONTROLLERS LOBOK AND KARON - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 2285 |
HAMDPUMBS INSTALLATION TO BOREHOLES IN ATEKER, CHEPTUMOT AND KOPEYON- KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2286 |
CONSTRUCTION OF ABEYON WATER PROJECT AND PIPING TO NAPITIRO DISPENSARY AND NAPITIRO PRIMARY SCHOOL- KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh 1,999,999 |
Comment
|
| 2287 |
RENOVATION AND PIPPING OF KOITOMO WATER PROJECT- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 2288 |
UPGRADING OF KOMOL BOREHOLE TO SOLAR POWERED-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 2289 |
PURCHASE OF WATER PIPES FOR BENDERA AND SAKAS-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 800,000 |
Comment
|
| 2290 |
DRILLING OF BOREHOLE AT KALAS- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 2291 |
PURCHASE AND SUPPLY OF WATER PIPES TANTANA AND SAKAS- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 2292 |
PROTECTION OF BENDERA SPRING-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 2293 |
PROTECTION OF CHEWOYET SPRING-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 2294 |
DRILLING AND EQUIPING KONGAI BOREHOLE -KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KASEI |
Ksh 2,000,000 |
Comment
|
| 2295 |
PURCHASE AND SUPPLY OF BORE HOLE REPAIR MATERIALS - KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 2296 |
DRILLING OF BOREHOLE AT NAPEYELEL - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 2297 |
DRILLING OF BOREHOLE AT NATIMERI - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 2298 |
PURCHASE AND SUPPLY OF ASSORTED WATER PIPES - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 1,500,000 |
Comment
|
| 2299 |
CONSTRUCTION OF SAND DAM AT KETII - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2300 |
CONSTRUCTION OF SAND DAM AT MORIONGWO - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2301 |
CONSTRUCTION OF SAND DAM AT LOMIROO - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2302 |
CONSTRUCTION OF SAND DAM AT NGORIAKAMAR - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2303 |
CONSTRUCTION OF SAND DAM AT EMPOGHAT - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2304 |
UPGRADING OF NAKWAPUO BOREHOLE TO SOLAR SYSTEM AND PIPING TO AMANI CENTRE- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh 2,500,000 |
Comment
|
| 2305 |
UPGRADING OF CHERANGAN BOREHOLE TO SOLAR SYSTEM- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh 2,000,000 |
Comment
|
| 2306 |
UPGRADING OF MOKONGWO TO SOLAR SYSTEM-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh 2,000,000 |
Comment
|
| 2307 |
DRILLING AND EQUIPING OF KADEKO- APONGOI BORE HOLE- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh 2,500,000 |
Comment
|
| 2308 |
SUPPLY OF BOREHOLE REPAIR MATERIALS AND REPAIR OF SOLAR POWERED AND HANDPUMPS ACROSS KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh 900,000 |
Comment
|
| 2309 |
CONSTRUCTION OF INTAKE AND PIPING OF WATER AT TRIK PRIMARY SCHOOL WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2310 |
CONSTRUCTION OF INTAKE AND PIPING OF MNOPOI WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 600,000 |
Comment
|
| 2311 |
CONSTRUCTION INTAKE AND PIPING OF WATER AT MURUNY PRIMARY AND SECONDARY- LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2312 |
PURCHASE AND SUPPLY OF WATER TANKS TO KIPAT, LOYAMURUK,LOMUKE PRI. AND RING RING COMMUNITY WATER POINTS - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2313 |
CONSTRUCTION OF INTAKE AND PIPING OF WATER AT CHEPARTEN-MURKISIAN WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 832,000 |
Comment
|
| 2314 |
RENOVATION OF INTAKE AND PIPPING KSAI WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2315 |
RENOVATION OF INTAKE AND PIPING OF LUTIPOI-SIMOTWO WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 600,000 |
Comment
|
| 2316 |
CHEPTORUK PYARUS KAPAKAI WATER SUPPLY-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh 599,910 |
Comment
|
| 2317 |
PIPING OF WUMBOGH-PITPAGH-WIYAN WATER PROJECT -LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LOMUT |
Ksh 4,000,000 |
Comment
|
| 2318 |
PIPING OF MALOS WATER PROJECT - LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 2319 |
REPAIR OF KOGHIN-KLOLO WATER PROJECT-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 2320 |
DE-SILTING OF CHEMURO WATER PAN.- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh 3,000,000 |
Comment
|
| 2321 |
DE-SILTING OF LOMORTOM WATER PAN.- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh 3,000,000 |
Comment
|
| 2322 |
DE-SILTING OF LOTULIANGIRO WATER PAN.- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh 3,000,000 |
Comment
|
| 2323 |
DRILLING A BORE HOLE AT CHELANGET- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh 2,000,000 |
Comment
|
| 2324 |
PURCHASE AND SUPPLY OF BOREHOLE MATERIALS- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 2325 |
PURCHASE OF WATER PIPES FOR MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 2326 |
MESHACK-FACTORY WATER SUPPLY- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 2327 |
PROTECTION OF SPRING WATER AT MBOGHOU IN KANGILIKWAN- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh 399,580 |
Comment
|
| 2328 |
SUPPLY AND DELIVERYOF WATER CASINGS FORBMNAGEI WARD-MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh 1,999,900 |
Comment
|
| 2329 |
DRILLING OF BOREHOLE AT NAKTOPAR-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 2330 |
DRILLING OF BOREHOLE AT LOKITEDEL- RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 2331 |
DRILLING OF BOREHOLE AT KOPEMOI-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 2332 |
DRILLING OF BOREHOLE AT SIMATWA - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 2333 |
PURCHASE AND SUPPLY OF BORE-HOLE REPAIR MATERIAL ENTIRE WARD-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 1,500,000 |
Comment
|
| 2334 |
WATER PIPING OF WATER FROM HILL TO VILLAGE POOLE - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 999,989 |
Comment
|
| 2335 |
PROPOSED PIPING OF WATER FROM MAIN BOREHOLE- CENTRE KAITUKUM-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh 999,920 |
Comment
|
| 2336 |
PURCHASE AND SUPPLY OF WATER PIPES TO FARMERS - SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh 800,000 |
Comment
|
| 2337 |
PIPPING OF CHEPKOLOL-3G VILLAGE WATER PROJECT- SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh 900,000 |
Comment
|
| 2338 |
REPAIR OF PIPES OF SIMBOIYWO- CHOPOTWO WATER- SEKER WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh 1,500,000 |
Comment
|
| 2339 |
PURCHASE OF WATER BOOSTER- SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 2340 |
PIPING OF MTELO- KACHESOIT WATER PROJECT- SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh 2,000,000 |
Comment
|
| 2341 |
COMPLETION OF MTELO KACHESOIT WATER PROJECT-SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh 999,920 |
Comment
|
| 2342 |
PIPING OF WATER FROM KAPCHILA TO THE TANK AT ASIWARENG, KAPCHILA CENTRE AND AIOC KAPCHILA-SIYOI |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 800,000 |
Comment
|
| 2343 |
RENOVATION OF KAPKATET WATER SOURCE AND PIPPING TOKAPTOBOSWA,LOKAPEL PRIMARY ,KIPTENTEN AND KAP-NDEGE VILLAGE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 2344 |
SPRING PROTECTION AT TENDWO IN ROROKET VILLAGE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2345 |
CONSTRUCTION OF WATER INTAKE AND PIPING AT KAPSIRPEI WATER PROJECT TO SERVE KAPRECH PRIMARY, SECONDARY AND ADJACENT VILLAGE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 2346 |
DRILLING OF A BORE HOLE AT SIYOI CENTRE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 2,000,000 |
Comment
|
| 2347 |
SOLAR INSTALLATION AND PIPING OF SIYOI CENTER BOREHOLE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 2,500,000 |
Comment
|
| 2348 |
DRILLING OF A BORE HOLE AT TALAU CENTER- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 2,000,000 |
Comment
|
| 2349 |
SOLAR INSTALLATION AND PIPING OF TALAU CENTER BOREHOLE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 2,500,000 |
Comment
|
| 2350 |
WATER PIPING FROM KAIBOS WATER TANK TO JUNCTION WATER TANK, KIPKORINYA PRIMARY AND CATTLE DIP, KAIBOS PRIMARY AND SECONDARY SCHOOL, MOYAKIT AND KIWANJA VILLAGES.- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 1,500,000 |
Comment
|
| 2351 |
SPRING PROTECTION AT KAPSOKWO VILLAGE IN TALAU- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2352 |
SPRING PROTECTION AT TULWET VILLAGE IN TALAU- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2353 |
SPRING PROTECTION AT CHEMOSI VILLAGE IN TALAU- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2354 |
PURCHASE AND SUPPLY OF ASSORTED WATER PIPES TO KAPKECHA AND,CHEPORIOT VILLAGE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 700,000 |
Comment
|
| 2355 |
RENOVATION OF WATER INTAKE AT KAPLAIN AND PIPPING TO KAPLAIN CENTER, KIPSAKAS PRI. SCHOOL AND ADJACENT VILLAGE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 2356 |
INSTALLATION OF SOLAR AT CHEPO- ASACHA BOREHOLE - SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,300,000 |
Comment
|
| 2357 |
CONSTRUCTION OF SUB-SURFACE DAM AT NAKARUKAI- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 2358 |
CONSTRUCTION OF SUB-SURFACE DAM AT ANGAMIT- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 2359 |
INSTALLATION OF SOLAR AT NAKUYEN BORE HOLE- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,300,000 |
Comment
|
| 2360 |
DRILLING OF BORE HOLE AT TEPANYANG-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 2361 |
DRILLING OF BORE HOLE AT KASIYOYOWO-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 2362 |
DRILLING OF BORE HOLE AT NAUYAYELEL-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 2363 |
CONSTRUCTION OF SAND DAM AT KALAS- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 2364 |
UPGRADING OF KINGISIA- KOPULIO WARD BOREHOLE TO SOLAR POWERED-SUAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,299,990 |
Comment
|
| 2365 |
UPGRADING OF KOKWOLIKWON- KARON BOREHOLE TO SOLAR POWERED-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh 2,299,900 |
Comment
|
| 2366 |
PURCHASE AND SUPPLY OF WATER PIPES - TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
TAPACH |
Ksh 2,000,000 |
Comment
|
| 2367 |
CONSTRUCTION OF FURROW AT SANGAT, OROLWO-WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
WEIWEI |
Ksh 1,000,000 |
Comment
|
| 2368 |
CONSTRUCTION OF KEWAMUNY – PAROO FURROW- WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
WEIWEI |
Ksh 1,500,000 |
Comment
|
| 2369 |
PURCHASE AND SUPPLY OF WATER PIPES FOR TANTAI WATER PROJECT- WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
WEIWEI |
Ksh 1,200,000 |
Comment
|
| 2370 |
PURCHASE OF PIPES AND POTTING TUBES FOR SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SOOK |
Ksh 2,500,000 |
Comment
|
| 2371 |
CONSTRUCTION OF WATER INTAKE AT KAPSAMBUL - SUKUT WATER PROJECT IN TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2372 |
ANNUAL ROADS INVENTORY AND CONDITION SURVEY |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 3,000,000 |
Comment
|
| 2373 |
EMBOUGH-PSAPAI-KRICH-MATOLONG ROAD (PART EXPANSION AND HEAVY GRADING WORKS 28KMS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ENDUGH |
Ksh 6,440,320 |
Comment
|
| 2374 |
TUNOYO-KOLA-CHEPNYAL ROAD (LIGHT BUSH CLEARING AND HEAVY GRADING WORKS 22KMS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SOOK |
Ksh 5,298,880 |
Comment
|
| 2375 |
LITYEI SECONDARY-KOMOLE ROAD (CULVERT REPAIR, HEAVY GRADING AND SPOT GRAVELLING 4KMS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MNAGEI |
Ksh 3,500,000 |
Comment
|
| 2376 |
TALAU-KIPKORINYA-KAIBOS-SIYOI ROAD (DRAINAGE WORKS, HEAVY GRADING AND SPOT GRAVELLING WORKS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SIYOI |
Ksh 4,000,000 |
Comment
|
| 2377 |
KITELAKAPEL-LOKITEDEL-LODUPUP ROAD (HEAVY GRADING AND SPOT GRAVELLING) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
RIWO |
Ksh 4,000,000 |
Comment
|
| 2378 |
CHEWOYET PRI.-TAMPU-LUTHERAN ROAD (DRAINAGE WORKS, HEAVY GRADING AND SPOT GRAVELLING WORKS 4KMS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 6,404,893 |
Comment
|
| 2379 |
KAPLES-KOTULPOGH-CHEPKIRINYONY-APEKER-TUWIT ROAD (OPENING AND HEAVY GRADING WORKS 5.0KMS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 5,530,778 |
Comment
|
| 2380 |
KASEI-CHEPURWO-APUKE ROAD (BUSH CLEARING AND OPENING OF MORITA JUNCTION-APUKE SECTION 6.5KMS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 6,844,734 |
Comment
|
| 2381 |
LOTEPES-LOKILELIAN-LOKWAMOR-LOKITEDEL ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KODICH |
Ksh 5,000,000 |
Comment
|
| 2382 |
MOINOI-CHUWAI-APUKE ROAD (BUSH CLEARING AND OPENING 3.4KMS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KIWAWA |
Ksh 5,808,441 |
Comment
|
| 2383 |
LENGOROK-AKORET-APUKE ROAD (BUSH CLEARING AND OPENING 5.0KMS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ALALE |
Ksh 6,000,000 |
Comment
|
| 2384 |
KACHELIBA-TAPADANY-KARIAMACHIN ROAD (DOZER WORKS, GRADING AND SPOT GRAVELLING 3KMS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SUAM |
Ksh 3,998,156 |
Comment
|
| 2385 |
KABICHBICH-SIMOTWO-MOTPOKOR ROAD (GRADING AND SPOT GRAVELLING 15KMS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LELAN |
Ksh 5,609,296 |
Comment
|
| 2386 |
KAA LONGAR-MARSITOT-KOSULOL ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 5,567,873 |
Comment
|
| 2387 |
SINA-PTOP-TAPACH ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
TAPACH |
Ksh 4,000,000 |
Comment
|
| 2388 |
ROAD OPENING OF KAPUSHEN-KAMOLOGON-CHESUKO ROAD 5KMS |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
TAPACH |
Ksh 4,850,000 |
Comment
|
| 2389 |
ROAD OPENING OF AROL -PARAMATAI ROAD 5KMS |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
RIWO |
Ksh 5,000,000 |
Comment
|
| 2390 |
ROAD OPENING OF SEKEMION-SUKUT ROAD 5KMS |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
TAPACH |
Ksh 5,000,000 |
Comment
|
| 2391 |
CHESOR-KERELWA-KAPCHIKAR ROAD (RECONSTRUCTION BY DOZER WORKS 6KMS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
BATEI |
Ksh 4,950,000 |
Comment
|
| 2392 |
WAKOR-KOKWOTENDWO-NYARPAT ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
WEIWEI |
Ksh 5,000,000 |
Comment
|
| 2393 |
SIGOR-AKIRIAMET-AMOLEM ROAD (HEAVY GRADING, LIGHT BUSH CLEARING AND SPOT GRAVELLING 15KMS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MASOL |
Ksh 5,550,890 |
Comment
|
| 2394 |
KISONOWON-OTIOT-MARUS ROAD (REALIGNMENT BY EXCAVATION, BUSH CLEARING AND HEAVY GRADING 12KMS) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LOMUT |
Ksh 6,489,881 |
Comment
|
| 2395 |
OPENING OF CHESO-TEMOO ROAD 3KMS |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SEKERR |
Ksh 2,000,000 |
Comment
|
| 2396 |
GRADING AND GRAVELLING OF MBARA-CHEPKOYON ROAD 1.5KMS |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SEKERR |
Ksh 2,000,000 |
Comment
|
| 2397 |
MARICH-BOOSTER-MARINY ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SEKERR |
Ksh 4,000,000 |
Comment
|
| 2398 |
CONSTRUCTION OF WEIWEI-TAMKAL-SOLION ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
WEIWEI |
Ksh 3,000,000 |
Comment
|
| 2399 |
GRADING OF KIWAWA-AKORKEA ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KIWAWA |
Ksh 4,800,000 |
Comment
|
| 2400 |
CONSTRUCTION OF TALAU-BONDENI BOX CULVERT |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SIYOI |
Ksh 4,500,000 |
Comment
|
| 2401 |
MANUAL RESHAPING OF CHEPKOTI ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SIYOI |
Ksh 600,000 |
Comment
|
| 2402 |
CONSTRUCTION OF TOMENA-ARAMAKET ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 2403 |
CONSTRUCTION OF PARAYWA-KAPCHILA ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SIYOI |
Ksh 2,500,000 |
Comment
|
| 2404 |
PROPOSED CONSTRUCTION OF KORKORWO SLAB-RIWO WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
RIWO |
Ksh 4,500,000 |
Comment
|
| 2405 |
ROAD OPENING OF KRICH-RERES ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ENDUGH |
Ksh 5,000,000 |
Comment
|
| 2406 |
ROADS MAINTENANCE |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 875,725 |
Comment
|
| 2407 |
MAINTENANCE OF POKATUSA JUNCTION-KOKWOCHAYA ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KIWAWA |
Ksh 1,985,189 |
Comment
|
| 2408 |
MAINTENANCE OF NGOTUT-KARIAMAWOI-TUWIT ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 3,482,991 |
Comment
|
| 2409 |
MANUAL RESHAPING OF KAIPONU-KOPOCH ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
RIWO |
Ksh 399,600 |
Comment
|
| 2410 |
ROAD OPENING OF TOO-SESSEN-KAMKETO ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 4,000,000 |
Comment
|
| 2411 |
GRADING OF CHEPNYAL-KOTIT-CHEPOLET-KRIICH ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ENDUGH |
Ksh 4,000,000 |
Comment
|
| 2412 |
COMPLETION OF DARAJA MUNGU -CHEMALTIN-MOTPOKOR ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LELAN |
Ksh 3,000,000 |
Comment
|
| 2413 |
ROAD OPENING OF KANISA MBILI-MSALABA-SENETWO ROAD(PENDING BILL) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 4,000,000 |
Comment
|
| 2414 |
GRADING OF MURKWIJIT-KANGLIKWAN-KERINGET ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 2415 |
BACKFILLING OF TARTAR BOX CULVERT |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 2416 |
COMPLETION OF KOKWOPSIS-KAIPAWIS-LOSA-CHONGIS ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
TAPACH |
Ksh 3,000,000 |
Comment
|
| 2417 |
MANUAL RESHAPING OF PARUA-KAPLELACH ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
BATEI |
Ksh 400,000 |
Comment
|
| 2418 |
MANUAL RESHAPING OF KOCHIY-CHESIMAYA ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
BATEI |
Ksh 499,800 |
Comment
|
| 2419 |
MANUAL RESHAPING OF KIWANJA NDEGE-NANGORTUM ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MNAGEI |
Ksh 450,000 |
Comment
|
| 2420 |
PAYMENT FOR CASUAL LABOURERS ON CHUMNI-ATACHA ROAD (PENDING BILL) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MNAGEI |
Ksh 253,944 |
Comment
|
| 2421 |
PAYMENT FOR CASUAL LABOURER ON SENETWO ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 235,000 |
Comment
|
| 2422 |
CONSTRUCTION OF SIRWACH-KAPURKUT ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 4,499,548 |
Comment
|
| 2423 |
CONSTRUCTION OF BUKWO-CHEPKOROPON ACCESS ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
RIWO |
Ksh 2,500,000 |
Comment
|
| 2424 |
CHEPTUYA-KARIWO-KUTUNG ROAD(10KMS)-MNAGEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MNAGEI |
Ksh 4,676,610 |
Comment
|
| 2425 |
KASEI-CHEBURWO-CHESPEN ROAD(15KMS)- KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 5,950,837 |
Comment
|
| 2426 |
MOINOI-CHUWAI-APUKE ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KIWAWA |
Ksh 6,994,815 |
Comment
|
| 2427 |
DARAJA MUNGU-CHEMALTIN-MOTPOKOR ROAD -LELAN/CHEPARERIA WARDS 7KMS |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LELAN |
Ksh 471,535 |
Comment
|
| 2428 |
KOPOCH-KORMONOT ECDE ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SUAM |
Ksh 3,299,430 |
Comment
|
| 2429 |
CHUMNI-ATACHA ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,101,963 |
Comment
|
| 2430 |
GRADING OF MURUNY-TUKUMO ROAD-LELAN WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LELAN |
Ksh 543,859 |
Comment
|
| 2431 |
GRADING AND SPOT GRAVELLING OF NYANGAITA-TAKIYWA ROAD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MASOL |
Ksh 2,000,000 |
Comment
|
| 2432 |
COUNTY COMMUNITY SERVICE |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 15,840,000 |
Comment
|
| 2433 |
PURCHASE OF GRADER |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 30,000,000 |
Comment
|
| 2434 |
COMPLETION OF TURKWEL BRIDGE |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 5,000,000 |
Comment
|
| 2435 |
PROPOSED CONSTRUCTION OF IYOON BRIDGE(PENDING BILL)-WEIWEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
WEIWEI |
Ksh 2,000,000 |
Comment
|
| 2436 |
REPAIR OF KODERA FOOTBRIDGE |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 2437 |
CONSTRUCTION OF CHEMUJURO BOX CULVERT |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 5,000,000 |
Comment
|
| 2438 |
CONSTRUCTION OF SHALPOGH FOOT BRIDGE |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 5,000,000 |
Comment
|
| 2439 |
REPAIR OF CHERANGAN FOOT BRIDGE |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2440 |
GRADING OF FEEDER ROADS(PSUTONU,PSERO,KALITIT,TARAK,CHEBON,TELO,KACHEPURKONG/MWOTOT/KONTOPILET)-TAPACH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
TAPACH |
Ksh 3,500,000 |
Comment
|
| 2441 |
ROAD OPENING OF TANGASIA-PTARKONG-KITAKSHS ROAD-TAPACH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
TAPACH |
Ksh 250,000 |
Comment
|
| 2442 |
KAPTUKOR-AMKOKON-KOKUNUR-KAPELNYANG ROAD-TAPACH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
TAPACH |
Ksh 3,500,000 |
Comment
|
| 2443 |
ROAD OPENING OF SENGERERWO-TANGASIA ROAD-TAPACH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
TAPACH |
Ksh 300,000 |
Comment
|
| 2444 |
MANUAL RESHAPING OF TORORO-MWOTOT ROAD-TAPACH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2445 |
CONSTRUCTION OF SANGWET-CHEMELINY-SINA ROAD-TAPACH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 2446 |
BUSH CLEARING AT MAINJUNCTION-KONGELAI DISPENSARY-KWA APOLO ROAD-RIWO WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 2447 |
BUSH CLEARING AT NAKWANGAMORU-MARICHOR-KODOKONY ROAD-RIWO WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 2448 |
DOZER WORKS AT MARCHA JUNCTION-PRURWOK ROAD-RIWO WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
RIWO |
Ksh 1,500,000 |
Comment
|
| 2449 |
DOZER WORKS AT LOKNA-TAKAR-CHEPKIRONY ROAD-RIWO WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 2450 |
GRADING OF KAMAKONGEN-NAKTOPAR ROAD-RIWO WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 2451 |
GRADING OF AKIRIAMET-AMOLEM ROAD-MASOL WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 2452 |
MANUAL RESHAPING OF LOTONGOT-AMOLEM ROAD-MASOL WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MASOL |
Ksh 400,000 |
Comment
|
| 2453 |
GRADING OF SIMBOL-SURUMBEN ROAD-MASOL WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 2454 |
GRADING AND DRAINAGE WORKS OF TOMPUL-CHEPTRAM-KRIICH-KALAN(25KMS)-ENDUGH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ENDUGH |
Ksh 4,000,000 |
Comment
|
| 2455 |
ROAD OPENING OF CHEPOKACHIM-RERES ROAD-ENDUGH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ENDUGH |
Ksh 600,000 |
Comment
|
| 2456 |
ROAD OPENING OF RERES-KASES ROAD-ENDUGH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ENDUGH |
Ksh 600,000 |
Comment
|
| 2457 |
ROAD OPENING OF EMPASOYEN-KETYAM ROAD-ENDUGH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 2458 |
ROAD OPENING OF KUDUNGOLE-RORACH ROAD-ENDUGH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 2459 |
MANUAL RESHAPING OF MERUR ROAD-ENDUGH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ENDUGH |
Ksh 600,000 |
Comment
|
| 2460 |
GRADING OF KAMANAU JUNCTION-SURUMBEN ROAD-LOMUT WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LOMUT |
Ksh 1,500,000 |
Comment
|
| 2461 |
ROAD GRADING OF ANNET-KATIUT-PITPAGH-SORORO AND CHERATAK CULVERT INSTALLATION ROAD-LOMUT WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LOMUT |
Ksh 2,000,000 |
Comment
|
| 2462 |
ROAD GRADING OF KONA-SAPULMOI ROAD-LOMUT WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 2463 |
GRADING OF CHEMURLOKOTYO-KOKWORITIT-MNYOKOT ROAD-LOMUT WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LOMUT |
Ksh 1,500,000 |
Comment
|
| 2464 |
GRAVELLING OF IMONPOGHET ROAD-LELAN WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2465 |
CONSTRUCTION OF KAGHMUU-PKOROI-STONES ROAD-LELAN WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2466 |
INSTALLATION OF CULVERTS AT DARAJA-DIP-CHESUSWON ROAD-LELAN WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LELAN |
Ksh 900,000 |
Comment
|
| 2467 |
SAMICH-PTIMORWO ROAD-BATEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 2468 |
RESHAPING OF EMPOGHAT-KAPECHEKWA ROAD-SEKERR WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SEKERR |
Ksh 250,000 |
Comment
|
| 2469 |
ROAD OPENING OF CHEPOTWO-YAS ECDE FEEDER ROAD-SEKERR WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 2470 |
ROAD OPENING OF CHEPOTWO-SOSTIN GOK DISPENSARY FEEDER ROAD-SEKERR WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 2471 |
ROAD OPENING OF SOSTIN-CHEMSAR FEEDER ROAD-SEKERR WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SEKERR |
Ksh 300,000 |
Comment
|
| 2472 |
ROAD OPENING OF KRIM-CHEMNYARILACH POGH FEEDER ROAD-SEKERR WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 2473 |
ROAD OPENING OF MUNGAT-TEMOW- PSAPAI ROAD-SEKERR WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SEKERR |
Ksh 2,000,000 |
Comment
|
| 2474 |
ROAD OPENING OF SENGELE-MATAGH FEEDER ROAD-SEKERR WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SEKERR |
Ksh 203,000 |
Comment
|
| 2475 |
MANUAL RESHAPING OF KATAMAS ROAD-KIWAWA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2476 |
GRADING OF KOPITO-WASAT ROAD-KIWAWA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2477 |
CONSTRUCTION OF MURRIAN-TOPOYEN ROAD-WEIWEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 2478 |
CONSTRUCTION OF KAKAWA-SANGAT ROAD-WEIWEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KIWAWA |
Ksh 400,000 |
Comment
|
| 2479 |
BUSH CLEARING AT KANGLIKWAN ROAD(0.5KMS)-MNAGEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MNAGEI |
Ksh 200,000 |
Comment
|
| 2480 |
BUSH CLEARING OF KISHAUNET-TARTAR ROAD(PENDING BILL) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 2481 |
BUSH CLEARING OF KAMAROW-KERINGET ROAD(PENDING BILL) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 2482 |
GRADING OF AMAKURIAT-OTUKO-ALALE GIRLS ROAD-ALALE WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ALALE |
Ksh 2,000,000 |
Comment
|
| 2483 |
GRADING OF KATICH -NASURET ROAD -ALALE WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ALALE |
Ksh 1,000,000 |
Comment
|
| 2484 |
MANUAL RESHAPING OF KIMPUR -ORON ROAD -ALALE WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ALALE |
Ksh 466,207 |
Comment
|
| 2485 |
GRADING OF KOSAMUK-SASAK ROAD-ALALE WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ALALE |
Ksh 1,000,000 |
Comment
|
| 2486 |
MANUAL RESHAPING OF NAWORKUL-TOMATANGOKWO ROAD-ALALE WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ALALE |
Ksh 400,000 |
Comment
|
| 2487 |
MANUAL RESHAPING OF SIMAT ROAD-ALALE WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ALALE |
Ksh 300,000 |
Comment
|
| 2488 |
OPENING OF CHESUSWON- TAKAR ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 100,000 |
Comment
|
| 2489 |
OPENING OF KAMKETO -KAMNONGOWO ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 2,000,000 |
Comment
|
| 2490 |
OPENING OF KOROKOU-EMBO KATNGWOI ROAD -KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 300,000 |
Comment
|
| 2491 |
OPENING OF MALKUY-KAPKEWA ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 300,000 |
Comment
|
| 2492 |
MANUAL RESHAPING OF KOROKOW-ROROK ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 600,000 |
Comment
|
| 2493 |
MANUAL RESHAPING OF OPOL-KLAYA ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 600,000 |
Comment
|
| 2494 |
MANUAL RESHAPING OF CHEPKONDOL-KOKATEN ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 400,000 |
Comment
|
| 2495 |
GRADING OF KATUKUMWOK-OPOL ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 2496 |
OPENING OF KASHELPOGH-KOPOLUK ROAD-CHEPARERIA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 2,000,000 |
Comment
|
| 2497 |
OPENING OF KAKALAS ROAD-CHEPARERIA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 2,000,000 |
Comment
|
| 2498 |
INSTALLATION OF CULVERTS AT PROPOI-CHEPARERIA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2499 |
OPENING OF CHUUWAI ROAD-CHEPARERIA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 100,000 |
Comment
|
| 2500 |
MORWONGAR-KALERE ROAD-SUAM WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SUAM |
Ksh 1,000,000 |
Comment
|
| 2501 |
OPENING OF NAKUYEN-LOKOMOLO ROAD-SUAM WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 2502 |
OPENING OF KARON-KOSIA-UGANDA BORDER ROAD-SUAM WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SUAM |
Ksh 1,000,000 |
Comment
|
| 2503 |
MANUAL RESHAPING OF KALOKORU-LOKII ROAD-SUAM WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 2504 |
MANUAL RESHAPING OF ACHILA ROAD -SUAM WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SUAM |
Ksh 300,000 |
Comment
|
| 2505 |
BUSH CLEARING OF TANDAPOS-KAPETAKINEI ROAD -SUAM WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SUAM |
Ksh 1,100,000 |
Comment
|
| 2506 |
GRADING OF KAROON-MORUEBONG-ABONGAI ROAD-SUAM WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 2507 |
DOZER WORKS OF TARMACK JUNCTION-NAPITIRO-LONGENYA-CHEMILIOT ROAD-KAPCHOK WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,414,641 |
Comment
|
| 2508 |
INSTALLATION OF CULVERT AT PISAA ROAD-KAPCHOK WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 700,000 |
Comment
|
| 2509 |
GRADING OF LOPUSOL-KAPEYON-AKIRIAMET ROAD-KAPCHOK WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,500,000 |
Comment
|
| 2510 |
OPENING OF KAA KOMTIN ROAD -KAPENGURIA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,200,000 |
Comment
|
| 2511 |
OPENING OF TUKUMWO ROAD -KAPENGURIA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 2512 |
GRADING OF KAPKORIS-CHEMNGAYAM ROAD-KAPENGURIA WARD(PENDING BILL) |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 350,000 |
Comment
|
| 2513 |
PROPOSED IMPROVEMENT AND MAINTENANCE WORKS CULVERTS INSTALLATION AT ALMARIS ROAD-KAPENGURIA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 144,536 |
Comment
|
| 2514 |
CULVERT INSTALLATION AT KATIPOROT ROAD-KAPENGURIA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 600,000 |
Comment
|
| 2515 |
OPENING AND CONSTRUCTION OF SLAB AT KAKPAW ROAD-KAPENGURIA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 2516 |
OPENING OF CHUMAIM ROAD-KAPENGURIA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 900,000 |
Comment
|
| 2517 |
BUSH CLEARING OF KAROON-CHEPTUYIS ROAD-KODICH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KODICH |
Ksh 400,000 |
Comment
|
| 2518 |
BUSH CLEARING OF NAMODO-CHAWOI ROAD-KODICH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KODICH |
Ksh 400,000 |
Comment
|
| 2519 |
BUSH CLEARING OF LOKII-KRIMTII ROAD-KODICH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KODICH |
Ksh 400,000 |
Comment
|
| 2520 |
DOZER WORKS OF 4 KM MISKWONY-CHEPKIRONY ROAD-SOOK WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 2521 |
DOZER WORKS OF 3KM CHEPTONGO-LETWA PRIMARY ROAD-SOOK WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 2522 |
ROAD OPENING OF 3KM KOCHAR-TOKOROI ROAD-SOOK WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 2523 |
DOZERWORKS TANYKUT-TOTUM ROAD-SOOK WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 2524 |
DOZER WORKS 3KM KONA-TOPNA ROAD-SOOK WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 2525 |
GRADING OF KIPKORINYA-KAIBOS-KAPKATET-KIPTENDEN ROAD-SIYOI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SIYOI |
Ksh 3,000,000 |
Comment
|
| 2526 |
CONSTRUCTION OF CONCRETE SLAB AT KAPKECHA-CHEPYOMOT ROAD-SIYOI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2527 |
ROAD OPENING OF TALAU-KAPSURUM ROAD-SIYOI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SIYOI |
Ksh 1,700,000 |
Comment
|
| 2528 |
CONSTRUCTION OF ONE LINE CULVERT AT KIBEIGO-SIYOI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SIYOI |
Ksh 300,000 |
Comment
|
| 2529 |
CONSTRUCTION OF ONE LINE CULVERT AT KIPSAKAS-SIYOI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SIYOI |
Ksh 300,000 |
Comment
|
| 2530 |
ROAD OPENING OF KAMAKETOI-KAPLAIN ROAD(COMPLETION)-SIYOI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2531 |
CULVERT INSTALLATION AT MATHARE- KOLOWO ROAD -MNAGEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 2532 |
MAINTENANCE AT LOPALAL BOX CULVERT-MNAGEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MNAGEI |
Ksh 900,000 |
Comment
|
| 2533 |
CULVERT INSTALLATION AT TIMBIR FEEDER ROAD-SUAM WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 2534 |
CONSTRUCTION OF SEKWANG-SAWAYAN-KAITUKUM MAIN ROAD(DOZER WORKS)-RIWO WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SUAM |
Ksh 2,491,564 |
Comment
|
| 2535 |
KAPSAIT-CHORWAI ROAD(MURRAMING)-LELAN WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LELAN |
Ksh 1,000,508 |
Comment
|
| 2536 |
ROAD MAINTENANCE-LELAN WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LELAN |
Ksh 400,000 |
Comment
|
| 2537 |
KABICHBICH-KAPKUNYUK-CHEPARTEN ROAD(MURRAMING)-LELAN WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LELAN |
Ksh 2,000,000 |
Comment
|
| 2538 |
CONSTRUCTION OF SOLION-POITO ROAD-WEIWEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 2539 |
CONSTRUCTION OF YWOPIT-SOT ROAD - SEKERR WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SEKERR |
Ksh 300,000 |
Comment
|
| 2540 |
CONSTRUCTION OF MARINY-KAPONPON-SINAYA ROAD-SEKERR WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SEKERR |
Ksh 300,000 |
Comment
|
| 2541 |
CONSTRUCTION OF KAGHAT-KARIWOI ROAD-CHEPARERIA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2542 |
BUSH CLEARING OF AKIRIAMET-MADING-LOKASUR ROAD-KAPCHOK WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 2543 |
BUSH CLEARING OF NAUMA-NASURET ROAD-ALALE WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
ALALE |
Ksh 299,077 |
Comment
|
| 2544 |
BUSH CLEARING OF CHEMATCHOR-NADEKELE ROAD-KODICH ROAD KODICH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KODICH |
Ksh 650,000 |
Comment
|
| 2545 |
CONSTRUCTION OF MUNGAT-TEMOW-PSAPAI ROAD- SEKERR WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,999,834 |
Comment
|
| 2546 |
MAINTENACE OF KITALAKAPEL CENTRE - KITALAKAPEL SECONDARY ROAD-RIWO WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 2547 |
CONSTRUCTION OF MOROMBUS-KROMWO-CHELAKATET ROAD-CHEPARERIA WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2548 |
GRADING OF CHEPSIKIN NANGOLENYANG ROAD-KODICH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KODICH |
Ksh 1,200,000 |
Comment
|
| 2549 |
GRADING OF NADEKELE-LOKWALOI ROAD-KODICH WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KODICH |
Ksh 1,000,000 |
Comment
|
| 2550 |
CONSTRUCTION OF KOSUPKO-SAKAT ROAD- LOMUT WARD (NEW |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
LOMUT |
Ksh 2,099,020 |
Comment
|
| 2551 |
MANUAL RESHAPING OF KOTULPOGH-RARAITEN ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 300,000 |
Comment
|
| 2552 |
MANUAL RESHAPING OF KALAM-TIPON ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 300,000 |
Comment
|
| 2553 |
MANUAL RESHAPING OF GHATIA KOGHUMOI ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 300,000 |
Comment
|
| 2554 |
MANUAL RESHAPING OF GHATIA CHEPOSERA ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 300,000 |
Comment
|
| 2555 |
MANUAL RESHAPING OF KAKITOR-AKWICHANIAN ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 200,000 |
Comment
|
| 2556 |
MANUAL RESHAPING OF LALWA KAMKETO-KASITIT ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 400,000 |
Comment
|
| 2557 |
ROAD OPENING OF CHEPTADAGH ROAD-KASEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 2558 |
CONSTRUCTION OF KOKWOTENDWO-KAMOI ROAD-WEIWEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 2559 |
CONSTRUCTION OF SOKA FOOTBRIDGE-WEIWEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
WEIWEI |
Ksh 2,700,000 |
Comment
|
| 2560 |
CONSTRUCTION OF IPEET FOOTBRIDGE-WEIWEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
WEIWEI |
Ksh 2,700,000 |
Comment
|
| 2561 |
CONSTRUCTION OF KALE FOOTBRIDGE-WEIWEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
WEIWEI |
Ksh 2,700,000 |
Comment
|
| 2562 |
CONSTRUCTION OF FOOT BRIDGE AT NYASI MOJA-SIYOI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
SIYOI |
Ksh 150,000 |
Comment
|
| 2563 |
CONSTRUCTION OF KAIPRA FOOTBRIDGE-MASOL WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MASOL |
Ksh 2,600,000 |
Comment
|
| 2564 |
CONSTRUCTION OF SURUMBEN FOOTBRIDGE-MASOL WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MASOL |
Ksh 2,596,834 |
Comment
|
| 2565 |
CONSTRUCTION OF STADIUM-MILIMANI FOOTBRIDGE -MNAGEI WARD |
Public Works, Transport and Infrastructure |
2021-2022 |
Complete
|
MNAGEI |
Ksh 1,399,598 |
Comment
|
| 2566 |
EMERGENCY LOCUST RESPONSE PROJECT |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 34,504,000 |
Comment
|
| 2567 |
KENYA CLIMATE SMART AGRICULTURE PROJECT(KCSAP)-DONOR FUND COUNTY CONTRIBUTION (SIYOI, SOOK, ENOUGH,LOMUT,ALALE AND SEKERR) |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 5,200,000 |
Comment
|
| 2568 |
KENYA CLIMATE SMART AGRICULTURE PROJECT(KCSAP) (SIYOI, SOOK, ENOUGH,LOMUT, ALALE AND SEKER) |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
SIYOI, SOOK, ENOUGH,LOMUT, ALALE AND SEKER |
Ksh 353,574,020 |
Comment
|
| 2569 |
FENCING OF KABICHBICH PYRETHRUM DEMONSTRATION PLOT |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2570 |
TAMUGH IRRIGATION PROJECT |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
SOOK |
Ksh 5,000,000 |
Comment
|
| 2571 |
PURCHASE OF PIPES FOR MREL IRRIGATION SCHEME(PENDING BILL) |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
WEIWEI |
Ksh 1,200,000 |
Comment
|
| 2572 |
PURCHASE OF CERTIFIED CROP SEEDS TO BE DISTRIBUTED TO FARMERS IN ALL WARDS(MAIZE,ONIONS,GREEN GRAMS,MILLET,SORGHUM ETC) |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
ALL WARDS |
Ksh 52,700,000 |
Comment
|
| 2573 |
PURCHASE OF ASSORTED SEEDLINGS (COFFEE,TEA, SISAL, PYRETHRUM, COTTON,SUNFLOWER,ALOE VERA,ONIONS,HORTICULTURE CROPS) IN RESPECTIVE WARDS |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
ALL WARDS |
Ksh 10,000,000 |
Comment
|
| 2574 |
CONSTRUCTION OF SUKUK FURROW -LOMUT WARD (ROLLOVER) |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 2575 |
REPAIR OF IPEET WATER FURROW -WEIWEI WARD(ROLLOVER) |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
WEIWEI |
Ksh 300,000 |
Comment
|
| 2576 |
ESTABLISHMENT OF CHERANGAN DEMO PLOT-KODICH WARD(ROLLOVER) |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
KODICH |
Ksh 1,200,000 |
Comment
|
| 2577 |
REHABILITATION OF PARRO FURROW-WEIWEI WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
WEIWEI |
Ksh 1,000,000 |
Comment
|
| 2578 |
REPAIR OF WATER FURROW AT PTOKOU-WEIWEI WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
WEIWEI |
Ksh 300,000 |
Comment
|
| 2579 |
PURCHASE OF TWO WATER PUMPS-KAPCHOK WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2580 |
PURCHASE OF MONEY MAKER WATER PUMPS-RIWO WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 2581 |
PURCHASE AND SUPPLY OF FARM TOOLS TO WOMEN FARMERS ACROSS THE WARD-KODICH WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 2582 |
PURCHASE OF MAIZE SEEDS-SUAM WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 2583 |
PURCHASE AND SUPPLY OF MAIZE SEEDS-KIWAWA WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
KIWAWA |
Ksh 600,000 |
Comment
|
| 2584 |
PURCHASE AND SUPPLY OF MANGO SEEDLINGS-KIWAWA WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
KIWAWA |
Ksh 500,000 |
Comment
|
| 2585 |
PURCHASE OF ONIONS SEEDS-LOMUT WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
LOMUT |
Ksh 2,000,000 |
Comment
|
| 2586 |
PURCHASE OF WATER MELONS SEEDS-LOMUT WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 2587 |
PURCHASE OF TOMATOES SEEDS -LOMUT WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 2588 |
PURCHASE OF CRAFTED MANGO TREE SEEDLINGS-LOMUT WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 2589 |
PURCHASE OF ONION SEEDS-LELAN WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2590 |
PURCHASE OF ONION SEEDS-WEIWEI WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
WEIWEI |
Ksh 2,000,000 |
Comment
|
| 2591 |
PURCHASE AND SUPPLY OF AVACADO SEEDLINGS TO FARMERS-SIYOI WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 2592 |
PURCHASE OF OVACADO SEEDLINGS-KIWAWA WARD |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
KIWAWA |
Ksh 900,000 |
Comment
|
| 2593 |
PURCHASE AND SUPPLY OF BOMA RHODES TO FARMERS-CHEPARERIA WARD(ROLLOVER) |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2594 |
ASDSP COUNTY CONTRIBUTION |
AGRICULTURE AND IRRIGATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 5,500,000 |
Comment
|
| 2595 |
ASDSP II |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 44,035,628 |
Comment
|
| 2596 |
EU -IDEAS GRANT |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 11,000,000 |
Comment
|
| 2597 |
EU-NASUKUTA PROJECT COUNTY CONTRIBUTION |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 20,000,000 |
Comment
|
| 2598 |
COMPLETION OF ALALE VERTINERY OFFICE |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
ALALE |
Ksh 4,000,000 |
Comment
|
| 2599 |
CONSTRUCTION OF ALALE VERTINERY OFFICE(PENDING BILL) |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
ALALE |
Ksh 311,790 |
Comment
|
| 2600 |
PERIMETER WALL MIFUGO HOUSE-PENDING BILL |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 4,312,436 |
Comment
|
| 2601 |
PURCHASE OF TRANSPORTATION LORRY |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 8,900,000 |
Comment
|
| 2602 |
PURCHASE OF PASTURE SEEDS |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 7,400,000 |
Comment
|
| 2603 |
PURCHASE OF ANIMAL FEEDS |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 2,500,000 |
Comment
|
| 2604 |
PURCHASE OF SAHIWAL BULLS |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 5,000,000 |
Comment
|
| 2605 |
PURCHASE OF GALLA GOATS |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 2606 |
PURCHASE OF MERINO RAMS(ROLLOVER 1.5M) |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 3,500,000 |
Comment
|
| 2607 |
PURCHASE OF POULTRY BREEDS(TO BE DISTRIBUTED TO ALL 20 WARDS AT LOCATIONAL LEVEL (AT LEAST 2500 PER LOCATION) )(ROLLOVER) |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
ALL WARDS |
Ksh 1,854,400 |
Comment
|
| 2608 |
PURCHASE OF DAIRY HEIFERS AND BULLS |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
SOME WARDS |
Ksh 4,000,000 |
Comment
|
| 2609 |
PURCHASE AND SUPPLY OF ACARICIDES-LELAN WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
LELAN |
Ksh 1,400,000 |
Comment
|
| 2610 |
PURCHASE OF SPRAY PUMPS-ALALE WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
ALALE |
Ksh 900,000 |
Comment
|
| 2611 |
PURCHASE OF SPRAY PUMPS-KAPCHOK WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2612 |
PURCHASE OF ACARICIDES -MASOL WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 2613 |
PUTRCHASE OF ACARICIDES/DEWORMERS-KAPENGURIA WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,800,000 |
Comment
|
| 2614 |
PURCHASE OF ACARICIDES AND DEWORMERS-KASEI WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KASEI |
Ksh 2,000,000 |
Comment
|
| 2615 |
PURCHASE OF ACARICIDES-ALALE WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
ALALE |
Ksh 800,000 |
Comment
|
| 2616 |
PURCHASE OF ACARICIDES/DEWORMERS-SUAM WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
SUAM |
Ksh 800,000 |
Comment
|
| 2617 |
PURCHASE AND SUPPLY OF SPRAY PUMPS-SUAM WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 2618 |
PURCHASE OF ACARICIDES-KIWAWA WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 2619 |
PURCHASE AND SUPPLY OF FOOT PUMP-KIWAWA WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KIWAWA |
Ksh 500,000 |
Comment
|
| 2620 |
PURCHASE OF ACARICIDES-BATEI WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
BATEI |
Ksh 2,000,000 |
Comment
|
| 2621 |
PURCHASE OF KNAPSUCK SPRAY PUMPS FOR FARMERS(ROLLOVER)-WEIWEI WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
WEIWEI |
Ksh 679,057 |
Comment
|
| 2622 |
PURCHASE OF CHAFF CUTTERS FOR MILK COOLERS-LELAN WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
LELAN |
Ksh 900,000 |
Comment
|
| 2623 |
PURCHASE OF ACARICIDES-ENDUGH WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
ENDUGH |
Ksh 799,997 |
Comment
|
| 2624 |
RENOVATION OF TIKIT CATTLE DIP-MASOL WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
MASOL |
Ksh 1,067,250 |
Comment
|
| 2625 |
CONSTRUCTION OF MBARA CATTLE DIP-PENDING BILL |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
SEKERR |
Ksh 2,112,383 |
Comment
|
| 2626 |
CONSTRUCTION OF ORWA METTALIC CRUSH-PENDING BILL |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,198,619 |
Comment
|
| 2627 |
CONSTRUCTION OF METALLIC CRUSH AT TAMARUKWO(PENDING BILL)-ENDUGH WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
ENDUGH |
Ksh 1,199,836 |
Comment
|
| 2628 |
CONSTRUCTION OF TILAKAI CATTLE DIP-LOMUT WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
LOMUT |
Ksh 2,200,000 |
Comment
|
| 2629 |
CONSTRUCTION OF SOKUT CATTLE DIP-BATEI WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
BATEI |
Ksh 2,500,000 |
Comment
|
| 2630 |
RENOVATION OF SEBIT CATTLE DIP-BATEI WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 2631 |
RENOVATION OF MASWAN CATTLE DIP-BATEI WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
BATEI |
Ksh 800,000 |
Comment
|
| 2632 |
CONSTRUCTION OF CATTLE CRUSH-KIWAWA WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KIWAWA |
Ksh 1,500,000 |
Comment
|
| 2633 |
CONSTRUCTION OF CATTLE CRUSH AT OTUKO-ALALE WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
ALALE |
Ksh 1,200,000 |
Comment
|
| 2634 |
CONSTRUCTION OF MUNYOPELPEL CATTLEDIP-CHEPARERIA WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 2,000,000 |
Comment
|
| 2635 |
CONSTRUCTION OF CATTLE DIP AT SHALPOGH -CHEPARERIA WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 100,000 |
Comment
|
| 2636 |
COMPLETION OF NGINGINAT CATTLEDIP -CHEPARERIA WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 1,200,000 |
Comment
|
| 2637 |
COMPLETION OF CHEPTURNGUNY CATTLEDIP -CHEPARERIA WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 1,200,000 |
Comment
|
| 2638 |
CONSTRUCTION OF MAKANY CATTLE CRUSH-SUAM WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
SUAM |
Ksh 1,200,000 |
Comment
|
| 2639 |
REHABILITATION OF KATEMONGOR CATTLE DIP(PENDING BILL)-SUAM WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
SUAM |
Ksh 74,260 |
Comment
|
| 2640 |
CONSTRUCTION OF CATTLE CRUSH AT KANASAT-KAPCHOK WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,200,000 |
Comment
|
| 2641 |
CONSTRUCTION OF KAIKAI CATTLE DIP- |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 39,965 |
Comment
|
| 2642 |
REPAIRS OF CHEPNYAL CATTLE DIP-SOOK WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
SOOK |
Ksh 200,000 |
Comment
|
| 2643 |
RENOVATION OF CHOROK CATTLE DIP-SIYOI WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
SIYOI |
Ksh 2,000,000 |
Comment
|
| 2644 |
RENOVATION OF RINGRING CATTLE DIP-LELAN WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
LELAN |
Ksh 300,000 |
Comment
|
| 2645 |
CONSTRUCTION OF CHELOKOTETWO CATTLE CRUSH-RIWO WARD(ROLLOVERS) |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
RIWO |
Ksh 1,200,000 |
Comment
|
| 2646 |
REPAIR OF KITALAKAPEL CATTLE DIP-RIWO WARD(ROLLOVERS) |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2647 |
RENOVATION OF MURKWIJIT CATTLE DIP |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
MNAGEI |
Ksh 1,200,000 |
Comment
|
| 2648 |
CONSTRUCTION OF NAKIROKONY METALLIC CRUSH-ALALE WARD(ROLLOVERS) |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
ALALE |
Ksh 1,200,000 |
Comment
|
| 2649 |
REPAIR OF KAPSAIT CATTLE DIP-LELAN WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
LELAN |
Ksh 98,200 |
Comment
|
| 2650 |
FENCING OF PARAYWA CATTLE DIP(ROLLOVER)-SIYOI WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
SIYOI |
Ksh 199,950 |
Comment
|
| 2651 |
CONSTRUCTION OF PARAYWA CATTLE DIP(ROLLOVER)- SIYOI WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
SIYOI |
Ksh 1,999,886 |
Comment
|
| 2652 |
CONSTRUCTION OF MAYAYPOGH CATTLE CRUSH NEW(ROLLOVER) -KASEI WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KASEI |
Ksh 1,199,359 |
Comment
|
| 2653 |
CONSTRUCTION OF CATTLE DIP AT KAPSIMOTWO(ROLLOVER)-CHEPARERIA WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 1,500,000 |
Comment
|
| 2654 |
PURCHASE OF HAY FOR FARMERS-KIWAWA WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 2655 |
PURCHASE OF BOMA RHODES SEEDS TO FARMERS-KAPENGURIA WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,800,000 |
Comment
|
| 2656 |
PURCHASE OF GOATS-KIWAWA WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2657 |
PURCHASE OF GOATS-KAPCHOK WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,850,000 |
Comment
|
| 2658 |
PURCHASE AND DISTRIBUTION OF GOATS TO VULNARABLE FARMERS-KODICH WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KODICH |
Ksh 2,400,000 |
Comment
|
| 2659 |
PURCHASE OF GALLA GOATS -SUAM WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
SUAM |
Ksh 1,000,000 |
Comment
|
| 2660 |
PURCHASE OF GOATS (NAUME,ASACHAYO,NETWOK,KONGELAI)-RIWO WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
RIWO |
Ksh 1,400,000 |
Comment
|
| 2661 |
PURCHASE OF DAIRY CATTLE FOR FARMERS -ENDUGH WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
ENDUGH |
Ksh 2,998,800 |
Comment
|
| 2662 |
PURCHASE OF LAND FOR SENETWO CATTLE DIP-CHEPARERIA WARD |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 800,000 |
Comment
|
| 2663 |
ASDSP COUNTY CONTRIBUTION |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 5,500,000 |
Comment
|
| 2664 |
ASDSP II |
Livestock, Fisheries and Veterinary Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 44,035,628 |
Comment
|
| 2665 |
RENOVATION OF CLASSROOMS AT ECDE COLLEGE |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 2666 |
COMPLETION OF COUNTY DEPARMENT OF EDUCATION OFFICE BLOCK AT KAPENGURIA(ROLLOVER) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 905,543 |
Comment
|
| 2667 |
CONSTRUCTION OF CLASSROOMS AT ECDE COLLEGE KAPENGURIA(PENDING BILL) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 12,000,000 |
Comment
|
| 2668 |
SPRING PROTECTION AT ECDE WATER PROJECT KAPENGURIA(ROLLOVER) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 799,534 |
Comment
|
| 2669 |
FENCING OF ECDE COLLEGE(PENDING BILL) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 7,703,806 |
Comment
|
| 2670 |
COMPLETION OF TWIN WORKSHOP BLOCK C AT SIGOR VTC |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
WEIWEI |
Ksh 4,000,000 |
Comment
|
| 2671 |
COMPLETION OF TWIN WORKSHOP BLOCK C AT KODICH VTC |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KODICH |
Ksh 4,000,000 |
Comment
|
| 2672 |
COMPLETION OF TWO ECDE CLASSROOMS AT KARELACHON ECDE-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2673 |
COMPLETION OF TWO ECDE CLASSROOMS AT ROSOMA ECDE-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2674 |
COMPLETION OF TWO ECDE CLASSROOMS AT KAKRES ECDE-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2675 |
COMPLETION OF TWO ECDE CLASSROOMS AT TELO ECDE-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 200,000 |
Comment
|
| 2676 |
COMPLETION OF TWO ECDE CLASSROOMS AT PTARAKON ECDE-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 200,000 |
Comment
|
| 2677 |
COMPLETION OF TWO ECDE CLASSROOMS AT KALITIT ECDE-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 200,000 |
Comment
|
| 2678 |
COMPLETION OF TWO ECDE CLASSROOMS AT CHEBON ECDE-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 200,000 |
Comment
|
| 2679 |
COMPLETION OF TWO ECDE CLASSROOMS AT KONTOPILET ECDE-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 200,000 |
Comment
|
| 2680 |
COMPLETION OF TWO ECDE CLASSROOMS AT CHEPOIYWO ECDE-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 200,000 |
Comment
|
| 2681 |
CONSTRUCTION OF TWO ECDE CLASSROOMS AT LULWOI ECDE-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2682 |
CONSTRUCTION OF TWO ECDE CLASSROOMS AT MARANGAR ECDE-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2683 |
INFRASTRUCTURAL SUPPORT TO ST.JOSEPH TAPACH MIXED SECONDARY SCHOOL(CONSTRUCTION OF LABORATORY)-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 2684 |
COMPLETION OF TWO WORKSHOP ROOMS AT SONDANY VTC-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 2685 |
CONSTRUCTION OF CLASSROOM AT KARENGER ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2686 |
CONSTRUCTION OF CLASSROOM AT MONGORION ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2687 |
CONSTRUCTION OF CLASSROOM AT LOKONYIN ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2688 |
CONSTRUCTION OF CLASSROOM AT KOMOLKIPI ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2689 |
COMPLETION OF CLASSROOM AT LODUPUP ECDE -RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
RIWO |
Ksh 200,000 |
Comment
|
| 2690 |
CONSTRUCTION OF ECDE CLASSROOM AT SEREWO ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2691 |
CONSTRUCTION OF PIT LATRINE AT CHEPTAMAS ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 2692 |
CONSTRUCTION OF PIT LATRINES AT NGORIAKSHS ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 2693 |
CONSTRUCTION OF PIT LATRINES AT CHEPANYINTA ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 2694 |
CONSTRUCTION OF PIT LATRINE AT KUSIOLOI ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 2695 |
CONSTRUCTION OF PIT LATRINES AT KAIPRA ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 2696 |
CONSTRUCTION OF PIT LATRINE AT NAURIEN ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 2697 |
CONSTRUCTION OF CLASSROOM AT LOKARKAR PRIMARY-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 2698 |
CONSTRUCTION OF PIT LATRINE AND FENCING OF CHEPAIYWAT ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 400,000 |
Comment
|
| 2699 |
CONSTRUCTION OF PIT LATRINE AT CHEPURKUT ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 2700 |
CONSTRUCTION OF PIT LATRINE AT KATANGUN ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 2701 |
CONSTRUCTION OF PIT LATRINE AT KOPENI ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 200,000 |
Comment
|
| 2702 |
COMPLETION OF KLAAN DORMITORY-ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ENDUGH |
Ksh 1,000,000 |
Comment
|
| 2703 |
RENOVATION OF ADMINISTRATION BLOCK AT ST.MICHAELS SECONDARY SCHOOL PTOYO-ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ENDUGH |
Ksh 800,000 |
Comment
|
| 2704 |
CONSTRUCTION OF ECDE CLASSROOM AT TENGAR ECDE-ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ENDUGH |
Ksh 700,000 |
Comment
|
| 2705 |
COMPLETION OF KANAA ECDE-ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 2706 |
CONSTRUCTION OF CLASSROOM AT TUNOYO PRIMARY SCHOOL-ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 2707 |
COMPLETION OF TOPOROP ECDE-ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ENDUGH |
Ksh 335,859 |
Comment
|
| 2708 |
INFRASTRACTURAL SUPPORT TO CHEPOLET VTC-ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ENDUGH |
Ksh 1,000,000 |
Comment
|
| 2709 |
FENCING OF ANNIKEN PRIMARY SCHOOL-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 2710 |
CONSTRUCTION OF PIT LATRINE AT PARARAS ECDE-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LOMUT |
Ksh 300,000 |
Comment
|
| 2711 |
CONSTRUCTION OF CLASSROOM AT KAPTILON ECDE-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LOMUT |
Ksh 600,000 |
Comment
|
| 2712 |
CONSTRUCTION OF ECDE CLASSROOM AT KAMANAU ECDE-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 2713 |
CONSTRUCTION OF PIT LATRINE AT KATUKURI ECDE-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 2714 |
CONSTRUCTION OF PIT LATRINE AT KASIRITIAN ECDE-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 2715 |
CONSTRUCTION OF PIT LATRINE AT CHEPAR ECDE-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 2716 |
CONSTRUCTION OF PIT LATRINE AT PEWA ECDE-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 2717 |
CONSTRUCTION OF PIT LATRINE AT NYINYOT ECDE-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 2718 |
COMPLETION OF TWO ECDE CLASSROOMS AT KOMUGH ECDE-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 2719 |
CONSTRUCTION OF PIT LATRINE AT CHERATAK ECDE-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 2720 |
CONSTRUCTION OF ECDE CLASSROOM AT CHORWAI-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2721 |
COMPLETION OF TWO ECDE CLASSROOMS AT TRIK ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 300,000 |
Comment
|
| 2722 |
CONSTRUCTION OF MBAYAI ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2723 |
CONSTRUCTION OF ECDE CLASSROOM AT KABICHBICH -LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2724 |
COMPLETION OF KAPSAIT SECONDARY SCHOOL LABORATORY-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 2,000,000 |
Comment
|
| 2725 |
CONSTRUCTION OF ECDE CLASSROOM AT IMONPOGHET -LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2726 |
CONSTRUCTION OF ECDE CLASSROOM AT KAPSAIT -LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2727 |
CONSTRUCTION OF ECDE CLASSROOM AT KOKWOPLEKWA -LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2728 |
CONSTRUCTION OF ECDE CLASSROOM AT PSUKUNO ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2729 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPUNGON ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2730 |
CONSTRUCTION OF ECDE CLASSROOM AT MURKSHAN ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2731 |
CONSTRUCTION OF ECDE CLASSROOM AT PARAYON ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2732 |
CONSTRUCTION OF ECDE CLASSROOM AT MOKOYON ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2733 |
CONSTRUCTION OF ECDE CLASSROOM AT KOROSION ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2734 |
CONSTRUCTION OF ECDE CLASSROOM AT AKIRIA(MANIAN) ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 2735 |
COMPLETION OF TWO CLASSROOMS AT KAPKRESS ECDE-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
BATEI |
Ksh 300,000 |
Comment
|
| 2736 |
COMPLETION OF CLASSROOM AT MOTOKORON ECDE-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
BATEI |
Ksh 200,000 |
Comment
|
| 2737 |
RENOVATION OF CLASSROOMS AT SEBIT PRIMARY SCHOOL-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
BATEI |
Ksh 1,200,000 |
Comment
|
| 2738 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPTIYA-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 2739 |
CONSTRUCTION OF ECDE CLASSROOM AT NGEREL-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 2740 |
CONSTRUCTION OF ECDE CLASSROOM AT KOTULPOGH-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 2741 |
COMPLETION OF TWO ECDE CLASSROOMS AT ROROK-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
BATEI |
Ksh 300,000 |
Comment
|
| 2742 |
CONSTRUCTION OF ECDE CLASSROOM AT ST.MARY'S PORIO-KRUT ECDE-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 500,000 |
Comment
|
| 2743 |
CONSTRUCTION OF PIT LATRINE AT ST MARY'S PORIO-KRUT ECDE-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 2744 |
CONSTRUCTION OF TWO ECDE CLASSROOM AT LULWO ECDE-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 2745 |
CONSTRUCTION OF FR.ROBERT ECDE AT SOSTIN-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 2746 |
CONSTRUCTION OF BOYS DORMITORY AT EMBOGHAT-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 2747 |
CONSTRUCTION OF GIRLS DORMITORY AT CHEPTEM-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 2748 |
CONSTRUCTION OF TWO ECDE CLASSROOM AT PAREK ECDE-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 2749 |
CONSTRUCTION OF BOYS DORMITORY AT CHEPTEM-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 2750 |
CONSTRUCTION OF TWO ECDE CLASSROOMS AT EMBOSEKERR-SEKERR |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 2751 |
CONSTRUCTION OF TWO ECDE CLASSROOM AT ST.MARK ECDE ORWO-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 2752 |
CONSTRUCTION OF ECDE CLASSROOM AT MEELE ECDE -KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 2753 |
CONSTRUCTION OF ECDE CLASSROOM AT LOKITEDEL ECDE-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 2754 |
CONSTRUCTION OF ECDE CLASSROOM AT MBARU ECDE-KIWAWA |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 2755 |
CONSTRUCTION OF ECDE CLASSROOM AT KAPEM ECDE-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 2756 |
CONSTRUCTION OF ECDE CLASSROOM AT AIC KAMILA ECDE-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 2757 |
CONSTRUCTION OF TWO CLASSROOMS AT ABUR ECDE-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KIWAWA |
Ksh 1,200,000 |
Comment
|
| 2758 |
CONSTRUCTION OF PIT LATRINE AT NAKIRERIT ECDE-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KIWAWA |
Ksh 500,000 |
Comment
|
| 2759 |
CONSTRUCTION OF ECDE CLASSROOM AT IYOON ECDE-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 2760 |
CONSTRUCTION OF ECDE CLASSROOM AT IPEET ECDE-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 2761 |
CONSTRUCTION OF ECDE CLASSROOM AT PSAKAS ECDE-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 2762 |
CONSTRUCTION OF ECDE CLASSROOM AT KORELLACH ECDE-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 2763 |
CONSTRUCTION OF ENDOW ECDE-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
WEIWEI |
Ksh 1,000,000 |
Comment
|
| 2764 |
COMPLETION OF CHEPANGANG ECDE-MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MNAGEI |
Ksh 150,000 |
Comment
|
| 2765 |
CONSTRUCTION OF PIT LATRINE AT TARTAR ECDE CENTRE -MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 2766 |
CONSTRUCTION OF ECDE CLASSROOM AT MAKUTANO ECDE-MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 2767 |
COMPLETION OF AMON ECDE -MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 2768 |
COMPLETION OF TOMKOKALYA ECDE -MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 2769 |
CONSTRUCTION OF LOMURIEBUL ECDE CLASSROOM AT LOMURIEBUL-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ALALE |
Ksh 600,000 |
Comment
|
| 2770 |
CONSTRUCTION OF ALANY ECDE-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ALALE |
Ksh 600,000 |
Comment
|
| 2771 |
COMPLETION OF KIPOMOT ECDE CLASSROOM-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ALALE |
Ksh 300,000 |
Comment
|
| 2772 |
CONSTRUCTION OF ECDE CLASSROOM AT TUNOYO-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KASEI |
Ksh 800,000 |
Comment
|
| 2773 |
CONSTRUCTION OF ECDE CLASSROOMS AT CHEPOGHIN ECDE-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KASEI |
Ksh 800,000 |
Comment
|
| 2774 |
CONSTRUCTION OF CLASSROOMS AT PTOKOW ECDE-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KASEI |
Ksh 800,000 |
Comment
|
| 2775 |
CONSTRUCTION OF CLASSROOMS AT ONGOKOK ECDE-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KASEI |
Ksh 800,000 |
Comment
|
| 2776 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEMNYARAT-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KASEI |
Ksh 800,000 |
Comment
|
| 2777 |
CONSTRUCTION OF KOKATEN ECDE CLASSROOM-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KASEI |
Ksh 800,000 |
Comment
|
| 2778 |
CONSTRUCTION OF APETAA ECDE CLASSROOM -KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KASEI |
Ksh 800,000 |
Comment
|
| 2779 |
CONSTRUCTION OF TINYAR ECDE CLASSROOM-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KASEI |
Ksh 800,000 |
Comment
|
| 2780 |
CONSTRUCTION OF CHEPTUYIS ECDE CLASSROOMS-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2781 |
COMPLETION OF SAKALE ECDE-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 150,000 |
Comment
|
| 2782 |
SUPPORT FOR BUSARY FOR YOUTH AT CHEPARERIA YOUTH POLYTECHNIC-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 150,000 |
Comment
|
| 2783 |
CONSTRUCTION OF REKERET ECDE CLASSROOM-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2784 |
CONSTRUCTION OF KAPKARAWAI ECDE CLASSROOM-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2785 |
CONSTRUCTION OF TOLKAGHIN ECDE CLASSROOM-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2786 |
CONSTRUCTION OF SIMAT ECDE CLASSROOM-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2787 |
CONSTRUCTION OF RIRIMBOI ECDE CLASSROOM -CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2788 |
CONSTRUCTION OF KANGORIO ECDE CLASSROOM-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2789 |
CONSTRUCTION OF PKATIENY ECDE CLASSROOM -CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2790 |
CONSTRUCTION OF KODOSO ECDE CLASSROOM-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 300,000 |
Comment
|
| 2791 |
CONSTRUCTION OF PIT LATRINE AT NASUKUTA ECDE -CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 200,000 |
Comment
|
| 2792 |
CONSTRUCTION OF TUKUMO ECDE CLASSROOM-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2793 |
CONSTRUCTION OF TOMKO SITIT ECDE CLASSROOM-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2794 |
CONSTRUCTION OF KAPCHETARIM ECDE CLASSROOM -CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2795 |
COMPLETION OF CHESOYOW ECDE CLASSROOM -CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 200,000 |
Comment
|
| 2796 |
COMPLETION OF CHEPUKAT ECDE CLASSROOM-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 200,000 |
Comment
|
| 2797 |
CONSTRUCTION OF KAMAWUWA ECDE-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 200,000 |
Comment
|
| 2798 |
CONSTRUCTION OF CHEPAKUL ECDE CLASSROOM-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 200,000 |
Comment
|
| 2799 |
CONSTRUCTION OF CHEMOTONG ECDE CLASSROOM -CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 300,000 |
Comment
|
| 2800 |
CONSTRUCTION OF TAPOYO ECDE CLASSROOM-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2801 |
CONSTRUCTION OF CHELOMBAI ECDE CLASSROOM-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2802 |
CONSTRUCTION OF MSALABA ECDE CLASSROOM -CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2803 |
COMPLETION OF KATUBEROT ECDE CLASSROOM-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SUAM |
Ksh 400,000 |
Comment
|
| 2804 |
COMPLETION OF CHEPKENEROI ECDE CLASSROOM -SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SUAM |
Ksh 300,000 |
Comment
|
| 2805 |
COMPLETION OF MURUEBONG ECDE CLASSROOM-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SUAM |
Ksh 200,000 |
Comment
|
| 2806 |
COMPLETION OF LOPUSIENIKOU ECDE CLASSROOM-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 2807 |
CONSTRUCTION OF ECDE CLASSROOMS AT AGC KODERA ECDE-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 2808 |
CONSTRUCTION OF ECDE CLASSROOMS AT CHEPTUOT-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 2809 |
CONSTRUCTION OF NASAKAM ECDE-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 2810 |
CONSTRUCTION OF NAPITIRO ECDE-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 2811 |
CONSTRUCTION OF BARAKA ECDE-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 2812 |
CONSTRUCTION OF KAWOLOK ECDE-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 2813 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPTOKOL ECDE-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 2814 |
COMPLETION OF LOSAM ECDE-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 2815 |
COMPLETION OF KOPEYON ECDE-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 200,000 |
Comment
|
| 2816 |
COMPLETION OF TUWIT ECDE-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 311,000 |
Comment
|
| 2817 |
COMPLETION OF MUKURI ECDE-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 200,000 |
Comment
|
| 2818 |
CONSTRUCTION OF ECDE CLASSROOM AT KILIMANJARO-KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 2819 |
INFRASTRUCTURE SUPPORT TO ST.JOSEPH NAKWIJIT BOYS SECONDARY SCHOOL-KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KODICH |
Ksh 800,000 |
Comment
|
| 2820 |
CONSTRUCTION OF OROLWO ECDE-KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 2821 |
CONSTRUCTION OF NAKWAPUO ECDE-KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 2822 |
CONSTRUCTION OF ECDE CLASSROOM AT KODICH CATHOLIC CHURCH-KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 2823 |
CONSTRUCTION OF ECDE CLASSROOM AT SAPIREE PRIMARY SCHOOL-KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 2824 |
CONSTRUCTION OF ONE CLASSROOM AT AIC MISKWONY PRIMARY SCHOOL -SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 600,000 |
Comment
|
| 2825 |
CONSTRUCTION OF GIRL'S DORMITORY AT PCHOLPOGH PRIMARY SCHOOL -SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 400,000 |
Comment
|
| 2826 |
CONSTRUCTION OF THREE CLASSROOMS AT JERUSALEM PRIMARY SCHOOL -SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 1,500,000 |
Comment
|
| 2827 |
CONSTRUCTION OF ECDE CLASSROOM AT TAMUGH PRIMARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 2828 |
CONSTRUCTION OF TWO CLASSROOM AT CHEPTESOK PRIMARY SCHOOL -SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 800,000 |
Comment
|
| 2829 |
COMPLETION OF MUNGIT ECDE CLASSROOM-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 100,000 |
Comment
|
| 2830 |
CONSTRUCTION OF TWO CLASSROOM AT TOKISOM PRIMARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 2831 |
CONSTRUCTION OF TWO CLASSROOMS AT ST.MONICAS GIRLS SECONDARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 2832 |
CONSTRUCTION OF A DORMITORY AT ST MONICAS GIRLS SECONDARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 2833 |
CONSTRUCTION OF ONE CLASSROOM AT LETWA SECONDARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 700,000 |
Comment
|
| 2834 |
CONSTRUCTION OF STAFF HOUSES AT PRIRO PRIMARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 600,000 |
Comment
|
| 2835 |
CONSTRUCTION OF ONE CLASSROOM AT CHEPOSEKEK SECONDARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 700,000 |
Comment
|
| 2836 |
CONSTRUCTION OF DORMITORY AT CHEKOMOS MIXED SECONDARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 2837 |
CONSTRUCTION OF A CLASSROOM AT PTOO GIRLS SECONDARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 2838 |
CONSTRUCTION OF ONE CLASSROOM AT TOPNO PRIMARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 2839 |
CONSTRUCTION OF ECDE CLASSROOM AT TOKOROI-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 600,000 |
Comment
|
| 2840 |
CONSTRUCTION OF ONE CLASSROOM AT KOCHAR PRIMARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 2841 |
COMPLETION OF TOMBUL PRIMARY SCHOOL GIRL'S DORMITORY-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 400,000 |
Comment
|
| 2842 |
CONSTRUCTION OF ECDE CLASSROOM AT PILILAI-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 2843 |
CONSTRUCTION OF NAPUDES ECDE PSAPA ONE CLASSROOM-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 550,000 |
Comment
|
| 2844 |
COMPLETION OF TINTAR GIRLS DORMITORY-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 250,000 |
Comment
|
| 2845 |
CONSTRUCTION OF ONE CLASSROOM AT ST. MICHAELS MURKUTWO ECDE-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 2846 |
CONSTRUCTION OF ADMNISTRATION BLOCK AT PCHOPIGH GIRLS SECONDARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 400,000 |
Comment
|
| 2847 |
CONSTRUCTION OF ONE CLASSROOM AT AKIRIAMET ACADEMY-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 2848 |
RENOVATION OF FIVE CLASSROOMS AT TAMUGH PRIMARY-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 2849 |
CONSTRUCTION OF TOILETS AT KIPKORINYA ECDE-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 200,000 |
Comment
|
| 2850 |
COMPLETION OF STOTWO ECDE CLASSROOMS-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 200,000 |
Comment
|
| 2851 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT SIKININ-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2852 |
INFRASTRACTURE SUPPORT ST.PETERS KAPKECHA SECONDARY SCHOOL(CLASSROOM)-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2853 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT SINENDEN-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2854 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT KAPNGORIO-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2855 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT LOKAPEL-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2856 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT KAPKATET-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2857 |
COMPLETION OF KAMAKETOI ECDE CLASSROOMS-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 150,000 |
Comment
|
| 2858 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT KIPSAKAS-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2859 |
CONSTRUCTION OF ONE ECDE CLASSROM AT BOMA-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 2860 |
YOUTH EMPOWERMENT (DRIVING SHOOL)-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 2861 |
COMPLETION OF CLASSROOM AT KAROROK ECDE-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ALALE |
Ksh 184,471 |
Comment
|
| 2862 |
COMPLETION OF ODONG ECDE-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ALALE |
Ksh 100,000 |
Comment
|
| 2863 |
COMPLETION OF KOMOLWO ECDE-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ALALE |
Ksh 100,000 |
Comment
|
| 2864 |
COMPLETION OF NATAPAR ECDE-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ALALE |
Ksh 100,000 |
Comment
|
| 2865 |
COMPLETION OF NARWARA ECDE-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ALALE |
Ksh 100,000 |
Comment
|
| 2866 |
SUPPORT OF DRIVING SCHOOL AT KODICH VTC-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SUAM |
Ksh 1,000,000 |
Comment
|
| 2867 |
CONSTRUCTION OF CLASSROOM AT KATANGUN ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 2868 |
CONSTRUCTION OF A CLASSROOM AT LETWA PRIMARY SCHOOL- SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 2869 |
CONSTRUCTION OF TWO CLASSROOMS AT KANASAT ECDE-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2870 |
CONSTRUCTION OF ECDE CLASSROOM AT MOINO-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 2871 |
CONSTRUCTION OF ECDE CLASSROOMS AT SOGHU-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 2872 |
CONSTRUCTION OF ECDE CLASSROOMS AT TUMKO KALYA - MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MNAGEI |
Ksh 100,000 |
Comment
|
| 2873 |
CONSTRUCTION OF ECDE CLASSROOM AT MORTOME - MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 2874 |
CONSTRUCTION OF ECDE CLASSROOM AT NACHUKUT - MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MNAGEI |
Ksh 100,000 |
Comment
|
| 2875 |
COMPLETION OF CLASSROOM AT KAROROK ECDE- ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ALALE |
Ksh 131,114 |
Comment
|
| 2876 |
COMPLETION OF KARENGAMUKAT ECDE (ONGOING)- KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 2877 |
COMPLETION OF CLASSROOM AT LOKUYI ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 2878 |
RENOVATION OF KAKONEROI ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
RIWO |
Ksh 200,000 |
Comment
|
| 2879 |
CONSTRUCTION OF ONE CLASSROOM AT PRINDA ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 2880 |
FENCING OF LOKUYII ECDE AND COMPLETION OF CLASSROOMS AT LOKUYII ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 2881 |
CONSTRUCTION OF PIT LATRINE AT LOKUYI ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
RIWO |
Ksh 200,000 |
Comment
|
| 2882 |
CONSTRUCTION OF PIT LATRINE AT KAPACHEKWO ECDE- SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 2883 |
COMPLETION OF ECDE CLASSROOM AT PARUA EAST ECDE-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
BATEI |
Ksh 400,000 |
Comment
|
| 2884 |
CONSTRUCTION OF CLASSROOMS AT CHOPOTWO ECDE-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 800,000 |
Comment
|
| 2885 |
CONSTRUCTION OF ECDE CLASSROOM AT LOPUSIENIKOU-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 2886 |
PURCHASE OF LAND FOR LOYAMURUK VOCATIONAL TRAINING CENTRE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LELAN |
Ksh 3,200,000 |
Comment
|
| 2887 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT CHEMUSERION ECDE(PENDING BILL)-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
LOMUT |
Ksh 498,272 |
Comment
|
| 2888 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPKOTI(PENDING BILL)-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 340,808 |
Comment
|
| 2889 |
CONSTRUCTION OF CLASSROOMS AT LOSAM KAPCHOK GIRLS SECONDARY SCHOOL-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,149,870 |
Comment
|
| 2890 |
CONSTRUCTION OF NGENGECH ECDE CLASSROOM (PENDING BILL)- SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SUAM |
Ksh 738,320 |
Comment
|
| 2891 |
CONSTRUCTION OF MORON ECDE(PENDING BILL)-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ALALE |
Ksh 1,299,513 |
Comment
|
| 2892 |
CONSTRUCTION OF ONE ECDE CLASSROOM AT KAPTOLOMWO ECDE(PENDING BILL)-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KASEI |
Ksh 1,299,700 |
Comment
|
| 2893 |
CONSTRUCTION OF TWO ECDE CLASSROOM AT KAPORO(PENDING BILL)-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 259,333 |
Comment
|
| 2894 |
CONSTRUCTION OF ECDE CLASSROOM AND PIT LATRINE AT CHORWA-SEKERR WARD (PENDING BILL) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 649,900 |
Comment
|
| 2895 |
CONSTRUCTION OF TWO ECDE CLASSROOMS AT ORURO(PENDING BILL)-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 2,302,971 |
Comment
|
| 2896 |
CONSTRUCTION OF TWO ECDE CLASSROOM AT ST.JOHN SENGELEL(PENDING BILL)-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 704,074 |
Comment
|
| 2897 |
CONSTRUCTION OF TWO ECDE CLASSROOMS AT NGOYOMWO(PENDING BILL)-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,602,579 |
Comment
|
| 2898 |
CONSTRUCTION OF TWO ECDE CLASSROOMS AT CHEPKONDOL(PENDING BILL)-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 969,470 |
Comment
|
| 2899 |
CONSTRUCTION OF TWO ECDE CLASSROOMS AT KAIPA MAYOS(PENDING BILL)-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,043,442 |
Comment
|
| 2900 |
CONSTRUCTION OF ECDE CLASSROOM AND PIT LATRINE AT KASOKIT ECDE-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KASEI |
Ksh 102,327 |
Comment
|
| 2901 |
CONSTRUCTION OF ECDE AND PIT LATRINE AT SITOT KIWAWA(ROLLOVER) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KIWAWA |
Ksh 338,183 |
Comment
|
| 2902 |
CONSTRUCTION OF ECDE CLASSROOM AT CHITUKAGH-KAPCHOK |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 129,926 |
Comment
|
| 2903 |
CONSTRUCTION OF ECDE CLASSROOM AT SUKUT-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
TAPACH |
Ksh 187,525 |
Comment
|
| 2904 |
CONSTRUCTION OF ECDE CLASSROOM AND PIT LATRINE AT LOLWONOI-CHEPARERIA(ROLLOVER) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 50,000 |
Comment
|
| 2905 |
CONSTRUCTION OF TWO ECDE CLASSROOMS AT CHORWA- SEKEER WARD(ROLLOVER) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 2,299,900 |
Comment
|
| 2906 |
CONSTRUCTION OF ECDE CLASSROOM AND PIT LATRINE AT LOKII-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SUAM |
Ksh 165,533 |
Comment
|
| 2907 |
CONSTRUCTION OF ECDE CLASSROOM AT NASIKIRIO-SUAM WARD(ROLLOVER) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SUAM |
Ksh 46,400 |
Comment
|
| 2908 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPEL-CHEPARERIA WARD(ROLLOVER) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 436,279 |
Comment
|
| 2909 |
COMPLETION OF TWO ECDE CLASSROOM AT KAPORO-SEKERR WARD(ROLLOVER) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SEKERR |
Ksh 385,850 |
Comment
|
| 2910 |
CONSTRUCTION OF ECDE CLASSROOM AT TOO SOSTIN-WEIWEI WARD(ROLLOVER) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
WEIWEI |
Ksh 221,290 |
Comment
|
| 2911 |
CONSTRUCTION OF CLASSROOM AT WURAR-ENDUGH WARD(ROLLOVER) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ENDUGH |
Ksh 498,137 |
Comment
|
| 2912 |
PURCHASE OF ECDE CHAIRS- ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ENDUGH |
Ksh 800,000 |
Comment
|
| 2913 |
PURCHASE OF ECDE CHAIRS-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 2914 |
PURCHASE OF ECDE CHAIRS-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 1,200,000 |
Comment
|
| 2915 |
PURCHASE OF ECDE LEARNING MATERIALS(CHEPURKUT,KOPENI,KATANGUN,CHEPTAMAS,CHEPAYWAT,CHEPANYINTA,NGORIAKSHS,KOSIOLOI,KAIPRA,NAURIEN @100K EACH)-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 2916 |
PURCHASE OF CHAIRS FOR ECDES-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
BATEI |
Ksh 1,300,000 |
Comment
|
| 2917 |
SUPPLY AND EQUIPING OF ECDE CENTRES -MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
MNAGEI |
Ksh 2,500,000 |
Comment
|
| 2918 |
PURCHASE OF CHAIRS FOR ECDE CENTRES-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 2919 |
PURCHASE OF ECDE CHAIRS ACROSS THE WARD-KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 3,000,000 |
Comment
|
| 2920 |
PURCHASE OF ECDE CHAIRS AND TABLES-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 2921 |
PURCHASE OF ECDE IRONSHEETS-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SUAM |
Ksh 200,000 |
Comment
|
| 2922 |
PURCHASE OF ECDE LEARNING MATERIALS-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SUAM |
Ksh 774,000 |
Comment
|
| 2923 |
PURCHASE OF IRON SHEETS FOR ECDE CENTRES-KAPCHOK WARD(ROLLOVER) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 2924 |
PURCHASE OF IRON SHEETS FOR ECDE CENTRES- KIWAWA WARD(ROLLOVER) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 2925 |
PURCHASE AND SUPPLY OF LEARNING MATERIALS FOR ECDE KODICH WARD(ROLLOVER) |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KODICH |
Ksh 500,000 |
Comment
|
| 2926 |
PURCHASE OF IRONSHEETS FOR ECDES -ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 2927 |
PURCHASE OF SAUCE PANS FOR ECDE CENTRES -ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 2928 |
PURCHASE OF ECDE LEARNING MATERIALS TO ALL WARD ECDES-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SIYOI |
Ksh 2,550,000 |
Comment
|
| 2929 |
PURCHASE OF ECDE LEARNING MATERIALS-KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 5,700,000 |
Comment
|
| 2930 |
PURCHASE OF ECDE LEARNING MATERIALS-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 2931 |
PURCHASE OF SOURCE PANS FOR ECDE CENTRES-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2021-2022 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 2932 |
TARMACKING OF KACHELIBA TOWNSHIP ROADS- |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
MNAGEI |
Ksh 4,491,423 |
Comment
|
| 2933 |
COMPLETION OF PIT LATRINE AT ORTUM MARKET |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
BATEI |
Ksh 363,169 |
Comment
|
| 2934 |
PERIMETER WALL ARDI HOUSE-PENDING BILL |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 3,100,000 |
Comment
|
| 2935 |
PROPOSED COUNTY WELCOME,DEPARTURE AND ADVERTISEMENT BOARD AT MORKWIJIT |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
MNAGEI |
Ksh 602,658 |
Comment
|
| 2936 |
PURCHASE OF LAND FOR CHEPARERIA TOWN DUMP SITE(2 ACRES) |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 1,500,000 |
Comment
|
| 2937 |
MAINTENANCE OF KAPENGURIA MUNICIPALITY ACCESS ROADS |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
MNAGEI |
Ksh 10,099,355 |
Comment
|
| 2938 |
CONSTRUCTION OF RECREACTION PARK AT MAKUTANO TOWN,LEVELLING AND PAVING OF FIRE STATION AND PURCHASE OF FIVE MARKET STALLS CONTAINERS (KUSP-UDG)ROLLOVER |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
MNAGEI |
Ksh 35,824,842 |
Comment
|
| 2939 |
FEASIBILITY STUDY |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 2940 |
LEVELLING MAKUTANO PUBLIC TOILET |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
MNAGEI |
Ksh 299,851 |
Comment
|
| 2941 |
COMPLETION OF LOMUT MARKET PIT LATRINE-LOMUT WARD |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 2942 |
INSTALLATION OF SOLAR STREET LIGHTS (SOKOTOW, KONA,PTIRAP,CHEPTOKOL,OTIOT,PITPAGH,MNYEKOK,RITIT,KSERA,SASACH,CHORWA,KAMANAU,PARKINO) |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
LOMUT |
Ksh 1,001,728 |
Comment
|
| 2943 |
CONSTRUCTION OF CHEPKORIONG PUBLIC TOILET-BATEI WARD |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 2944 |
CONSTRUCTION OF PIT LATRINE AT MWOTOT MARKET-TAPACH WARD |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
TAPACH |
Ksh 350,000 |
Comment
|
| 2945 |
PURCHASE OF WORKSHOP TOOLS FOR KODICH JUA KALI WORKSHOP-KODICH WARD |
Lands, Housing, Planning and Urban Development |
2021-2022 |
Complete
|
KODICH |
Ksh 1,200,000 |
Comment
|
| 2946 |
WSTF-EU-CPIRA KACHELIBA PUBLIC SANITATION FACILITY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SUAM |
Ksh 750,000 |
Comment
|
| 2947 |
PURCHASE OF WATER PIPES FOR KAPSANGAR WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 2948 |
PURCHASE OF WATER TANKS KAPTABUK LOCATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 2949 |
REPAIR/PURCHASE OF SOLAR PANNELS AND PUMPS FOR KANYARKWATCENTRE,KARENGER AND KANYARKWAT GIRLS. |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
RIWO |
Ksh 2,500,000 |
Comment
|
| 2950 |
REPAIR/PURCHASE OF SOLAR PANNELS AND PUMPS FOR KAMKETO,KATUDA,WASAT,KAURIONG AND SENETWO |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KASEI |
Ksh 1,500,000 |
Comment
|
| 2951 |
PURCHASE OF GRAVELL PACKS |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 2952 |
EXTENSION OF TOGHOMO WATER SUPPLY PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LOMUT |
Ksh 10,000,000 |
Comment
|
| 2953 |
EMPOHAT-POROWO WATER SUPPLY PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 5,000,000 |
Comment
|
| 2954 |
PURCHASE AND SUPPLY OF PIPES FOR KAPCHEMUK WATER SUPPLY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 3,000,000 |
Comment
|
| 2955 |
PURCHASE AND SUPPLY OF PIPES FOR KOROSION WATER SUPPLY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 2,000,000 |
Comment
|
| 2956 |
ALALE GRAVITY WATER SUPPLY PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 5,000,000 |
Comment
|
| 2957 |
KAMERIS WATER SUPPLY PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 3,000,000 |
Comment
|
| 2958 |
ENOPOGH-EMBOUGH WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SOOK |
Ksh 8,000,000 |
Comment
|
| 2959 |
KANYERUS WATER SUPPLY PROJCET-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
RIWO |
Ksh 2,065,910 |
Comment
|
| 2960 |
CONSTRUCTION OF WATER PAN AT KERMONOT -WEST POKOT SUB COUNTY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 4,410,300 |
Comment
|
| 2961 |
CONSTRUCTION OF KAKOGHIN WATER PAN-RIWO WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
RIWO |
Ksh 5,000,000 |
Comment
|
| 2962 |
CONSTRUCTION OF KAPKORUS-MAKUTANO WATER SUPPLY PROJECT(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 13,127,972 |
Comment
|
| 2963 |
DESILTING OF KOKWOMOGH WATER PAN -RIWO WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
RIWO |
Ksh 5,000,000 |
Comment
|
| 2964 |
CHERU WATER PIPING PROJECT(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ENDUGH |
Ksh 300,000 |
Comment
|
| 2965 |
UPGRADE OF NAPITIRO BOREHOLE(PENDING BILL) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 2966 |
GULLEY RECLAMATION AT EMBOASIS PRIMARY SCHOOL(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SCHOOL |
Ksh 749,763 |
Comment
|
| 2967 |
PURCHASE OF DRILLING RIG |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 40,000,000 |
Comment
|
| 2968 |
PURCHASE OF NEW COMPRESSOR FOR DRILLING RIG(EXISTING RIG) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 8,150,000 |
Comment
|
| 2969 |
PURCHASE OF NEW ENGINE FOR DRILLING RIG(EXISTING RIG) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,660,000 |
Comment
|
| 2970 |
PURCHASE OF LAND FOR WATER TREATMENT PLANT(MURUNY-CHEPARERIA WATER PROJECT)(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 1,200,000 |
Comment
|
| 2971 |
GULLEY RECLAMATION AT EMBOASIS PRIMARY SCHOOL(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SCHOOL |
Ksh 749,762 |
Comment
|
| 2972 |
PURCHASE OF TREE SEEDLINGS FOR WEST POKOT SUB-COUNTY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 3,000,000 |
Comment
|
| 2973 |
PURCHASE OF TREE SEEDLINGS FOR WEST POKOTSUBCOUNTY(PENDING BILL) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 2974 |
PURCHASE OF TREE SEEDLINGS FOR CENTRAL POKOTSUBCOUNTY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 2975 |
PURCHASE OF TREE SEEDLINGS FOR POKOT SOUTH SUBCOUNTY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 3,000,000 |
Comment
|
| 2976 |
PURCHASE OF POTTING TUBES FOR TREE NURSERIES |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 2977 |
EXTENSION OF TUKUMO WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 700,000 |
Comment
|
| 2978 |
CONSTRUCTION OF CHEMOLO WATER INTAKE-TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
TAPACH |
Ksh 300,000 |
Comment
|
| 2979 |
PURCHASE AND SUPPLY OF WATER PIPES TO TELO AND KAPOMO WATER SUPPLY PROJECT-TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
TAPACH |
Ksh 1,500,000 |
Comment
|
| 2980 |
PURCHASE AND SUPPLY OF WATER PIPES-TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
TAPACH |
Ksh 2,000,000 |
Comment
|
| 2981 |
CONSTRUCTION OF SIKOWO PRIMARY SCHOOL WATER INTAKE -TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
TAPACH |
Ksh 300,000 |
Comment
|
| 2982 |
CONSTRUCTION OF CHEPUNGUNGU WATER INTAKE AND PIPELINE REPAIR TO WATER TANK-TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 2983 |
CONSTRUCTION OF PTOP WATER INTAKE-TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
TAPACH |
Ksh 300,000 |
Comment
|
| 2984 |
CONSTRUCTION OF KACHEPURKONG PRIMARY AND SECONDARY WATER SUPPLY-TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
TAPACH |
Ksh 940,253 |
Comment
|
| 2985 |
UPGRADING OF LODUPUP BOREHOLE TO SOLAR POWER-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
RIWO |
Ksh 1,900,000 |
Comment
|
| 2986 |
LODUPUP DISPENSARY WATER PROJECT(PIPING AND TANKS)-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 2987 |
DRILLING OF LOCHIYO BOREHOLE -RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
RIWO |
Ksh 1,950,000 |
Comment
|
| 2988 |
DRILLING OF SIMATWA PRIMARY SCHOOL BOREHOLE-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
RIWO |
Ksh 1,950,000 |
Comment
|
| 2989 |
DRILLING OF MISIKWONY BOREHOLE -RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
RIWO |
Ksh 1,300,000 |
Comment
|
| 2990 |
KACHAMBILWA SUB-SURFACE DAM-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
RIWO |
Ksh 600,000 |
Comment
|
| 2991 |
UPGRADING OF GHATOY BOREHOLE TO SOLAR-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MASOL |
Ksh 2,000,000 |
Comment
|
| 2992 |
UPGRADING OF CHEPAYWAT BOREHOLE TO SOLAR-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MASOL |
Ksh 2,000,000 |
Comment
|
| 2993 |
REPAIR OF BOREHOLES(KALAS,CHIRKIL,CHEPURKUT,LOKARKAR) -MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MASOL |
Ksh 2,800,000 |
Comment
|
| 2994 |
PURCHASE OF BOREHOLE REPAIR MATERIALS-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 2995 |
PURCHASE OF PIPES FOR MOMORO WATER PROJECT-ENDUGH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ENDUGH |
Ksh 2,500,000 |
Comment
|
| 2996 |
REPAIR OF CHEPTIRA-CHERELIO WATER PROJECT-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 2997 |
PURCHASE OF PIPES FOR POROYON AND MASAT WATER SUPPLY-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LOMUT |
Ksh 600,000 |
Comment
|
| 2998 |
PURCHASE OF PIPES FOR KOKPOR-CHEMALEY WATER SUPPLY-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 2999 |
KOPOKUKUGH-KOKWOMESES-ROSO WATER PIPING-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 3000 |
CONSTRUCTION OF SENGEKO WATER SUPPLY-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 3001 |
CONSTRUCTION OF PUPOGH-DIP-SINTAI-KSERA WATER SUPPLY-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 3002 |
EMPOTAPASIAK-KOKWOMWOKOI WATER SUPPLY REPAIR-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LOMUT |
Ksh 600,000 |
Comment
|
| 3003 |
PURCHASE OF PIPES FOR IMONPOGHET WATER PROJECT-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 3004 |
PURCHASE OF PIPES FOR CHOROK WATER PROJECT-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 600,000 |
Comment
|
| 3005 |
PURCHASE OF PIPES FOR KAPTABUK AND MOKOYON LOCATIONS-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 400,000 |
Comment
|
| 3006 |
PURCHASE OF PIPES FOR LELAN AND KAPYONGEN LOCATIONS-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3007 |
PURCHASE OF PIPES AT KURKAT-KOPUM WATER PROJECT-BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
BATEI |
Ksh 700,000 |
Comment
|
| 3008 |
CONSTRUCTION OF KALEKWAN INTAKE-BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 3009 |
CONSTRUCTION OF MTELO-CHIKAR WATER PROJECT-SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,200,100 |
Comment
|
| 3010 |
CONSTRUCTION OF KAPSOO-YAS-MARICH PASS WATER PROJECT-SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SEKERR |
Ksh 1,500,000 |
Comment
|
| 3011 |
REPAIR OF CHEMORIL-CHUWAI WATER PROJECT-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 3012 |
PIPING AND COMPLETION OF ATATAR BOREHOLE-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KIWAWA |
Ksh 1,800,000 |
Comment
|
| 3013 |
EQUIPING OF KATUKURI BOREHOLE-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KIWAWA |
Ksh 300,000 |
Comment
|
| 3014 |
REPAIR OF ALL SOLAR BOREHOLES-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KIWAWA |
Ksh 1,500,000 |
Comment
|
| 3015 |
PURCHASE OF BOREHOLES REPAIR MATERIALS-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KIWAWA |
Ksh 500,000 |
Comment
|
| 3016 |
PURCHASE OF THREE SOLAR PUMPS-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KIWAWA |
Ksh 1,100,000 |
Comment
|
| 3017 |
EXTENSION OF WATER PROJECT AT SOLION-KASUS-WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
WEIWEI |
Ksh 2,000,000 |
Comment
|
| 3018 |
DRILLING OF POTO BOREHOLE-WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
WEIWEI |
Ksh 2,300,000 |
Comment
|
| 3019 |
SUPPLY OF PIPES FOR LOKORNOI-CHEPNONOI WATER SUPPLY -MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MNAGEI |
Ksh 1,500,000 |
Comment
|
| 3020 |
NOKOWO TAMPALAL WATER PROJECT(PENDING BILL)-MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MNAGEI |
Ksh 72,000 |
Comment
|
| 3021 |
COMPLETION OF INSTALLATION OF SOLAR PENELS FOR KACHEPKAI WATER PROJECT-MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MNAGEI |
Ksh 200,000 |
Comment
|
| 3022 |
SPRING PROTECTION AT BAPTIST AREA -MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 3023 |
CONSTRUCTION OF LOWOYATEN SAND DAM-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 900,000 |
Comment
|
| 3024 |
CONSTRUCTION OF KOCHICH SAND DAM-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 3025 |
DRILLING OF BOREHOLE AT CHEPOSEKOGH-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 2,000,000 |
Comment
|
| 3026 |
PURCHASE OF GENERATOR FOR AKIRIAMET WATER PROJECT- -ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 3027 |
CONSTRUCTION OF KOMUN SAND DAM-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 750,000 |
Comment
|
| 3028 |
REPAIR OF KATICH SOLAR BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 850,000 |
Comment
|
| 3029 |
CONSTRUCTION OF CHEPURES SUB-SURFACE DAM-KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KASEI |
Ksh 600,000 |
Comment
|
| 3030 |
REPAIR OF IYON(CHEPKOPEGH) SUB-SURFACE DAM-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 3031 |
DRILLING OF LOCHURTUT BOREHOLE-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SUAM |
Ksh 2,300,000 |
Comment
|
| 3032 |
PURCHASE OF BOREHOLES REPAIR MATERIALS-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SUAM |
Ksh 1,500,000 |
Comment
|
| 3033 |
WATER TROUGH AT SITIT BOREHOLE-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SUAM |
Ksh 200,000 |
Comment
|
| 3034 |
REPAIR OF SHONGEN BOREHOLE-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SUAM |
Ksh 200,000 |
Comment
|
| 3035 |
REPAIR OF BOREHOLES-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SUAM |
Ksh 300,000 |
Comment
|
| 3036 |
REPAIR OF KATOPOTON(KAMOKONGWO) BOREHOLE(PURCHASE OF MOTOR)-KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 3037 |
PURCHASE OF BOREHOLES REPAIR MATERIALS AND REPAIR OF KAWOLOK,CHITUKAGH,BENDERA AND KOTULPOGH BOREHOLES-KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 750,000 |
Comment
|
| 3038 |
KALUKUNA SOLAR POWER,BOREHOLE STRACTURES,WATER TROUGH AND FETCHING SITES |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 3039 |
PIPING OF WATER FROM NAMORU TO MAKALA-KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 3040 |
PURCHASE OF WATER CONTROLLERS-KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 3041 |
SOLAR INSTALLATION AT KARON BOREHOLE-KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 3042 |
UPGRADING OF KASES BOREHOLE TO SOLAR-KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,999,800 |
Comment
|
| 3043 |
PURCHASE OF WATER PIPES FOR TOKOLTO WATER PROJECT-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 3044 |
DRILLING OF BOREHOLE AT LULUNGA-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KODICH |
Ksh 2,500,000 |
Comment
|
| 3045 |
UPGRADING OF KOYOLE BOREHOLE WITH SOLAR POWER-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KODICH |
Ksh 1,900,000 |
Comment
|
| 3046 |
UPGRADING OF CHEMATICHOR BOREHOLE WITH SOLAR POWER-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KODICH |
Ksh 1,900,000 |
Comment
|
| 3047 |
DRILLING OF BOREHOLE AT KAPCHILLA-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 2,000,000 |
Comment
|
| 3048 |
COMPLETION OF PARAYWA WATER PROJECT-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 3049 |
PROTECTION OF WATER INTAKE AT KORPUN-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 200,000 |
Comment
|
| 3050 |
PURCHASE AND SUPPLY OF ASSORTED PIPES-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 400,000 |
Comment
|
| 3051 |
COMPLETION OF KAPKATET WATER INTAKE-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 200,000 |
Comment
|
| 3052 |
CONSTRUCTION OF WATER INTAKE AND PIPING AT KAPKAPEN-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 3053 |
PROTECTION OF WATER INTAKE AND PIPING AT SHETTER-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 3054 |
CONSTRUCTION OF KIPTENDEN WATER TANK-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 600,000 |
Comment
|
| 3055 |
PROTECTION OF WATER INTAKE AND PIPING AT SIRKO-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 300,000 |
Comment
|
| 3056 |
CONSTRUCTION OF WATER INTAKE,PIPING AND WATER TANK AT KIPKORINYA-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 1,400,000 |
Comment
|
| 3057 |
KAMARKECH WATER PROJECT- KAPENGURIA WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 3058 |
PIPING OF NGOLEYO WATER PROJECT- KAPENGURIA WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 3059 |
SAKAT WATER PROJECT PIPING-KAPENGURIA WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 3060 |
LAYING OF WATER PIPES FOR KAPTIMOT-TAKAYWA-MASOL WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 3061 |
REPAIR OF CHEPROMWAI BOREHOLE-MASOL WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 3062 |
PURCHASE OF TOOLS AND EQUIPMENT FOR BOREHOLES REPAIR-ALALE WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 300,000 |
Comment
|
| 3063 |
PURCHASE,SUPPLY AND INSTALLATION OF SQF 2.2-2 WATER PUMPS(REMOI,ALANY,CHEMULUNJO AND KATICH BOREHOLES)-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 2,000,000 |
Comment
|
| 3064 |
PURCHASE OF PLASTIC DROP RAISER PIPES FOR NAUMA BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 300,000 |
Comment
|
| 3065 |
SUPPLY OF PIPES AND BOREHOLE REPAIR MATERIALS-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 1,200,000 |
Comment
|
| 3066 |
REPAIR OF BOREHOLES AT ALALE WARD(LOEMAMOSING,KATICH,ORON,KASITOT,KAPTUKEN,NAUYAPONG,LOKITONYALA B,LODONY,LOMURIEBUL,LOBIROI)-ALALE WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 3067 |
DRILLING AND EQUIPING OF KISIAMOI BOREHOLE-ALALE WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 2,000,000 |
Comment
|
| 3068 |
CONSTRUCTION OF OMORWO SAND DAM-ALALE WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 3069 |
PIPING AND SUPPLY OF LOKITONYALA WATER PROJECT-ALALE WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 2,000,000 |
Comment
|
| 3070 |
KOKWOAMURO WATER PIPING EXTENSION-ALALE WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 600,000 |
Comment
|
| 3071 |
CONSTRUCTION OF PARAYWA WATER PROJECT-SIYOI WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 1,500,000 |
Comment
|
| 3072 |
CONSTRUCTION OF WATER TANK AT KRENGOT-SIYOI WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 650,000 |
Comment
|
| 3073 |
DRILLING OF KRENGOT WATER PROJECT-SIYOI WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 1,500,000 |
Comment
|
| 3074 |
CONSTRUCTION OF WATER DAM AT CHETOKOL-KAPCHOK WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 5,000,000 |
Comment
|
| 3075 |
DRILLING OF BOREHOLE AT TUWIT -KAPCHOK WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 3076 |
DRILLING OF BOREHOLE AT KAPANYIRIT -KAPCHOK WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 3077 |
DRILLING BOREHOLE AT LOMURYAMOI-SUAM WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 3078 |
DRILLING OF ANGAMIT BOREHOLE-SUAM WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 3079 |
RETICULATION OF ALELIA BOREHOLE-SUAM WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SUAM |
Ksh 1,500,000 |
Comment
|
| 3080 |
DRILLING OF BOREHOLE AT LOBOT-KASEI WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KASEI |
Ksh 2,000,000 |
Comment
|
| 3081 |
DRILLING OF BOREHOLE AT TAKAYWA JUNCTION-KASEI WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 3082 |
DRILLING OF OF CHEPORON BOREHOLE-KIWAWA WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 3083 |
DRILLING OF LOYWOKOR BOREHOLE-RIWO WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 3084 |
BOREHOLE REPAIRS AND PURCHASE OF BOREHOLE EQUIPMENTS-RIWO WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 3085 |
CONSTRUCTION (KOPOLONGA) KOSOCHPOGH-KALYA WATER PROJECT-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 3086 |
DRILLING OF BOREHOLE AT TAMAKARU - SEKERR WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SEKERR |
Ksh 2,000,000 |
Comment
|
| 3087 |
CONSTRUCTION OF KOSILTIONY WATER SUPPLY PROJECT-TAPACH WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
TAPACH |
Ksh 1,500,000 |
Comment
|
| 3088 |
CONSTRUCTION OF TULUNGWO-KATUKURI WATER SUPPLY-LOMUT WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 3089 |
PURCHASE AND SUPPLY OF WATER PIPES FOR VILLAGES(KAKITONGIN,KAKOLOL,KALOSHOMPO,KAMANAU AND KORORA)-LOMUT WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LOMUT |
Ksh 250,000 |
Comment
|
| 3090 |
PURCHASE AND SUPPLY OF WATER PIPES FOR LOTEPES,KITAR VILLAGES-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KODICH |
Ksh 1,200,000 |
Comment
|
| 3091 |
PIPING OF KAPANYIRIT-DAM VILLAGE WATER SUPPLY-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LOMUT |
Ksh 400,000 |
Comment
|
| 3092 |
CONSTRUCTION OF WATER TANK AT KORPUN -SIYOI WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 599,990 |
Comment
|
| 3093 |
KAPKATET WATER TANK- SIYOI WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 598,200 |
Comment
|
| 3094 |
CONSTRUCTION OF KAMAKETOI WATER TANK SIYOI WARD(ONGOING)(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 499,860 |
Comment
|
| 3095 |
SOLAR UPGRADING OF YWALAPONG BOREHOLE -SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SUAM |
Ksh 1,699,000 |
Comment
|
| 3096 |
DRILLING OF BOREHOLES(CHEPKINEGH ,KAMILA, KARIONOMORU,NAKUSE,ATOT,RORON,MOINOI,NAKORETE,LORACH,CHERELYO,KATUMWON, KONGELAIHILL,MORIOKWO,PLOT,LOLOCHECDE-,SIYOI, SEC,BORA LEE ,KOPEYON,KOPITIRO,KALOTAKA,KALEMNGOLE, MORKAPURA,MALMTICH,NYANGAITA,NAURIEN,TUMBOCHESUT)(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
VARIOUS WARDS |
Ksh 5,594,917 |
Comment
|
| 3097 |
CONSTRUCTION OF KAMWOTINY WATER PROJECT-MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MNAGEI |
Ksh 1,700,000 |
Comment
|
| 3098 |
INSTALLATION OF SOLAR PANNELS FOR KACHEPKAI WATER PROJECT-MNAGEI WARD (NEW)(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 3099 |
PIPING AND EXTENSION AT KAMKETO BOREHOLE(ROLLOVER)-KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KASEI |
Ksh 1,800,000 |
Comment
|
| 3100 |
REPAIR OF LOBIROI SOLAR POWERDED BOREHOLE(ROLLOVER)-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 1,060,000 |
Comment
|
| 3101 |
INSTALLATION OF SOLAR CHERANGAN SHALLOW WELL(ROLLLOVER) - KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KODICH |
Ksh 1,000,000 |
Comment
|
| 3102 |
INSTALLATION OF SOLAR POWER AT CHEMULUNJO BOREHOLE(ROLLOVER)-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
RIWO |
Ksh 2,400,000 |
Comment
|
| 3103 |
CONSTRUCTION OF NATELENG-NGOLEYO WATER SPRING MNAGEI WARD (NEW) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MNAGEI |
Ksh 249,990 |
Comment
|
| 3104 |
CONSTRUCTION OF NAKOWO TAMBALAL WATER PROJECT IN MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MNAGEI |
Ksh 71,956 |
Comment
|
| 3105 |
DRILLING OF BOREHOLE AT LOSIYWAT-SUAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 3106 |
PURCHASE AND SUPPLY OF BOREHOLE REPAIR MATERILAS-KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KASEI |
Ksh 1,102,327 |
Comment
|
| 3107 |
ESTABLISHMENT OF TREE NURSERY(ROLLOVER)-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 3108 |
SPRING PROTECTION AT KAPSOYA-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 200,000 |
Comment
|
| 3109 |
PROTECTION OF CHEPKOTI WATER SPRING-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SIYOI |
Ksh 200,000 |
Comment
|
| 3110 |
REPAIR AND FENCING OF CHEMULUNCHO SOLAR BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 3111 |
PURCHASE AND SUPPLY OF WATER TANK FOR ADUNGONGIRO WATER PROJECT 10,000LTRS-LELAN WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 211,906 |
Comment
|
| 3112 |
PURCHASE AND SUPPLY OF WATER TANKS -LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 3113 |
PURCHASE OF WATER SUPPLIES REPAIR MATERIALS -LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 3114 |
PURCHASE , SUPPLY AND INSTALLATION OF WATER TANKS (10,000 LTRS FOR VILLAGES KANGAL,KACHEMORICH,ROSO,KAKITONGIN AND TULULISHO) (5000 LTRS FOR ECDES KASIRITIAN,KISHOREI,NYINYOT,CHEPAR AND KATUKURI)- LOMUT WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LOMUT |
Ksh 2,500,000 |
Comment
|
| 3115 |
PURCHASE OF FIVE WATER TANKS FOR PARIS AMANGOLE,KORLIMA,CHESUBET KIWANJA,PIGHAN LOCHIO,CHEPUKAT SIATOLIM-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3116 |
PURCHASE OF METALLIC MOBILE WATER TANK(WATER BOOSTER)-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KODICH |
Ksh 1,099,800 |
Comment
|
| 3117 |
PURCHASE OF TANKS(10,000LTRS) FOR KAMITO GIRLS AND NANGROTUM SECONDARY SCHOOLS |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
MNAGEI |
Ksh 200,000 |
Comment
|
| 3118 |
PURCHASE AND SUPPLY OF WATER TANK AT TIYINEI-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
SUAM |
Ksh 200,000 |
Comment
|
| 3119 |
PURCHASE AND SUPPLY OF WATER PIPES(1 FOR 10000 LTRS AND 2 FOR 5000 LTRS) AND THREE WATER TANKS FOR CHEPUSAL WATER PROJECT-LELAN WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
LELAN |
Ksh 800,000 |
Comment
|
| 3120 |
PURCHASE OF SOLAR PANNELS, PIPES,TAPS,WATER TANKS AT OROLWO AND NAKWIJIT BOREHOLES(ROLLOVER)-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KODICH |
Ksh 1,200,000 |
Comment
|
| 3121 |
PURCHASE AND SUPPLY OF TREE SEEDLINGS FOR KAPKOGHIN AND TERER |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3122 |
PURCHASE OF TREE SEEDLINGS FOR KOITUMO VILLAGE-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 3123 |
PURCHASE AND DISTRIBUTION OF TREE SEEDLINGS FROM TAPACH WEST, KOKWOPSIS AND NYARKULIAN TREE NURSERY GROUPS -TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 3124 |
PURCHASE OF POTTING TUBES FOR TREE NURSERIES-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 2,300,000 |
Comment
|
| 3125 |
PURCHASE OF TREE SEEDLINGS TO BE DISTRIBUTED TO THE LAND SLIDE AREAS ACROSS THE WARD -KAPENGURIA WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,950,000 |
Comment
|
| 3126 |
COVID-19 GRANTS FROM NATIONAL GOVERNMENT |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 6,417,121 |
Comment
|
| 3127 |
WORLD BANK LOAN FOR TRANSFORMING HEALTH SYSTEMS FOR UNIVERSAL CARE PROJECT |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 67,346,327 |
Comment
|
| 3128 |
COMPLETION OF KARENGER DISPENSARY |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
RIWO |
Ksh 4,300,000 |
Comment
|
| 3129 |
PROPOSED EXTENSION TO DOCTORS LOUNGE AT KCRH |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 144,903 |
Comment
|
| 3130 |
PROPOSED CONSTRUCTION OF ABLUTION BLOCK AT ISOLATION WARD AT KCRH |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 5,000,000 |
Comment
|
| 3131 |
PROPOSED CONSTRUCTION OF PEDIATRIC WARD AT KABICHBICH HOSPITAL(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
LELAN |
Ksh 4,999,761 |
Comment
|
| 3132 |
PROPOSED CONSTRUCTION OF PEDIATRIC WARD AT CHEPARERIA HOSPITAL(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 4,999,953 |
Comment
|
| 3133 |
PROPOSED CONSTRUCTION OF PEDIATRIC WARD AT SIGOR HOSPITAL(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
WEIWEI |
Ksh 4,991,475 |
Comment
|
| 3134 |
COMPLETION OF PEDIATRIC WARD AT KABICHBICH HOSPITAL |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
LELAN |
Ksh 2,000,000 |
Comment
|
| 3135 |
COMPLETION OF PEDIATRIC WARD AT CHEPARERIA HOSPITAL |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 2,000,000 |
Comment
|
| 3136 |
COMPLETION OF PEDIATRIC WARD AT SIGOR HOSPITAL |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
WEIWEI |
Ksh 2,000,000 |
Comment
|
| 3137 |
PROPOSED CONSTRUCTION OF RENAL UNIT SEPTIC TANK AT KCRH(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 4,362,346 |
Comment
|
| 3138 |
PROPOSED CONSTRUCTION OF CHMT TOILET(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,200,000 |
Comment
|
| 3139 |
PROPOSED CONSTRUCTION OF LABORATORY AT SIGOR SUB-COUNTY HOSPITAL(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
WEIWEI |
Ksh 3,332,634 |
Comment
|
| 3140 |
CONSTRUCTION OF TOILETS AT SIGOR SUB-COUNTY HOSPITAL |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
WEIWEI |
Ksh 354,000 |
Comment
|
| 3141 |
PROPOSED CONSTRUCTION OF PUBLIC TOILET AND WASHROOM AT KCRH |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 56,188 |
Comment
|
| 3142 |
RENOVATION OF PROCUREMENT OFFICE AT CHMT HQ(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 3143 |
RENOVATION AND EQUIPING OF DOCTORS LOUNGE |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 28,610 |
Comment
|
| 3144 |
RENOVATION OF UTILITY ROOM AT ISOLATION WARD AT KCRH |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 400,000 |
Comment
|
| 3145 |
WALLING AND EXTERNAL WORKS BLOOD BANK PHASE I |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
MNAGEI |
Ksh 113,036 |
Comment
|
| 3146 |
PURCHASE AND INSTALLATION OF HIGH LEVEL AND LOW LEVEL WATER TANKS AT ISOLATION WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 3147 |
PROPOSED CONSTRUCTION OF GUARD HOUSE AND CHAINLINK FENCE AT ISOLATION WARD AT KCRH |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 2,597,890 |
Comment
|
| 3148 |
CHEPARERIA SUB-COUNTY HOSPITAL LABORATORY-ELECTRICAL AND MECHANICAL INSTALLATION(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 3,500,000 |
Comment
|
| 3149 |
KACHELIBA SUB-COUNTY HOSPITAL CABLING AND POWER CONNECTION |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SUAM |
Ksh 2,400,000 |
Comment
|
| 3150 |
COLLECTION OF RAIN WATER AT KCRH |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 2,362,784 |
Comment
|
| 3151 |
PURCHASE OF MOTORCYCLES |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 420,000 |
Comment
|
| 3152 |
PURCHASE OF 1 AMBULANCE-PENDING BILL |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 640,208 |
Comment
|
| 3153 |
EQUIPING OF THEATRE AND EYE UNIT AT KACHELIBA SUBCOUNTY HOSPITAL(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 5,000,000 |
Comment
|
| 3154 |
PURCHASE OF OFFICE FURNITURE FOR ALALE AND KABICHBICH (ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3155 |
SUPPLY AND DELIVERY OF FURNITURE FOR DOCTORS CALLROOM AT KCRH |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3156 |
PURCHASE OF LABORATORY EQUIPMENT |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 3,000,000 |
Comment
|
| 3157 |
ENVIRONMENTAL IMAPCT ASSESSMENT(NEMA) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 8,039 |
Comment
|
| 3158 |
RENOVATION/EXTENSION OF OFFICE AT KACHELIBA HOSPITAL(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3159 |
RENOVATION AND EQUIPING OF DOCTORS HOUSE |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 3160 |
SOFTWARE AND SERVER UPGRADE AT KCRH |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 2,200,000 |
Comment
|
| 3161 |
PURCHASE OF NETWORKING AND COMPUTERS AT KAPENGURIA (ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,300,000 |
Comment
|
| 3162 |
CONSTRUCTION OF TAKAIYWA MATERNITY WING-MASOL WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 3163 |
FENCING OF KRIICH DISPENSARY-ENDUGH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ENDUGH |
Ksh 1,400,000 |
Comment
|
| 3164 |
COMPLETION OF CHEPOLET DISPENSARY TOILETS AND FENCING-ENDUGH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ENDUGH |
Ksh 800,000 |
Comment
|
| 3165 |
COMPLETION OF CHEWARANY DISPENSARY-ENDUGH |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ENDUGH |
Ksh 350,000 |
Comment
|
| 3166 |
CONSTRUCTION OF MBARA DISPENSARY-SEKERR WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SEKERR |
Ksh 2,000,000 |
Comment
|
| 3167 |
COMPLETION OF MORTOME DISPENSARY -MNAGEI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
MNAGEI |
Ksh 1,500,000 |
Comment
|
| 3168 |
COMPLETION OF TAMPALAL DISPENSARY ONGOING -MNAGEI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
MNAGEI |
Ksh 800,000 |
Comment
|
| 3169 |
COMPLETION OF KALAPATA DISPENSARY STAFF HOUSE -ALALE WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 3170 |
CONSTRUCTION OF CHEPKOSIL DISPENSARY-KASEI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KASEI |
Ksh 3,000,000 |
Comment
|
| 3171 |
COMPLETION OF MATERNITY WING AT OROLWO DISPENSARY-KODICH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KODICH |
Ksh 750,000 |
Comment
|
| 3172 |
COMPLETION OF LOKILELIAN DISPENSARY-KODICH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 3173 |
COMPLETION OF STAFF HOUSES AT AGC CHEPNYAL DISPENSARY-SOOK WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SOOK |
Ksh 400,000 |
Comment
|
| 3174 |
CONSTRUCTION OF PIT LATRINE AT NAKWIJIT DISPENSARY |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KODICH |
Ksh 220,000 |
Comment
|
| 3175 |
COMPLETION OF LABORATORY AT CHEPNYAL DISPENSARY-SOOK WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 3176 |
COMPLETION OF PARAYWA DISPENSARY-SIYOI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 3177 |
CONSTRUCTION OF SEPTIC TANK AT KAIBOS DISPENSARY-SIYOI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SIYOI |
Ksh 600,000 |
Comment
|
| 3178 |
RENOVATION OF POLE DISPENSARY-RIWO WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
RIWO |
Ksh 400,000 |
Comment
|
| 3179 |
RENOVATION OF NAUYAPONG DISPENSARY -ALALE WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ALALE |
Ksh 400,000 |
Comment
|
| 3180 |
RENOVATION OF NASAL DISPENSARY -ALALE WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ALALE |
Ksh 400,000 |
Comment
|
| 3181 |
RENOVATION OF KASEI DISPENSARY -KASEI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 3182 |
FENCING OF SASAK DISPENSARY -ALALE WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ALALE |
Ksh 1,000,000 |
Comment
|
| 3183 |
EQUIPING OF MURWONGAR DISPENSARY-SUAM |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 3184 |
EQUIPPING OF NGOTUT DISPENSARY-KAPCHOK WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 3185 |
EQUIPING OF TIYINEI DISPENSARY-SUAM WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 3186 |
EQUIPPING OF KAPSAIT DISPENSARY-LELAN WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3187 |
COMPLETION OF KAMELEI DISPENSARY-TAPACH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
TAPACH |
Ksh 600,000 |
Comment
|
| 3188 |
COMPLETION OF STAFF HOUSE AT NAGWOILAP DISPENSARY -ALALE WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ALALE |
Ksh 1,000,000 |
Comment
|
| 3189 |
EQUIPING OF KALAPATA DISPENSARY- ALALE WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 3190 |
EQUIPING OF NAGWOILAP DISPENSARY ALALE WARD(ONGOING) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 3191 |
FENCING OF KOTIT DISPENSARY-ENDUGH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 3192 |
COMPLETION OF NAPITIRO DISPENSARY STAFF HOUSES-KAPCHOK WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 700,000 |
Comment
|
| 3193 |
COMPLETION OF KALUKUNA DISPENSARY-KAPCHOK WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,333,489 |
Comment
|
| 3194 |
RENOVATION OF KATOPOTEN DISPENSARY -KODICH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KODICH |
Ksh 800,000 |
Comment
|
| 3195 |
CONSTRUCTION OF AUSKION DISPENSARY PIT LATRINE-RIWO WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
RIWO |
Ksh 200,000 |
Comment
|
| 3196 |
CONSTRUCTION OF PIT LATRINES AT KRURU DISPENSARY-RIWO WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 3197 |
COMPLETION OF STAFF HOUSE AT KONGELAI DISPENSARY-RIWO WARD(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
RIWO |
Ksh 2,879,975 |
Comment
|
| 3198 |
PROPOSED CONSTRUCTION OF STAFF HOUSE AT KAMAYECH DISPENSARY -RIWO WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
RIWO |
Ksh 569,797 |
Comment
|
| 3199 |
COMPLETION OF STAFF HOUSE AT SEBIT DISPENSARY-BATEI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
BATEI |
Ksh 499,000 |
Comment
|
| 3200 |
CONSTRUCTION OF MALE WARD AT TAMKAL(PENDING BILL)-WEIWEI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
WEIWEI |
Ksh 899,836 |
Comment
|
| 3201 |
CONSTRUCTION OF MATERNITY WING AT PARAYON DISPENSARY-TAPACH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
TAPACH |
Ksh 1,849,377 |
Comment
|
| 3202 |
CONSTRUCTION OF WARD BLOCK AT TAPACH DISPENSARY-TAPACH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
TAPACH |
Ksh 692,384 |
Comment
|
| 3203 |
COMPLETION OF NYARKULIAN MATERNITY WING BLOCK-TAPACH |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
TAPACH |
Ksh 204,280 |
Comment
|
| 3204 |
SONDANY MATERNITY BLOCK FLOORING WITH TILES-TAPACH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
TAPACH |
Ksh 700,000 |
Comment
|
| 3205 |
CONSTRUCTION OF AKIRIAMET DISPENSARY-MASOL WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
MASOL |
Ksh 5,000,000 |
Comment
|
| 3206 |
COMPLETION OF MERUR DISPENSARY(PENDING BILL)-ENDUGH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ENDUGH |
Ksh 2,544,818 |
Comment
|
| 3207 |
COMPLETION OF CHEPOLET DISPENSARY(PENDING BILL)-ENDUGH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ENDUGH |
Ksh 2,084,490 |
Comment
|
| 3208 |
CONSTRUCTION OF TWO DOOR TOILET AT ORWA DISPENSARY-SEKERR WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SEKERR |
Ksh 251,500 |
Comment
|
| 3209 |
CONSTRUCTION OF PIT LATRINE AND URINAL AT KONGELAI MARKET-RIWO WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
RIWO |
Ksh 377,700 |
Comment
|
| 3210 |
PROPOSED RENOVATION OF OPD AT ANTI-MALARIA LOMUT DISPENSARY-LOMUT WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
LOMUT |
Ksh 644,800 |
Comment
|
| 3211 |
COMPLETION OF SOBUKWO DISPENSARY(PENDING BILL)-BATEI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
BATEI |
Ksh 1,900,000 |
Comment
|
| 3212 |
COMPLETION OF PUSOL DISPENSARY-BATEI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
BATEI |
Ksh 1,600,000 |
Comment
|
| 3213 |
COMPLETION OF KODONGOU DISPENSARY-MNAGEI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
MNAGEI |
Ksh 3,471,722 |
Comment
|
| 3214 |
CONSTRUCTION OF PSIGIRIO DISPENSARY STAFF HOUSE-MNAGEI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
MNAGEI |
Ksh 1,400,000 |
Comment
|
| 3215 |
PROPOSED COMPLETION OF SENETWO DISPENSARY(PENDING BILL)- CHEPARERIA WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 1,849,156 |
Comment
|
| 3216 |
COMPLETION OF YWALATEKE MATERNITY WING-CHEPARERIA WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 1,476,500 |
Comment
|
| 3217 |
PROPOSED COMPLETION OF STAFF HOUSES AT KONYAO DISPENSARY-KAPCHOK WARD (PENDING BILL) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 402,000 |
Comment
|
| 3218 |
CONSTRUCTION OF PIT LATRINE AT KALEMNGOROK DISPENSARY-KODICH WARD(PENDING BILL) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KODICH |
Ksh 230,000 |
Comment
|
| 3219 |
CONSTRUCTION OF STAFF HOUSE AT KALEMNGOROK DISPENSARY-KODICH WARD(PENDING BILL) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KODICH |
Ksh 200,000 |
Comment
|
| 3220 |
CONSTRUCTION OF KAPTOLOMWO DISPENSARY STAFF HOUSE-KASEI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KASEI |
Ksh 369,618 |
Comment
|
| 3221 |
PROPOSED CONSTRUCTION OF PIT LATRINE AT CHEPKUGAT DISPENSARY-CHEPARERIA WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 181,377 |
Comment
|
| 3222 |
CONSTRUCTION OF SHALPOGH COMMUNITY DISPENSARY PIT LATRINE-CHEPARERIA WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 3223 |
COMPLETION OF KRIICH MATERNITY WING- ENDUGH WARD (ONGOING)(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ENDUGH |
Ksh 2,000,000 |
Comment
|
| 3224 |
COMPLETION OF SHALPOGH DISPENSARY-CHEPARERIA WARD(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 492,698 |
Comment
|
| 3225 |
COMPLETION OF SOLION DISPENSARY-WEIWEI WARD(ROLLOVER) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
WEIWEI |
Ksh 895,857 |
Comment
|
| 3226 |
RENOVATION OF LENGOROK DISPENSARY(PENDING BILL)-ALALE WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ALALE |
Ksh 750,000 |
Comment
|
| 3227 |
RENOVATION OF KASITOT DISPENSARY(PENDING BILL)-ALALE WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ALALE |
Ksh 715,650 |
Comment
|
| 3228 |
CONSTRUCTION OF CHEPOKACHIM DISPENSARY-ENDUGH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ENDUGH |
Ksh 651,913 |
Comment
|
| 3229 |
RENOVATION OF PTOYO HEALTH CENTRE-ENDUGH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ENDUGH |
Ksh 715,300 |
Comment
|
| 3230 |
PROPOSED COMPLETION OF EMBOUGH MATERNITY-SOOK WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SOOK |
Ksh 1,248,370 |
Comment
|
| 3231 |
CONSTRUCTION OF WARD BLOCK AT SINA DISPENSARY-TAPACH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
TAPACH |
Ksh 2,062,609 |
Comment
|
| 3232 |
CONSTRUCTION OF WARD BLOCK AT TAPACH DISPENSARY-TAPACH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
TAPACH |
Ksh 247,292 |
Comment
|
| 3233 |
PROPOSED CONSTRUCTION OF TWIN STAFF HOUSE AT TALON DISPENSARY -SEKERR WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SEKERR |
Ksh 960,000 |
Comment
|
| 3234 |
COMPLETION OF PROPOI DISPENSARY-CHEPARERIA WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 355,455 |
Comment
|
| 3235 |
CONSTRUCTION OF PIT LATRINE AT POROWO DISPENSARY-LELAN WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
LELAN |
Ksh 400,000 |
Comment
|
| 3236 |
CONSTRUCTION OF KRENGOT DISPENSARY-SIYOI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SIYOI |
Ksh 12,063 |
Comment
|
| 3237 |
CONSTRUCTION OF KOTIT DISPENSARY PIT LATRINE-ENDUGH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ENDUGH |
Ksh 400,000 |
Comment
|
| 3238 |
CHAINLINK FENCE AT LENGOROK DISPENSARY-ALALE WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ALALE |
Ksh 199,940 |
Comment
|
| 3239 |
FENCING OF CHEMAKEW DISPENSARY-RIWO WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 3240 |
ELECTRICAL WORKS AT YWALATEKE GENERAL WARD AND MATERNITY BLOCK-CHEPARERIA WARD(PENDING BILL) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 1,009,835 |
Comment
|
| 3241 |
CHAINLINK FENCING , GATE AND STAFF QUARTERS RENOVATION FOR NAPITIRO DISPENSARY-KAPCHOK WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 3242 |
PROPOSED CHAINLINK FENCE AT WAKOR DISPENSARY-WEIWEI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
WEIWEI |
Ksh 569,797 |
Comment
|
| 3243 |
PURCHASE OF 5,000 LTS TANK EACH FOR TUWIT,NGOTUT ,NAPITIRO,LOSAM,KALUKUNA AND MADING DISPENSARIES-KAPCHOK WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 3244 |
FENCING OF NYANGAITA DISPENSARY-MASOL WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
MASOL |
Ksh 156,484 |
Comment
|
| 3245 |
EQUIPING OF KRENGOT DISPENSARY-SIYOI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SIYOI |
Ksh 400,000 |
Comment
|
| 3246 |
EQUIPING OF LABORATORY AT KIWAWA DISPENSARY-KIWAWA WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KIWAWA |
Ksh 800,000 |
Comment
|
| 3247 |
PURCHASE OF BEDS AND MATRESSES FOR PARAYWA,KAIBOSAND TALAU MATERNITIES-SIYOI WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
SIYOI |
Ksh 600,000 |
Comment
|
| 3248 |
SUPPLY,DELIVERY AND INSTALATION OF SOLAR(TIPET,TAMARUKWO,WANYOI AND KRIICH)-ENDUGH WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
ENDUGH |
Ksh 943,900 |
Comment
|
| 3249 |
SUPPLY AND DELIVERY OF MEDICAL INSTRUMENTS FOR RURAL DISPENSARIES-KIWAWA WARD(PENDING BILL) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KIWAWA |
Ksh 1,502,300 |
Comment
|
| 3250 |
SUPPLY AND DELIVERY OF MEDICAL INSTRUMENTS FOR RURAL DISPENSARIES-KODICH WARD(PENDING BILL) |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KODICH |
Ksh 1,999,900 |
Comment
|
| 3251 |
PURCHASE OF MAMA KITS-KAPCHOK WARD |
HEALTH AND SANITATION |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 400,000 |
Comment
|
| 3252 |
COMPLETION OF MTELO COTTAGES |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 25,000,000 |
Comment
|
| 3253 |
KOPOCH TOURIST HOTEL-PENDING BILL |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
SUAM |
Ksh 14,712,304 |
Comment
|
| 3254 |
PROPOSED CONSTRUCTION OF TOILET AND KITCHEN(PENDING BILL) |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 814,000 |
Comment
|
| 3255 |
FENCING OF CHEPARERIA YOUTH EMPOWERMENT CENTRE |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 3256 |
PROPOSED LEVELLING OF PLAYING FIELDS AT SIGOR,CHEPARERIA AND RUNO(PENDING BILL) |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
CHEPARERIA AND WEI WEI |
Ksh 1,549,398 |
Comment
|
| 3257 |
PURCHASE OF SPORTS BUS |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 7,800,000 |
Comment
|
| 3258 |
LEVELING OF TANGASIA SPORTS FIELD-TAPACH WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 3259 |
LEVELING OF KAPKUNYUK PRIMARY SCHOOL PLAYING FIELD-LELAN WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
LELAN |
Ksh 999,920 |
Comment
|
| 3260 |
EXTENSION OF KAPKUNYUK PRIMARY SCHOOL FIELD LEVELLING-LELAN WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3261 |
LEVELLING OF CHEPUNGON FIELD-LELAN WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 3262 |
LEVELING OF FIELD AT SAMOR PRIMARY -BATEI WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
BATEI |
Ksh 1,500,000 |
Comment
|
| 3263 |
COMPLETION OF KERELWA LEVELLING-BATEI WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
BATEI |
Ksh 800,000 |
Comment
|
| 3264 |
COMPLETION OF BEADS SHADE FOR USHANGA WOMEN-CHEPARERIA WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 3265 |
BUSH CLEARING AND LEVELLING OF KODICH BOYS SECONDARY FIELD-KODICH WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 3266 |
LEVELLING OF GALIB PRIMARY SCHOOL PLAYGROUND- MNAGEI WARD (ONGOING) |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
MNAGEI |
Ksh 499,558 |
Comment
|
| 3267 |
RENOVATION OF YASS SHRINE AT ST.FRANCIS -CHEPOTWO-SEKERR WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
SEKERR |
Ksh 465,131 |
Comment
|
| 3268 |
PURCHASE OF TENTS -RIWO WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 3269 |
PURCHASE AND SUPPLY OF IRON SHEETS TO SUPPORT VULNARABLE WOMEN(TURKWEL)-ENDUGH WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
ENDUGH |
Ksh 800,000 |
Comment
|
| 3270 |
PURCHASE OF IRONSHEETS FOR KAMAA WOMEN GROUPS-KAPCHOK WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 4,000,000 |
Comment
|
| 3271 |
PURCHASE OF IRONSHEETS FOR KOO WOMEN GROUPS-KAPCHOK WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 4,000,000 |
Comment
|
| 3272 |
PURCHASE OF IRONSHEETS-SUAM WARD |
Tourism, Youths, Culture and Social Services |
2021-2022 |
Complete
|
SUAM |
Ksh 2,487,680 |
Comment
|
| 3273 |
KDSP LEVEL II GRANT- CONSTRUCTION OF RADIOLOGY BLOCK AT KRH |
FINANCE AND ECONOMIC PLANNING |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 66,268,057 |
Comment
|
| 3274 |
SANITATION FACILITIES FOR REVENUE SHADES |
FINANCE AND ECONOMIC PLANNING |
2021-2022 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 3275 |
PROPOSED CONSTRUCTION OF CLASSROOM BLOCK FOR MASOL INTERGRATED PROJECT(ROLLOVER) |
FINANCE AND ECONOMIC PLANNING |
2021-2022 |
Complete
|
MASOL |
Ksh 1,575,550 |
Comment
|
| 3276 |
PROPOSED CONSTRUCTION OF HEALTH CENTRE FOR MASOL INTERGRATED PROJECT(ROLLOVER) |
FINANCE AND ECONOMIC PLANNING |
2021-2022 |
Complete
|
MASOL |
Ksh 1,660,738 |
Comment
|
| 3277 |
GRAVELLING OF MAKUTANO PARKING AREAS(ROLLOVER) |
FINANCE AND ECONOMIC PLANNING |
2021-2022 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 3278 |
PURCHASE OF MOTOR VEHICLES |
FINANCE AND ECONOMIC PLANNING |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 59,100,000 |
Comment
|
| 3279 |
PURCHASE OF CCTV SYSTEM(ROLLOVER) |
FINANCE AND ECONOMIC PLANNING |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3280 |
PURCHASE OF NEW REVENUE SYSTEM-ONGOING |
FINANCE AND ECONOMIC PLANNING |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 6,800,000 |
Comment
|
| 3281 |
CONSTRUCTION OF COUNTY COMMISSIONER'S OFFICE |
CPSM, ICT and Decentralized Units |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 15,500,252 |
Comment
|
| 3282 |
CONSTRUCTION OF PIT LATRINE AT KASEI WARD OFFICE(PENDING BILL) |
CPSM, ICT and Decentralized Units |
2021-2022 |
Complete
|
KASEI |
Ksh 500,000 |
Comment
|
| 3283 |
COMPLETION OF SUB-COUNTY OFFICE AT SIGOR |
CPSM, ICT and Decentralized Units |
2021-2022 |
Complete
|
WEIWEI |
Ksh 2,127,637 |
Comment
|
| 3284 |
CONSTRUCTION OF SUB-COUNTY OFFICE AT CHEPARERIA(PENDING BILL) |
CPSM, ICT and Decentralized Units |
2021-2022 |
Complete
|
CHEPARERIA |
Ksh 895,106 |
Comment
|
| 3285 |
CONSTRUCTION OF MASOL WARD OFFICE(PENDING BILL) |
CPSM, ICT and Decentralized Units |
2021-2022 |
Complete
|
MASOL |
Ksh 389,494 |
Comment
|
| 3286 |
CONSTRUCTION OF KODICH WARD OFFICE(PENDING BILL) |
CPSM, ICT and Decentralized Units |
2021-2022 |
Complete
|
KODICH |
Ksh 1,311,234 |
Comment
|
| 3287 |
CONSTRUCTION OF SOOK WARD OFFICE(PENDING BILL) |
CPSM, ICT and Decentralized Units |
2021-2022 |
Complete
|
SOOK |
Ksh 200,000 |
Comment
|
| 3288 |
CONSTRUCTION OF SEKERR WARD OFFICE(PENDING BILL) |
CPSM, ICT and Decentralized Units |
2021-2022 |
Complete
|
SEKERR |
Ksh 927,580 |
Comment
|
| 3289 |
CONSTRUCTION OF RIWO WARD OFFICE(PENDING BILL) |
CPSM, ICT and Decentralized Units |
2021-2022 |
Complete
|
RIWO |
Ksh 2,657,627 |
Comment
|
| 3290 |
CONSTRUCTION OF LOMUT WARD OFFICE(PENDING BILL) |
CPSM, ICT and Decentralized Units |
2021-2022 |
Complete
|
LOMUT |
Ksh 1,766,515 |
Comment
|
| 3291 |
PURCHASE OF TEN TRACTORS FOR COUNTY COMMUNITY SERVICE |
CPSM, ICT and Decentralized Units |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 38,600,000 |
Comment
|
| 3292 |
CONSTRUCTION OF NEW COUNTY ASSEMBLY |
County Assembly |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 32,000,000 |
Comment
|
| 3293 |
CONSTRUCTION OF PIT LATRINE AT BENDERA MARKET(ROLLOVER) |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 498,568 |
Comment
|
| 3294 |
SUPPLY AND DELIVERY OF SACCO COMPUTERS AND ACCESSORY |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 2,998,000 |
Comment
|
| 3295 |
FENCING OF KAMELEI MARKET |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
TAPACH |
Ksh 2,400,000 |
Comment
|
| 3296 |
FENCING OF MANGO PROCESSING PLANT |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
LOMUT |
Ksh 3,000,000 |
Comment
|
| 3297 |
MAINTENANCE OF MAKUTANO MARKET STALLS(PENDING BILL) |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
MNAGEI |
Ksh 450,000 |
Comment
|
| 3298 |
CONSTRUCTION OF BODABODA SHED AT SIGOR(PENDING BILL) |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
WEIWEI |
Ksh 499,999 |
Comment
|
| 3299 |
PURCHASE AND INSTALLATION OF SACCO MANAGEMENT SYSTEM(ROLLOVER) |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 4,495,000 |
Comment
|
| 3300 |
PURCHASE AND INSTALLATION OF ICT NETWORKING EQUIPMENTS FOR WEPESA(ROLLOVER |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,495,000 |
Comment
|
| 3301 |
ENVIRONMENTAL IMPACT ASSESSMENT FOR MILK PROCESSING PLANT(ROLLOVER) |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 3302 |
PURCHASE OF LAND FOR KACHELIBA MARKET(ROLLOVER) |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 3303 |
PURCHASE AND SUPPLY OF PACKAGING EQUIPMENTS OF HONEY TO KODICH FARMERS CO-OPERATIVE-KODICH WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
KODICH |
Ksh 1,700,000 |
Comment
|
| 3304 |
SUPPORT OF PYEPOYWO WOMEN GROUP-KASEI WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
KASEI |
Ksh 400,000 |
Comment
|
| 3305 |
SUPPORT OF SARAMEE COOLING PLANT-LELAN WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
LELAN |
Ksh 200,000 |
Comment
|
| 3306 |
SUPPORT OF SIYOI MULTI-PRODUCE COOPERATIVE SOCIETY-SIYOI WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
SIYOI |
Ksh 800,000 |
Comment
|
| 3307 |
SUPPORT OF TULWET COOPERATIVE SOCIETY -SIYOI WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
SIYOI |
Ksh 400,000 |
Comment
|
| 3308 |
SUPPORT OF NARII FARMERS COOPERATIVE SOCIETY LIMITED(COFFEE)-TAPACH WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
TAPACH |
Ksh 550,000 |
Comment
|
| 3309 |
SUPPORT OF MOKOYON COOPERATIVE(FARM INPUTS)-LELAN WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 3310 |
SUPPORT OF KAPCHOK COOPERATIVES-KAPCHOK WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 3311 |
SUPPORT OF PYEPOYWO SELF HELP GROUP-KAPCHOK WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 3312 |
CONSTRUCTION OF MARKET SHED AT NYARKULIAN-TAPACH WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
TAPACH |
Ksh 2,000,000 |
Comment
|
| 3313 |
CONSTRUCTION OF BODABODA SHED AT SINA-TAPACH WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
TAPACH |
Ksh 600,000 |
Comment
|
| 3314 |
INSTALLATION OF STREET LIGHTS AT MAKUTANO-MNAGEI WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
MNAGEI |
Ksh 2,128,000 |
Comment
|
| 3315 |
CONSTRUCTION OF BODABODA SHED AT PARAYWA-SIYOI WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 3316 |
CONSTRUCTION OF BODABODA SHED AT KRENGOT-SIYOI WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 3317 |
CONSTRUCTION OF MARKET SHED AT KATIKOMOR MARKET-RIWO WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 3318 |
CONSTRUCTION OF BODABODA SHED AT KITELAKAPEL-RIWO WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 3319 |
CONSTRUCTION OF KAPLELACH COOLER ONGOING -BATEI WARD(ROLLOVER) |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
BATEI |
Ksh 2,699,999 |
Comment
|
| 3320 |
CONSTRUCTION OF CHEPAIYWAT BODA BODA SHED -MASOL WARD (ROLLOVER) |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
MASOL |
Ksh 498,962 |
Comment
|
| 3321 |
CONSTRUCTION OF TAKAIYWA BODA BODA SHED -MASOL WARD (ROLLOVER) |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
MASOL |
Ksh 498,986 |
Comment
|
| 3322 |
CONSTRUCTION OF JUA KALI WORKSHOP AT KODICH-KODICH WARD(ROLLOVER) |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
KODICH |
Ksh 799,599 |
Comment
|
| 3323 |
CONSTRUCTION OF BODA BODA SHED AT KAPTABUK-LELAN WARD(ROLLOVER) |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
LELAN |
Ksh 498,400 |
Comment
|
| 3324 |
CONSTRUCTION OF BODABODA SHED AT KATIKOMOR MARKET-RIWO WARD(ROLLOVER) |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
RIWO |
Ksh 499,999 |
Comment
|
| 3325 |
CONSTRUCTION OF MARKET SHED AT SEREWO MARKET-RIWO WARD(ROLLOVER) |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
RIWO |
Ksh 999,943 |
Comment
|
| 3326 |
EQUIPING OF KAPLELACH MILK COOLING PLANT-BATEI WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
BATEI |
Ksh 800,000 |
Comment
|
| 3327 |
PURCHASE AND SUPPLY OF UMBRELLA SHADES FOR TRADERS-SUAM WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 3328 |
PURCHASE IRONSHEETS TO KODICH NETWORK SILK GROUP-KODICH WARD |
TRADE, INDUSTRIALIZATION, COOPERATIVE DEVELOPMENT |
2021-2022 |
Complete
|
KODICH |
Ksh 800,000 |
Comment
|
| 3329 |
BENDERA MARKET |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 3330 |
CONSTRUCTION OF WEST POKOT COUNTY MILK PROCESSING PLANT AT KABICHBICH -TOILET BLOCK |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
LELAN |
Ksh 2,500,000 |
Comment
|
| 3331 |
CONSTRUCTION OF WEST POKOT COUNTY MILK PROCESSING PLANT AT LELAN - WATER SUPPLY |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
LELAN |
Ksh 2,000,000 |
Comment
|
| 3332 |
CONSTRUCTION OF KANYARKWAT MARKET SHADE/OPEN AIR MARKET-ROLL OVER |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
RIWO |
Ksh 5,000,000 |
Comment
|
| 3333 |
SAMOR BODABODA SHADE |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 3334 |
KODICH FARMERS COOPERATIVES |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
KODICH |
Ksh 853,400 |
Comment
|
| 3335 |
KONGELAI MARKET |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 3336 |
KITALAKAPEL BODABODA SHADE |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
RIWO |
Ksh 499,969 |
Comment
|
| 3337 |
SEREWO MARKET SHADE |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
RIWO |
Ksh 999,943 |
Comment
|
| 3338 |
KATIKOMOR MARKET MARKET SHADE |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
RIWO |
Ksh 999,998 |
Comment
|
| 3339 |
MAKUTANO STREET LIGHTS |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
MNAGEI |
Ksh 628,000 |
Comment
|
| 3340 |
OROLWO AND KARAMERI STREET LIGHTS |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
KODICH |
Ksh 1,000,000 |
Comment
|
| 3341 |
KRENGOT BODA BODA SHADE |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
SIYOI |
Ksh 499,949 |
Comment
|
| 3342 |
SINA BODABODA SHADE |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
TAPACH |
Ksh 599,972 |
Comment
|
| 3343 |
SIGOR BODABODA SHADE |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
WEIWEI |
Ksh 499,994 |
Comment
|
| 3344 |
MORIOTEY GOAT KEEPING SELF HELP GROUP |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
KAPCHOK |
Ksh 700,000 |
Comment
|
| 3345 |
SIYOI COOPERATIVE SOCIETY |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 3346 |
TULWET COOPERATIVE SOCIETY |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 3347 |
KAIBOS COOPERATIVE SOCIETY |
Trade, Industrialization and Cooperative Development |
2022-2023 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 3348 |
NEW COUNTY ASSEMBLY |
County Assembly |
2022-2023 |
Complete
|
KAPENGURIA |
Ksh 8,000,000 |
Comment
|
| 3349 |
COUNTY ASSEMBLY CAFETERIA CANOPY AND WASH AREA |
County Assembly |
2022-2023 |
Complete
|
KAPENGURIA |
Ksh 3,000,000 |
Comment
|
| 3350 |
NEW COUNTY ASSEMBLY-TWO COMMITTEE ROOMS |
County Assembly |
2022-2023 |
Complete
|
KAPENGURIA |
Ksh 6,000,000 |
Comment
|
| 3351 |
MAZE |
County Assembly |
2022-2023 |
Complete
|
KAPENGURIA |
Ksh 15,000,000 |
Comment
|
| 3352 |
MODERN COUNTY ASSEMBLY BUILDING |
County Assembly |
2022-2023 |
Complete
|
KAPENGURIA |
Ksh 40,000,000 |
Comment
|
| 3353 |
COUNTY ASSEMBLY BUILDING |
County Assembly |
2022-2023 |
Complete
|
KAPENGURIA |
Ksh 15,000,000 |
Comment
|
| 3354 |
SEKUTION WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
TAPACH |
Ksh 5,000,000 |
Comment
|
| 3355 |
LOKISHAKONA WATER PAN |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
MASOL |
Ksh 5,000,000 |
Comment
|
| 3356 |
ALALE GRAVITY WATER SUPPLY PROJECT (ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
ALALE |
Ksh 5,000,000 |
Comment
|
| 3357 |
KAMERIS WATER SUPPLY PROJECT (ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
ALALE |
Ksh 3,000,000 |
Comment
|
| 3358 |
KAMUNONO WATER PAN |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KASEI |
Ksh 5,000,000 |
Comment
|
| 3359 |
KIWAWA WATER PANS |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 5,000,000 |
Comment
|
| 3360 |
EMPOHAT-POROWO WATER SUPPLY PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LELAN |
Ksh 4,997,484 |
Comment
|
| 3361 |
KOROSION WATER SUPPLY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LELAN |
Ksh 1,998,000 |
Comment
|
| 3362 |
ENOPOGH-EMBOUGH WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SOOK |
Ksh 8,083,274 |
Comment
|
| 3363 |
NAPIZ BOREHOLE |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
ALALE |
Ksh 2,560,000 |
Comment
|
| 3364 |
CHERU WATER PIPING PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LELAN |
Ksh 299,950 |
Comment
|
| 3365 |
DRILLING RIG |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KAPENGURIA |
Ksh 42,000,000 |
Comment
|
| 3366 |
MURUNY-CHEPARERIA WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
CHEPARERIA |
Ksh 1,800,000 |
Comment
|
| 3367 |
WEST POKOT SUBCOUNTY TREE SEEDLINGS |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
ALL WEST POKOT SUB COUNTY WARDS |
Ksh 2,000,000 |
Comment
|
| 3368 |
PURCHASE OF TREE SEEDLINGS FOR CENTRAL POKOT SUBCOUNTY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LOMUT,WEI WEI,SEKERR AND MASOL |
Ksh 2,000,000 |
Comment
|
| 3369 |
PURCHASE OF TREE SEEDLINGS FOR POKOT SOUTH SUBCOUNTY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LELAN AND TAPACH |
Ksh 2,000,000 |
Comment
|
| 3370 |
PURCHASE OF POTTING TUBES FOR TREE NURSERIES |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 3371 |
DRILLING OF BOREHOLE AT KAMARIL VILLAGE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
ALALE |
Ksh 2,000,000 |
Comment
|
| 3372 |
REPAIR OF BOREHOLES AT LODONY, LOLEPON, NAUYAPONG, ORON, KAPTUGEN, LUEMAMOSING AND REMOI -ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
ALALE |
Ksh 600,000 |
Comment
|
| 3373 |
DRILLING OF BOREHOLE AT NAGWOILAP VILLAGE -ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
ALALE |
Ksh 2,000,000 |
Comment
|
| 3374 |
DRILLING OF BOREHOLE AT KASITOT DISPENSARY -ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
ALALE |
Ksh 2,000,000 |
Comment
|
| 3375 |
PURCHASE OF PIPES AND OTHER BOREHOLE REPAIR MATERIALS-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
ALALE |
Ksh 699,944 |
Comment
|
| 3376 |
CONSTRUCTION OF KOMUN SAND DAM-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
ALALE |
Ksh 749,824 |
Comment
|
| 3377 |
DRILLING OF BOREHOLE AT CHEPOSEKOGH-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
ALALE |
Ksh 1,996,250 |
Comment
|
| 3378 |
PIPING OF WATER LUTUPOGH-CHEPOKORIONG-BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
BATEI |
Ksh 700,000 |
Comment
|
| 3379 |
PIPING OF KURKAT-MISTIN-BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 3380 |
PURCHASE OF PIPES AT KURKAT-KOPUM WATER PROJECT-BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
BATEI |
Ksh 699,650 |
Comment
|
| 3381 |
DRILLING OF KAPSINIA BOREHOLE AND SOLAR INSTALLATION -CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
CHEPARERIA |
Ksh 2,100,000 |
Comment
|
| 3382 |
REPAIR OF KOSULOL INTAKE-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 3383 |
PIPING OF LORI WATER PROJECT-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 3384 |
PIPING OF KOPOLONGA KALYA WATER PROJECT-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 3385 |
CONSTRUCTION (KOPOLONGA) KOSOCHPOGH-KALYA WATER PROJECT-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
CHEPARERIA |
Ksh 498,000 |
Comment
|
| 3386 |
DRILLING OF BOREHOLE AT CHEPTUYUN WITH HAND PUMP-ENDUGH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
ENDUGH |
Ksh 2,500,000 |
Comment
|
| 3387 |
DRILLING OF KOPEYON BOREHOLE-KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KAPCHOK |
Ksh 1,900,000 |
Comment
|
| 3388 |
DRILLING OF KALIOKON BOREHOLE-KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KAPCHOK |
Ksh 1,900,000 |
Comment
|
| 3389 |
SOLAR INSTALLATION AT KARON BOREHOLE-KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KAPCHOK |
Ksh 1,999,980 |
Comment
|
| 3390 |
INSTALATION OF KAPANYIRIT BOREHOLE - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 3391 |
PURCHASE OF MOTORS/PUMPS AND CONTROLERS OF NASAKAM, KODERA AND LOBOK BOREHOLES - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KAPCHOK |
Ksh 1,900,000 |
Comment
|
| 3392 |
REPAIR OF KATOPOTON(KAMOKONGWO) BOREHOLE (PURCHASE OF MOTOR)-KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 3393 |
PIPING OF WATER AT BENDERA MARKET -KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KAPENGURIA |
Ksh 1,600,000 |
Comment
|
| 3394 |
REHABILITATION OF SAKAS WATER SPRING - KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3395 |
REPAIROF KIWAWA SOLAR BOREHOLE-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 3396 |
REPAIR OF KAURIONG SOLAR BOREHOLE-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 3397 |
REPAIR OF NAKWAPUO SOLAR BOREHOLE-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 3398 |
REPAIR OF KAMILA SOLAR BOREHOLE-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 3399 |
REPAIR OF APLIEP SOLAR BOREHOLE-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 3400 |
REPAIR OF KASES SOLAR BOREHOLE-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 3401 |
UPGRADING OF KATUMKALE BOREHOLE TO SOLAR PUMP-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 1,800,000 |
Comment
|
| 3402 |
PURCHASE OF BOREHALL MAINTENANCE MATIRIALS-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 3403 |
DRILLING OF CHEPORON BOREHOLE - KIWAWA WARD (ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 3404 |
REPAIR OF CHEMORIL-CHUWAI WATER PROJECT-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 1,999,956 |
Comment
|
| 3405 |
REPAIR OF KATUKUMWOK AND WASAT SOLAR BOREHOLES-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 1,500,000 |
Comment
|
| 3406 |
EQUIPING OF KATUKURI BOREHOLE-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 299,500 |
Comment
|
| 3407 |
REPAIR OF KARENGEMUKAT,KALODEKE BOREHOLES-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KIWAWA |
Ksh 300,000 |
Comment
|
| 3408 |
REHABILITATION AND PIPPING OF OROLWO CENTRE -KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KODICH |
Ksh 2,000,000 |
Comment
|
| 3409 |
REPAIR OF KAMKESIN AND LOTEPES SOLAR-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 3410 |
CONSTRUCTION OF SAND DAM AT NAKALIMUN-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KODICH |
Ksh 750,000 |
Comment
|
| 3411 |
CONSTRUCTION OF SAND DAM AT LOKICHAR- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KODICH |
Ksh 750,000 |
Comment
|
| 3412 |
PURCHASE AND REPAIR OF BOREHOLE MATIRIALS-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KODICH |
Ksh 1,500,000 |
Comment
|
| 3413 |
DRILLING OF BOREHOLE AT KOTULPOGH-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KODICH |
Ksh 2,300,000 |
Comment
|
| 3414 |
SOLAR INSTALLATION AT KOTULPOGH BOREHOLE -KODICH WARD. |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KODICH |
Ksh 2,200,000 |
Comment
|
| 3415 |
DRILLING OF BOREHOLE AT AROL-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KODICH |
Ksh 2,300,000 |
Comment
|
| 3416 |
SOLAR INSTALLATION AT AROL BOREHOLE-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KODICH |
Ksh 2,200,000 |
Comment
|
| 3417 |
PURCHASE AND SUPPLY OF WATER PIPES FOR LOTEPES, KITAR VILLAGES-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KODICH |
Ksh 1,200,000 |
Comment
|
| 3418 |
DRILLING OF BOREHOLE AT LULUNGA-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KODICH |
Ksh 2,542,500 |
Comment
|
| 3419 |
PURCHASE OF SOLAR PANNELS, PIPES, TAPS, WATER TANKS AT OROLWO AND NAKWIJIT BOREHOLES(ROLLOVER)-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KODICH |
Ksh 1,199,950 |
Comment
|
| 3420 |
UPGRADING OF KOYOLE BOREHOLE WITH SOLAR POWER-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KODICH |
Ksh 1,899,950 |
Comment
|
| 3421 |
KANYANGURU WATER PROJECT INTAKE AND PIPING-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LELAN |
Ksh 300,000 |
Comment
|
| 3422 |
CONSTRUCTION OF POROWO-CHELOPOTWO-LAIN WATER PROJECT(INTAKE,PIPING AND TANKS)-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 3423 |
CONSTRUCTION OF LUTUPOI WATER INTAKE AND WATER TANK-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3424 |
PURCHASE OF WATER SUPPLIES REPAIR MATERIALS -LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LELAN |
Ksh 999,360 |
Comment
|
| 3425 |
PURCHASE AND SUPPLY OF WATER TANK FOR ADUNGONGIRO WATER PROJECT 10,000LTRS-LELAN WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LELAN |
Ksh 111,906 |
Comment
|
| 3426 |
PURCHASE AND SUPPLY OF WATER TANK FOR MANIAN PRIMARY SCHOOL 10,000LTRS-LELAN WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LELAN |
Ksh 100,000 |
Comment
|
| 3427 |
PURCHASE OF PIPES FOR POROYON AND MASAT WATER SUPPLY-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LOMUT |
Ksh 599,750 |
Comment
|
| 3428 |
PURCHASE OF PIPES FOR KOKPOR-CHEMALEY WATER SUPPLY-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LOMUT |
Ksh 199,800 |
Comment
|
| 3429 |
PURCHASE , SUPPLY AND INSTALLATION OF WATER TANKS (10,000 LTRS FOR VILLAGES KANGAL,KACHEMORICH,ROSO,KAKITONGIN AND TULULISHO) (5000 LTRS FOR ECDES KASIRITIAN,KISHOREI,NYINYOT,CHEPAR AND KATUKURI)- LOMUT WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
LOMUT |
Ksh 1,249,990 |
Comment
|
| 3430 |
DRILLING OF BOREHOLE AT NYANGAITA BOYS SECONDARY SCHOOL-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
MASOL |
Ksh 2,100,000 |
Comment
|
| 3431 |
DRILLING OF BOREHOLE AT KOKOCHA-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
MASOL |
Ksh 2,100,000 |
Comment
|
| 3432 |
DRILLING OF BOREHOLE AT KAPENU-MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
MASOL |
Ksh 2,100,000 |
Comment
|
| 3433 |
DRILLING OF BOREHOLE AT ORON -MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
MASOL |
Ksh 2,100,000 |
Comment
|
| 3434 |
REPAIR AND REHABILITATION OF LOKISHOKANA DAM -MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
MASOL |
Ksh 2,100,000 |
Comment
|
| 3435 |
LODUPUP DISPENSARY WATER PROJECT (PIPING AND TANKS)- RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 3436 |
CONSTRUCTION OF PAYO SAND DAM - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 3437 |
CONSTRUCTION OF APUKE SAND DAM-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 3438 |
INSTALLATION OF HAND PUMP AT MORIOKWO BOREHOLE - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 3439 |
INSTALLATION OF HAND PUMP AT KONGELAI BOREHOLE - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 3440 |
INSTALLATION OF HAND PUMP AT LOYWOKOR BOREHOLE - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 3441 |
INSTALLATION OF HAND PUMP AT CHERELIO BOREHOLE - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 650,000 |
Comment
|
| 3442 |
COMPLETION PIPING LOPALAL WATER PROJECT-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 3443 |
PURCHASE OF MONEY MAKERS-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 3444 |
DRILLING OF PLOT BOREHOLE - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 3445 |
REPAIR AND PIPING OF CHEMULUNJO BOREHOLE-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 1,050,000 |
Comment
|
| 3446 |
DRILLING OF BOREHOLE AT KATUMWON-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 1,300,000 |
Comment
|
| 3447 |
DRILLING OF BOREHOLE AT LOCHIO-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 3448 |
INSTALLATION OF SOLAR PANEL AT KA-APETA CENTRE BOREHOLE-MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
MNAGEI |
Ksh 2,500,000 |
Comment
|
| 3449 |
DRILLING OF BOREHOLE AT KAMITO GIRLS SEC.SCHOOL-MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
MNAGEI |
Ksh 2,100,000 |
Comment
|
| 3450 |
INSTALLATION OF SOLAR PANEL FOR MURKWIJIT CENTRE BOREHOLE-MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
MNAGEI |
Ksh 2,100,000 |
Comment
|
| 3451 |
SUPPLY OF PIPES FOR LOKORNOI-CHEPNONOI WATER SUPPLY -MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
MNAGEI |
Ksh 1,400,000 |
Comment
|
| 3452 |
SPRING PROTECTION AT BAPTIST AREA -MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
MNAGEI |
Ksh 499,900 |
Comment
|
| 3453 |
CONSTRUCTION OF KAMWOTINY WATER PROJECT -MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
MNAGEI |
Ksh 1,699,997 |
Comment
|
| 3454 |
CONSTRUCTION OF MTELO-SENGELEL WATER PROJECT- SEKERR |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SEKERR |
Ksh 2,500,000 |
Comment
|
| 3455 |
CONSTRUCTION OF MTELO-MBARA WATER PROJECT- SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SEKERR |
Ksh 2,500,000 |
Comment
|
| 3456 |
REHABILITATION OF ORWA WATER PROJECT - SEKERR |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SEKERR |
Ksh 500,000 |
Comment
|
| 3457 |
PIPING OF MARICH-ADIPO-POGHOI WATER SUPPLY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SEKERR |
Ksh 1,500,000 |
Comment
|
| 3458 |
RENOVATION OF PAMBA DAM-SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SEKERR |
Ksh 500,000 |
Comment
|
| 3459 |
CONSTRUCTION OF CHEPORIOTLOTEPA INTAKE AND PIPING -SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SIYOI |
Ksh 1,500,000 |
Comment
|
| 3460 |
PIPING OF SIMAT AND KAPKECHA -SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SIYOI |
Ksh 1,500,000 |
Comment
|
| 3461 |
CONSTRUCTION OF INTAKE,TANK AND PIPING AT DARAJA MUNGU - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SIYOI |
Ksh 1,500,000 |
Comment
|
| 3462 |
SIYOI WATER INTAKE AND TANK - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 3463 |
SPRING PROTECTION AT ARAP MAINA - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 3464 |
DRILLING OF BOREHOLE AT KAPCHILLA-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SIYOI |
Ksh 2,000,000 |
Comment
|
| 3465 |
SPRING PROTECTION AT KAPSOYA-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SIYOI |
Ksh 199,990 |
Comment
|
| 3466 |
COMPLETION OF KAPKATET WATER INTAKE-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SIYOI |
Ksh 199,800 |
Comment
|
| 3467 |
CONSTRUCTION OF WATER TANK AT KRENGOT-SIYOI WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SIYOI |
Ksh 649,600 |
Comment
|
| 3468 |
DRILLING OF BOREHOLE AT KOKWOLIKWON-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 3469 |
DRILLING OF BOREHOLE AT NAKUYEN-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 3470 |
DRILLING OF BOREHOLE AT CHEPOASACHA-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 3471 |
DRILLING OF BOREHOLE AT KINGISIA-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 3472 |
UPGRADE KATUBOROT BOREHOLE TO SOLAR-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SUAM |
Ksh 4,400,000 |
Comment
|
| 3473 |
UPGRADE CHERELIO BOREHOLE TO SOLAR-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SUAM |
Ksh 2,500,000 |
Comment
|
| 3474 |
PURCHASE AND SUPPLY OF WATER TANK AT TIYINEI-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SUAM |
Ksh 200,000 |
Comment
|
| 3475 |
PURCHASE AND SUPPLY OF WATER PIPES FOR KAPUSIEN CATTLE DIP WATER PROJECT, TELO WATER PROJECT, TONDWO ECD WATER PROJECT, KABOMO WATER PROJECT, KAPCHESICH WATER PROJECT AND SEKUTION DISPENSARY- SEKUTION SECONDARY WATER PROJECT - TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
TAPACH |
Ksh 2,600,000 |
Comment
|
| 3476 |
PURCHASE AND SUPPLY OF WATER PIPES FOR TARTAR - TANGASIA WATER PROJECT, MWOTOT MILK COOLING PLANT WATER PROJECT, CHEPUNGUNG WATER PROJECT, SESIMWO WATER PROJECT AND LULWOI ECDE CENTRE WATER PROJECT - TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
TAPACH |
Ksh 2,500,000 |
Comment
|
| 3477 |
CONSTRUCTION OF KOSILTIONY WATER SUPPLY PROJECT-TAPACH WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
TAPACH |
Ksh 1,419,656 |
Comment
|
| 3478 |
DRILLING OF POTO BOREHOLE-WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
WEIWEI |
Ksh 2,319,960 |
Comment
|
| 3479 |
INSTALATION OF SOLAR PANELS AND PIPING OF TIPET BOREHOLE - ENDUGH |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
ENDUGH |
Ksh 2,500,000 |
Comment
|
| 3480 |
KACHAMBILWA SUB-SURFACE DAM-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
RIWO |
Ksh 600,000 |
Comment
|
| 3481 |
PURCHASE OF TREE SEEDLINGS - KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
KAPENGURIA |
Ksh 3,000,000 |
Comment
|
| 3482 |
PURCHASE OF TREE SEEDLINGS - MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 3483 |
PURCHASE OF TREE SEEDLINGS AND TUBES - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SIYOI |
Ksh 3,000,000 |
Comment
|
| 3484 |
KONGOT TREE NURSERY - SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2022-2023 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 3485 |
PURCHASE OF ONE (1) MOTOR VEHICLE |
County Assembly |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 11,666,161 |
Comment
|
| 3486 |
EQUIPING OF NEW COUNTY ASSEMBLY |
County Assembly |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 56,442,172 |
Comment
|
| 3487 |
PURCHASE AND INSTALLATION OF LIFT MORDERN COUNTY ASSEMBLY BUILDING |
County Assembly |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 1,414,760 |
Comment
|
| 3488 |
PURCHASE OF GENERATOR-MORDERN COUNTY ASSEMBLY BUILDING |
County Assembly |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 9,900,000 |
Comment
|
| 3489 |
CONSTRUCTION OF MODERN TOILET AT TRADE OFFICE |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 3,000,000 |
Comment
|
| 3490 |
CONSTRUCTION OF KONYAO MARKET TOILET BLOCK |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 3491 |
COMPLETION OF WEST POKOT MILK PROCESSING PLANT - WATER SUPPLY |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
LELAN |
Ksh 3,000,000 |
Comment
|
| 3492 |
RENOVATION OF TRADE AND COOPERATIVE COOPERATIVE OFFICES |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 3493 |
CONSTRUCTION OF MOTOR VEHICLE SHADE AT COOPERATIVE OFFICE |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 3494 |
COMPLETION OF FENCING OF MILK PROCESSING PLANT - LELAN WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
LELAN |
Ksh 1,500,000 |
Comment
|
| 3495 |
PURCHASE OF LAND FOR KACHELIBA MARKET (PENDING BILL) |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 3496 |
PROPOSED CONSTRUCTION OF BODA BODA SHADE AT SIGOR(PENDING BILL) |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
WEIWEI |
Ksh 499,999 |
Comment
|
| 3497 |
CAPITAL TRANSFERS TO INDIVIDUALS AND HOUSEHOLDS -SUPPORT TO KAMKETO BEE KEEPERS COOPERATIVE SOCIETY LTD - KASEI WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 3498 |
SUPPORT TO SIYOI DAIRY COOPERATIVE SOCIETY - SIYOI WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 3499 |
CAPITAL TRANSFERS TO NON PROFIT ORGANISATION AND ASSOCIATIONS - SUPPORT TO NARII FCS LTD KAPOROWO COFFEE FARMERS -TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 3500 |
CAPITAL TRANSFERS TO NON PROFIT ORGANISATION AND ASSOCIATIONS -CONSTRUCTION OF MILK COOLING PLANT AT SONDANY FCS LTD -TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 3501 |
CAPITAL TRANSFERS TO NON PROFIT ORGANISATION AND ASSOCIATIONS - CONSTRUCTION OF MILK COOLING PLANT AT PTOP FCS LTD -TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 3502 |
CAPITAL TRANSFERS TO NON PROFIT ORGANISATION AND ASSOCIATIONS - COMPLETION OF SOKALE FCS LTD MILK COOLING PLANT -TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 3503 |
COMPLETION AND OPERATIONALIZATION OF TAPACH FCS LTD COOLING PLANT FOR MILK -TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 3504 |
CONSTRUCTION OF MARKET SHADE AT SEREWO MARKET -RIWO WARD(ROLL OVER) |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
RIWO |
Ksh 999,943 |
Comment
|
| 3505 |
INSTALLATION OF STREET LIGHTS AT MAKUTANO-MNAGEI WARD (ROLL OVER) |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
MNAGEI |
Ksh 621,000 |
Comment
|
| 3506 |
INSTALATION OF STREET LIGHTS AT OROLWO AND KARAMERI -KODICH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KODICH |
Ksh 1,000,000 |
Comment
|
| 3507 |
CONSTRUCTION OF BODA BODA SHED AT LOWOIS IN KIWAWA WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KIWAWA |
Ksh 500,000 |
Comment
|
| 3508 |
CONSTRUCTION OF BODA BODA SHED AT MARICH IN SEKKER WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
SEKKER |
Ksh 600,000 |
Comment
|
| 3509 |
CONSTRUCTION OF BODABODA SHED AT NAKUYEN TRADING CENTRE - SUAM WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 3510 |
CONSTRUCTION OF BODABODA SHED AT MORWONGOR TRADING CENTRE - SUAM WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 3511 |
PURCHASE OF LAND FOR FRESH PRODUCE MARKET-KODICH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KODICH |
Ksh 1,500,000 |
Comment
|
| 3512 |
PURCHASE OF LAND FOR TAMUGH MARKET IN SOOK WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 3513 |
FENCING OF COUNTY WATER HQ OFFICE |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 748,000 |
Comment
|
| 3514 |
ALALE GRAVITY WATER SUPPLY PROJECT(ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
ALALE |
Ksh 1,406,624 |
Comment
|
| 3515 |
EMPOHAT-POROWO WATER SUPPLY PROJECT(ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SIYOI |
Ksh 4,997,484 |
Comment
|
| 3516 |
PURCHASE OF BOREHOLE REPAIR MATERIALS FOR SIGOR SUB COUNTY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
WEI WEI |
Ksh 3,000,000 |
Comment
|
| 3517 |
PURCHASE OF BOREHOLE REPAIR MATERIALS FOR NORTH POKOT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
ALALE |
Ksh 3,000,000 |
Comment
|
| 3518 |
DRILLING OF BOREHOLE IN KAIWOW - KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 2,100,000 |
Comment
|
| 3519 |
PURCHASE AND SUPPLY OF TANKS(5000LTRS) FOR SCHOOLS IN CHEPTULEL,MASOL AND PORKOYO LOCATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LOMUT, MASOL, SEKERR |
Ksh 1,500,000 |
Comment
|
| 3520 |
RAISING OF BAMBOO SEEDLINGS AT OFFICE TREE NURSERY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 300,000 |
Comment
|
| 3521 |
PURCHASE OF CERTIFIED TREE SEEDS FOR COUNTY TREE NURSERIES AND SUPPORT 100 YOUTH AND WOMEN GROUPS |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 200,000 |
Comment
|
| 3522 |
PURCHASING OF POTTING TUBES TO SUPPORT TREE NURSERIES AND FOR YOUTH, WOMEN, & GREEN CHAMPION GROUPS |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3523 |
PURCHASE OF TREE SEEDLINGS AND DISTRIBUTED TO FARMERS IIN WEST POKOT SUB-COUNTY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 900,000 |
Comment
|
| 3524 |
DRILLING OF BOREHOLE AT NAGWOILAP VILLAGE -ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
ALALE |
Ksh 2,000,000 |
Comment
|
| 3525 |
INSTALATION OF KAPANYIRIT BOREHOLE - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 3526 |
REPAIR OF APLIEP SOLAR BOREHOLE-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 3527 |
DRILLING OF CHEPORON BOREHOLE - KIWAWA WARD (ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 3528 |
CONSTRUCTION OF LUTUPOI WATER INTAKE AND WATER TANK-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3529 |
PURCHASE AND SUPPLY OF WATER TANK FOR MANIAN PRIMARY SCHOOL 10,000LTRS-LELAN WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LELAN |
Ksh 100,000 |
Comment
|
| 3530 |
DRILLING OF BOREHOLE AT LOCHIO-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 3531 |
SPRING PROTECTION AT BAPTIST AREA -MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
MNAGEI |
Ksh 499,900 |
Comment
|
| 3532 |
REHABILITATION OF ORWA WATER PROJECT - SEKERR |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SEKERR |
Ksh 500,000 |
Comment
|
| 3533 |
KONGOT TREE NURSERY - SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 3534 |
KACHAMBILWA SUB-SURFACE DAM-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
RIWO |
Ksh 600,000 |
Comment
|
| 3535 |
DRILLING OF KATUKURI BOREHOLE -ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
ALALE |
Ksh 1,200,000 |
Comment
|
| 3536 |
REPAIR OF LOKITONYALA SOLAR BOREHOLE AND PURCHASE OF 10,000 LTRS WATER TANK - ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 3537 |
PURCHASE OF TREE SEEDLINGS FROM CHEMNGOROR TREE NURSERY- BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 3538 |
CONSTRUCTION OF SUB-SURFACE DAM AT SUKUT- BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 3539 |
PLELAKAN PIPING OF WATER KINDO – LILIMARENG TO SCHOOLS-- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 3540 |
DRILLING OF MADING BOREHOLE - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 3541 |
DRILLING OF ATEKER BOREHOLE - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 3542 |
PURCHASE OF SOLAR PUMP AND CONTROLLERS - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 3543 |
DRILLING OF BORE HOLE AT KOMOL- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 3544 |
SUPPLY OF BOREHOLE DRILLING MATERIALS FOR KONGAI BOREHOLE-KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 3545 |
CONSTRUCTION OF SAND DAM AT KACHARETA-KIWAWA WARD- KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh 500,000 |
Comment
|
| 3546 |
CONSTRUCTION OF SAND DAM AT KAINGENY- KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh 500,000 |
Comment
|
| 3547 |
DRILLING OF BOREHOLE AND INSTALLATION OF HAND PUMP AT NAKUSE - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh 2,500,000 |
Comment
|
| 3548 |
DRILLING OF BOREHOLE AND INSTALLATION OF HAND PUMP AT KALODEKE- KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh 2,500,000 |
Comment
|
| 3549 |
CONSTRUCTION OF SAND DAM AT KAIBONG - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh 800,000 |
Comment
|
| 3550 |
REPAIR OF LOKICHAR ,NAKWAPUO ,LOMADA,ADADAT BOREHOLE- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 3551 |
DRILLING OF BOREHOLE AT APRIKI- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KODICH |
Ksh 2,800,000 |
Comment
|
| 3552 |
REPAIR OF WATER INTAKE AND PIPING PLALANG WATER PROJECT- LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LELAN |
Ksh 700,000 |
Comment
|
| 3553 |
CONSTRUCTION OF SONGWO-CHEPAYWAT-KORORA-CHESTA-PARKINO WATER PROJECT -LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LOMUT |
Ksh 2,000,000 |
Comment
|
| 3554 |
CONSTRUCTION AND PIPING OF WATER AT MARANSA-KAUK WATER SUPPLY -LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LOMUT |
Ksh 2,000,000 |
Comment
|
| 3555 |
CONSTRUCTION AND PIPING OF WATER PROJECT AT EMPOGH- KASAMUGH - SUKUK-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 3556 |
CONSTRUCTION AND PIPING OF WATER PROJECT AT CHEMURLOKOTYO-TANYINGWAN-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 3557 |
EXTENSION OF PIPED WATER FROM KANGORIA VILLAGE TO ORON ECDE - MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
MASOL |
Ksh 300,000 |
Comment
|
| 3558 |
SUPPLY OF WATER PIPES TO MNAGEI WATER PROJECTS - MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 3559 |
PURCHASE OF BORE HOLE REPAIR TOOLS- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
MNAGEI |
Ksh 400,000 |
Comment
|
| 3560 |
PURCHASE AND SUPPLY OF BOREHOLE MATERIALS- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
MNGAEI |
Ksh 900,000 |
Comment
|
| 3561 |
PURCHASE AND SUPPLY OF WATER TANKS ACROSS THE WARD - SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 3562 |
COMPLETION OF MTELO - KACHESOIT WATER PROJECT - SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 3563 |
SUPPLY OF TREE SEEDLINGS AND POTTING TUBES TO SUPPORT YOUTH,WOMEN,SCHOOLS AND PWD - SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SEKERR |
Ksh 1,700,000 |
Comment
|
| 3564 |
DRILLING OF A BORE HOLE AT NASOLOT- SEKKER WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SEKERR |
Ksh 2,200,000 |
Comment
|
| 3565 |
PURCHASE AND SUPPLY OF WATER PIPES TO ROSOMA WATER PROJECT, ST. PADUA SINA SECONDARY SCHOOL AND LULWOI ECDE WATER PROJECT-TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
TAPACH |
Ksh 2,500,000 |
Comment
|
| 3566 |
REPAIR AND MAINTAINANCE OF PIPED WATER AT LUTUPOGH- TAKAR DISPENSARY- WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 3567 |
FENCING AND CONSTRUCTION OF WATER TROUGH AT SOKOPET WATER POINT -WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 3568 |
DESILTING AND FENCING OF POGHOGH WATER POINT -WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 3569 |
CULVERT INSTALLATION AND SPOT GRAVELLING AT PRISON BRIDGE – TUYEBEI CENTER – AIC KIPKORINYA JUNCTION ROAD-SIYOI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
SIYOI |
Ksh 1,200,000 |
Comment
|
| 3570 |
GRADING OF KERENGET – KATLAL – SINENDEN –KATLAL – KAMARINY ROAD, SIYOI LOCATION-SIYOI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
SIYOI |
Ksh 1,500,000 |
Comment
|
| 3571 |
SPOT GRAVELLING OF KIPKORINYA JUNCTION- BOMA CENTER – MACHINJONI BRIDGE ROAD, TALAU LOCATION-SIYOI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 3572 |
CULVERT INSTALLATION AT LOKADANY – SKININ BRIDGE, KAISAKAT LOCATION-SIYOI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
SIYOI |
Ksh 2,000,000 |
Comment
|
| 3573 |
CULVERT INSTALLATION AT KANGLIKWAN - KWA BARINGO ROAD-MNAGEI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 3574 |
GRADING AND GRAVELLING OF UMBWA MOJA - MITI MOJA ROAD-MNAGEI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 3575 |
GRADING AND GRAVELLING OF KWA CHIEF-KWA TUMKOU-CHEMAIN ROAD-MNAGEI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 3576 |
GRADING AND GRAVELLING OF LITYEI PRIMARY-ISAAC KIDE KOMOLE ROAD MNAGEI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 3577 |
GRADING AND GRAVELLING OF MURKWIJIT-TOMKO KALYA ROAD-MNAGEI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 3578 |
GRADING AND MURRAMMING OF KWA CHIEF-TINJA ROAD MANAGEI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 2,500,000 |
Comment
|
| 3579 |
GRADING OF NASOKOL - KARUFAS - KIWANJA NDEGE ROAD-MNAGEI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 3580 |
GRADING OF BCFC - KAA KIDE - KAA PLEKWA ROAD-MNAGEI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 3581 |
FIELD LEVELLING OF KAIBOS FOOTBALL PITCH, KAIBOS LOCATION-SIYOI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 3582 |
GRADING OF RAINBOW-KARAS ROAD-KAPENGURIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3583 |
CULVERT INSTALLATION AT SAINT MARY'S SPRINGS-KAPENGURIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3584 |
STREET LIGHTING OF TANGATANGA KASAMUGH HOMES ROAD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 550,000 |
Comment
|
| 3585 |
GRADING OF ARAMAASAI- KALOMOYWO ROAD-KAPENGURIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3586 |
GRADING OF NGOLEYO -KOMOL ROAD-KAPENGURIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 600,000 |
Comment
|
| 3587 |
GRADING AND MURMURING OF KARAS – SIYOI ROAD-KAPENGURIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3588 |
GRADING OF NGOLEYO – KACHUKORKOR ROAD-KAPENGURIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3589 |
GRADING OF PUTER – EMBOASIS ROAD-KAPENGURIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3590 |
RENOVATION OF CHEPARERIA MUNICIPALITY OFFICE |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 3,000,000 |
Comment
|
| 3591 |
GRADING AND MURRAMING OF MUNICIPALITY STREETS WITHIN CHEPARERIA-CHEPARERIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 3,000,000 |
Comment
|
| 3592 |
INSTALLATION OF TWO METALLIC BINS AT CHEPARERIA MUNICIPALITY-CHEPARERIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 3593 |
PURCHASE OF LAND FOR CHEPARERIA DUMPSITE -CHEPARERIA (ROLLOVER) |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 4,000,000 |
Comment
|
| 3594 |
RENOVATION OF CHEPARERIA MUNICIPALITY OFFICE (PHASE TWO) |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 3,000,000 |
Comment
|
| 3595 |
PROPOSED FENCING OF DUMPSITE LAND FOR CHEPARERIA MUNIOCIPALITY |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 2,000,000 |
Comment
|
| 3596 |
CHEPARERIA MUNICIPALITY ROAD MAINTENANCE FUEL SUPPLY-CHEPARERIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 2,000,000 |
Comment
|
| 3597 |
CONSTRUCTION OF CULVERT AT KAPILAT-KAPKATANYANG-YWALATEKE ROAD-CHEPARERIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 3598 |
CONSTRUCTION OF CULVERT AT CHEPARERIA-KARUWON-MURPUS ACADEMY ROAD ROAD-CHEPARERIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 3599 |
OPENING OF ROAD AT TUKUMO – KASEKON – KAKOKO, SENETWO LOCATION-CHEPARERIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 1,500,000 |
Comment
|
| 3600 |
CONSTRUCTION OF PUBLIC TOILET AT CHEPARERIA MARKET-CHEPARERIA WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 3601 |
CONSTRUCTION OF PUBLIC TOILET AT KAMELEI MARKET-TAPACH WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
TAPACH |
Ksh 550,000 |
Comment
|
| 3602 |
CONSTRUCTION OF PUBLIC TOILET AT KONGELAI MARKET-RIWO WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
RIWO |
Ksh 550,000 |
Comment
|
| 3603 |
CONSTRUCTION OF PUBLIC TOILET AT RUMUS MARKET-KASEI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
KASEI |
Ksh 900,000 |
Comment
|
| 3604 |
CONSTRUCTION OF PUBLIC TOILET AT KAMBIKARAYA MARKET-SEKER WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
SEKER |
Ksh 800,000 |
Comment
|
| 3605 |
CONSTRUCTION OF PUBLIC TOILET AT SIGOR MARKET-WEIWEI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
WEIWEI |
Ksh 700,000 |
Comment
|
| 3606 |
ELECTRICITY STREET LIGHT AT SINA,TAPACH , KAMELEI (TAPACH WARD) AND KACHEMOKEN (CHEPARERIA WARD) |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 5,000,000 |
Comment
|
| 3607 |
MARKING OF PARKING LOTS AT MAKUTANO-MNAGEI WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 3608 |
INSTALLATION OF STREET LIGHTING - LOMUT WARD(ROLL OVER) |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
LOMUT |
Ksh 1,199,750 |
Comment
|
| 3609 |
INSTALLATION OF STREET LIGHTING - KONYAO-KAPCHOK WARD (ROLL OVER) |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 993,500 |
Comment
|
| 3610 |
PROPOSED INSTALLATION OF STREET LIGHTS ALONG MASAINI MARKET-MNAGEI WARD(ROLL OVER) |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 3611 |
OPENING OF ACCESS ROADS AT LOMUT CENTER-LOMUT WARD |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 3612 |
PHYSICAL PLANNING OF AMAKURIAT,KITUTI, NASAL URBAN CENTRES |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
ALALE |
Ksh 3,000,000 |
Comment
|
| 3613 |
PHYSICAL PLANNING AT CHEPNYAL CENTRE-SOOK WARD(ROLL OVER) |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
SOOK |
Ksh 600,000 |
Comment
|
| 3614 |
PREPARATION OF PHYSICAL LAND USE DEVELOPMENT PLANS FOR URBAN CENTRES OF SIGOR, NYANGAITA AND AKIRIAMET. (ROLL OVER) |
LANDS,HOUSING,PLAANING AND URBAN DEVELOPMENT |
2025-2026 |
Complete
|
MASOL |
Ksh 2,999,527 |
Comment
|
| 3615 |
SUPPORT FOR CULTURAL ACTIVITIES MATERIALS KIWAWA WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KIWAWA |
Ksh 1,500,000 |
Comment
|
| 3616 |
PURCHASE AND SUPPLY OF SPORTING EQUIPMENT AND MATERIALSKASI WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KASEI |
Ksh 1,500,000 |
Comment
|
| 3617 |
PURCHASE AND SUPPLY OF SPORTING EQUIPMENT -RIWO WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
RIWO |
Ksh 1,500,000 |
Comment
|
| 3618 |
PURCHASE AND SUPPLY OF SPORTING EQUIPMENT AND MATERIALS-WEIWEI WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
WEIWEI |
Ksh 700,000 |
Comment
|
| 3619 |
PURCHASE AND SUPPLY OF SPORTING EQUIPMENT AND MATERIALS -LELAN WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
LELAN |
Ksh 1,100,000 |
Comment
|
| 3620 |
PURCHASE AND SUPPLY OF SPORTING EQUIPMENT AND MATERIALS -CHEPARERIA WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 3621 |
PURCHASE AND SUPPLY OF SPORTING EQUIPMENT AND MATERIALS-SUAM WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 3622 |
PURCHASE AND SUPPLY OF SPORTING EQUIPMENT AND MATERIALS- KAPCHOK WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 1,500,000 |
Comment
|
| 3623 |
PURCHASE OF FUEL FOR FIELD LEVELING OF MAKUTANO PRIM ARY SCHOOL- MNAGEI WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 3624 |
PURCHASE AND SUPPLY OF SPORTING EQUIPMENT -ALALE WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
ALALE |
Ksh 1,000,000 |
Comment
|
| 3625 |
PURCHASE AND SUPPLY OF SPORTING EQUIPMENT AND MATERIALS-ALALE WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 3626 |
FACILITATION TO SPORTING ACTIVITIES ACROSS THE WARD-RIWO WARD. |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 3627 |
PURCHASE AND SUPPLY OF SPORTING EQUIPMENT MATERIALS-SEKERR WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
SEKERR |
Ksh 2,000,000 |
Comment
|
| 3628 |
PURCHASE AND SUPPLY OF SPORTING EQUIPMENT -RIWO WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
RIWO |
Ksh 1,500,000 |
Comment
|
| 3629 |
FIELD LEVELING OF NATELENG PRIMARY SCHOOL MNAGEI WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
MNAGEI |
Ksh 800,000 |
Comment
|
| 3630 |
TAMUGH PRIMARY FIELD CONSTRUCTIO N OF LOWER SIDE – SOOK WARD. |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
SOOK |
Ksh 1,500,000 |
Comment
|
| 3631 |
PURCHASE AND SUPPLY OF SPORTING EQUIPMENT -KIWAWA WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KIWAWA |
Ksh 1,500,000 |
Comment
|
| 3632 |
SUPPORT OF CULTURAL ACTIVITIES IN KIWAWA WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KIWAWA |
Ksh 1,300,000 |
Comment
|
| 3633 |
PURCHASE AND SUPPLY OF IRON -KIWAWA WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 3634 |
PURCHASE AND SUPPLY OF IRON SHEETS FOR ST PETER'S CHEMOLO- TAPACH WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
TAPACH |
Ksh 400,000 |
Comment
|
| 3635 |
PURCHASE AND SUPPLY OF IRON SHEETS-SUAM WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 3636 |
PURCHASE AND SUPPLY OF IRON SHEETS-KODICH WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KODICH |
Ksh 1,500,000 |
Comment
|
| 3637 |
SUPPORT OF PROMOTIONAL CULTURAL ACTIVITIES -TAPACH WARD. |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
TAPACH |
Ksh 1,500,000 |
Comment
|
| 3638 |
PURCHASE AND SUPPLY OF IRON SHEETS FOR KAMAA WOMEN GROUP-KAPCHOK WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 3,000,000 |
Comment
|
| 3639 |
PURCHASE AND SUPPLY OF IRON SHEETS FOR KOO WOMEN GROUP -KAPCHOK WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KAPCHOK |
Ksh 3,000,000 |
Comment
|
| 3640 |
PURCHASE AND SUPPLY OF IRON SHEETS -ALALE WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
ALALE |
Ksh 1,500,000 |
Comment
|
| 3641 |
PURCHASE AND SUPPLY OF IRON SHEETS -WEIWEI WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
WEIWEI |
Ksh 2,500,000 |
Comment
|
| 3642 |
PURCHASE AND SUPPLY OF IRON SHEETS -SEKERR WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
SEKERR |
Ksh 3,000,000 |
Comment
|
| 3643 |
PURCHASE AND SUPPLY OF IRON SHEETS -SOOK WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
SOOK |
Ksh 3,000,000 |
Comment
|
| 3644 |
COMPLETION OF MASOL CULTURAL CENTRE- MASOL WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 3645 |
PURCHASE AND SUPPLY OF TRADITIONAL DANCE MATERIALS -CHEPARERIA WARD |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 3646 |
FENCING MTELLO COTTAGE |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 250,000 |
Comment
|
| 3647 |
CONSTRUCTIO N OF PARKING AND EXTERNAL WORKS AT MTELLO COTTAGE RESTAURANT AND CONFERENCE FACILITY |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 750,000 |
Comment
|
| 3648 |
COMPLETION OF MAKUTANO STADIUM / TOILET VALLEYBALL |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
MNAGEI |
Ksh 5,000,000 |
Comment
|
| 3649 |
GATE CONSTRUCTION OF NASOLOT GAME RESERVE FOR REVENUE COLLECTION |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 3650 |
SUPPLY OF TROPHY MEDALS AND AWARDS MATERIALS |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3651 |
PURCHASE AND SUPPLY OF ADVERTISING MATERIALS -ROLL OVER |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3652 |
PURCHASE AND SUPPLY OF USHANGA IN ALALE WARD - ROLL OVER |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 3653 |
PURCHASE AND SUPPLY OF SPORTING EQUIPMENT MATERIALS IN RIWO WARD - |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
RIWO |
Ksh 2,800,000 |
Comment
|
| 3654 |
ADVERTISING AWARENESS AND PUBLICITY |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 3655 |
CONSTRUCTION SIYOI SOCIAL HALL AND YOUTH ADVISORY CENTRE |
TOURISM,YOUTHS,CULTURE AND SOCIAL SERVICES |
2025-2026 |
Complete
|
SIYOI |
Ksh 24,142,256 |
Comment
|
| 3656 |
CONSTRUCTION OF SIRWACH-KAPURKUT ROAD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KASEI |
Ksh 4,499,547 |
Comment
|
| 3657 |
YWALATEKE-MOKOYON-CHEPARTEN -SARAMEE ROAD(36KMS)-LELAN WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LELAN |
Ksh 8,000,000 |
Comment
|
| 3658 |
TAPOYO-MOKONGWO-PSHIAN-SHALPOGH-CHEMOTONG ROAD(18KMS)-CHEPARERIA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 5,000,000 |
Comment
|
| 3659 |
KOKWOPSIS-KAIPAWIS-LOSA-CHONGIS ROAD(9KMS)-TAPACH WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
TAPACH |
Ksh 6,000,000 |
Comment
|
| 3660 |
SEBIT-PARUA-PTOP ROAD(18KMS)-BATEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
BATEI |
Ksh 8,000,000 |
Comment
|
| 3661 |
WEIWEI-TAMKAL-SOLION ROAD(26KMS) WEIWEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
WEI WEI |
Ksh 8,000,000 |
Comment
|
| 3662 |
CHESTA-CHEPTOKOL-KAPATET ROAD(27KMS) LOMUT WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LOMUT |
Ksh 9,000,000 |
Comment
|
| 3663 |
KACHANGUYA-NYANGAITA-TAKAYWA ROAD(13 KMS)-MASOL WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
MASOL |
Ksh 7,000,000 |
Comment
|
| 3664 |
CHEPTEM-KAPORO ROAD(10KMS)-SEKERR WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SEKERR |
Ksh 8,000,000 |
Comment
|
| 3665 |
KAPKATA-KASITIT-TIPET ROAD (15KMS)-ENDUGH WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ENDUGH |
Ksh 7,000,000 |
Comment
|
| 3666 |
TINDAR-CHOLPOGH-MISKWONY ROAD(17KMS)-SOOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SOOK |
Ksh 7,000,000 |
Comment
|
| 3667 |
SOKO-HEWANI-KAAKAGHIN-SUAM ROAD(9KMS)-RIWO WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
RIWO |
Ksh 5,000,000 |
Comment
|
| 3668 |
CHEPTUYA-KARIWO-KUTUNG ROAD(10KMS)-MNAGEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
MNAGEI |
Ksh 5,000,000 |
Comment
|
| 3669 |
KARAS-CHEPTAPESHA-KALOMOYWO-SOKOMOKO ROAD(9KMS)-KAPENGURIA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 6,000,000 |
Comment
|
| 3670 |
KACHELIBA-KANYERUS ROAD(36KMS) SUAM WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SUAM |
Ksh 7,000,000 |
Comment
|
| 3671 |
NG'OTUT- AMALER ROAD(15KMS)-KAPCHOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 5,000,000 |
Comment
|
| 3672 |
LENGOROK-AKORET-APUKE ROAD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ALALE |
Ksh 7,000,000 |
Comment
|
| 3673 |
DARAJA MUNGU-CHEMALTIN-MOTPOKOR ROAD -LELAN/CHEPARERIA WARDS 7KMS |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LELAN |
Ksh 4,000,000 |
Comment
|
| 3674 |
WEIWEI-TAMKAL-SOLION-KAPUSIEN |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
WEI WEI |
Ksh 3,668,981 |
Comment
|
| 3675 |
CHEPKECHIR-KOPOCH ROAD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 4,296,292 |
Comment
|
| 3676 |
MAINTENANCE OF MURKWIJIT-TOMKOKALYA-KITALAPOSHO -CHEMAIN ROAD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
MNAGEI |
Ksh 1,011,525 |
Comment
|
| 3677 |
KERINGET-CHEPTUYA-KADOKONY ROAD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
MNAGEI |
Ksh 1,939,196 |
Comment
|
| 3678 |
CONSTRUCTION OF CHEPTRAM-MOMORO ROAD-ENDUGH WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ENDUGH |
Ksh 2,697,000 |
Comment
|
| 3679 |
ROAD MAINTENANCE OF KRICH ROAD-ENDUGH WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ENDUGH |
Ksh 300,000 |
Comment
|
| 3680 |
MAINTENANCE OF CHEPOLET-CHILAKOU ROAD -ENDUGH WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ENDUGH |
Ksh 400,000 |
Comment
|
| 3681 |
GRADING OF PRISON-TIROKWO ROAD-WEIWEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
WEI WEI |
Ksh 2,996,280 |
Comment
|
| 3682 |
ROAD OPENING OF KOSOWIL- TILAK ROAD- KAPENGURIA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 999,920 |
Comment
|
| 3683 |
ROAD MAINTENANCE OF TULIAKIN-BENSON ROAD-KAPENGURIA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3684 |
ROAD MAINTENANCE OF CHEPKECHIR ROAD- KAPENGURIA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 200,000 |
Comment
|
| 3685 |
ROAD MAINTENANCE OF TILAK SECONDARY -CHEZUPO- KASAIT ROAD-KAPENGURIA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 250,000 |
Comment
|
| 3686 |
ROAD OPENING AND MAINTENANCE OF KAKPAW- TILAK ROAD-KAPENGURIA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 300,000 |
Comment
|
| 3687 |
MAINTENANCE OF TUKOO-SIYOI ROAD-KAPENGURIA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 900,000 |
Comment
|
| 3688 |
CONSTRUCTION OF KOMOL- PUTOR ROAD ROAD-KAPENGURIA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,199,150 |
Comment
|
| 3689 |
CONSTRUCTION OF LORACH-KATAUN ROAD-MASOL WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
MASOL |
Ksh 1,999,492 |
Comment
|
| 3690 |
BUSH CLEARING AT KAITAPUS-NGORIAKES ROAD-MASOL WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
MASOL |
Ksh 400,000 |
Comment
|
| 3691 |
BUSH CLEARING AT SURUMBEN-KOKWOKOCHI ROAD-MASOL WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
MASOL |
Ksh 400,000 |
Comment
|
| 3692 |
ROAD OPENING OF KACHANGUYA-ARUR ROAD(ONGOING)- MASOL WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
MASOL |
Ksh 4,284,880 |
Comment
|
| 3693 |
CONSTRUCTION OF KAARON-MURIOKUPOI ALALE WARD (ONGOING) |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
MASOL |
Ksh 400,000 |
Comment
|
| 3694 |
CONSTRUCTION OF AMAKURIAT- LONGOLEMOR ROAD-ALALE WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ALALE |
Ksh 250,000 |
Comment
|
| 3695 |
CONSTRUCTION OF KOSAMUK-SASAK ROAD ALALE WARD (NEW) |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ALALE |
Ksh 1,000,000 |
Comment
|
| 3696 |
BUSH CLEARING OF ORON- CHEPSEPIN ROAD ALALE WARD (NEW) |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 3697 |
GRADING OF CHEMULUNCHO-KISIAMOI ROAD-ALALE WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ALALE |
Ksh 999,949 |
Comment
|
| 3698 |
BUSH CLEARING OF MEKUYE-LOWASPEI ROAD-ALALE WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ALALE |
Ksh 550,000 |
Comment
|
| 3699 |
BUSH CLEARING OF NAUMA-NASURET ROAD-ALALE WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ALALE |
Ksh 299,077 |
Comment
|
| 3700 |
CONSTRUCTION OF KAMERIS SLAB-ALALE WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ALALE |
Ksh 999,050 |
Comment
|
| 3701 |
BUSH CLEARING OF CHEPOROKOK-KAMORIL ROAD-ALALE WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ALALE |
Ksh 399,999 |
Comment
|
| 3702 |
CONSTRUCTION OF KARON SLAB-ALALE WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ALALE |
Ksh 999,398 |
Comment
|
| 3703 |
BUSH CLEARING OF CHORORKOGH-MARNGOLE ROAD-ALALE WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
ALALE |
Ksh 250,000 |
Comment
|
| 3704 |
CONSTRUCTION OF ONE LINE CULVERT AT TINTIKET TALAU-SIYOI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SIYOI |
Ksh 203,189 |
Comment
|
| 3705 |
CONSTRUCTION OF TWO LINE CULVERT AT COFFEE FACTORY PRISON-SIYOI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SIYOI |
Ksh 600,271 |
Comment
|
| 3706 |
CONSTRUCTION OF ONE LINE CULVERT 600MM AT COFFEE FACTORY-SIYOI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SIYOI |
Ksh 200,000 |
Comment
|
| 3707 |
INSTALLATION OF TWO LINE CULVERTS AT KAIBOS-KANYONGI ROAD-SIYOI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SIYOI |
Ksh 499,972 |
Comment
|
| 3708 |
CULVERT INSTALLATION AT MATHARE- KOLOWO ROAD -MNAGEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 3709 |
CONSTRUCTION OF TARTAR-KALAPATA ROAD-MNAGEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
MNAGEI |
Ksh 499,960 |
Comment
|
| 3710 |
STAMPS REMOVAL AT KAPETA-KAINGENY-SHONGEN ROAD- SUAM WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SUAM |
Ksh 499,001 |
Comment
|
| 3711 |
STAMPS REMOVAL AT KASES-UGANDA BORDER(KOSIA) ROAD-SUAM WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SUAM |
Ksh 299,582 |
Comment
|
| 3712 |
CULVEFRT INSTALLATION AT TIMBIR FEEDER ROAD-SUAM WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 3713 |
BUSH CLEARING AT SAKAT ROAD-SUAM WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SUAM |
Ksh 499,941 |
Comment
|
| 3714 |
STAMPS REMOVAL AT TANDAPUS-MURWONGAR ROAD-SUAM WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SUAM |
Ksh 499,716 |
Comment
|
| 3715 |
STAMPS REMOVAL AT KAPETAKINEI-SACHAN ROAD-SUAM WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SUAM |
Ksh 499,001 |
Comment
|
| 3716 |
CONSTRUCTION OF NAKUYEN-LOYONG'ONG-KOKWOCHAYA ROAD-SUAM WARD (NEW) |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SUAM |
Ksh 799,239 |
Comment
|
| 3717 |
REPAIR OF NALIAMIT FOOTBRIDGE- SUAM WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SUAM |
Ksh 108,000 |
Comment
|
| 3718 |
ROAD OPENING OF KAGHPAYIM-MISITIN ROAD-BATEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
BATEI |
Ksh 200,000 |
Comment
|
| 3719 |
CONSTRUCTION OF TOPERON KAPKOPOI ROAD- BATEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
BATEI |
Ksh 499,496 |
Comment
|
| 3720 |
CONSTRUCTION OF CHESOR-KOMOLOI ROAD-BATEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
BATEI |
Ksh 399,516 |
Comment
|
| 3721 |
CONSTRUCTION OF SAPUR -KOMOL-TOMNYOR ROAD -BATEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
BATEI |
Ksh 699,851 |
Comment
|
| 3722 |
CONSTRUCTION OF SEBIT- MOKUWO ROAD-BATEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
BATEI |
Ksh 200,000 |
Comment
|
| 3723 |
CONSTRUCTION OF TUYUNWO-KAPURET ROAD-BATEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
BATEI |
Ksh 399,272 |
Comment
|
| 3724 |
CONSTRUCTION OF PARUA-CHEPOKORO -STEN ROAD-BATEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
BATEI |
Ksh 399,272 |
Comment
|
| 3725 |
CONSTRUCTION OF PARUA-PENON ROAD-BATEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
BATEI |
Ksh 398,576 |
Comment
|
| 3726 |
CONSTRUCTION OF LULWO- PTARKONG ROAD-BATEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
BATEI |
Ksh 300,000 |
Comment
|
| 3727 |
CONSTRUCTION OF SOBUKWO-KADOW ROAD-BATEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
BATEI |
Ksh 399,808 |
Comment
|
| 3728 |
CONSTRUCTION OF KASAKA -TAKAR ROAD-KASEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KASEI |
Ksh 2,994,353 |
Comment
|
| 3729 |
CONSTRUCTION OF AKELIN-CHESAPUL-TAKAR ROAD-KASEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KASEI |
Ksh 400,000 |
Comment
|
| 3730 |
CONSTRUCTION OF KOKWOOROLWO -KAMNONGOWO-KAPYOMOT ROAD-KASEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KASEI |
Ksh 2,999,899 |
Comment
|
| 3731 |
CONSTRUCTION OF TOO SESSEN-KAMKETO ROAD-KASEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KASEI |
Ksh 2,999,000 |
Comment
|
| 3732 |
CONSTRUCTION OF KATUKUMWOK -OPOL ROAD-KASEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KASEI |
Ksh 2,999,899 |
Comment
|
| 3733 |
BUSH CLEARING OF MISTIN- MALKUI ROAD-KASEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KASEI |
Ksh 200,000 |
Comment
|
| 3734 |
BUSH CLEARING OF KAWORONY -KOKOYO ROAD-KASEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KASEI |
Ksh 400,000 |
Comment
|
| 3735 |
BUSH CLEARING OF KOUR -KAMUNONO ROAD-KASEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KASEI |
Ksh 400,000 |
Comment
|
| 3736 |
BUSH CLARING OF TAKAYWA JUNCTION-KOUR ROAD-KASEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KASEI |
Ksh 400,000 |
Comment
|
| 3737 |
DOZER ROAD OPENING AT LETWA-CHEPOSEKEK-KAROCHOLE ROAD(6KM) -SOOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SOOK |
Ksh 1,498,435 |
Comment
|
| 3738 |
DOZER WORKS AT MWOTOT-KASOSION-TOPUO ROAD (4KM)- SOOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SOOK |
Ksh 1,499,273 |
Comment
|
| 3739 |
DOZER WORKS AT KADOU- KAPLELACH PRIMARY ROAD-SOOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SOOK |
Ksh 999,212 |
Comment
|
| 3740 |
DOZER WORKS AT SRO-KATIMORIL ROAD (3KM)-SOOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SOOK |
Ksh 998,468 |
Comment
|
| 3741 |
DOZER WORKS AT CHEPKALIANG-MUNGIT-CHEPKOPEGH ROAD (5KM)-SOOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SOOK |
Ksh 1,498,994 |
Comment
|
| 3742 |
DOZER WORKS AT KASAKA-YEMIS ROAD(3KMS)-SOOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SOOK |
Ksh 999,989 |
Comment
|
| 3743 |
DOZER WORKS AT CHEPTOCH CENTRE-ANGACHA ROAD(4KMS)-SOOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 3744 |
GRADING OF SITOT-KACHUMAKINEI ROAD-SOOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SOOK |
Ksh 1,077,640 |
Comment
|
| 3745 |
PRIRO-PTAKACH-TOPTOLUM ROAD DOZER WORKS(ONGOING)-SOOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SOOK |
Ksh 1,500,000 |
Comment
|
| 3746 |
ROAD IMPROVEMENT AND MAINTENANCE WORKS AT MISKWONY-MOTPOKIRIK-EMBOKECH ROAD-SOOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SOOK |
Ksh 1,999,347 |
Comment
|
| 3747 |
DOZER WORKS AT NAKWANGAMORU-KAKORURON ROAD-RIWO WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
RIWO |
Ksh 799,842 |
Comment
|
| 3748 |
CONSTRUCTION OF MAIN JUNCTION - CHEMAKEW PRIMARY ROAD-RIWO WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
RIWO |
Ksh 499,600 |
Comment
|
| 3749 |
CONSTRUCTION OF LIMANGOLE-CHEPOTARAMA ROAD(DOZER WORKS)-RIWO WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
RIWO |
Ksh 1,399,374 |
Comment
|
| 3750 |
DOZER WORKS AT PARAMATAI- AROL-ADURKOIT DISPENSARY ROAD(NEW)- RIWO WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
RIWO |
Ksh 999,935 |
Comment
|
| 3751 |
BUSH CLEARING AT LIMANGOLE-LOKUYI ROAD-RIWO WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
RIWO |
Ksh 200,000 |
Comment
|
| 3752 |
BUSH CLEARANCE OF LODUPUP PRIMARY-LOMUSUKUR RIVER ROAD-RIWO WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
RIWO |
Ksh 399,952 |
Comment
|
| 3753 |
ROAD MAINTENANCE OF CHEMULUNJO ROAD-RIWO WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
RIWO |
Ksh 200,000 |
Comment
|
| 3754 |
DOZER WORKS AT HOLY TRINITY-CHEPTUIS ROAD-RIWO WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
RIWO |
Ksh 499,960 |
Comment
|
| 3755 |
GRADING OF KABICHBICH-CHEPKOIROT,KABTABUK-SINGOROKOI ROAD-LELAN WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LELAN |
Ksh 2,993,206 |
Comment
|
| 3756 |
PLALANG-LINGAMOI ROAD-LELAN WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LELAN |
Ksh 515,000 |
Comment
|
| 3757 |
KABICHBICH-KAPKUNYUK-CHEPARTEN ROAD(MURRAMING)-LELAN WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LELAN |
Ksh 2,000,000 |
Comment
|
| 3758 |
MANUAL RESHAPING OF TACHIT-MOTPOSOO ROAD-LELAN WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LELAN |
Ksh 100,000 |
Comment
|
| 3759 |
CONSTRUCTION OF KADUKUNYA -RINGRING ROAD-LELAN WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LELAN |
Ksh 1,997,334 |
Comment
|
| 3760 |
ROAD OPENING OF KAPCHEMOK -KAPTUM ROAD-LELAN WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LELAN |
Ksh 200,000 |
Comment
|
| 3761 |
CONSTRUCTION MURKUSIAN HILLS ROAD-LELAN WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LELAN |
Ksh 200,000 |
Comment
|
| 3762 |
ROAD OPENING OF NYAL-SIMOTWO ROAD-LELAN WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LELAN |
Ksh 200,000 |
Comment
|
| 3763 |
ROAD OPENING OF KORIIKOWOW-CHEPUSAL ROAD-LELAN WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LELAN |
Ksh 200,000 |
Comment
|
| 3764 |
CONSTRUCTION OF KAGHMU- CHEPTUPON ROAD-LELAN ROAD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LELAN |
Ksh 200,000 |
Comment
|
| 3765 |
ROAD OPENING OF CHEPARTEN-KWALE ROAD-LELAN WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LELAN |
Ksh 200,000 |
Comment
|
| 3766 |
CONSTRUCTION OF MOROMBUS-KROMWO-CHELAKATET ROAD-CHEPARERIA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 3767 |
CONSTRUCTION OF AMCHAS-CHUWUWAI ROAD-CHEPARERIA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 200,000 |
Comment
|
| 3768 |
CONSTRUCTION OF MARSITOT-CHEPORO ROAD- CHEPARERIA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 100,000 |
Comment
|
| 3769 |
CONSTRUCTION OF CHEPARERIA-CHEMARMAR-KORELACH PARAK ROAD -CHEPARERIA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 2,999,900 |
Comment
|
| 3770 |
CONSTRUCTION OF SOLION-POITO ROAD-WEIWEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 3771 |
CONSTRUCTION OF KALAM-TAKAR ROAD-WEIWEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
WEI WEI |
Ksh 499,960 |
Comment
|
| 3772 |
CONSTRUCTION OF SANGAT-YAUYAU ROAD-WEIWEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 3773 |
CONSTRUCTION OF KOKWOTEDWO-KAMOI ROAD-WEIWEI WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 3774 |
CONSTRUCTION OF CHEPOTWO-SOSTIN ROAD - SEKERR WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 3775 |
CONSTRUCTION OF KAPORO-CHORWA ROAD - SEKERR WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SEKERR |
Ksh 400,000 |
Comment
|
| 3776 |
CONSTRUCTION OF CHEMINGAT-KARKAR ROAD - SEKERR WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 3777 |
CONSTRUCTION OF LOWAYA-KAPORO ROAD - SEKERR WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,299,897 |
Comment
|
| 3778 |
CONSTRUCTION OF NGOYOMWO-OMPOSEKER-SEKER WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 3779 |
CONSTRUCTION OF PEOTA- EMBOAGHAT ROAD- SEKERR WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SEKERR |
Ksh 299,995 |
Comment
|
| 3780 |
CONSTRUCTION OF MARINY-KAPONPON-SINAYA ROAD- SEKERR WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SEKERR |
Ksh 300,000 |
Comment
|
| 3781 |
CONSTRUCTION OF MUNGAT-TEMOW-PSAPAI ROAD- SEKERR WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,999,834 |
Comment
|
| 3782 |
CONSTRUCTION OF KAPORO-CHORWA ROAD-SEKERR WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 3783 |
MANUAL WORKS AT MARICH BRIDGE- SEKERR WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 3784 |
MANUAL RESHAPING OF CHEPKONDOL-SENGELEL DISPENSARY ROAD SEKERR ROAD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
SEKERR |
Ksh 100,000 |
Comment
|
| 3785 |
CONSTRUCTION OF CHEMATCHOR-KODICH ROAD KODICH WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KODICH |
Ksh 804,170 |
Comment
|
| 3786 |
GRADING OF NAKWIJIT-LOKWALOI ROAD - KODICH WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KODICH |
Ksh 999,148 |
Comment
|
| 3787 |
REMOVAL OF STUMPS AND OPENING OF LOKICHAR-RERETIANG ROAD-KODICH WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KODICH |
Ksh 700,000 |
Comment
|
| 3788 |
BUSH CLEARING AT MOTANY-CHESAWACH ROAD-KODICH WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KODICH |
Ksh 499,728 |
Comment
|
| 3789 |
GRADING OF CHEMATCHOR-NAMUTON ROAD-KODICH WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KODICH |
Ksh 1,999,910 |
Comment
|
| 3790 |
GRADING OF CHEPSUKUN-KALEMNGOROK ROAD(12KMS)-KODICH WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KODICH |
Ksh 1,199,992 |
Comment
|
| 3791 |
CONSTRUCTION OF SOPOWEN-KALTIT ROAD-TAPACH WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
TAPACH |
Ksh 400,000 |
Comment
|
| 3792 |
TORORO-MWOTOT ROAD OPENING-TAPACH WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
TAPACH |
Ksh 400,000 |
Comment
|
| 3793 |
BUSH CLEARING AT KODERA-NGOTUT-AMALER ROAD-KAPCHOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 3794 |
BUSH CLEARING AT LOKWALOI-KAMBI NDEGE ROAD -KAPCHOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,200,000 |
Comment
|
| 3795 |
BUSH CLEARING AT LOKEMER- LOKASUR ROAD - KAPCHOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 200,000 |
Comment
|
| 3796 |
BUSH CLEARING OF KAAGHAT-LITYEI VILLAGE- KAPCHOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 200,000 |
Comment
|
| 3797 |
BUSH CLEARING OF KOPEYON- PISAA ROAD- KAPCHOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 3798 |
BUSH CLEARING OF KODOMUCH-DAM-LOSAM ROAD-KAPCHOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 200,000 |
Comment
|
| 3799 |
BUSH CLEARING OF AKIRIAMET-MADING-LOKASUR ROAD-KAPCHOK WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 3800 |
GRADING OF LOMUT-SURUMBEN ROAD-LOMUT WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LOMUT |
Ksh 998,992 |
Comment
|
| 3801 |
CONSTRUCTION OF SUKUK-PITPAGH ROAD-LOMUT WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 3802 |
CONSTRUCTION OF BENDERA-KWOKOMESES ROAD-LOMUT WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LOMUT |
Ksh 400,000 |
Comment
|
| 3803 |
BUSH CLEARING OF KAPATET-POTIEN ROAD-LOMUT WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 3804 |
CONSTRUCTION OF KOSUPKO-SAKAT ROAD- LOMUT WARD (NEW |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
LOMUT |
Ksh 2,099,020 |
Comment
|
| 3805 |
GRADING OF LOWOI-LOKITEDEL ROAD-KIWAWA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KIWAWA |
Ksh 2,499,220 |
Comment
|
| 3806 |
MAINTENANCE OF KAPKOGHIN ROAD-KIWAWA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KIWAWA |
Ksh 400,000 |
Comment
|
| 3807 |
GRADING AT AKIRIAMET- MBARU ROAD-KIWAWA WARD |
ROADS, PUBLIC WORKS AND TRANSPORT |
2020-2021 |
Complete
|
KIWAWA |
Ksh 918,140 |
Comment
|
| 3808 |
PURCHASE OF CERTIFIED CROP SEEDS TO BE DISTRIBUTED TO FARMERS IN ALL WARDS(MAIZE, ONIONS, GREEN GRAMS, MILLET, SORGHUM ETC) |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
ALL THE 20 WARDS |
Ksh 108,359,200 |
Comment
|
| 3809 |
KENYA CLIMATE SMART AGRICULTURE PROJECT(KCSAP)-DONOR FUND COUNTY CONTRIBUTION |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
SIYOI,SOOK,ENDOUGH, SEKER,LOMUT,ALALE |
Ksh 5,200,000 |
Comment
|
| 3810 |
KENYA CLIMATE SMART AGRICULTURE PROJECT(KCSAP) |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
ALALE,SIYOI,SOOK,SEKER,ENDOUGH AND LOMUT WARDS |
Ksh 320,000,420 |
Comment
|
| 3811 |
PURCHASE OF SEEDLINGS (COFFEE,TEA, SISAL, PYRETHRUM,COTTON,SUNFLOWER,ALOE VERA,ONIONS,HORTICULTURE CROPS) IN RESPECTIVE WARDS |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
THREE WARDS (TAPACH,LELAN,SIYOI) |
Ksh 6,395,000 |
Comment
|
| 3812 |
PURCHASE OF IRRIGATION PIPES- SUAM WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
SUAM |
Ksh 200,000 |
Comment
|
| 3813 |
PURCHASE OF GENERATOR PIPES FOR KAPKOGHIN(IRRIGATION)- KIWAWA WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 3814 |
REPAIR OF WATER FURROW AT PTOKOU-WEIWEI WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
WEI WEI |
Ksh 300,000 |
Comment
|
| 3815 |
REPAIR OF IPEET WATER FURROW -WEIWEI WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
WEI WEI |
Ksh 300,000 |
Comment
|
| 3816 |
PURCHASE OF PIPES FOR IRRIGATION FOR LOPALAL FARMERS-RIWO WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 3817 |
PURCHASE OF PIPES FOR IRRIGATION -MASOL WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
MASOL |
Ksh 1,200,000 |
Comment
|
| 3818 |
CONSTRUCTION OF SUKUK FURROW LOMUT WARD (NEW) |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 3819 |
ESTABLISHMENT OF CHERANGAN DEMO PLOT-KODICH WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
KODICH |
Ksh 1,200,000 |
Comment
|
| 3820 |
PURCHASE OF SPRAY PUMPS FOR FARMERS -SUAM WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
SUAM WARD |
Ksh 499,600 |
Comment
|
| 3821 |
PURCHASE OF SPRAY PUMPS AND ACARICIDES FOR FARMERS-KAPCHOK WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 900,000 |
Comment
|
| 3822 |
PURCHASE OF WATER PUMPS FOR IRRIGATION FOR FARMERS-RIWO WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
RIWO |
Ksh 200,000 |
Comment
|
| 3823 |
PURCHASE OF BARBED WIRE FOR DISTRIBUTION TO FARMERS -KIWAWA WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 3824 |
PURCHASE AND SUPPLY OF ONIONS,TOMATOES,SUKUMA WIKI,CABBAGES AND SPINACH-KAPCHOK WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 3825 |
PURCHASE AND SUPPLY OF MAIZE SEEDS-SUAM WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
SUAM WARD |
Ksh 400,000 |
Comment
|
| 3826 |
PURCHASING AND SUPPLY OF ONION SEEDS-BATEI WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
BATEI |
Ksh 3,000,000 |
Comment
|
| 3827 |
PURCHASE OF ONION SEEDS-LOMUT WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 3828 |
PURCHASE AND SUPPLY OF CERTIFIED ONIONS SEEDS FOR DISTRUBUTION TO FARMERS -KAPENGURIA WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 3829 |
PURCHASE AND SUPPLY OF CERTIFIED VEGETABLES SEEDS FOR DISTRUBUTION TO FARMERS -KAPENGURIA WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3830 |
PURCHASE AND SUPPLY OF CERTIFIED VEGETABLE SEEDS TO FARMERS-CHEPARERIA WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 936,300 |
Comment
|
| 3831 |
PURCHASE AND SUPPLY OF BOMA RHODES TO FARMERS-CHEPARERIA WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 3832 |
PURCHASE AND SUPPLY OF BANANAS AND OVACADOS SEEDLINGS TO FARMERS-KAPENGURIA WARD |
AGRICULTURE AND IRRIGATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 3833 |
RENOVATION OF VETERINARY LABORATORY IN WEST POKOT COUNTY |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,389,204 |
Comment
|
| 3834 |
RENOVATION OF MURKWIJIT CATTLE DIP |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
MNAGEI |
Ksh 1,200,000 |
Comment
|
| 3835 |
PROPOSED CONSTRUCTION OF A CHAIN LINK FENCE AND RENOVATION WORKS AT CHEPNYAL CATTLE DIP-SOOK WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
SOOK |
Ksh 850,000 |
Comment
|
| 3836 |
PURCHASE OF SAHIWAL BULLS BREEDS(ALALE,KIWAWA,KODICH ,KASEI,SUAM,RIWO,ENDUGH,MASOL,WEIWEI,LOMUT,KAPCHOK,CHEPARERRIA,SEKKER AND SOOK WARDS) |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
ALALE,KIWAWA,KODICH ,KASEI,SUAM,RIWO,ENDUGH,MASOL,WEIWEI,LOMUT,KAPCHOK,CHEPARERRIA,SEKKER AND SOOK |
Ksh 7,000,000 |
Comment
|
| 3837 |
PURCHASE OF POULTRY BREEDS(TO BE DISTRIBUTED TO ALL 20 WARDS AT LOCATIONAL LEVEL (AT LEAST 2500 PER LOCATION) ) |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
ALL WARDS |
Ksh 1,856,000 |
Comment
|
| 3838 |
RESTOCKING OF NASUKUTA LIVESTOCK IMPROVEMENT CENTER |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 2,800,000 |
Comment
|
| 3839 |
PURCHASE OF EQUIPMENT FOR NASUKUTA (JOINT PROJECT WITH EUROPEAN UNION) COUNTY CONTRIBUTION |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 41,000,000 |
Comment
|
| 3840 |
PURCHASE AND SUPPLY OF ACARICIDES-CHEPARERIA WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 2,300,000 |
Comment
|
| 3841 |
PURCHASE AND SUPPLY OF SPRAY PUMPS -CHEPARERIA WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 800,000 |
Comment
|
| 3842 |
PURCHASE OF ACARICIDES-WEIWEI WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 3843 |
PURCHASE OF KNAPSUCK SPRAY PUMPS FOR FARMERS-WEIWEI WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
WEI WEI |
Ksh 679,057 |
Comment
|
| 3844 |
PURCHASE OF ACARICIDES FOR ALL CATTLE DIPS-BATEI WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
BATEI |
Ksh 800,000 |
Comment
|
| 3845 |
PURCHASE OF KNAPSUCK SPRAY PUMPS-SUAM WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 3846 |
PURCHASE OF SPRAY PUMPS-ALALE WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
ALALE |
Ksh 200,000 |
Comment
|
| 3847 |
PURCHASE OF KNAPSUCK SPRAY PUMPS-KAPCHOK WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 400,000 |
Comment
|
| 3848 |
PURCHASE AND SUPPLY OF ACARICIDES TO 10 CATTLE DIPS-TAPACH WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 3849 |
PURCHASE AND SUPPLY OF KNAPSUCK SPRAY PUMPS -KAPENGURIA WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3850 |
SUPPLY OF ACARICIDES-LELAN WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
LELAN |
Ksh 458,000 |
Comment
|
| 3851 |
PURCHASE AND SUPPLY OF ACARICIDES-ENDUGH WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
ENDUGH |
Ksh 583,859 |
Comment
|
| 3852 |
PURCHASE OF ACARICIDES-RIWO WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
RIWO |
Ksh 400,000 |
Comment
|
| 3853 |
PURCHASE OF ACARICIDES FOR CATTLE DIPS-TAPACH WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 3854 |
PURCHASE OF ACARICIDES FOR DIPS(CHESTA,KOKWOPTIRIR,LOMUT,OTIOT)-LOMUT WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 3855 |
PURCHASE AND SUPPLY OF BOMA RHODES GRASS SEEDS FOR FARMERS -KAPENGURIA WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 3856 |
PURCHASE AND SUPPLY OF BOMA RHODES GRASS SEEDS FOR FARMERS -KODICH WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
KODICH |
Ksh 800,000 |
Comment
|
| 3857 |
PURCHASE OF LACTATING GOATS TO SUPPORT BREAST FEEDING MOTHERS (NUTRITIONAL SUPPLEMENTS) KODICH WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
KODICH |
Ksh 100,000 |
Comment
|
| 3858 |
PURCHASE OF GALLA GOATS FOR KIMPUR BREEDERS - KIWAWA WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 3859 |
PURCHASE OF DAIRY CATTLE FOR FARMERS -ENDUGH WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
ENDUGH |
Ksh 3,000,000 |
Comment
|
| 3860 |
PURCHASE OF CAMELS-MASOL WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
MASOL |
Ksh 1,500,000 |
Comment
|
| 3861 |
REPAIR OF RUNO CATTLE DIP-WEIWEI WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 3862 |
REPAIR OF KIRIAMET CATTLE DIP-BATEI WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
BATEI |
Ksh 400,000 |
Comment
|
| 3863 |
CONSTRUCTION OF NAKIROKONY METALLIC CRUSH-ALALE WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
ALALE |
Ksh 1,200,000 |
Comment
|
| 3864 |
CONSTRUCTION LOKITELAUYAN METALLIC CRUSH-ALALE AWRD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
ALALE |
Ksh 1,200,000 |
Comment
|
| 3865 |
CONSTRUCTION OF NAUYAPONG METALLIC CRUSH-ALALE WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
ALALE |
Ksh 1,200,000 |
Comment
|
| 3866 |
CONSTRUCTION OF CATTLE CRUSH AT KOPITIRO /TUWIT-KAPCHOK WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,200,000 |
Comment
|
| 3867 |
REPAIR OF KODERA CATTLE DIP-KAPCHOK WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 3868 |
CONSTRUCTION OF MORPUS CATTLE DIP-BATEI WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
BATEI |
Ksh 2,200,000 |
Comment
|
| 3869 |
CONSTRUCTION OF SAMICH CATTLE DIP-BATEI WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
BATEI |
Ksh 2,500,000 |
Comment
|
| 3870 |
CONSTRUCTION OF CHELOKOTETWO CATTLE CRUSH-RIWO WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
RIWO |
Ksh 1,200,000 |
Comment
|
| 3871 |
FENCING OF LIVESTOCK MARKET AT KONGELAI MARKET-RIWO WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 3872 |
CONSTRUCTION OF CATTLE DIP AT CHEPOSAIT-LELAN WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
LELAN |
Ksh 2,300,000 |
Comment
|
| 3873 |
WATER PIPING TO CHEPOSAIT CATTLE DIP-LELAN WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
LELAN |
Ksh 200,000 |
Comment
|
| 3874 |
RENOVATION OF CHESILKICH CATTLE DIP -LELAN WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
LELAN |
Ksh 400,000 |
Comment
|
| 3875 |
RENOVATION OF MSIYWON CATTLE DIP-LELAN WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3876 |
RENOVATION OF CHERMAN CATTLE DIP-LELAN WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3877 |
CONSTRUCTION OF CATTLE DIP AT KAPSIMOTWO-CHEPARERIA WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 1,500,000 |
Comment
|
| 3878 |
CONSTRUCTION OF CATTLE DIP AT CHEPKORONISWO-CHEPARERIA WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 2,200,000 |
Comment
|
| 3879 |
CONSTRUCTION OF CATTLE DIP AT TARAK-TAPACH WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
TAPACH |
Ksh 2,200,000 |
Comment
|
| 3880 |
COMPLETION OF CHEMOLO CATTLE DIP- TAPACH |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 3881 |
CONSTRUCTION OF KOKWOPSIS CATTLE DIP(PENDING BILL) -TAPACH WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
TAPACH |
Ksh 100,000 |
Comment
|
| 3882 |
CONSTRUCTION OF KOKWOPTORIR CATTLE DIP-LOMUT WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
LOMUT |
Ksh 300,000 |
Comment
|
| 3883 |
CONSTRUCTION OF CATTLE DIP AT OTIOT-LOMUT WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
LOMUT |
Ksh 2,500,000 |
Comment
|
| 3884 |
FENCING OF PARAYWA CATTLE DIP-SIYOI WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
SIYOI |
Ksh 199,950 |
Comment
|
| 3885 |
CONSTRUCTION OF NYARKULIAN CATTLE DIP-TAPACH WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
TAPACH |
Ksh 300,000 |
Comment
|
| 3886 |
FENCING OF KAGHOT CATTLE DIP TAPACH WARD (ONGOING) |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
TAPACH |
Ksh 299,800 |
Comment
|
| 3887 |
CONSTRUCTION OF PARAYWA CATTLE DIP- SIYOI WARD(NEW) |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
SIYOI |
Ksh 1,999,886 |
Comment
|
| 3888 |
CONSTRUCTION OF CHEPKECHIR CATTLE DIP NEW -BATEI WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
BATEI |
Ksh 2,500,000 |
Comment
|
| 3889 |
CONSTRUCTION OF MAYAYPOGH CATTLE CRUSH NEW -KASEI WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
KASEI |
Ksh 1,200,000 |
Comment
|
| 3890 |
CONSTRUCTION OF CATTLE CRUSH AT LOYWOKOR - RIWO WARD(NEW) |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
RIWO |
Ksh 1,199,475 |
Comment
|
| 3891 |
CONSTRUCTION OF CHELOPOY CATTLE DIP-KIWAWA WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
KIWAWA |
Ksh 470,000 |
Comment
|
| 3892 |
CONSTRUCTION OF PARAYON CATTLE DIP -TAPACH WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 3893 |
CONSTRUCTION OF KRIICH CATTLE DIP -ENDUGH WARD |
PASTORAL ECONOMY |
2020-2021 |
Complete
|
ENDUGH |
Ksh 2,200,000 |
Comment
|
| 3894 |
MAKUTANO PRIMARY SCHOOL PERIMETER WALL PROJECT(2018/2019) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 6,583,566 |
Comment
|
| 3895 |
SUPPLY AND DELIVERY OF CEMENT (PURCHASE OF CEMENT PENDING BILL MTELO ENTERPRISES) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 4,750,000 |
Comment
|
| 3896 |
WATER SUPPLY PROJECT AT ECDE COLLEGE KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 2,500,000 |
Comment
|
| 3897 |
FENCING OF ECDE COLLEGE KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 9,200,000 |
Comment
|
| 3898 |
PURCHASE AND INSTALLATION OF WATER STORAGE TANKS AT ECDE COLLEGE KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 3899 |
SPRING PROTECTION AT ECDE WATER PROJECT KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 800,000 |
Comment
|
| 3900 |
CONSTRUCTION OF TWIN BLOCK B AT SIGOR VOCATIONAL TRAINING CENTRE(COUNTY CONTRIBUTION) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 3,549,894 |
Comment
|
| 3901 |
COMPLETION OF TWO TWIN-WORKSHOP BLOCKS AT SINA VTC(COUNTY CONTRIBUTION) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,800,000 |
Comment
|
| 3902 |
RENOVATION OF KITCHEN AND DINNING AT KODICH YOUTH POLYTECHNIC(COUNTY CONTRIBUTION) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 1,500,000 |
Comment
|
| 3903 |
RENOVATION OF GIRLS HOSTEL AT ORTUM VTC(COUNTY CONTRIBUTION) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 3904 |
CONSTRUCTION OF TWIN WORKSHOP AT CHEPARERIA YOUTH POLYTECHNIC(COUNTY CONTRIBUTION) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 4,500,000 |
Comment
|
| 3905 |
COMPLETION OF MULTI PURPOSE HALL AT KAPENGURIA VTC(COUNTY CONTRIBUTION) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 2,400,000 |
Comment
|
| 3906 |
COMPLETION OF ADMINISTRATION/CLASSROOM BLOCK AT ALALE YOUTH POLYTECHNIC (COUNTY CONTRIBUTION) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 4,000,000 |
Comment
|
| 3907 |
COMPLETION OF ADMINISTRATION/CLASSROOM BLOCK AT CHEPOLET YOUTH POLYTECHNIC (COUNTY CONTRIBUTION) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 40,000,000 |
Comment
|
| 3908 |
CONSTRUCTION OF CLASSROOM AT KATANGUN ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 3909 |
CONSTRUCTION OF ECDE CLASSROOM AT KAKRUUT ECDE CENTRE-KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3910 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPINYINY ECDE- KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3911 |
CONSTRUCTION OF PIT LATRINE AT BAPTIST ECDE -KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 200,000 |
Comment
|
| 3912 |
CONSTRUCTION OF ECDE CLASSROOM AT TUKUMWO ECDE- KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3913 |
CONSTRUCTION OF PIT LATRINE AT CHELOWO ECDE- KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 200,000 |
Comment
|
| 3914 |
COMPLETION OF CLASSROOMS AT KARAS ECDE- KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 450,000 |
Comment
|
| 3915 |
CONSTRUCTION OF ECDE CLASSROOM AT KACHIKORKOR- KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3916 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPKAPECHAK ECDE- KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 3917 |
CONSTRUCTION OF ECDE CLASSROOM AT PSOROK ECDE-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 600,000 |
Comment
|
| 3918 |
COMPLETION OF ECDE CLASSROOM AT KOLA ECDE-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 100,000 |
Comment
|
| 3919 |
COMPLETION OF ECDE CLASSROOM AT PKOROW ECDE-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 100,000 |
Comment
|
| 3920 |
COMPLETION OF ECDE CLASSROOM AT TOKISOM ECDE-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 100,000 |
Comment
|
| 3921 |
CONSTRUCTION OF A CLASSROOM CHEPOSEKEK PRI. SCHOOL- SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 3922 |
CONSTRUCTION OF A CLASSROOM AT LETWA PRIMARY SCHOOL- SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 3923 |
CONSTRUCTION OF A GIRLS DORMITORY AT TINDAR-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 3924 |
CONSTRUCTION OF OF A CLASSROOM AT CHEPTESOK PRIMARY-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 3925 |
CONSTRUCTION OF A CLASSROOM AT KAPLELACH PRIMARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 3926 |
CONSTRUCTION OF AN ADMINISTRATION BLOCK AT CHEPKALIANG PRIMARY- SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 700,000 |
Comment
|
| 3927 |
RENOVATION OF EIGHT (8) CLASSROOMS AT EMPOGH PRIMARY- SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 3928 |
BUILDING OF TWO CLASSROOMS AT SAFINA BOYS- SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 3929 |
COMPLETION OF ADMINISTRATION BLOCK AT PCHOLPOGH- SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 700,000 |
Comment
|
| 3930 |
COMPLETION OF CLASSROOM AT ALL SAINTS TAMUGH SECONDARY SCHOOL- SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 600,000 |
Comment
|
| 3931 |
CONSTRUCTION OF A LIBRARY AT JERUSALEM GIRLS SECONDARY-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 3932 |
CONSTRUCTION OF TWO CLASSROOMS AT SAYONI GIRLS SECONDARY-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 3933 |
CONSTRUCTION OF ONE CLASSROOM AT FR. DILLON SECONDARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 3934 |
COMPLETION OF KATIMORIL ECDE-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 100,000 |
Comment
|
| 3935 |
CONSTRUCTION OF CLASSROOM AT CHEPOROMWAGH ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 3936 |
CONSTRUCTION OF CLASSROOM AT CHEPO-ANYINTA ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 3937 |
CONSTRUCTION OF CLASSROOM AT KANGISHA ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 3938 |
RENOVATION OF CLASSES AT KANGISHA PRIMARY SCHOOL-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 3939 |
CONSTRUCTION OF CLASSROOM AT TAKAIYWA ECDE-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 3940 |
RENOVATION OF CLASSES AT KOPOSES PRIMARY SCHOOL-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 3941 |
FENCING OF LOKARKAR PRIMARY SCHOOL-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 3942 |
RENOVATION OF ST.JOSEPH KADONGDONG ACK PRIMARY-MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 3943 |
CONSTRUCTION OF CLASSROOMS AT ELCK NAPIZ ECDE-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 3944 |
CONSTRUCTION OF CLASSROOM AT NARUORO ECDE-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 600,000 |
Comment
|
| 3945 |
CONSTRUCTION OF CLASSROOM AT KATICH ECDE-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 600,000 |
Comment
|
| 3946 |
CONSTRUCTION OF ONE CLASSROOM AT PARAYWA ECDE -SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 3947 |
CONSTRUCTION OF CLASSROOM AT SIKNIN ECDE-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 3948 |
CONSTRUCTION OF CLASSROOM AT LOKAPEL ECDE-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 3949 |
CONSTRUCTION OF TWO CLASSROOMS AT SIYOI ECDE-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 850,000 |
Comment
|
| 3950 |
CONSTRUCTION OF TWO CLASSROOMS AT KAPRECH ECDE -SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 850,000 |
Comment
|
| 3951 |
CONSTRUCTION OF ONE CLASSROOM AT KAPSURUM(BOMA) ECDE -SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 3952 |
INFRASTRUCTURE SUPPORT SIYOI SECONDARY-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 3953 |
INFRASTRUCTURE SUPPORT TALAU SECONDARY-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 3954 |
INFRASTUCTURE SUPPORT KAIBOS SECONDARY-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 1,000,000 |
Comment
|
| 3955 |
CONSTRUCTION OF ECDE CLASSES AT TUWIT- KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 3956 |
CONSTRUCTION OF TWO CLASSROOMS AT KANASAT ECDE-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 3957 |
CONSTRUCTION OF ECDE CLASSES AT KOPEYON- KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 3958 |
CONSTRUCTION OF TWIN CLASSROOM AT KAPCHOK GIRLS SEC(PENDING BILL)-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,600,000 |
Comment
|
| 3959 |
CONSTRUCTION OF ECDE CLASSES AT MUKURI-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 3960 |
CONSTRUCTION OF ECDE CLASSROOM AT LOPUSIENIKOU-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 3961 |
CONSTRUCTION OF ECDE CLASSROOM AT NGENGECHWO-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 3962 |
CONSTRUCTION OF ECD CLASSROOM AT KACHILIKINEI-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 3963 |
CONSTRUCTION OF ECDE CLASSROOM AT SOBUKWO-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 3964 |
CONSTRUCTION OF ECDECLASSROOM AT KUYOGH -BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 3965 |
CONSTRUCTION OF ECDE CLASSROOM AT ORTUM MIXED -BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 3966 |
CONSTRUCTION OF CLASSROOM AT KASERRO ECDE-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 3967 |
CONSTRUCTION OF CLASSROOM AT KURKATECDE-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 3968 |
CONSTRUCTION OF CLASSROOM AT CHEPOKORO ECDE-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 3969 |
CONSTRUCTION OF CLASSROOM AT OROLWO ECDE -BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 3970 |
CONSTRUCTION OF CLASSROOM AT CHEPOKORIONG ECDE-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 3971 |
CONSTRUCTION OF CLASSROOM AT PRIMOTOI ECDE-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 3972 |
CONSTRUCTION OF CLASSROOM AT KATUKUMWOK ECDE -KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 750,000 |
Comment
|
| 3973 |
CONSTRUCTION OF CLASSROOM AT KAPKEWA ECDE-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 750,000 |
Comment
|
| 3974 |
CONSTRUCTION OF CLASSROOM AT KOTULPOGH ECDE-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 750,000 |
Comment
|
| 3975 |
CONSTRUCTION OF CLASSROOM AT MOINOI ECDE-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 3976 |
CONSTRUCTION OF CLASSROOM AT KATUDA ECDE-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 3977 |
CONSTRUCTION OF CLASSROOM AT KATUMKALE ECDE-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 3978 |
CONSTRUCTION OF CLASSROOM AT LOCHERIAMONYANG ECDE-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 3979 |
CONSTRUCTION OF CLASSROOM AT NANGOLESINYON ECDE-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 3980 |
CONSTRUCTION OF CLASSROOM AT AKIRIAMET ECDE-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 3981 |
CONSTRUCTION OF CLASSROOM AT LOWOI ECDE-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 3982 |
CONSTRUCTION OF CLASSROOM AT TARAKIT ECDE-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 3983 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPANYINTA ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 3984 |
CONSTRUCTION OF ECDE CLASSROOM AT NATIRARA ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 3985 |
CONTRUCTION OF CLASSROOM AT ATACHA ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 3986 |
COMPLETION OF CLASSROOM AT AKERPOYESO ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 150,000 |
Comment
|
| 3987 |
CONSTRUCTION OF CLASSROOMS AT LODUPUP ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 3988 |
RENOVATION OF TWO CLASSROOMS AT KAPKUNYUK ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3989 |
CONSTRUCTION OF CLASSROOM AT MURUNY ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3990 |
CONSTRUCTION OF TWO CLASSROOMS AT KODEK ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3991 |
COMPLETION OF CLASSROOM AT PLALANG ECDE- LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 150,000 |
Comment
|
| 3992 |
COMPLETION OF CLASSROOM AT PTUNYONY ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 150,000 |
Comment
|
| 3993 |
COMPLETION OF CLASSROOMS AT KAPSANGAR ECDE- LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 200,000 |
Comment
|
| 3994 |
CONSTRUCTION OF TWO CLASSROOMS AT KAPKANYAR ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3995 |
CONSTRUCTION OF CLASSROOM AT CHEMOMUL ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3996 |
CONSTRUCTION OF CLASSROOM AT KAMONGES ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3997 |
CONSTRUCTION OF TWO CLASSROOMS AT TRIK ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 800,000 |
Comment
|
| 3998 |
CONSTRUCTION OF CLASSROOM AT LOPUSIMORU ECDE-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 3999 |
CONSTRUCTION OF ECDE CLASSROOM AT KAKOKO-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4000 |
CONSTRUCTION OF ECDE CLASSROOM AT KAGHAT -CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4001 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEMARMAR -CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4002 |
CONSTRUCTION OF ECDE CLASSROOM AT SAKALE-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4003 |
CONSTRUCTION OF ECDE CLASSROOM AT MOINO-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 4004 |
CONSTRUCTION OF ECDE CLASSROOM AT SKOT-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 4005 |
CONSTRUCTION OF ECDE CLASSROOM AT KORELLACH-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 4006 |
CONSTRUCTION OF ECDE CLASSROOM AT CHESIR-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 4007 |
CONSTRUCTION OF ECDE CLASSROOMS AT SOGHI-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 1,000,000 |
Comment
|
| 4008 |
CONSTRUCTION OF ECDE CLASSROOMS AT KALOYATUM -SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4009 |
CONSTRUCTION OF ECDE CLASSROOMS AT MESUR -SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4010 |
CONSTRUCTION OF ECDE CLASSROOMS AT YAS - SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4011 |
CONSTRUCTION OF ECDE CLASSROOM AT LOCHACHA -SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4012 |
CONSTRUCTION OF ECDE CLASSROOMS AT SOOT -SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4013 |
CONSTRUCTION OF ECDE CLASSROOMS AT CHEMUSAR - SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4014 |
CONSTRUCTION OF ECDE CLASSROOMS AT KAREMBANA - SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4015 |
CONSTRUCTION OF ECDE CLASSROOMS AT KAPONPON - SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4016 |
CONSTRUCTION OF ECDE CLASSROOMS AT KAMKET - SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4017 |
CONSTRUCTION OF ECDE CLASROOMS AT ST.MARYS PORIO KRUT -SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 500,000 |
Comment
|
| 4018 |
CONSTRUCTION OF CLASSROOM AT CHEMARIL ECDE CENTRE- ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 4019 |
CONSTRUCTION OF ECDE CLASSFROOM AT KAKACH ECDE-ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 4020 |
TRAINING OF DRIVERS AT KODICH YOUTH POLYTECHNIC- KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 900,000 |
Comment
|
| 4021 |
CONSTRUCTION OF PIT LATRINE AT CHERANGAN ECDE-KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 200,000 |
Comment
|
| 4022 |
COMPLETION OF CLASSROOM AT KRES ECDE-KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 300,000 |
Comment
|
| 4023 |
CONSTRUCTION OF ECDE CLASSROOM AT OROLWO DEP IN KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 4024 |
CONSTRUCTION OF PIT LATRINE AT LOTEPES ECDE-KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 300,000 |
Comment
|
| 4025 |
CONSTRUCTION OF CLASSROOM AT NAKWAPUO ECDE-KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 4026 |
CONSTRUCTION OF CLASSROOM AT A.I. C-KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 4027 |
CLASSROOM AND PIT LATRINE COMPLETION AT AROOL ECDE-KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 300,000 |
Comment
|
| 4028 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPTANY -KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 4029 |
CONSTRUCTION OF ECDE CLASSROOM AT ROSOMA-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 4030 |
CONSTRUCTION OF ECDE CLASSROOM AT KARELACHON-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 4031 |
CONSTRUCTION OF ECDE CLASSROOM AT KAKRES-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 4032 |
CONSTRUCTION OF VOCATIONAL TRAINING CENTER AT SONDANY-TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 4033 |
CONSTRUCTION OF ECDE CLASSROOM AT PTIRAP-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4034 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEMAIN-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4035 |
CONSTRUCTION OF ECDE CLASSROOM AT SAKAT-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4036 |
CONSTRUCTION OF ECDE CLASSROOMS AT KISHOREI -LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 4037 |
CONSTRUCTION OF ECDE CLASSROOM AT KSAA( LEBEI)-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4038 |
CONSTRUCTION OF ECDE CLASSROOM AT CHERELIO-LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4039 |
CONSTRUCTION OF ECDE CLASSROOM AT KORORA -LOMUT WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4040 |
CONSTRUCTION OF ECDE CLASSROOMS AT TUMKO KALYA - MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 1,100,000 |
Comment
|
| 4041 |
CONSTRUCTION OF ECDE CLASSROOMS AT KAMWOTINY - MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4042 |
CONSTRUCTION OF ECDE CLASSROOM AT MOSESWO -MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4043 |
CONSTRUCTION OF ECDE CLASSROOMS AT KOMOLEE - MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 1,100,000 |
Comment
|
| 4044 |
CONSTRUCTION OF ECDE CLASSROOM AT EMBOGHAT - MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4045 |
CONSTRUCTION OF ECDE CLASSROOM AT KERINGET - MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4046 |
CONSTRUCTION OF ECDE CLASSROOM AT MORTOME - MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4047 |
CONSTRUCTION OF ECDE CLASSROOM AT NACHUKUT - MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4048 |
CONSTRUCTION OF ECDE CLASSROOM AT KODONGOGH - MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4049 |
CONSTRUCTION OF ECDE CLASSROOM AT TAMPALAL - MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4050 |
CONSTRUCTION OF ECDE CLASSROOM AT KAPLELACHKOROR -MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4051 |
COMPLETION OF CLASSROOMS AT ST.ANTHONY KRIICH BOYS SECONDARY SCHOOL-ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 700,000 |
Comment
|
| 4052 |
CONSTRUCTION OF CLASSROOM AT TERERO PTOYO GIRLS SECONDARY SCHOOL ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 4053 |
CONSTRUCTION AND COMPLETION OF CLASSROOMS AT SIMAT ECDE-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 600,000 |
Comment
|
| 4054 |
COMPLETION OF CLASSROOMS AT SIMATECDE- SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 200,000 |
Comment
|
| 4055 |
CONSTRUCTION OF CLASSROOM AT NATAPAR BAPTIST ECDE ALALE WARD(NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 600,000 |
Comment
|
| 4056 |
COMPLETION CLASSROOM AT CHEPSEPIN ECDE- ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 100,000 |
Comment
|
| 4057 |
COMPLETION CLASSROOM AT ORON ECDE- ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 100,000 |
Comment
|
| 4058 |
COMPLETION OF CLASSROOM AT KAROROK ECDE- ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 131,114 |
Comment
|
| 4059 |
COMPLETION OF ODONG ECDE- ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 100,000 |
Comment
|
| 4060 |
COMPLETION OF OTUKWO ECDE- ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 100,000 |
Comment
|
| 4061 |
COMPLETION OF KAKOU ECDE- ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 100,000 |
Comment
|
| 4062 |
CONSTRUCTION OF CLASSROOM AT KAROROK ECDE-ALALE WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 4063 |
CONSTRUCTION OF NAPODO ECDE ALALE WARD(NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 600,000 |
Comment
|
| 4064 |
CONSTRUCTION OF KOMOLWO ECDE ALALE WARD(NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 600,000 |
Comment
|
| 4065 |
COMPLETION OF NASURET ECDE ALALE WARD(ONGOING) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 200,000 |
Comment
|
| 4066 |
CONSTRUCTION OF WOYAKOL ECDE ALALE WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 600,000 |
Comment
|
| 4067 |
CONSTRUCTION OF ACCK LOBIROI ECDE ALALE WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 600,000 |
Comment
|
| 4068 |
CONSTRUCTION OF MOTOKORON ECDE -BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 4069 |
CONSTRUCTION OF KACHEMOGEN ECDE -BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 4070 |
COMPLETION OF ROROK PRIMARY SCHOOL-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 4071 |
CONSTRUCTION OF SAMICH ECD-BATEI WARD (NEW |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 4072 |
CONSTRUCTION OF EMBOGHAT DAYSTAR ECDE-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 4073 |
CONSTRUCTION OF KOPOLONGA ECDE CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4074 |
CONSTRUCTION OF REPER ECDE CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4075 |
CONSTRUCTION OF KAMATEPON ECDE CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4076 |
CONSTRUCTION OF PLELAKAN ECDE CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4077 |
CONSTRUCTION OF SLA ECDE CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4078 |
CONSTRUCTION OF KALYA ECDE CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4079 |
CONSTRUCTION OF CHEPARER ECDE- CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4080 |
CONSTRUCTION OF MOMORO PRIMARY CLASSES ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 700,000 |
Comment
|
| 4081 |
COMPLETION OF SALAWA ECDE- ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 700,000 |
Comment
|
| 4082 |
INFRUSTRACTURAL SUPPORT OF KAPTEMOW SEC. SCHOOL- ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 4083 |
CONSTRUCTION OF KLAAN DORMITORY ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 700,000 |
Comment
|
| 4084 |
CONSTRUCTION OF SINJO ECD CENTRE- ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 4085 |
COMPLETION OF SOCHOY ECD CENTRE- ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 200,000 |
Comment
|
| 4086 |
COMPLETION OF KANAA ECD CENTRE- ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 200,000 |
Comment
|
| 4087 |
COMPLETION OF STEN ECDE CENTRE- ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 200,000 |
Comment
|
| 4088 |
COMPLETION OF KESOT ECD CENTRE- ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 200,000 |
Comment
|
| 4089 |
COMPLETION OF MURMOT ECDE ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 4090 |
INFRUSRTRUCTURAL SUPPORT TO CHERANGAN GIRLS SECONDARY SCHOOL-KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 1,000,000 |
Comment
|
| 4091 |
CONSTRUCTION OF CLASSROOM AT RERETIANG ECDE- KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 4092 |
CONSTRUCTION OF CLASSROOM AT KALAS ECDE -KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 4093 |
CONSTRUCTION OF KATIPOROT ECDE- KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4094 |
CONSTRUCTION OF SIMOTWO ECDE-KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 4095 |
COSTRUCTION OF KAKPAW ECDE-KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 450,000 |
Comment
|
| 4096 |
COMPLETION OF KOMOL ECDE-KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 150,000 |
Comment
|
| 4097 |
CONSTRUCTION OF ST.CHARLES LWANGA JUNCTION ECDE- KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4098 |
CONSTRUCTION OF TOKOLTO ECDE- KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4099 |
CONSTRUCTION OF CHEPKONEROI ECDE- KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4100 |
CONSTRUCTION OF SAKAT ECDE-KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4101 |
CONSTRUCTION OF ST.ANNES KARAS ECDE-KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4102 |
CONSTRUCTION OF NYAKULA ECDE-KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4103 |
CONSTRUCTION OF KORMONOT ECDE- KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4104 |
CONSTRUCTION OF KALAIN ECDE- KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4105 |
CONSTRUCTION OF KOKPECH ECDE-KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4106 |
CONSTRUCTION OF ST.JOSEPH TAKAR ECDE CENTRE-KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4107 |
CONSTRUCTION OF FAMILY LIFE ECDE -KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4108 |
COMPLETION OF KARENGAMUKAT ECDE (ONGOING)- KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 4109 |
COMPLETION OF NATEMERI ECDE KIWAWA WARD(ONGOING) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 4110 |
COMPLETION OF NAKUSE ECDE KIWAWA WARD(ONGOING) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 400,000 |
Comment
|
| 4111 |
COMPLETION OF NAKWAPUO ECDE KIWAWA WARD (ONGOING) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 4112 |
COMPLETION OF LOTITIEN ECDE KIWAWA WARD(ONGOING) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 4113 |
COMPLETION OF KAURIONG ECDE(ONGOING)-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 4114 |
COMPLETION OF KAMILA ECDE(ONGOING)-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 150,000 |
Comment
|
| 4115 |
COMPLETION OF ABUR ECDE(ONGOING)-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 4116 |
COMPLETION OF ATATAR ECDE(ONGOING)-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 4117 |
COMPLETION OF TATWA ECDE (ONGOING)-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 4118 |
CONSTRUCTION OF CHIROYON ECDE(ONGOING)-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 4119 |
CONSTRUCTION OF NAKORETE ECDE(ONGOING)-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 4120 |
CONSTRUCTION OF KACHEPUSIEN ECDE(ONGOING)-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 150,000 |
Comment
|
| 4121 |
CONSTRUCTION OF KAKOPON ECDE(ONGOING)-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 200,000 |
Comment
|
| 4122 |
CONSTRUCTION OF KALODEKEE ECDE (ONGOING)-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 250,000 |
Comment
|
| 4123 |
CONSTRUCTION OF KASES ECDE - KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 600,000 |
Comment
|
| 4124 |
CONSTRUCTION OF SONGWOT ECDE(NEW)-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 4125 |
CONSTRUCTION OF CLASSROOMS AT LOPET SECONDARY(NEW)-KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 4126 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPKATA ECDE- LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 4127 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPUNGON(KABICHBICH) ECDE- LELAN WARD(NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 4128 |
CONSTRUCTION OF ECDE CLASSROOM AT TACHIT -ECDE LELAN WARD(NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 4129 |
CONSTRUCTION OF ECDE CLASSROOM AT KARIAMAKITAI ECDE- LELAN WARD(NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 4130 |
CONSTRUCTION OF TWO ECDE CLASSROOMS AT AMON- MNAGEI WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 4131 |
CONSTRUCTION OF ECDE CLASSROOM AT KANGLIKWAN ''V''- MNAGEI WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4132 |
RENOVATION OF MAKUTANO ECDE-MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 150,000 |
Comment
|
| 4133 |
COMPLETION OF CHEPUNPUN ECDE-MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 150,000 |
Comment
|
| 4134 |
COMPLETION OF NANGROTUM ECDE-MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 150,000 |
Comment
|
| 4135 |
COMPLETION OF LOPALAL ECDE-MNAGEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 150,000 |
Comment
|
| 4136 |
CONSTRUCTION OF ECDE CLASSROOM AT KATINGUOY- MNAGEI WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4137 |
CONSTRUCTION OF ECDE CLASSROOM AT LOITANGOR- MNAGEI WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4138 |
CONSTRUCTION OF ECDE CLASSROOM AT KARIWO -MNAGEI WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4139 |
CONSTRUCTION OF ECDE CLASSROOM AT KAPYEMUT- MNAGEI WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4140 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPKOGHYO- MNAGEI WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4141 |
CONSTRUCTION OF A ECDE CLASSROOM AT MOKONGWO- MNAGEI WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4142 |
CONSTRUCTION OF A ECDE CLASSROOM AT KAMARROW- MNAGEI WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 600,000 |
Comment
|
| 4143 |
CONSTRUCTION OF CLASSROOM AT CHEPTAMAS ECDE- MASOL WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 4144 |
CONSTRUCTION OF ORON ECDE -MASOL WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MASOL |
Ksh 600,000 |
Comment
|
| 4145 |
CONSTRUCTION OF CLASSROOMS AT MASOL SECONDARY -MASOL WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 4146 |
CONSTRUCTION TWO CLASSROOMS AT ANNET PRIMARY ECDE- LOMUT WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 4147 |
CONSTRUCTION OF CLASSROOM AT KOKWOCHORWA ( CHEPEMOI) ECDE- LOMUT WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4148 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEMUSERIA ECDE- LOMUT WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4149 |
CONSTRUCTION OF ECDE CLASSROOM AT KATINOT ECDE- LOMUT WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4150 |
COMPLETION OF CLASSROOM AT LOMUT PRIMARY ECDE - LOMUT WARD(STALLED) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 4151 |
COMPLETION OF CLASSROOM AT MOGHO ECDE -LOMUT WARD (STALLED) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 200,000 |
Comment
|
| 4152 |
CONSTRUCTION OF ECDE CLASSROOM AT SAPULMOI ECDE- LOMUT WARD(NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4153 |
CONSTRUCTION OF CLASSROOM AT YOTWO ECDE- RIWO WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 4154 |
CONSTRUCTION OF CLASSROOM AT KOLIA ECDE- RIWO WARD (NEW |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 4155 |
CONSTRUCTION OF CLASSROOM AT KOPEMOI ECDE -RIWO WARD (NEW |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 4156 |
CONSTRUCTION OF CLASSROOM AT CHEPKOKOCH ECDE- RIWO WARD (NEW |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 4157 |
CONSTRUCTION OF CLASSROOMS AT KATUKUMWOK(KAPCHEMUKOT) ECDE RIWO WARD (NEW |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 4158 |
CONSTRUCTION OF CLASSROOM AT KAKORURON ECDE -RIWO WARD (NEW |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 4159 |
CONSTRUCTION OF CLASSROOM AT CHELOKOTETWO ECDE- RIWO WARD (NEW |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 4160 |
COMPLETION OF CLASSROOM AT LOKUYI ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 4161 |
CONSTRUCTION OF PIT LATRINE AT LOKUYI ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 200,000 |
Comment
|
| 4162 |
COMPLETION OF CLASSROOMS AT LOLOTWO ECDE- RIWO WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 4163 |
COMPLETION OF ECDE CLASSROOMS AT CHEMAKEU ECDE RIWO WARD (NEW |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 750,000 |
Comment
|
| 4164 |
CONSTRUCTION OF ECDE CLASSROOM AT KOITUKUM ECDE -RIWO WARD(NEW |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 4165 |
CONSTRUCTION OF CLASSROOM AT NAKTOPAR ECDE- RIWO WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 4166 |
COMPLETION OF CLASSROOM AT HABARI NJEMA ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 4167 |
COMPLETION OF ECDE CLASSROOM AT AUSKION ECDE -RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 245,000 |
Comment
|
| 4168 |
CONSTRUCTION OF ECDE CLASSROOM AT LETWA ECDE(NEW)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 4169 |
CONSTRUCTION OF ECDE CLASSROOM AT TOPTOLIM ECDE(NEW)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 4170 |
CONSTRUCTION OF ECDE CLASSROOM AT PRIRO ECDE(NEW)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 4171 |
CONSTRUCTION OF ECDE CLASSROOM AT PTAKACH ECDE(NEW)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 4172 |
CONSTRUCTION OF ECDE CLASSROOM AT LOYAYE ECDE(NEW)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 4173 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPTESOK ECDE (NEW)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 300,000 |
Comment
|
| 4174 |
CONSTRUCTION OF ECDE CLASSROOM AT ST MARY'S ECDE(ONGOING)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 300,000 |
Comment
|
| 4175 |
CONSTRUCTION OF ECDE CLASSROOM AT TINTAR ECDE(FINISHING)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 250,000 |
Comment
|
| 4176 |
CONSTRUCTION OF CLASSROOM AT CHEPNYAL GIRLS ECDE(NEW)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 4177 |
CONSTRUCTION OF ADMINISTRATION BLOCK AT ALL SAINTS TAMUGH SECONDARY-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 800,000 |
Comment
|
| 4178 |
CONSTRUCTION OF ADMINISTRATION BLOCK PCHOLPOGH GIRLS SECONDARY- SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 800,000 |
Comment
|
| 4179 |
CONSTRUCTION OF A CLSSROOMAT AT ST. PETERS PTIRA PRIMARY SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 4180 |
CONSTRUCTION OF CLASSROOM AT TAKAM ECDE(NEW)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 600,000 |
Comment
|
| 4181 |
CONSTRUCTION OF CLASSROOM AT PCHOLPOGH ECDE (NEW)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 4182 |
COMPLETION OF CLASSROOM AT CHEPOSEKEKECDE-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 200,000 |
Comment
|
| 4183 |
COMPLETION OF TWO CLASSROOMS OF CHEPOSEKEK PRIMARY SCHOOL -SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 450,000 |
Comment
|
| 4184 |
CONSTRUCTION OF ONE CLASSROOM AT KOCHAR-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 4185 |
CONSTRUCTION OF ST. FRANCIS KAPLELACH PRI SCHOOL (NEW)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 4186 |
CONSTRUCTION OF CLASSROOM AT SIRKOY PRIMARY SCHOOL (NEW)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 400,000 |
Comment
|
| 4187 |
CONSTRUCTION OF CLASSROOM AT KACHUMAKINEI PRI SCHOOL-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 500,000 |
Comment
|
| 4188 |
FENCING OF CHEPNYAL GIRLS PRIMARY DORMITORY-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 400,000 |
Comment
|
| 4189 |
CONSTRUCTION OF CLASSROOMS AT FR DILLON SEC SCHOOL(NEW)-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 1,500,000 |
Comment
|
| 4190 |
CONSTRUCTIONS OF ECDE CLASSROOMS AT SOKET ECDE-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4191 |
CONSTRUCTION OF PIT LATRINE AT SOKET ECDE-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 4192 |
COMPLETION OF CLASSROOMS AT ST MONICAH KAPSOO ECDE-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4193 |
CONSTRUCTION PIT LATRINE AT LOCHACHA ECDE-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 4194 |
COMPLETION OF CLASSROOM AT KASAKA ECDE -SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 4195 |
COMPLETION OF CLASSROOM AT SICHOT ECDE- SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 4196 |
CONSTRUCTION OF PIT LATRINE AT ST, JOSEPH LOLOCHECDE- SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 4197 |
CONSTRUCTION OF CLASSROOMS AT LOLOCHST. JOSEPH ECDE- SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4198 |
CONSTRUCTION OF PIT LATRINE AT LOWAYA ECDE- SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 4199 |
CONSTRUCTION OF PIT LATRINE AT CHEPOSANGIY ECDE -SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 4200 |
CONSTRUCTION OF CLASSROOMS AT RUK ECDE- SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4201 |
CONSTRUCTION OF PIT LATRINE AT RUKECDE- SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 4202 |
CONSTRUCTION OF CLASSROOMS AT KARKAR ECDE -SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4203 |
CONSTRUCTION OF CLASSROOMS AT KAPECHOKWO ECDE-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4204 |
CONSTRUCTION OF PIT LATRINE AT KAPACHEKWO ECDE- SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 4205 |
CONSTRUCTION OF CLASSROOMS AT SIMOTWO ECDE- SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4206 |
CONSTRUCTION OF PIT LATRINE AT SIMOTWO ECDE- SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 200,000 |
Comment
|
| 4207 |
CONSTRUCTION OF CLASSROOMS AT CHOPOTWO ECDE-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 800,000 |
Comment
|
| 4208 |
COMPLETION OF MARICH PRIMARY DINING HALL-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 450,000 |
Comment
|
| 4209 |
CONSTRUCTION OF TWO CLASSROOMS KIPKORINYA ECDE(NEW) -SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 850,000 |
Comment
|
| 4210 |
CONSTRUCTION OF TWO CLASSROOMS AT LOKORWO ECDE(NEW)-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 850,000 |
Comment
|
| 4211 |
COMPLETION OF CLASSROOMS AT KAIBOS ECDE -SIYOI WARD (STALLED) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 4212 |
COMPLETION OF CLASSROOM AT TALAU ECDE-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 150,000 |
Comment
|
| 4213 |
CONSTRUCTION OF TWO CLASSROOMS AT KAPKECHA ECDE -SIYOI WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 850,000 |
Comment
|
| 4214 |
COMPLETION OF CLASSROOM AT KORPUN ECDE- SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 100,000 |
Comment
|
| 4215 |
CONSTRUCTION OF TWO CLASSROOMS AT KAISAKAT ECDE -SIYOI WARD(NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 850,000 |
Comment
|
| 4216 |
CONSTRUCTION OF CLASSROOM AT AIC ASILONG PRIMARY ECDE- SUAM WARD (ONGOING) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 200,000 |
Comment
|
| 4217 |
CONSTRUCTION OF KOSIA ECDE CENTRE- SUAM WARD (ONGOING |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 200,000 |
Comment
|
| 4218 |
CONSTRUCTION OF CLASSROOM AT LONGORKAU ECDE CENTRE -SUAM WARD (ONGOIN) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 200,000 |
Comment
|
| 4219 |
CONSTRUCTION OF CLASSROOM AT TANDAPOS ECDE CENTRE- SUAM WARD (ONGOING) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 150,000 |
Comment
|
| 4220 |
CONSTRUCTION OF CLASSROOM AT KARON ECDE CENTRE- SUAM WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 4221 |
CONSTRUCTION OF CLASSROOM AT MORUONGOR ECDE CENTRE -SUAM WARD (NEW |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 4222 |
CONSTRUCTION OF CLASSROOM AT KASES ECDE CENTRE SUAM WARD (ONGOING) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 300,000 |
Comment
|
| 4223 |
CONSTRUCTION OF TWO CLASSROOMS AT ST PETERS CHEMOLO ECDE- TAPACH WARD(NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 4224 |
CONSTRUCTION OF ECDE CLASSROOMS AT SKAK ECDE- WEIWEI WARD(NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 2,000,000 |
Comment
|
| 4225 |
CONSTRUCTION OF ECDE CLASSROOMS AT CHEPTONGOGHIO ECDE- WEIWEI WARD(NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 1,000,000 |
Comment
|
| 4226 |
CONSTRUCTION OF ECDE CLASSROOM AT MARR ECDE-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 4227 |
CONSTRUCTION OF ECDE CLASSROOM AT SISIT ECDE-WEIWEI |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 1,000,000 |
Comment
|
| 4228 |
CONSTRUCTION OF ECDE CLASSROOM AT SUPETOI ECDE- WEIWEI WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 1,000,000 |
Comment
|
| 4229 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPTESOK ECDE-WEIWEI WARD(NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 4230 |
CONSTRUCTION OF ECDE CLASSROOM AT MOCHOWON ECDE -WEIWEI WARD (NEW) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 4231 |
CONSTRUCTION OF CLASSROOM AT KLAYA ECDE-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 750,000 |
Comment
|
| 4232 |
CONSTRUCTION OF CLASSROOM AT TAKAR ECDE-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 750,000 |
Comment
|
| 4233 |
CONSTRUCTION OF CLASSROOM AT MKONGUR ECDE-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 750,000 |
Comment
|
| 4234 |
CONSTRUCTION OF CLASSROOM AT KAPTOLOMWO BAPTIST ECDE-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 750,000 |
Comment
|
| 4235 |
CONSTRUCTION OF CLASSROOM AT CHEPURWO ECDE-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 750,000 |
Comment
|
| 4236 |
CONSTRUCTION OF CLASSROOM AT KAPSENTOI ECDE-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 750,000 |
Comment
|
| 4237 |
CONSTRUCTION OF ECDE CLASSROOM AT TAKAYWA ECDE-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 750,000 |
Comment
|
| 4238 |
CONSTRUCTION OF CLASSROOM AT ELCK CHESPEN ECDE CENTERE (ONGOING)-KASEIWRAD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 400,000 |
Comment
|
| 4239 |
CONSTRUCTION OF CLASSROOMS AT KAPTEREMA ECDE -KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 750,000 |
Comment
|
| 4240 |
CONSTRUCTION OF CLASSROOM AT CHEMANANGA ECDE ONGOING-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 250,000 |
Comment
|
| 4241 |
CONSTRUCTION OF CLASSROOM AT KAWORONY ECDE ONGOING-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 250,000 |
Comment
|
| 4242 |
CONSTRUCTION OF CLASSROOM AT KAPKEWA ECDE ONGOING-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 250,000 |
Comment
|
| 4243 |
CONSTRUCTION OF CLASSROOM AT KAKITOR ECDE ONGOING-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 250,000 |
Comment
|
| 4244 |
CONSTRUCTION OF CLASSROOM AT KOKWOTIL ECDE ONGOING-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 250,000 |
Comment
|
| 4245 |
CONSTRUCTION OF CLASSROOM AT SUKUT ECDE ONGOING-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 750,000 |
Comment
|
| 4246 |
CONSTRUCTION OF CLASSROOM AT ELCK PUTOR ECDE-KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4247 |
CONSTRUCTION OF CLASSROOM AT CHIPAGH ECDE-BATEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 600,000 |
Comment
|
| 4248 |
CONSTRUCTION OF CLASSROOM AT EMPOKECH ECDE-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 350,000 |
Comment
|
| 4249 |
COMPLETION OF CLASSROOM AT EMPOKECHECDE-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 200,000 |
Comment
|
| 4250 |
CONSTRUCTION OF CLASSROOM AT CHEPTESOK ECDE-SOOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SOOK |
Ksh 300,000 |
Comment
|
| 4251 |
CONSTRUCTION OF ECDE CLASSROOM AT KOPULIO PRIMARY SCHOOL- SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 4252 |
CONSTRUCTION OF TWO CLASSROOMS AND PIT LATRINE KAMARINY A' ECDE (NEW) -SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 950,000 |
Comment
|
| 4253 |
CONSTRUCTION OF TWO CLASSROOMS AT ATARTAR ECDE (NEW) -KIWAWA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 4254 |
CONSTRUCTION OF CLASSROOM AT PONGONG ECDE-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4255 |
ESTABLISHMENT OF DRIVING COURSE AT CHEPARERIA POLYTECHNIC-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 4256 |
CONSTRUCTION OF CLASSROOM AT ALIMARIS ECDE- KAPENGURIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 450,000 |
Comment
|
| 4257 |
CONSTRUCTION OF TWO CLASSROOMS AT KUDULEM ECDE (NEW) -RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 4258 |
CONSTRUCTION OF CLASSROOM AT PEOTA ECDE-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 350,000 |
Comment
|
| 4259 |
CONSTRUCTION OF TWO CLASSROOMS AT R.C.E.A NASOLOT JUNCTION ECDE-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4260 |
COMPLETION OF TWO ECDE CLASSES AT KACHELIBA MUSLIM CENTRE-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 300,000 |
Comment
|
| 4261 |
CONSTRUCTION OF CLASSROOM AT ST. LWANGA KRESWO ECDE-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4262 |
COMPLETION OF CLASSROOM AT HOLISTIC ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 4263 |
COMPLETION OF CLASSROOM AT CHEPKEMEI ECDE -RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 4264 |
CONSTRUCTION OF CLASSROOM KATUKUMWOK ECDE-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 4265 |
EUIPING OF COMPUTER LAB AT KODICH VTC- KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 227,427 |
Comment
|
| 4266 |
FENCING, PURCHASE OF BEDS AND DESKS OF GIRLS DORMITORY AT KAPCHOK SECONDARY SCHOOL-KAPCHOK WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 538,906 |
Comment
|
| 4267 |
CONSTRUCTION OF TWO CLASSROOMS AND PIT LATRINE AT KAPCHILA ECDE-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 900,000 |
Comment
|
| 4268 |
COMPLETION OF ECDE CLASSROOMS AT SIKNIN ECDE-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 4269 |
COMPLETION OF ECDE CLASSROOMS AT KAPSURUM ECDE-SIYOI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SIYOI |
Ksh 650,000 |
Comment
|
| 4270 |
TRAINING OF DRIVERS AT KODICH YOUTH POLYTECHNIC- SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 700,000 |
Comment
|
| 4271 |
PENDING BILL OF CONSTRUCTION OF CLASSROOM AT AT PIGHAN ECDE- TAPACH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 714,497 |
Comment
|
| 4272 |
CONSTRUCTION OF 2 CLASSROOMS AT WURAR ECDE(PENDING BILL)-ENDUGH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 498,137 |
Comment
|
| 4273 |
COMPLETION OF TOPULUL ECDE-PENDING BILL- KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 145,700 |
Comment
|
| 4274 |
CONSTRUCTION OF ECDE AND PIT LATRINE AT SITOT KIWAWA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KIWAWA |
Ksh 338,183 |
Comment
|
| 4275 |
CONSTRUCTION OF ECDE CLASSROOM AND PIT LATRINE KALOMOYWO KAPENGURIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 232,104 |
Comment
|
| 4276 |
CONSTRUCTION OF ECDE CLASSROOM AND PIT LATRINE TUWIT-KAPCHOK |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 111,242 |
Comment
|
| 4277 |
CONSTRUCTION OF ECDE CLASSROOM AND PIT LATRINE AT LOLWONOI-CHEPARERIA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 196,161 |
Comment
|
| 4278 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPTAPA-KODICH |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 193,413 |
Comment
|
| 4279 |
CONSTRUCTION OF ECDE CLASSROOM AND PIT LATRINE AT CHEMOYOS-KASEI |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 366,507 |
Comment
|
| 4280 |
CONSTRUCTION OF ECDE CLASSROOM AND PIT LATRINE AT KASOKIT ACCK-KASEI |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 102,327 |
Comment
|
| 4281 |
CONSTRUCTION OF TWO ECDE CLASSROOMS AT CHORWA- SEKEER WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,650,000 |
Comment
|
| 4282 |
CONSTRUCTION OF ECDE CLASSROOM AT MISTIN-KASEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 228,884 |
Comment
|
| 4283 |
CONSTRUCTION OF ECDE CLASSROOM AT AMINITO-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 65,139 |
Comment
|
| 4284 |
CONSTRUCTION OF ECDE CLASSROOM AT KALAPOCHON-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 246,652 |
Comment
|
| 4285 |
CONSTRUCTION OF ECDE CLASSROOM AT LOKATUKOI-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 246,745 |
Comment
|
| 4286 |
CONSTRUCTION OF ECDE CLASSROOM AT PRINTA-RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 184,930 |
Comment
|
| 4287 |
CONSTRUCTION OF ECDE CLASSROOM AT TUKUMWOK -RIWO WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 135,875 |
Comment
|
| 4288 |
CONSTRUCTION OF ECDE CLASSROOM AT KALEMUNGOROK-KODICH WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 230,306 |
Comment
|
| 4289 |
CONSTRUCTION OF ECDE CLASSROOM AT KAPETAKINEI-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 121,933 |
Comment
|
| 4290 |
CONSTRUCTION OF ECDE CLASSROOM AT LOYAMOROK-LELAN WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 93,638 |
Comment
|
| 4291 |
CONSTRUCTION OF ECDE CLASSROOM AT NASIKIRIO-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 46,400 |
Comment
|
| 4292 |
CONSTRUCTION OF ECDE CLASSROOM AT SHONGENE-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 176,945 |
Comment
|
| 4293 |
CONSTRUCTION OF ECDE CLASSROOM AT CHEPEL-CHEPARERIA WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 92,223 |
Comment
|
| 4294 |
COMPLETION OF TWO ECDE CLASSROOM AT KAPORO-SEKERR WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4295 |
CONSTRUCTION OF ECDE CLASSROOM AT TENDAPOS-SUAM WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 100,000 |
Comment
|
| 4296 |
CONSTRUCTION OF ECDE CLASSROOM AT TOO SOSTIN-WEIWEI WARD |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 221,290 |
Comment
|
| 4297 |
AIC CHESOMBUR SEC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 4298 |
ANNET MIXED |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4299 |
CANON PRICE SEC TAMKAL |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 1,000,000 |
Comment
|
| 4300 |
CHEMALTIN SEC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 400,000 |
Comment
|
| 4301 |
CHEMUTLOKOTYO MIXED |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4302 |
CHEPARTEN MIXED |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 600,000 |
Comment
|
| 4303 |
CHEPKALIT MIXED |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 4304 |
CHEPKOPEGH SEC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4305 |
ELCK KORKOU GIRLS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 500,000 |
Comment
|
| 4306 |
KAMKETO BOYS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 500,000 |
Comment
|
| 4307 |
KAMKETO TRINITY GIRLS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 500,000 |
Comment
|
| 4308 |
KAPCHIKAR MIXED |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 500,000 |
Comment
|
| 4309 |
KAPCHOK GIRLS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 4310 |
KAPKUNYUK SEC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 400,000 |
Comment
|
| 4311 |
KAPTABUK BOYS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 4312 |
KARENGER SEC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
RIWO |
Ksh 1,500,000 |
Comment
|
| 4313 |
KASEI BOYS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KASEI |
Ksh 500,000 |
Comment
|
| 4314 |
KODICH BOYS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KODICH |
Ksh 500,000 |
Comment
|
| 4315 |
KOKWORITIT MIXED |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4316 |
KOKWOTENDWO MIXED |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 4317 |
KOKWOTENDWO SEC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 200,000 |
Comment
|
| 4318 |
KONYAO SEC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 4319 |
LAIKONG BOYS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 4320 |
LAIKONG GIRLS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 4321 |
MASOL MIXED SEC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
MASOL |
Ksh 1,000,000 |
Comment
|
| 4322 |
MOKOYON SEC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 4323 |
MTELO BOYS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 250,000 |
Comment
|
| 4324 |
NYARKULIAN SEC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 4325 |
ONOCH GIRLS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 4326 |
OTIOT MIXED |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 4327 |
SEKERR MIXED SEC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 500,000 |
Comment
|
| 4328 |
SEKUTION MIXED |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 4329 |
SONDANY SEC SCH |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 4330 |
ST ANTHONY CHOROK |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 400,000 |
Comment
|
| 4331 |
ST ANTHONY OF PADUA SINA |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 4332 |
ST COMBONI AMAKURIAT BOYS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ALALE |
Ksh 200,000 |
Comment
|
| 4333 |
ST JOSEPH TAPACH SEC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 700,000 |
Comment
|
| 4334 |
ST MICHAELS PTOYO GIRLS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 1,000,000 |
Comment
|
| 4335 |
TAPACH SEC SCH |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 300,000 |
Comment
|
| 4336 |
TIPET MIXED SEC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
ENDUGH |
Ksh 1,000,000 |
Comment
|
| 4337 |
WAKOR PRIMARY (SECONDARY) |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 1,000,000 |
Comment
|
| 4338 |
AIC SARAMEE PRY |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 300,000 |
Comment
|
| 4339 |
CHEPTESEK PRY |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 400,000 |
Comment
|
| 4340 |
KACHELIBA MUSLIMS |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 4341 |
KAPSAIT PRI |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LELAN |
Ksh 150,000 |
Comment
|
| 4342 |
MARICH PRI |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
SEKERR |
Ksh 500,000 |
Comment
|
| 4343 |
MNOKOWO PRY |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 1,000,000 |
Comment
|
| 4344 |
PARKINO PRY |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4345 |
TAMKAL VTC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 200,000 |
Comment
|
| 4346 |
TAPACH PRI SCH |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
TAPACH |
Ksh 200,000 |
Comment
|
| 4347 |
WAKOR PRIMARY |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
WEI WEI |
Ksh 400,000 |
Comment
|
| 4348 |
MURIAN ECDE |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 4349 |
CHESTA TTC |
EDUCATION AND TECHNICAL TRAINING |
2020-2021 |
Complete
|
LOMUT |
Ksh 1,200,000 |
Comment
|
| 4350 |
TARMACKING OF ORTUM TOWNSHIP ROADS- |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
BATEI |
Ksh 14,925,488 |
Comment
|
| 4351 |
TARMACKING OF KACHELIBA TOWNSHIP ROADS- |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
SUAM |
Ksh 12,893,811 |
Comment
|
| 4352 |
COMPLETION OF PIT LATRINE AT ORTUM MARKET |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
BATEI |
Ksh 1,199,058 |
Comment
|
| 4353 |
INSTALLATION OF HIGH MAST SECURITY LIGHT AT KACHELIBA MARKET |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
SUAM / RIWO |
Ksh 2,500,000 |
Comment
|
| 4354 |
PROPOSED COUNTY WELCOME,DEPARTURE AND ADVERTISEMENT BOARD AT MORKWIJIT |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
MNAGEI |
Ksh 1,784,187 |
Comment
|
| 4355 |
COUNTY SPATIAL PLAN(PENDING BILL) |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 6,656,121 |
Comment
|
| 4356 |
LEVELLING MAKUTANO PUBLIC TOILET |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
KAPENGURIA/ MNAGEI |
Ksh 300,000 |
Comment
|
| 4357 |
MAINTENANCE OF KAPENGURIA MUNICIPALITY ACCESS ROADS(COUNTY CONTRIBUTION) |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
KAPENGURIA/ MNAGEI |
Ksh 3,400,000 |
Comment
|
| 4358 |
MAINTENANCE OF KAPENGURIA MUNICIPALITY ACCESS ROADS(COUNTY CONTRIBUTION) |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,100,000 |
Comment
|
| 4359 |
CONSTRUCTION OF MODERN FIRE STATION AT KAPENGURIA |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 4,386,990 |
Comment
|
| 4360 |
UPGRADING TO BITUMEN STANDARD OF PAVES-SEBIT PLAZA ROAD,JUA KALI OPEN AIR MARKET-SANTON SUPERMARKET ROAD AND ROOFING OF MARKET STALLS |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
KAPENGURIA/ MNAGEI |
Ksh 50,000,000 |
Comment
|
| 4361 |
FEASIBILITY STUDIES |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 2,493,022 |
Comment
|
| 4362 |
REPAIR OF SEBIT PUBLIC PIT LATRINE-BATEI WARD |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
BATEI |
Ksh 300,000 |
Comment
|
| 4363 |
CONSTRUCTION OF PTAROKONG PUBLIC PIT LATRINE-BATEI WARD |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 4364 |
CONSTRUCTION OF SEROWO MARKET PIT LATRINE-RIWO WARD |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 4365 |
CONSTRUCTION OF PIT LATRINE AT MWOTOT MARKET-TAPACH WARD |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 4366 |
CONSTRUCTION OF NAKWIJIT MARKET PIT LATRINE-KODICH WARD |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
KODICH |
Ksh 300,000 |
Comment
|
| 4367 |
CONSTRUCTION OF PIT LATRINE AT TAMKAL MARKET-WEIWEI WARD |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 4368 |
TAMKAL MARKET SOLAR INSTALLATION(NEW) - WEIWEI WARD |
LANDS, HOUSING AND URBAN DEVELOPMENT |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 4369 |
EXTENSION OF PROCUREMENT OFFICE DEPARTMENT OF WATER |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 949,000 |
Comment
|
| 4370 |
PURCHASE OF PIPES AT SINA WATER PROJECT |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
TAPACH |
Ksh 2,000,000 |
Comment
|
| 4371 |
CONSTRUCTION OF SIGOR WATER PROJECT(COMPLETION NOT CONSTRUCTION) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
WEI WEI |
Ksh 1,440,000 |
Comment
|
| 4372 |
RETICULATION AND PIPING OF KACHELIBA WATER SUPPLY |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SUAM |
Ksh 1,999,800 |
Comment
|
| 4373 |
UPGRADE TWO BORE HOLES IN ALALE, KIWAWA, KASEI, KAPCHOK, KODICH, SUAM, RIWO,SEKERR,WEIWEI,LOMUT AND MASOL WARDS TO SOLAR POWERED AT COST OF 2 MILLION PER BORE HOLE -PENDING BILL |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 1,999,500 |
Comment
|
| 4374 |
UPGRADE TWO BORE HOLES IN ALALE, KIWAWA, KASEI, KAPCHOK, KODICH, SUAM, RIWO,SEKERR,WEIWEI,LOMUT AND MASOL WARDS TO SOLAR POWERED AT COST OF 2 MILLION PER BORE HOLE -PENDING BILL |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 1,999,800 |
Comment
|
| 4375 |
CONSTRUCTION OF KAPKORUS-MAKUTANO WATER SUPPLY PROJECT |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 23,450,000 |
Comment
|
| 4376 |
PROPOSED CONSTRUCTION OF NAMORU WATER PAN-NORTH POKOT SUB-COUNTY |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KODICH |
Ksh 19,452,678 |
Comment
|
| 4377 |
PROPOSED CONSTRUCTION OF ARUR WATER PAN- CENTRAL POKOT SUB-COUNTY |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
MASOL |
Ksh 19,104,540 |
Comment
|
| 4378 |
CONSTRUCTION OF KERMONOT EMBOASIS MINI DAM -WEST POKOT SUB COUNTY |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 11,702,600 |
Comment
|
| 4379 |
ESTABLISHMENT OF KONGELAI TREE NURSERY |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
RIWO |
Ksh 1,500,000 |
Comment
|
| 4380 |
ESTABLISHMENT OF KAPRECH TREE NURSERY |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SIYOI |
Ksh 1,500,000 |
Comment
|
| 4381 |
GULLEY RECLAMATION AT EMBOASIS PRIMARY SCHOOL |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 4382 |
RENOVATION OF CHEPNYAL TREE NURSERY |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 4383 |
PURCHASE OF POTTING TUBES TO SUPPORT FARMERS |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,100,000 |
Comment
|
| 4384 |
PURCHASE OF TREE SEEDLINGS |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 2,400,000 |
Comment
|
| 4385 |
PURCHASE OF TREE SEEDLINGS |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 4386 |
REHABILITATION OF TILAK SPRING-KAPENGURIA WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 999,000 |
Comment
|
| 4387 |
KATIPOROT WATER PROJECT PIPING-KAPENGURIA |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4388 |
KAMARKECH WATER PROJECT- KAPENGURIA WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 4389 |
PIPING OF NGOLEYO WATER PROJECT- KAPENGURIA WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 4390 |
SAKAT WATER PROJECT PIPING-KAPENGURIA WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 4391 |
REPAIR OF BOREHOLES AT ALALE WARD(LOEMAMOSING,KATICH,ORON,KASITOT,KAPTUKEN,NAUYAPONG,LOKITONYALA B,LODONY,LOMURIEBUL,LOBIROI)-ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 4392 |
CONSTRUCTION OF NACHURUR SAND DAM-ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 4393 |
CONSTRUCTION OF KARACHOMIN SAND DAM-ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 4394 |
CONSTRUCTION OF SILTA SAND DAM-UTOKO-ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 4395 |
CONSTRUCTION OF OMORWO SAND DAM-ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 4396 |
PIPING AND SUPPLY OF LOKITONYALA WATER PROJECT-ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 2,000,000 |
Comment
|
| 4397 |
CONSTRUCTION OF KAMARIAKOT SAND DAM-ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 4398 |
CONSTRUCTION OF APAWA SAND DAM-ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 4399 |
CONSTRUCTION OF NGELECHOM SAND DAM-ALALE WARD(RO) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 4400 |
CONSTRUCTION OF NASURET SAND DAM –ALALE |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 4401 |
CONSTRUCTION OF LOMURIEBEL SAND DAM |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 700,000 |
Comment
|
| 4402 |
KOKWOAMURO WATER PIPING EXTENSION-ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 600,000 |
Comment
|
| 4403 |
CONSTRUCTION OF PARAYWA WATER PROJECT-SIYOI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SIYOI |
Ksh 1,500,000 |
Comment
|
| 4404 |
CONSTRUCTION OF WATER TANK AT KRENGOT-SIYOI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SIYOI |
Ksh 650,000 |
Comment
|
| 4405 |
DRILLING OF KRENGOT WATER PROJECT-SIYOI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SIYOI |
Ksh 1,500,000 |
Comment
|
| 4406 |
PURCHASE OF ASSORTED PIPES -SIYOI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 4407 |
CONSTRUCTION OF TOTUM SHALLOW WELL - MNAGEI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 4408 |
PROTECTION OF KOMOLEE SPRING IN MNAGEI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
MNAGEI |
Ksh 200,000 |
Comment
|
| 4409 |
CONSTRUCTION OF WATER DAM AT CHETOKOL-KAPCHOK WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 5,000,000 |
Comment
|
| 4410 |
DRILLING OF BOREHOLE AT TUWIT -KAPCHOK WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 4411 |
UPGRADING OF LONGARKAU BOREHOLE-SUAM WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SUAM |
Ksh 1,800,000 |
Comment
|
| 4412 |
RETICULATION OF ALELIA BOREHOLE-SUAM WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SUAM |
Ksh 1,500,000 |
Comment
|
| 4413 |
INSTALLATION OF SOLAR POWER AT KAMKETO BOREHOLE-KASEI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KASEI |
Ksh 1,800,000 |
Comment
|
| 4414 |
INSTALLATION OF SOLAR POWER AT CHEMULUNJO BOREHOLE-RIWO WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
RIWO |
Ksh 2,400,000 |
Comment
|
| 4415 |
REPAIR OF CHEMULUNJO SUBSURFACE DAM-RIWO WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
RIWO |
Ksh 400,000 |
Comment
|
| 4416 |
DRILLING OF LOYWOKOR BOREHOLE-RIWO WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 4417 |
DRILLING OF BOREHOLE AT SIMOTWO PRIMARY SCHOOL-RIWO WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
RIWO |
Ksh 1,200,000 |
Comment
|
| 4418 |
BOREHOLE REPAIRS AND PURCHASE OF BOREHOLE EQUIPMENTS-RIWO WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
RIWO |
Ksh 300,000 |
Comment
|
| 4419 |
PIPING OF CHESIRORO WATER PROJECT-LELAN WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LELAN |
Ksh 300,000 |
Comment
|
| 4420 |
PIPING OF KAPSAKAR-TARTAR WATER PROJECT-LELAN WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LELAN |
Ksh 300,000 |
Comment
|
| 4421 |
PIPING OF PLALANG WATER PROJECT-LELAN WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LELAN |
Ksh 200,000 |
Comment
|
| 4422 |
CONSTRUCTION OF WATER PROJECT AT SOLION-KASUS-WEIWEI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
WEI WEI |
Ksh 1,000,000 |
Comment
|
| 4423 |
DRILLING OF BOREHOLE AT TAMAKARU IN SEKERR WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SEKERR |
Ksh 2,000,000 |
Comment
|
| 4424 |
DRILLING OF BOREHOLE AT CHEPOSANGIY IN SEKERR WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,200,000 |
Comment
|
| 4425 |
PIPING OF OROLWO WATER SUPPLY-KODICH WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KODICH |
Ksh 800,000 |
Comment
|
| 4426 |
PURCHASE AND SUPPLY OF PIPES FOR SERON-PTOYO WATER PROJECT-ENDUGH |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ENDUGH |
Ksh 1,600,000 |
Comment
|
| 4427 |
PIPING OF KLAAN WATER PROJECT-ENDUGH WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ENDUGH |
Ksh 2,000,000 |
Comment
|
| 4428 |
CONSTRUCTION OF WATER TANK AT PSERO-TAPACH WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 4429 |
CONSTRUCTION OF KOSILTIONY WATER SUPPLY PROJECT-TAPACH WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,500,000 |
Comment
|
| 4430 |
PKALINY SPRING PROTECTION -LOMUT WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LOMUT |
Ksh 250,000 |
Comment
|
| 4431 |
CONSTRUCTION OF TULUNGWO-KATUKURI WATER SUPPLY-LOMUT WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4432 |
REPAIR OF RATA,CHEPTULEL BOYS,CHEPTULEL PRIMARY,SOKOTOW CENTRE WATER SUPPLIES-LOMUT WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4433 |
REPAIRS OF SORORO WATER PROJECT -TOPOWON-LOMUT WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4434 |
SUPPLY AND LYING OF PIPES FOR KOGHIN- KILOLO WATER PROJECT-LOMUT WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LOMUT |
Ksh 600,000 |
Comment
|
| 4435 |
REPAIR OF 12 BOREHOLES @50K(LOKODOSO,NAUYOPONG,KASITOT,LODONY,OTUKO,ALANY,REMOI,KAPUNETEN,LEOMAMOSING,LOLEPON)-ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 599,000 |
Comment
|
| 4436 |
UPGRADING OF LOKITANYALA BOREHOLE TO SOLAR POWERED AND PIPING SYSTEM-ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 2,990,900 |
Comment
|
| 4437 |
REPAIR OF BOREHOLES(LOKODOSO,NAUYOPONG,KASITOT,LODONY,LEOMAMOSING,ALANY,REMOI,KAPUNETEN,LOLEPON) - ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 499,950 |
Comment
|
| 4438 |
CONSTRUCTION OF ALANY SAND DAM ALALE WARD (NEW) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 690,000 |
Comment
|
| 4439 |
CONSTRUCTION OF SILTA SAND DAM NEW -ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 701,510 |
Comment
|
| 4440 |
REPAIR OF LOBIROI SOLAR POWERDED BOREHOLE-ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 1,060,000 |
Comment
|
| 4441 |
SOLAR INSTALLATION FOR NAMORU BOREHOLE- KAPCHOK WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,999,900 |
Comment
|
| 4442 |
SOLAR INSTALLATION AT KODERA BOREHOLE-KAPCHOK WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 4443 |
PURCHASE OF TWO SOLAR PUMPS FOR KALUKUNA AND AMALER-KAPCHOK WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,060,000 |
Comment
|
| 4444 |
DRILLING OF BORAA-LEE BOREHOLE KAPCHOK WARD (NEW |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,200,000 |
Comment
|
| 4445 |
DRILLING OF BOREHOLE AT KOPEYON- KAPCHOK WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,080,000 |
Comment
|
| 4446 |
DRILLING OF KOPITIRO(KATAKAR) BOREHOLE KAPCHOK WARD (NEW |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,200,000 |
Comment
|
| 4447 |
DRILLING OF KAA-LOTAKA( AKURION) BOREHOLE- KAPCHOK WARD (NEW) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,200,000 |
Comment
|
| 4448 |
CONSTRUCTION OF SAND DAM AT KONGAI-KASEI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KASEI |
Ksh 999,978 |
Comment
|
| 4449 |
INSTALLATION OF CHERANGAN SHALLOW WELL - KODICH WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KODICH |
Ksh 1,000,000 |
Comment
|
| 4450 |
REPAIR OF NAMUTON OF BOREHOLE- KODICH WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KODICH |
Ksh 299,990 |
Comment
|
| 4451 |
REHABILITATION OF KATAR BOREHOLE-KODICH WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KODICH |
Ksh 299,952 |
Comment
|
| 4452 |
REHABILITATION OF MOINO WATER FURROW (PENDING BILL)-LOMUT WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LOMUT |
Ksh 552,129 |
Comment
|
| 4453 |
INTAKE CONSTRUCTION OF PTENGURO PROJECT -LOMUT WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LOMUT |
Ksh 999,291 |
Comment
|
| 4454 |
SUPO-PILIL-KAKITONGIN WATER PROJECT LOMUT WARD(NEW) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LOMUT |
Ksh 499,990 |
Comment
|
| 4455 |
CONSTRUCTION OF LOTONGOT SAND DAM(ONGOING)-MASOL WARD(NOT SAND DAM BUT WATERPAN) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
MASOL |
Ksh 1,066,000 |
Comment
|
| 4456 |
CONSTRUCTION OF MURKWIJIT WATER SPRINGS-MNAGEI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
MNAGEI |
Ksh 249,995 |
Comment
|
| 4457 |
EXTENSION OF LOKORNOI WATER SUPPLY PROJECT MNAGEI WARD (ONGOING) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
MNAGEI |
Ksh 399,000 |
Comment
|
| 4458 |
CONSTRUCTION OF MOSESWO WATER SPRING-MNAGEI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
MNAGEI |
Ksh 299,995 |
Comment
|
| 4459 |
CONSTRUCTION OF WATER TANK AT KORPUN -SIYOI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SIYOI |
Ksh 599,990 |
Comment
|
| 4460 |
KAPKATET WATER PROJECT PIPING SYSTEM-SIYOI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SIYOI |
Ksh 899,540 |
Comment
|
| 4461 |
KAPKATET WATER TANK- SIYOI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SIYOI |
Ksh 598,200 |
Comment
|
| 4462 |
CONSTRUCTION OF WATER TANKS AT SIYOI SECONDARY SCHOOL- SIYOI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SIYOI |
Ksh 599,950 |
Comment
|
| 4463 |
KAPKATET WATER INTAKE PROTECTION- SIYOI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SIYOI |
Ksh 499,820 |
Comment
|
| 4464 |
CONSTRUCTION OF KAMAKETOI WATER TANK SIYOI WARD(ONGOING) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SIYOI |
Ksh 499,860 |
Comment
|
| 4465 |
CONSTRUCTION OF TARURU WATER TANK SIYOI WARD (ONGOING) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SIYOI |
Ksh 499,800 |
Comment
|
| 4466 |
UPGRADING OF SHONGEN BOREHOLE TO SOLAR POWER -SUAM WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SUAM |
Ksh 1,699,000 |
Comment
|
| 4467 |
SOLAR UPGRADING OF YWALAPONG BOREHOLE -SUAM WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SUAM |
Ksh 1,699,000 |
Comment
|
| 4468 |
EQUIPING OF APARIPAR AND APIRAKWANG/ANGAMIT BOREHOLES- SUAM WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SUAM |
Ksh 791,190 |
Comment
|
| 4469 |
PIPELINE OF RUNO WATER PROJECT -WEIWEI WARD (NEW) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
WEI WEI |
Ksh 499,998 |
Comment
|
| 4470 |
INSTALLATION OF SOLAR PANEL AT KRIMTI BOREHOLE- KODICH WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KODICH |
Ksh 1,500,000 |
Comment
|
| 4471 |
PURCHASE OF BOREHOLE REPAIR MATERIALS (KAMILA,KATUMKALE,NATEMERI,LOCHURIAMONYANG , KASES , APLIYEP , KAURIONG AND KATUKUMWOK BOREHOLES)-KIWAWA WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KIWAWA |
Ksh 600,000 |
Comment
|
| 4472 |
CONSTRUCTION OF NATELENG-NGOLEYO WATER SPRING MNAGEI WARD (NEW) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
MNAGEI |
Ksh 250,000 |
Comment
|
| 4473 |
KAMOROW SPRING PROTECTION-MNAGEI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
MNAGEI |
Ksh 250,000 |
Comment
|
| 4474 |
CONSTRUCTION OF KAMWOTINY WATER PROJECT-MNAGEI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
MNAGEI |
Ksh 2,300,000 |
Comment
|
| 4475 |
INSTALLATION OF SOLAR PANNELS FOR KACHEPKAI WATER PROJECT-MNAGEI WARD (NEW) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 4476 |
CONSTRUCTION OF JILAKOW SUB SURFACE DAM- ENDUGH WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ENDUGH |
Ksh 1,100,000 |
Comment
|
| 4477 |
WUMKO-SASACH WATER PROJECT(PIPES AND INTAKE)-LOMUT WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LOMUT |
Ksh 1,137,870 |
Comment
|
| 4478 |
CHEPTIRA-KOKWORITIT WATER PROJECT(PIPING)-LOMUT WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 4479 |
PURCHASE OF REPAIR MATERIALS AND REPAIR OF FULL GOSPEL BOREHOLE-SUAM WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 4480 |
PURCHASE OF BOREHOLE REPAIR MATERIALS-SUAM WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SUAM |
Ksh 300,000 |
Comment
|
| 4481 |
INTAKE CONSTRUCTION AND PIPES LAYING OF KAPSAMBUL-SUKUT WATER PROJECT- TAPACH WARD (NEW) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 4482 |
PURCHASE OF BOREHOLE REPAIR MATERIALS (KAMKETO,KASEPA,KANG'OLETIANG, KAMATA JUMVI AND KASEI BOYS BOREHOLES )- KASEI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KASEI |
Ksh 200,000 |
Comment
|
| 4483 |
RETICULATION OF TIYINEI BOREHOLE-SUAM WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SUAM |
Ksh 800,000 |
Comment
|
| 4484 |
SPRING PROTECTION OF PSER -SIMIT WATER SPRING-MNAGEI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 4485 |
PURCHASE OF PIPES FOR ATARTAR-KIWAWA WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KIWAWA |
Ksh 550,000 |
Comment
|
| 4486 |
PROPOSED UPGRADING PIPING OF KOMPAS(TUTURIAMOI)BOREHOLE IN KODICH WARD-KODICH WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KODICH |
Ksh 800,000 |
Comment
|
| 4487 |
CONSTRUCTION OF NAKOWO TAMBALAL WATER PROJECT IN MNAGEI WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
MNAGEI |
Ksh 328,000 |
Comment
|
| 4488 |
ESTABLISHMENT OF KONGELAI TREE NUSERY-RIWO WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
RIWO |
Ksh 1,499,519 |
Comment
|
| 4489 |
ESTABLISHMENT OF TREE NURSERY-ALALE WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 500,000 |
Comment
|
| 4490 |
PURCHASE OF GENERATOR FOR AKIRIAMET WATER PROJECT - ALALE WARD (NEW) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
ALALE |
Ksh 1,300,000 |
Comment
|
| 4491 |
PURCHASE OF WATER PIPES FOR KARIMAKITAI 160K, PSUKUNO PRIMARY 160K, PTUNYONY 160K, SAWARIT KIYARA 160K, KACHEPTOT CHEPARTEN 160K, ADUNGONGIRO 100K-LELAN WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
LELAN |
Ksh 900,000 |
Comment
|
| 4492 |
PURCHASE AND DISTRIBUTION OF TREE SEEDLINGS (KAPSIPIRAI CHEMOLO YOUTH GROUP-150K,NYARKULIAN YOUTH GROUP-250K)-TAPACH WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
TAPACH |
Ksh 400,000 |
Comment
|
| 4493 |
PURCHASE OF TREE SEEDLINGS -SIYOI WARD (ONGOING) |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SIYOI |
Ksh 999,920 |
Comment
|
| 4494 |
PURCHASE OF TREE SEEDLINGS-SUAM WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 4495 |
PURCHASE OF TREE SEEDLINGS FOR DISTRIBUTION ACROSS THE WARD-KAPENGURIA WARD |
WATER, ENVIRONEMNT AND NATURAL RESOURCES |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,950,000 |
Comment
|
| 4496 |
CONSTRUCTION OF WEST POKOT COUNTY MILK PROCESSING PLANT |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
LELAN |
Ksh 15,000,000 |
Comment
|
| 4497 |
CONSTRUCTION OF WEST POKOT COUNTY MANGO PROCESSING PLANT |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
LOMUT |
Ksh 10,000,000 |
Comment
|
| 4498 |
PROPOSED CONSTRUCTION OF MURKWIJIT COOLING PLANT |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
MNAGEI |
Ksh 522,001 |
Comment
|
| 4499 |
PURCHASE AND DELIVERY OF COMPUTERS AND PRINTERS FOR WEPESA |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 3,000,000 |
Comment
|
| 4500 |
PURCHASE AND INSTALLATION OF WEPESA SYSTEM |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 4,500,000 |
Comment
|
| 4501 |
PURCHASE AND INSTALLATION OF ICT NETWORKING EQUIPMENT FOR WEPESA |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 4502 |
CONSTRUCTION OF FRESH PRODUCE MARKET AT LOMUT(PENDING BILL) |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
LOMUT |
Ksh 5,534,420 |
Comment
|
| 4503 |
FEASIBILITY AND APPRAISAL STUDIES /EIA |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4504 |
CONDUCTING ENVIRONMENTAL IMPACT ASSESSMENT FOR MANGO PROCESSING PLANT AT LOMUT AND MILK PROCESSING PLANT |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
LOMUT AND KABICHBICH |
Ksh 3,099,670 |
Comment
|
| 4505 |
COMPLETION OF KACHELIBA MARKET |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
SUAM |
Ksh 177,073 |
Comment
|
| 4506 |
CONSTRUCTION OF PIT LATRINE AT BENDERA MARKET |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4507 |
PURCHASE OF LAND FOR KACHELIBA MARKET |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
SUAM |
Ksh 770,000 |
Comment
|
| 4508 |
CONSTRUCTION OF KAPLELACH COOLER ONGOING -BATEI WARD |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
BATEI |
Ksh 1,800,000 |
Comment
|
| 4509 |
CONSTRUCTION OF MARKET SHED AT SEBIT-BATEI WARD |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
BATEI |
Ksh 528,850 |
Comment
|
| 4510 |
CONSTRUCTION OF CHEPAIYWAT BODA BODA SHED -MASOL WARD |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 4511 |
CONSTRUCTION OF TAKAIYWA BODA BODA SHED -MASOL WARD |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 4512 |
CONSTRUCTION OF JUA KALI WORKSHOP AT KODICH-KODICH WARD |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
KODICH |
Ksh 800,000 |
Comment
|
| 4513 |
CONSTRUCTION OF BODABODA SHED AT MURIAN-BATEI WARD |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 4514 |
CONSTRUCTION OF BODA BODA SHED AT KAPSAIT-LELAN WARD |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 4515 |
CONSTRUCTION OF BODA BODA SHED AT KAPTABUK-LELAN WARD |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
LELAN |
Ksh 500,000 |
Comment
|
| 4516 |
CONSTRUCTION OF BODABODA SHED AT KAIBOS -SIYOI WARD (NEW) |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
SIYOI |
Ksh 498,180 |
Comment
|
| 4517 |
CONSTRUCTION OF MARKET SHED AT SINA MARKET- TAPACH WARD (NEW) |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,999,840 |
Comment
|
| 4518 |
CONSTRUCTION OF MARKET SHED AT KAMELEI MARKET -TAPACH WARD (NEW) |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,962,569 |
Comment
|
| 4519 |
CONSTRUCTION OF BODABODA SHED AT TALAU- SIYOI WARD(NEW) |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
SIYOI |
Ksh 498,180 |
Comment
|
| 4520 |
CONSTRUCTION OF BODABODA SHED AT KERINGET CENTRE- MNAGEI WARD (NEW) |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 4521 |
CONSTRUCTION OF BODA BODA SHED AT KATIKOMOR MARKET-RIWO WARD |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 4522 |
CONSTRUCTION OF MARKET SHED AT SEREWO MARKET-RIWO WARD |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 4523 |
CONSTRUCTION OF TIKIT MARKET (ONGOING) -MASOL WARD |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
MASOL |
Ksh 56,241 |
Comment
|
| 4524 |
PURCHASE AND SUPPLY OF PACKAGING EQUIPMENTS FOR KODICH COOPERATIVES FARMERS-KODICH WARD |
Trade, Industrialization and Cooperative Development |
2020-2021 |
Complete
|
KODICH |
Ksh 784,694 |
Comment
|
| 4525 |
MEDICAL EQUIPMENT FOR COVID - 19 ISOLATION CENTER |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 9,186,500 |
Comment
|
| 4526 |
FABRICATION OF HOSPITAL BEDS |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 11,990,400 |
Comment
|
| 4527 |
SUPPLY AND DELIVERY OF ASSORTED MEDICAL EQUIPMENT FOR ICU |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 46,324,000 |
Comment
|
| 4528 |
PROPOSED GAS PIPING AND EXTENSION WORKS IN KCRH |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,796,459 |
Comment
|
| 4529 |
RENOVATION OF PIT LATRINE FOTTALAU AND KAIBOS |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SIYOI |
Ksh 198,681 |
Comment
|
| 4530 |
CONSTRUCTION OF A WARD AT KABICHBICH HOSPITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
LELAN |
Ksh 3,000,000 |
Comment
|
| 4531 |
CONSTRUCTION OF PEDIATRIC WARD AT CHEPARERIA HOSPITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 3,000,000 |
Comment
|
| 4532 |
CONSTRUCTION OF PEDIATRIC WARD AT SIGOR SUB-COUNTY HOSPITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
WEI WEI |
Ksh 3,000,000 |
Comment
|
| 4533 |
CONSTRUCTION OF BLOOD BANK GATE HOUSE,PIT LATRINE AND FITTINGS |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
MNAGEI |
Ksh 1,160,000 |
Comment
|
| 4534 |
CONSTRUCTION OF DRUGS STORE AT KACHELIBA SUB COUNTY HOSPITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SUAM |
Ksh 3,329,090 |
Comment
|
| 4535 |
CONSTRUCTION OF EYE UNIT AT KACHELIBA SUB COUNTY HOSPITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SUAM |
Ksh 876,250 |
Comment
|
| 4536 |
CONSTRUCTION OF OPERATION THEATRE AT KACHELIBA SUB-COUNTY HOSPITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SUAM |
Ksh 1,919,407 |
Comment
|
| 4537 |
PROPOSED CONSTRUCTION OF RENAL UNIT SEPTIC TANK AT KCRH |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 4,362,346 |
Comment
|
| 4538 |
PROPOSED CONSTRUCTION OF CHMT TOILET |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,200,000 |
Comment
|
| 4539 |
ADDITIONAL WORKS TO EXTENSION OF AMENITY WARD AT KCRH |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 532,466 |
Comment
|
| 4540 |
PROPOSED CONSTRUCTION OF LABORATORY AT SIGOR SUB-COUNTY HOSPITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
WEI WEI |
Ksh 3,332,634 |
Comment
|
| 4541 |
CONSTRUCTION OF PUBLIC TOILET AND WASHROOMS AT SIGOR SUB-COUNTY HOSPITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
WEI WEI |
Ksh 1,323,689 |
Comment
|
| 4542 |
COMPLETION OF KARENGER DISPENSARY |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
RIWO |
Ksh 2,300,000 |
Comment
|
| 4543 |
CONSTRUCTION OF ISOLATION WARD 8 AT KCRH |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 3,685,971 |
Comment
|
| 4544 |
CONSTRUCTION OF PUBLIC TOILETS AT KACHELIBA SUB-COUNTY HOSPITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SUAM |
Ksh 178,448 |
Comment
|
| 4545 |
CONSTRUCTION OF TOILETS AT SIGOR SUB-COUNTY HOSPITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
WEI WEI |
Ksh 354,000 |
Comment
|
| 4546 |
PROPOSED CONSTRUCTION OF PUBLIC TOILET AND WASHROOM AT KCRH |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 56,188 |
Comment
|
| 4547 |
RENOVATION OF PROCUREMENT OFFICE AT CHMT HQ |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 4548 |
PROPOSED PAINTING WORKS AT KCRH |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,497,560 |
Comment
|
| 4549 |
RENOVATION AND EQUIPING OF DOCTORS LOUNGE |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 28,610 |
Comment
|
| 4550 |
SUPPLY,DELIVERY AND INSTALATION OF SUPPLY CABLE FROM POWER HOUSE TO ICU UNIT AT KCRH(KCRH POWER CABLES CONNECTION WORKS) |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,034,001 |
Comment
|
| 4551 |
LEVELLING AND PUTTING UP CABROS OF CASUALTY COMPOUND AT KCRH |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,466,660 |
Comment
|
| 4552 |
CONSTRUCTION OF CASUALTY FENCE AND GATE AT KCRH |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,904,328 |
Comment
|
| 4553 |
CONSTRUCTION OF BOUNDARY WALL AT BLOOD BANK |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
MNAGEI |
Ksh 3,800,000 |
Comment
|
| 4554 |
PROPOSED ELECTRICAL INSTALLATION,STREET LIGHTS AND INTERNAL WORKS AT BLOOD BANK CENTRE |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 2,198,548 |
Comment
|
| 4555 |
KACHELIBA SUB-COUNTY HOSPITAL CABLING AND POWER CONNECTION |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SUAM |
Ksh 2,400,000 |
Comment
|
| 4556 |
FENCING OF SIGOR SUB-COUNTY HOSPITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
WEI WEI |
Ksh 1,000,000 |
Comment
|
| 4557 |
PURCHASE OF MOTORCYCLES |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 420,000 |
Comment
|
| 4558 |
EQUIPING OF THEATRE AND EYE UNIT AT KACHELIBA SUBCOUNTY HOSPITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SUAM |
Ksh 5,000,000 |
Comment
|
| 4559 |
PURCHASE OF OFFICE FURNITURE FOR DISPENSARIES |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ALL WARDS |
Ksh 500,000 |
Comment
|
| 4560 |
SUPPLY AND DELIVERY OF FURNITURE AND FITTINGS FOR CHEPARERIA SUB-COUNTY LABORATORY |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 4,500,000 |
Comment
|
| 4561 |
SUPPLY AND DELIVERY OF FURNITURE FOR DOCTORS CALLROOM AT KCRH |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4562 |
ENVIRONMENTAL IMAPCT ASSESSMENT(NEMA) |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
20 DISPENSARIES, 3 MAJOR PROJECTS |
Ksh 8,039 |
Comment
|
| 4563 |
PURCHASE OF LAND FOR KARENGER DISPENSARY |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 4564 |
ALTERATION TO PROPOSED ICU/HDU |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 2,800,000 |
Comment
|
| 4565 |
CONSTRUCTION OF DOCTORS LOUNGE |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 3,100,000 |
Comment
|
| 4566 |
RENOVATION/EXTENSION OF OFFICE AT KACHELIBA HOSPITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SUAM |
Ksh 500,000 |
Comment
|
| 4567 |
PROPOSED ACCESS AND PARKING TO CT SCAN AND MRI AT KAPENGURIA REFERRAL HOSPTITAL |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 4,000,000 |
Comment
|
| 4568 |
CONSTRUCTION OF RETAINING WALL-RENAL UNIT |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 2,700,000 |
Comment
|
| 4569 |
PURCHASE OF AMBULANCE |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 10,518,608 |
Comment
|
| 4570 |
PURCHASE OF KAPENGURIA ICT SYSTEM |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 3,500,000 |
Comment
|
| 4571 |
COMPLETION OF STAFF HOUSE AT NAGWOILAP DISPENSARY -ALALE WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ALALE |
Ksh 1,000,000 |
Comment
|
| 4572 |
CONSTRUCTION OF KASES STAFF HOUSE-KIWAWAWARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 4573 |
CONSTRUCTION OF WASAT STAFF HOUSE-KIWAWA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 4574 |
CONSTRUCTION OF STAFF HOUSE AT EMBOASIS DISPENSARY -KAPENGURIA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 4575 |
CONSTRUCTION OF STAFF HOUSE AT KAPKAREMBA DISPENSARY- BATEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
BATEI |
Ksh 1,500,000 |
Comment
|
| 4576 |
CONSTRUCTION AND REPAIR OF KASITOT DISPENSARY PIT LATRINES- ALALE WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ALALE |
Ksh 551,000 |
Comment
|
| 4577 |
FENCING,GATE AND PIT LATRINE FOR KALUKUNA DISPENSARY -KAPCHOK WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 700,000 |
Comment
|
| 4578 |
COMPLETION OF KOCHIY DISPENSARY-BATEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
BATEI |
Ksh 800,000 |
Comment
|
| 4579 |
CONSTRUCTION OF LABORATORY AT KIWAWA HEALTH CENTRE-KIWAWA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 4580 |
COMPLETION OF KAURIONG MATERNITY WING-KIWAWA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 4581 |
CONSTRUCTION OF CHEMALTIN DISPENSARY-LELAN WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 4582 |
CONSTRUCTION OF PIT LATRINE AND FENCING OF SOLION DISPENSARY-WEIWEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
WEI WEI |
Ksh 500,000 |
Comment
|
| 4583 |
CONSTRUCTION OF MATERNITY WING AT NAKWIJIT DISPENSARY- KODICH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KODICH |
Ksh 800,000 |
Comment
|
| 4584 |
CONSTRUCTION OF MATERNITY WING AT KISERA -LOMUT WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
LOMUT |
Ksh 1,700,000 |
Comment
|
| 4585 |
CONSTRUCTION OF MORTOME DISPENSARY-MNAGEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
MNAGEI |
Ksh 1,700,000 |
Comment
|
| 4586 |
COMPLETION OF TAMPALAL DISPENSARY- MNAGEI WARD (ONGOING) |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 4587 |
COMPLETION OF KAPROM DISPENSARY -KAPENGURIA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 4588 |
RENOVATION OF CHEPTIYA STAFF HOUSE-BATEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 4589 |
CONSTRUCTION OF MANIAN DISPENSARY LELAN WARD(NEW) |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
LELAN |
Ksh 2,000,000 |
Comment
|
| 4590 |
PURCHASE AND INSTALLATION OF WATER TANK FOR KASES DISPENSARY -KIWAWA |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KIWAWA |
Ksh 400,000 |
Comment
|
| 4591 |
EQUPING OF PTOKOU DISPENSARY-WEIWEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
WEI WEI |
Ksh 700,000 |
Comment
|
| 4592 |
COMPLETION OF PARAYWA MATERNITY WING -SIYOI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SIYOI |
Ksh 300,000 |
Comment
|
| 4593 |
COMPLETION OF OUTPATIENT BLOCK AT KAIBOS DISPENSARY- SIYOI WARD (STALLED) |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SIYOI |
Ksh 400,000 |
Comment
|
| 4594 |
EQUIPING OF KAPRECH DISPENSARY-SIYOI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SIYOI |
Ksh 300,000 |
Comment
|
| 4595 |
EQUIPING OF KRENGOT DISPENSARY(ONGOING)-SIYOI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SIYOI |
Ksh 300,000 |
Comment
|
| 4596 |
CONSTRUCTION OF DISPENSARY AT TORORO-TAPACH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 4597 |
COMPLETION OF SEKUTION DISPENSARY -TAPACH WARD (ONGOING) |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 4598 |
CONSTRUCTION OF NYARPAT DISPENSARY -TAPACH WARD(NEW) |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
TAPACH |
Ksh 2,500,000 |
Comment
|
| 4599 |
CONSTRUCTION OF CHONGIS DISPENSARY-TAPACH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
TAPACH |
Ksh 2,500,000 |
Comment
|
| 4600 |
COMPLETION OF KARAMERI STAFF HOUSE-KODICH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KODICH |
Ksh 500,000 |
Comment
|
| 4601 |
CONSTRUCTION OF PUSIAN DISPENSARY -CHEPARERIA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 4602 |
CONSTRUCTION OF HEALTH CENTER AT CHEPKOBEGH-CHEPARERIA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 4603 |
COMPLETION OF KAPKORIS MATERNITY WING-KAPENGURIA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 300,000 |
Comment
|
| 4604 |
CONSTRUCTION OF KOMOL DISPENSARY -KAPENGURIA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 4605 |
COMPLETION OF ROPONYWO DISPENSARY -KAPENGURIA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4606 |
CONSTRUCTION OF NASURET DISPENSARY-ALALE WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ALALE |
Ksh 2,000,000 |
Comment
|
| 4607 |
CHAINLINK FENCING, GATE AND PIT LATRINE FOR TUWIT DISPENSARY-KAPCHOK WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,300,000 |
Comment
|
| 4608 |
CONSTRUCTION OF PIT LATRINE AT KIWAKAN DISPENSARY -SEKERR WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SEKERR |
Ksh 250,000 |
Comment
|
| 4609 |
COMPLETION OF OF SARMACH DISPENSARY-SEKERR WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,000,000 |
Comment
|
| 4610 |
RENOVATION OF STAFF HOUSE AT SARMACH DISPENSARY-SEKERR WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SEKERR |
Ksh 600,000 |
Comment
|
| 4611 |
COMPLETION OF KIWAKAN DISPENSARY- SEKERR WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SEKERR |
Ksh 500,000 |
Comment
|
| 4612 |
CONSTRUCTION OF PIT LATRINE AT TALON DISPENSARY -SEKERR WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SEKERR |
Ksh 250,000 |
Comment
|
| 4613 |
CONSTRUCTION OF PIT LATRINE AT CHORWA DISPENSARY- SEKERR WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SEKERR |
Ksh 250,000 |
Comment
|
| 4614 |
CONSTRUCTION OF PIT LATRINE AT ORWA DISPENSARY-SEKERR WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SEKERR |
Ksh 300,000 |
Comment
|
| 4615 |
FENCING OF KIWAKAN DISPENSARY-SEKERR WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SEKERR |
Ksh 700,000 |
Comment
|
| 4616 |
ELECRICITY INSTALLATION AT SARMACH DISPENSARY-SEKERR |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SEKERR |
Ksh 340,000 |
Comment
|
| 4617 |
CONSTRUCTION OF KAMKETO DISPENSARY-KASEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KASEI |
Ksh 3,000,000 |
Comment
|
| 4618 |
COMPLETION OF TIYINEI MATERNITY - SUAM WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SUAM |
Ksh 456,000 |
Comment
|
| 4619 |
CONSTRUCTION OF LELMOLO DISPENSARY -KASEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 4620 |
CONSTRUCTION OF CHESUSWON DISPENSARY-KASEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KASEI |
Ksh 2,000,000 |
Comment
|
| 4621 |
FENCING OF KOUR DISPENSARY -KASEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 4622 |
CONSTRUCTION OF CHEPNYAL MATERNITY WING(NEW)-SOOK WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SOOK |
Ksh 2,000,000 |
Comment
|
| 4623 |
PURCHASE AND INSTALLATION OF WATER TANKS AT CHEPNYAL DISPENSARY-SOOK WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SOOK |
Ksh 300,000 |
Comment
|
| 4624 |
CONSTRUCTION OF LABORATORY AT CHEPNYAL DISPENSARY -SOOK WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 4625 |
RENOVATION OF KAPSAIT DISPENSARY MARTENITY-LELAN WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 4626 |
COMPLETION OF STAFF HOUSE AT KONGELAI DISPENSARY-RIWO WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
RIWO |
Ksh 2,879,975 |
Comment
|
| 4627 |
CONSTRUCTIONOF STAFF HOUSE AT LOMUT ANTI-MALARIA DISPENSARY-LOMUT WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
LOMUT |
Ksh 92,304 |
Comment
|
| 4628 |
COMPLETION OF CHEPOTARAMA STAFF HOUSE-RIWO WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
RIWO |
Ksh 376,000 |
Comment
|
| 4629 |
PROPOSED COMPLETION OF STAFF HOUSE AT KONYAO DISPENSARY-KAPCHOK WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 298,500 |
Comment
|
| 4630 |
CONSTRUCTION OF STAFF HOUSE AT KERINGET DISPENSARY-MNAGEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
MNAGEI |
Ksh 33,810 |
Comment
|
| 4631 |
CONSTRUCTION OF MBARA DISPENSARY -SEKERR WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SEKERR |
Ksh 2,500,000 |
Comment
|
| 4632 |
CONSTRUCTION OF STAFF HOUSE AT KIWAKAN DISPENSARY-SEKERR WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SEKERR |
Ksh 1,800,807 |
Comment
|
| 4633 |
COMPLETION OF STAFF HOUSE AT SEBIT DISPENSARY-BATEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 4634 |
CONSTRUCTION OF PIT LATRINE AT KONGELAI MARKET(PENDING BILL)-RIWO WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 4635 |
CONSTRUCTION OF KODONGOU DISPENSARY- MNAGEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
MNAGEI |
Ksh 4,971,722 |
Comment
|
| 4636 |
CONSTRUCTION OF PIT LATRINE AT TAMPALAL DISPENSARY-MNAGEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 4637 |
CONSTRUCTION OF MATERNITY WING AT CHEPTIANGWA DISPENSARY-CHEPARERIA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 1,500,000 |
Comment
|
| 4638 |
CONSTRUCTION OF MATERNITY WING AT YWALATEKE DISPENSARY-CHEPARERIA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 4639 |
CONSTRUCTION OF MATERNITY WING AT PSERUM DISPENSARY-CHEPARERIA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 3,000,000 |
Comment
|
| 4640 |
CONSTRUCTION OF MALE WARD AT TAMKAL DISPENSARY-WEIWEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
WEI WEI |
Ksh 1,000,000 |
Comment
|
| 4641 |
CONSTRUCTION OF CHEPOLET DISPENSARY-ENDUGH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ENDUGH |
Ksh 1,800,000 |
Comment
|
| 4642 |
CONSTRUCTION OF OFMERUR DISPENSARY-ENDUGH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ENDUGH |
Ksh 1,659,656 |
Comment
|
| 4643 |
CONSTRUCTION OF CHEPOKACHIM DISPENSARY-ENDUGH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ENDUGH |
Ksh 1,500,000 |
Comment
|
| 4644 |
CONSTRUCTION OF PIT LATRINE AT CHEPOKACHIM DISPENSARY-ENDUGH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 4645 |
COMPLETION OF KOTIT DISPENSARY-ENDUGH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ENDUGH |
Ksh 4,468,003 |
Comment
|
| 4646 |
CONSTRUCTION OF WARD BLOCK AT SINA DISPENSARY-TAPACH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
TAPACH |
Ksh 2,062,609 |
Comment
|
| 4647 |
CONSTRUCTION OF DISPENSARY AT PTOP-TAPACH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
TAPACH |
Ksh 235,329 |
Comment
|
| 4648 |
CONSTRUCTION OF WARD BLOCK AT TAPACH DISPENSARY-TAPACH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
TAPACH |
Ksh 3,071,219 |
Comment
|
| 4649 |
CONSTRUCTION OF MATERNITY WING AT PARAYON DISPENSARY-TAPACH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 4650 |
COMPLETION OF NYARKULIAN MATERNITY WING BLOCK-TAPACH |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 4651 |
CONSTRUCTION OF KOSITOT DISPENSRAY-LOMUT WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
LOMUT |
Ksh 1,000,000 |
Comment
|
| 4652 |
PROPOSED EXTENSION OF VERANDA AT PTOKOU DISPENSARY-WEIWEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
WEI WEI |
Ksh 203,680 |
Comment
|
| 4653 |
COMPLETION OF KRIICH MATERNITY WING- ENDUGH WARD (ONGOING) |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ENDUGH |
Ksh 2,000,000 |
Comment
|
| 4654 |
COMPLETION OF TUWIT DISPENSARY- KAPCHOK WARD (ONGOING) |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 34,855 |
Comment
|
| 4655 |
CONSTRUCTION OF CHEPKIENY-DISPENSARY LELAN WARD (NEW) |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 4656 |
COMPLETION OF MASOL DISPENSARY-MASOL WARD (ONGOING) |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
MASOL |
Ksh 500,000 |
Comment
|
| 4657 |
PROPSED CONSTRUCTION OF TWIN STAFF HOUSE AT TALON DISPENSARY -SEKERR WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SEKERR |
Ksh 575,572 |
Comment
|
| 4658 |
CONSTRUCTION OF KAPRECH DISPENSARY PIT LATRINE - SIYOI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SIYOI |
Ksh 3,000,000 |
Comment
|
| 4659 |
CONSTRUCTION KRENGOT DISPENSARY PIT LATRINE- SIYOI WARD(ONGOING) |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SIYOI |
Ksh 300,000 |
Comment
|
| 4660 |
COMPLETION OF SHALPOGH DISPENSARY-CHEPARERIA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 1,065,773 |
Comment
|
| 4661 |
COMPLETION OF PROPOI DISPENSARY-CHEPARERIA WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 3,554,555 |
Comment
|
| 4662 |
CONSTRUCTION OF AKIRIAMET DISPENSARY-MASOL WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
MASOL |
Ksh 1,367,250 |
Comment
|
| 4663 |
CONSTRUCTION OF PIT LATRINE AT CHEPOTARAMA DISPENSARY-RIWO WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
RIWO |
Ksh 270,000 |
Comment
|
| 4664 |
CONSTRUCTION OF KRURU DISPENSARY-RIWO WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
RIWO |
Ksh 545,980 |
Comment
|
| 4665 |
CONSTRUCTION AND COMPLETION OF SIMOTWO DISPENSARY-LELAN WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
LELAN |
Ksh 387,937 |
Comment
|
| 4666 |
CONSTRUCTION OF KTOMWONY DISPENSARY - LELAN WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
LELAN |
Ksh 1,777,585 |
Comment
|
| 4667 |
COMPLETION OF POROWO DISPENSARY-LELAN WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
LELAN |
Ksh 1,200,584 |
Comment
|
| 4668 |
COMPLETION OF SOLION DISPENSARY-WEIWEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
WEI WEI |
Ksh 895,857 |
Comment
|
| 4669 |
CONSTRUCTION OF MATERNITY WING AT TALAU DISPENSARY-SIYOI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SIYOI |
Ksh 1,774,550 |
Comment
|
| 4670 |
CONSTRUCTION OF KRENGOT DISPENSARY-SIYOI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SIYOI |
Ksh 3,000,000 |
Comment
|
| 4671 |
COMPLETION OF KATOPOTEN DISPENSARY-KODICH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KODICH |
Ksh 5,000,000 |
Comment
|
| 4672 |
COMPLETION OF PARUA MATERNITY WING-BATEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
BATEI |
Ksh 5,000,000 |
Comment
|
| 4673 |
CONSTRUCTION OF KOTIT DISPENSARY PIT LATRINE-ENDUGH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ENDUGH |
Ksh 400,000 |
Comment
|
| 4674 |
RENOVATION OF KESOT DISPENSARY- ENDUGH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ENDUGH |
Ksh 206,279 |
Comment
|
| 4675 |
CHAINLINK FENCING , GATE,STAFF QUARTERS RENOVATION FOR NGOTUT DISPENSARY -KAPCHOK WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 4676 |
CHAINLINK FENCING , GATE AND STAFF QUARTERS RENOVATION FOR NAPITIRO DISPENSARY-KAPCHOK WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 4677 |
FENCING OF NYANGAITA DISPENSARY-MASOL WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
MASOL |
Ksh 156,484 |
Comment
|
| 4678 |
INSTALLATION OF ELECTRICITY AT KAPRECH DISPENSARY-SIYOI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
SIYOI |
Ksh 50,000 |
Comment
|
| 4679 |
EQUIPING OF SEBIT DISPENSARY-BATEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 4680 |
EQUIPING OF KERELWA DISPENSARY-BATEI WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 4681 |
EQUIPING AND SOLAR INSATALLATION AT TIPET DISPENSARY-ENDUGH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ENDUGH |
Ksh 2,000,000 |
Comment
|
| 4682 |
EQUIPING AND SOLAR INSATALLATION AT TAMARUKWO DISPENSARY-ENDUGH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ENDUGH |
Ksh 2,000,000 |
Comment
|
| 4683 |
EQUIPING AND SOLAR INSATALLATION AT WANYOI DISPENSARY-ENDUGH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ENDUGH |
Ksh 200,000 |
Comment
|
| 4684 |
EQUIPING AND SOLAR INSATALLATION AT KRIICH DISPENSARY-ENDUGH WARD |
HEALTH AND SANITATION |
2020-2021 |
Complete
|
ENDUGH |
Ksh 2,000,000 |
Comment
|
| 4685 |
COMPLETION AND EQUIPING OF MTELO COTTAGES |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 12,210,794 |
Comment
|
| 4686 |
COMPLETION OF LEVELING OF NYARKULIAN PRIMARY SCHOOL-TAPACH |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
TAPACH |
Ksh 2,000,000 |
Comment
|
| 4687 |
PROPOSED LEVELLING OF PLAYING FIELDS AT SIGOR,CHEPARERIA AND RUNO(PENDING BILL) |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
WEIWEI, CHEPARERIA |
Ksh 1,549,398 |
Comment
|
| 4688 |
MAKUTANO STADIUM(PHASE 11) PENDING BILL |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
MNAGEI |
Ksh 687,638 |
Comment
|
| 4689 |
PURCHASE OF TEN TRACTORS FOR COUNTY COMMUNITY SERVICE |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
COUNTY WIDE |
Ksh 35,100,000 |
Comment
|
| 4690 |
ENVIRONMENTAL IMPACT ASSESSMENT (PENDING BILL KOPOCH HOTEL) |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 4691 |
LEVELING OF KAPKUNYUK PRIMARY SCHOOL PLAYING FIELD-LELAN WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 4692 |
LEVELING OF KERELWA PRIMARY FIELD-BATEI WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 4693 |
LEVELLING OF TOTUM PRIMARY SCHOOL -MNAGEI WARD (ONGOING) |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 4694 |
LEVELLING OF GALIB PRIMARY SCHOOL PLAYGROUND MNAGEI WARD (ONGOING) |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 4695 |
LEVELLING OF LOTEPES PLAYING GROUND-KODICH WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
KODICH |
Ksh 1,125,000 |
Comment
|
| 4696 |
SUPPORT OF SPORTS ACTIVITIES - |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 4697 |
SUPPORT OF SPORTS ACTIVITIES-LELAN WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
LELAN |
Ksh 400,000 |
Comment
|
| 4698 |
SUPPORT OF SPORT ACTIVITIES IN ENTIRE WARD-SIYOI WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
SIYOI |
Ksh 500,000 |
Comment
|
| 4699 |
SUPPORT SPORTS ACTIVITIES-ALALE WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
ALALE |
Ksh 300,000 |
Comment
|
| 4700 |
SUPPORT OF YOUTH ACTIVITIES & GAMES -KAPCHOK WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
KAPCHOK |
Ksh 400,000 |
Comment
|
| 4701 |
SUPPORT OF SPORT ACTIVITIES-SUAM WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
SUAM |
Ksh 1,000,000 |
Comment
|
| 4702 |
NAMESET CULTURAL ACTIVITIES-KASEI WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
KASEI |
Ksh 444,638 |
Comment
|
| 4703 |
SUPPORT OF SPORTS ACTIVITIES-KASEI WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
KASEI |
Ksh 500,000 |
Comment
|
| 4704 |
WOMEN AND YOUTH EMPOWERMENT -KASEI WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 4705 |
SUPPORT OF SPORT ACTIVITITY-KIWAWA WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
KIWAWA |
Ksh 600,000 |
Comment
|
| 4706 |
TRAINING AND SUPPORT OF TRADITIONAL DANCERS -KAPENGURIA WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 4707 |
SUPPORT OF SPORTS ACTIVITIES -KAPENGURIA WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,600,000 |
Comment
|
| 4708 |
SUPPORT OF SPORTS ACTIVITIES -LOMUT WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
LOMUT |
Ksh 300,000 |
Comment
|
| 4709 |
SUPPORT OF YOUTH AND SPORTS -RIWO WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 4710 |
SUPPORT FOR YOUTH ACTIVITIES -RIWO WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
RIWO |
Ksh 800,000 |
Comment
|
| 4711 |
SUPPORT OF SPORTS ACTIVITIES-TAPACH WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
TAPACH |
Ksh 500,000 |
Comment
|
| 4712 |
SUPPORT FOR YOUTH SPORTS ACTIVITIES -BATEI WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
BATEI |
Ksh 500,000 |
Comment
|
| 4713 |
SUPPORT OF SPORTS ACTIVITIES-WEIWEI WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
WEI WEI |
Ksh 300,000 |
Comment
|
| 4714 |
SUPPORT OF SPORTS ACTIVITIES-ENDUGH WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
ENDUGH |
Ksh 400,000 |
Comment
|
| 4715 |
SUPPORT OF SPORTS ACTIVITIES IN KODICH- WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
KODICH |
Ksh 600,000 |
Comment
|
| 4716 |
SUPPORT OF YOUTHS SPORTING ACTIVITIES-MASOL WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
MASOL |
Ksh 800,000 |
Comment
|
| 4717 |
SUPPORT OF SPORTS ACTIVITIES-MNAGEI WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 4718 |
PURCHASE AND SUPPLY OF USHANGA MATERIALS -SIYOI WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
SIYOI |
Ksh 100,000 |
Comment
|
| 4719 |
PURCHASE AND SUPPLY OF USHANGA MATERIALS AND TRADITIONAL COSTUMES - BATEI WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
BATEI |
Ksh 900,000 |
Comment
|
| 4720 |
PURCHASE OF USHANGA MATERIALS-ALALE WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
ALALE |
Ksh 300,000 |
Comment
|
| 4721 |
PURCHASE OF UNIFORMS AND CLOTHING - (POLO T SHIRTS) |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
COUNTY |
Ksh 180,000 |
Comment
|
| 4722 |
PURCHASE OF UNIFORMS (KAPENGURIA HEROES AND TARTAR GIRLS) |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
COUNTY |
Ksh 254,000 |
Comment
|
| 4723 |
YOUTH SUPPORT(SPORTS EQUIPMENT’S) PROGRAMME RIWO WARD (NEW) |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
RIWO |
Ksh 500,000 |
Comment
|
| 4724 |
PURCHASE OF GAMES UNIFORMS FOR YOUTHS-MNAGEI WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
MNAGEI |
Ksh 2,900,000 |
Comment
|
| 4725 |
PURCHASE OF UNIFORMS FOR SPORTS -LOMUT WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4726 |
PURCHASE OF SPORTS UNIFORMS-ALALE WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
ALALE |
Ksh 400,000 |
Comment
|
| 4727 |
PURCHASE OF POLO TSHIRTS FOR COUNTY COMMUNITY SERVICE |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
COUNTY |
Ksh 1,750,000 |
Comment
|
| 4728 |
SPECIALIZED DEVICES FOR PLWDS (BOBLEO CHILDREN'S HOME) |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
MNAGEI |
Ksh 450,000 |
Comment
|
| 4729 |
PURCHASE OF IRON SHEETS FOR WOMEN GROUPS(CHESTA,LOMUT AND SOKOTOW WOMEN GROUPS)-LOMUT WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
LOMUT |
Ksh 700,000 |
Comment
|
| 4730 |
PURCHASE OF IRON SHEETS TO SUPPORT VULNERABLE WOMEN-ALALE WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
ALALE |
Ksh 300,000 |
Comment
|
| 4731 |
PURCHASE OF IRON SHEETS FOR VULNERABLE GROUPS -SUAM WARD |
TOURSIM AND CULTURE |
2020-2021 |
Complete
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 4732 |
PROPOSED CONSTRUCTION OF ADMINSTRATION BLOCK FOR MASOL INTERGRATED PROJECT |
FINANCE AND ECONOMIC PLANNING |
2020-2021 |
Complete
|
MASOL |
Ksh 1,000,515 |
Comment
|
| 4733 |
PROPOSED CONSTRUCTION OF CLASSROOM BLOCK FOR MASOL INTERGRATED PROJECT |
FINANCE AND ECONOMIC PLANNING |
2020-2021 |
Complete
|
MASOL |
Ksh 1,575,550 |
Comment
|
| 4734 |
PROPOSED CONSTRUCTION OF HEALTH CENTRE FOR MASOL INTERGRATED PROJECT |
FINANCE AND ECONOMIC PLANNING |
2020-2021 |
Complete
|
MASOL |
Ksh 1,660,738 |
Comment
|
| 4735 |
CONSTRUCTION OF REVENUE SHADES/KIOSKS |
FINANCE AND ECONOMIC PLANNING |
2020-2021 |
Complete
|
LOMUT,CHEPARERIA,LELAN,RIWO,MNAGEI & BATEI |
Ksh 2,669,508 |
Comment
|
| 4736 |
GRAVELLING OF MAKUTANO PARKING AREAS |
FINANCE AND ECONOMIC PLANNING |
2020-2021 |
Complete
|
MNAGEI |
Ksh 1,000,000 |
Comment
|
| 4737 |
CCTV INSTALLATION TREASURY BUILDING(PENDING BILL) |
FINANCE AND ECONOMIC PLANNING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 1,150,000 |
Comment
|
| 4738 |
PURCHASE OF CCTV SYSTEM |
FINANCE AND ECONOMIC PLANNING |
2020-2021 |
Complete
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4739 |
WAKOR IRRIGATION CANAL |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
WEIWEI |
Ksh 499,210 |
Comment
|
| 4740 |
MREL IRRIGATION SCHEME |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
WEIWEI |
Ksh 2,606,051 |
Comment
|
| 4741 |
CERTIFIED CROP SEEDS |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
KAPENGURIA |
Ksh 62,474,197 |
Comment
|
| 4742 |
RIWO FARMERS SUPPORT |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
RIWO |
Ksh 400,000 |
Comment
|
| 4743 |
PURCHASE OF GENERATORS SEKEER |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
SEKEER |
Ksh 500,000 |
Comment
|
| 4744 |
PURCHASE OF SPRAY PUMPS SUAM |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
SUAM |
Ksh 500,000 |
Comment
|
| 4745 |
PURCHASE OF ONION SEEDS BATEI |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
BATEI |
Ksh 1,000,000 |
Comment
|
| 4746 |
PURCHASE OF ONION SEEDS CHEPARERIA |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 4747 |
PURCHASE OF ONION SEEDS LOMUT |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4748 |
PURCHASE OF WATER MELON SEEDS LOMUT |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4749 |
MAIZE SEEDS SUAM |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
SUAM |
Ksh 400,000 |
Comment
|
| 4750 |
FARMERS EMPOWERMENT THROUGH SEEDLINGS |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
WEIWEI |
Ksh 3,000,000 |
Comment
|
| 4751 |
PURCHASE OF SEEDS FOR FARMERS KAPENGURIA |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
KAPENGURIA |
Ksh 200,000 |
Comment
|
| 4752 |
MASOL IRRIGATION PIPING |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
MASOL |
Ksh 1,999,540 |
Comment
|
| 4753 |
PAROO FURROW |
AGRICULTURE AND IRRIGATION |
2019-2020 |
|
WEIWEI |
Ksh 699,760 |
Comment
|
| 4754 |
MAKUTANO PUBLIC TOILET |
FINANCE AND ECONOMIC PLANNING |
2019-2020 |
|
MNAGEI |
Ksh 3,018,686 |
Comment
|
| 4755 |
COUNTY TREASURY PIT LATRINE |
FINANCE AND ECONOMIC PLANNING |
2019-2020 |
|
KAPENGURIA |
Ksh 1,794,253 |
Comment
|
| 4756 |
COUNTY TREASURY BUILDING |
FINANCE AND ECONOMIC PLANNING |
2019-2020 |
|
KAPENGURIA |
Ksh 9,147,232 |
Comment
|
| 4757 |
COUNTY TREASURY GENERATOR |
FINANCE AND ECONOMIC PLANNING |
2019-2020 |
|
KAPENGURIA |
Ksh 1,996,000 |
Comment
|
| 4758 |
REVENUE SYSTEM |
FINANCE AND ECONOMIC PLANNING |
2019-2020 |
|
KAPENGURIA |
Ksh 6,500,000 |
Comment
|
| 4759 |
LIAISON OFFICE P |
COUNTY EXECUTIVE |
2019-2020 |
|
KAPENGURIA |
Ksh 950,000 |
Comment
|
| 4760 |
KARENGER DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 4761 |
LETWA DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SOOK |
Ksh 500,000 |
Comment
|
| 4762 |
KARENGER DISPENSARY STAFF HOUSE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
RIWO |
Ksh 3,000,000 |
Comment
|
| 4763 |
KCRH ELECTRICAL CABLE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 1,033,001 |
Comment
|
| 4764 |
KCRH ISOLATION WARD |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 2,686,136 |
Comment
|
| 4765 |
KCRH CASUALTY PIT LATRINE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 1,000,000 |
Comment
|
| 4766 |
KACHELIBA DRUG STORE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SUAM |
Ksh 2,798,207 |
Comment
|
| 4767 |
KACHELIBA HOSPITAL TOILETS |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SUAM |
Ksh 599,670 |
Comment
|
| 4768 |
SIGOR SUBCOUNTY HOSPITAL TOILETS |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
WEIWEI |
Ksh 354,000 |
Comment
|
| 4769 |
KCRH PUBLIC TOILET AND WASHROOM |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 300,000 |
Comment
|
| 4770 |
KACHELIBA EYE UNIT |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SUAM |
Ksh 1,500,000 |
Comment
|
| 4771 |
MATERNITY THEATRE RENOVATION |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 3,974,021 |
Comment
|
| 4772 |
WARD ONE RENOVATION |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 3,982,512 |
Comment
|
| 4773 |
WARD TWO RENOVATION |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 3,993,899 |
Comment
|
| 4774 |
KAPENGURIA WARD 4 REVOVATION |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 3,581,076 |
Comment
|
| 4775 |
DOCTORS LOUNGE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 1,500,000 |
Comment
|
| 4776 |
EIA |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 2,508,039 |
Comment
|
| 4777 |
KCRH BOUNDARY WALL |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 2,000,000 |
Comment
|
| 4778 |
CASUALITY LEVELLING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 2,500,000 |
Comment
|
| 4779 |
KACHELIBA HOSPITAL PLUMBING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SUAM |
Ksh 498,452 |
Comment
|
| 4780 |
KCRH ELECTRICAL DISTRIBUTION BOARD |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 4,599,400 |
Comment
|
| 4781 |
CHEPTRAM DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
ENDUGH |
Ksh 900,000 |
Comment
|
| 4782 |
CHEWARANY DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
ENDUGH |
Ksh 300,000 |
Comment
|
| 4783 |
AUSKION DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
RIWO |
Ksh 300,000 |
Comment
|
| 4784 |
KRURU DISPENSARY PIT LATRINE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
RIWO |
Ksh 300,000 |
Comment
|
| 4785 |
KAPRECH DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SIYOI |
Ksh 50,000 |
Comment
|
| 4786 |
PTOKOU DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
WEIWEI |
Ksh 249,650 |
Comment
|
| 4787 |
TUWITDISPENSARY TWIN STAFF HOUSE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPCHOK |
Ksh 219,926 |
Comment
|
| 4788 |
PSERUM MATERNITY WING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
CHEPARERIA |
Ksh 2,000,000 |
Comment
|
| 4789 |
KESOT DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
ENDUGH |
Ksh 406,279 |
Comment
|
| 4790 |
CHEPOKACHIM DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
ENDUGH |
Ksh 2,317,019 |
Comment
|
| 4791 |
NAKWIJIT MATERNITY WING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPCHOK |
Ksh 600,000 |
Comment
|
| 4792 |
CHEPSUKUN DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPCHOK |
Ksh 1,697,851 |
Comment
|
| 4793 |
TUWIT DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 4794 |
KOSITOT DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
LOMUT |
Ksh 600,000 |
Comment
|
| 4795 |
KAPRECH DISPENSARY PIT LATRINE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SIYOI |
Ksh 300,000 |
Comment
|
| 4796 |
TIYINEI MATERNITY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SUAM |
Ksh 200,000 |
Comment
|
| 4797 |
KANYERUS STAFF HOUSE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SUAM |
Ksh 850,000 |
Comment
|
| 4798 |
SINA DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
TAPACH |
Ksh 2,677,182 |
Comment
|
| 4799 |
PTOP DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
TAPACH |
Ksh 2,132,895 |
Comment
|
| 4800 |
TAPACH DISPENSARY WARD |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
TAPACH |
Ksh 2,114,673 |
Comment
|
| 4801 |
PARAYON MATERNITY WARD |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
TAPACH |
Ksh 1,000,000 |
Comment
|
| 4802 |
STAFF HOUSESAT CHEPTRAM |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
ENDUGH |
Ksh 1,548,800 |
Comment
|
| 4803 |
KOTIT DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
ENDUGH |
Ksh 1,253,583 |
Comment
|
| 4804 |
MERUR DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
ENDUGH |
Ksh 1,723,710 |
Comment
|
| 4805 |
CHEPOLET DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
ENDUGH |
Ksh 914,286 |
Comment
|
| 4806 |
KISERA MATERNITY WING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
LOMUT |
Ksh 1,700,000 |
Comment
|
| 4807 |
SHALPOGH DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
CHEPARERIA |
Ksh 1,099,472 |
Comment
|
| 4808 |
PROPOI DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
CHEPARERIA |
Ksh 791,525 |
Comment
|
| 4809 |
KODONG'OU DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
MNAGEI |
Ksh 2,471,721 |
Comment
|
| 4810 |
ANNET MATERNITY WING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
LOMUT |
Ksh 249,775 |
Comment
|
| 4811 |
PUSOL DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
BATEI |
Ksh 2,090,169 |
Comment
|
| 4812 |
PARUA MATERNITY WING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
BATEI |
Ksh 1,016,538 |
Comment
|
| 4813 |
SOBUKWO DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
BATEI |
Ksh 211,090 |
Comment
|
| 4814 |
SEBIT DISPENSARY STAFF HOUSES |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
BATEI |
Ksh 2,301,512 |
Comment
|
| 4815 |
COMPLETION OF CHEPOTARAMA STAFF HOUSE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
RIWO |
Ksh 1,400,000 |
Comment
|
| 4816 |
CHEPOTARAMA DISPENSARY PIT LATRINE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
RIWO |
Ksh 270,000 |
Comment
|
| 4817 |
CHEMAKEW DISPENSARY TOILETS |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
RIWO |
Ksh 30,000 |
Comment
|
| 4818 |
KRURU DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
RIWO |
Ksh 1,613,772 |
Comment
|
| 4819 |
KONYAO DISPENSARY STAFF HOUSE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPCHOK |
Ksh 298,500 |
Comment
|
| 4820 |
CHEPTIANGWA MATERNITY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
CHEPARERIA |
Ksh 417,180 |
Comment
|
| 4821 |
YWALATEKE GENERAL WARD ELECTRICAL WORKS |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
CHEPARERIA |
Ksh 448,235 |
Comment
|
| 4822 |
SIMOTWO DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
LELAN |
Ksh 1,301,832 |
Comment
|
| 4823 |
KTOMWONY DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
LELAN |
Ksh 2,848,071 |
Comment
|
| 4824 |
POROWO DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
LELAN |
Ksh 2,600,584 |
Comment
|
| 4825 |
CHEPUNGON DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
LELAN |
Ksh 4,449,637 |
Comment
|
| 4826 |
ONOCH DISPENSARY STAFF HOUSES |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
WEIWEI |
Ksh 646,320 |
Comment
|
| 4827 |
PTOKOU DISPENSARY PIT LATRINE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
WEIWEI |
Ksh 50,350 |
Comment
|
| 4828 |
PTOKOU DISPENSARY EQUPING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
WEIWEI |
Ksh 700,000 |
Comment
|
| 4829 |
TAMKAL DISPENSARY MALE WARD |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
WEIWEI |
Ksh 1,311,364 |
Comment
|
| 4830 |
SOLION DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
WEIWEI |
Ksh 895,857 |
Comment
|
| 4831 |
PSIGIRIO DISPENSARY STAFF HOUSES |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
MNAGEI |
Ksh 1,695,470 |
Comment
|
| 4832 |
KERINGET DISPENSARY STAFF HOUSES |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
MNAGEI |
Ksh 577,900 |
Comment
|
| 4833 |
TAPACH DISPENSARY STAFF HOUSE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
TAPACH |
Ksh 380,600 |
Comment
|
| 4834 |
KIWAKAN DISPENSARY STAFF HOUSES |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SEKEER |
Ksh 1,642,807 |
Comment
|
| 4835 |
TALON DISPENSARYSTAFF HOUSES |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SEKEER |
Ksh 467,070 |
Comment
|
| 4836 |
TALAUDISPENSARY MATERNITY WING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SIYOI |
Ksh 3,819,978 |
Comment
|
| 4837 |
KAIBOS HEALTH CENTRE MATERNITY WING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SIYOI |
Ksh 1,783,000 |
Comment
|
| 4838 |
KRENGOT DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SIYOI |
Ksh 1,089,829 |
Comment
|
| 4839 |
KASITOT DISPENSARY PIT LATRINES |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
ALALE |
Ksh 395,328 |
Comment
|
| 4840 |
NAKWOILAP DISPENSARY PIT LATRINES |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
ALALE |
Ksh 500,000 |
Comment
|
| 4841 |
OROLWO DISPENSARY MATERNITY WING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPCHOK |
Ksh 772,573 |
Comment
|
| 4842 |
MBARU DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KIWAWA |
Ksh 700,000 |
Comment
|
| 4843 |
KARAMERI DISPENSARY URINAL BLOCK |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
KAPCHOK |
Ksh 1,200,000 |
Comment
|
| 4844 |
KANGLIKWAN DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 4845 |
TAPACH DISPENSARY |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
TAPACH |
Ksh 460,300 |
Comment
|
| 4846 |
KALEMREKAI DISPENSARY RENOVATION |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
RIWO |
Ksh 1,000,000 |
Comment
|
| 4847 |
LENGOROK DISPENSARY FENCING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
ALALE |
Ksh 200,000 |
Comment
|
| 4848 |
NYANGAITA DISPENSARY FENCING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
MASOL |
Ksh 150,000 |
Comment
|
| 4849 |
KAPRECH DISPENSARY FURNITURE |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SIYOI |
Ksh 300,000 |
Comment
|
| 4850 |
CHORWA DISPENSARY SOLAR INSTALLATION |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SEKEER |
Ksh 300,000 |
Comment
|
| 4851 |
ALON DISPENSARY EQUIPPING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SEKEER |
Ksh 150,000 |
Comment
|
| 4852 |
ORWA DISPENSARYEQUIPING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SEKEER |
Ksh 350,000 |
Comment
|
| 4853 |
KIWAKAN DISPENSARY EQUIPING |
HEALTH, SANITATION AND EMERGENCY SERVICES |
2019-2020 |
|
SEKEER |
Ksh 500,000 |
Comment
|
| 4854 |
KAPERUR RIVER BOX CULVERT |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SIYOI |
Ksh 5,941,900 |
Comment
|
| 4855 |
LOPSIMORU ROAD BACKFILLING AND GRADING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
RIWO |
Ksh 271,001 |
Comment
|
| 4856 |
TALAU BONDENI ROAD TWIN BOX CULVERT |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SIYOI |
Ksh 5,951,815 |
Comment
|
| 4857 |
ORTUM MARR SUSPENDED FOOTBRIDGE |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
BATEI |
Ksh 1,941,167 |
Comment
|
| 4858 |
ONOCH FOOTBRIDGE IMPROVEMENT |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
BATEI |
Ksh 2,003,810 |
Comment
|
| 4859 |
KATIPOROT CULVERTS |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SUAM |
Ksh 299,454 |
Comment
|
| 4860 |
CHEPKOPEGH-NAKWIJIT-KESOT-KAPKATA ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SOOK |
Ksh 1,795,680 |
Comment
|
| 4861 |
CHEPTUYA-CHEPKOGHY-OLOKORNOI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
RIWO |
Ksh 3,000,000 |
Comment
|
| 4862 |
KAMELEI-KAPUSIEN ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
TAPACH |
Ksh 2,000,000 |
Comment
|
| 4863 |
KOTIT—CHEPNYAL-KOLA-TUNOYO ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SOOK |
Ksh 4,000,000 |
Comment
|
| 4864 |
CHEPTOKOL-KOKWORITIT-KAPATET ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LOMUT |
Ksh 4,000,000 |
Comment
|
| 4865 |
LOMUT-ANNET-KATIUT-CHEPKOKOGH-OTIOT-MARUS ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LOMUT |
Ksh 4,000,000 |
Comment
|
| 4866 |
SHALPOGH-CHEMOTONG |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
BATEI |
Ksh 3,000,000 |
Comment
|
| 4867 |
KABICHBICH-SIMOTWO-MOTPOKOR ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 5,000,000 |
Comment
|
| 4868 |
WEIWEI-TAMKAL-SOLION-KAPUSIEN ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 4,000,000 |
Comment
|
| 4869 |
WAKOR-KOKWOTENDWO-NYARPAT ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 8,000,000 |
Comment
|
| 4870 |
SIGOR-AKIRIAMET-AMOLEM ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 2,000,000 |
Comment
|
| 4871 |
KAMLA-MBARU-KASEI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KASEI |
Ksh 3,000,000 |
Comment
|
| 4872 |
KIWAWA-KATUMKALE-NANGOLESINYON-KALODEKE ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KIWAWA |
Ksh 3,000,000 |
Comment
|
| 4873 |
KACHELIBA-KANYERUS ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SUAM |
Ksh 2,500,000 |
Comment
|
| 4874 |
NGOTUT-KAMKETO-KASEI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KASEI |
Ksh 4,000,000 |
Comment
|
| 4875 |
CHEPKOGHIN-SOSTIN-MBARA-KAPORO ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SEKEER |
Ksh 8,000,000 |
Comment
|
| 4876 |
SERETOW-CHEPTYA-SAMOR ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
BATEI |
Ksh 4,000,000 |
Comment
|
| 4877 |
CHEPKECHIR-KOPOCH ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPENGURIA |
Ksh 4,448,180 |
Comment
|
| 4878 |
TRANZOIA BORDER-KARENGER-KANYRKWAT ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 4879 |
ORTUM-SOBUKWO-EMBOUGH-SAPAI-KRIICH-RERES ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
BATEI |
Ksh 8,000,000 |
Comment
|
| 4880 |
KASEI-APETA-KOWUR-OMBOLION ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KASEI |
Ksh 7,000,000 |
Comment
|
| 4881 |
WOYAKOL-KALAPATA-LODWARR-APUKE ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ALALE |
Ksh 6,000,000 |
Comment
|
| 4882 |
YWALATEKE-MOKOYON-KAPTABUK-SARAMEE ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 5,000,000 |
Comment
|
| 4883 |
CHEPKONOCHOROKSOWERWO ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 3,000,000 |
Comment
|
| 4884 |
NAKWAPUOCHERANGANNAKWIJIT ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 3,000,000 |
Comment
|
| 4885 |
CHEPKOBEGH-PONGONG ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
CHEPARERIA |
Ksh 3,000,000 |
Comment
|
| 4886 |
KIPAT-CHORWAI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 2,000,000 |
Comment
|
| 4887 |
CHEPARERIA-CHEPTURNGUNY ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
CHEPARERIA |
Ksh 3,000,000 |
Comment
|
| 4888 |
KAPCHILA-CHOROK-RINGRING-CHESUBET ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 5,000,000 |
Comment
|
| 4889 |
CHEPARERIA BOX CULVERT |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
CHEPARERIA |
Ksh 5,000,000 |
Comment
|
| 4890 |
TIPPET-KUDONGOLE-CHEPOKACHIM ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ENDUGH |
Ksh 5,000,000 |
Comment
|
| 4891 |
KONA-SAPULMOI-NGOLEKEN-CHEPTULEL PRIMARY CHESEGON ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LOMUT |
Ksh 3,000,000 |
Comment
|
| 4892 |
KANYARKWAT-SUAM-KAPETAKINEI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
RIWO |
Ksh 3,000,000 |
Comment
|
| 4893 |
KABICHBICH-KAPKUNYUK-LAIN ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 3,000,000 |
Comment
|
| 4894 |
KIPAT-CHORWAI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 2,000,000 |
Comment
|
| 4895 |
SINA-PTOP – TAPACH ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
TAPACH |
Ksh 2,599,000 |
Comment
|
| 4896 |
KACHELIBA-KANYERUS ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SUAM |
Ksh 4,251,539 |
Comment
|
| 4897 |
KISHAUNET –TARTAR ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MNAGEI |
Ksh 1,600,000 |
Comment
|
| 4898 |
NGENGENCH - KAPETAKINEI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SUAM |
Ksh 631,040 |
Comment
|
| 4899 |
LOMUT – ANNET - KATIUTO - TIOT - MARUS ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LOMUT |
Ksh 4,470,613 |
Comment
|
| 4900 |
ORTUM - SOBUKWO - PSAPAI - KRICH ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
BATEI |
Ksh 668,947 |
Comment
|
| 4901 |
CHEPOKACHIM ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ENDUGH |
Ksh 350,000 |
Comment
|
| 4902 |
KASES-CHEPOKACHIM ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ENDUGH |
Ksh 350,000 |
Comment
|
| 4903 |
RERES-CHEPOKACHIM ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ENDUGH |
Ksh 350,000 |
Comment
|
| 4904 |
KUDUNGOLE-CHEPOKACHIM ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ENDUGH |
Ksh 350,000 |
Comment
|
| 4905 |
KAARON-MURIOKUPOI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ALALE |
Ksh 400,000 |
Comment
|
| 4906 |
AMAKURIAT-LONGOLEMOR ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ALALE |
Ksh 250,000 |
Comment
|
| 4907 |
CHEMIYIN-SASAK SLAB |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ALALE |
Ksh 500,000 |
Comment
|
| 4908 |
CHEMULUNJO-KISIAMOI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ALALE |
Ksh 750,000 |
Comment
|
| 4909 |
KOSAMUK-SASAK ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ALALE |
Ksh 1,000,000 |
Comment
|
| 4910 |
ORON CHEPSEPIN ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ALALE |
Ksh 500,000 |
Comment
|
| 4911 |
KOCHIY-CHESIMAYA ROAD OPENING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
BATEI |
Ksh 300,000 |
Comment
|
| 4912 |
LULWO-PTARKONG ROAD MAINTENANCE |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
BATEI |
Ksh 260,000 |
Comment
|
| 4913 |
CHEPKARARAT-LULWO CENTRE KWANZA ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
BATEI |
Ksh 400,000 |
Comment
|
| 4914 |
CHIPAGH KUTUNG ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
BATEI |
Ksh 600,000 |
Comment
|
| 4915 |
SEBIT-CHEPOKORIONG-KAPKAREMBA ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
BATEI |
Ksh 300,000 |
Comment
|
| 4916 |
PUSIAN-CHEPKOPEGH ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
CHEPARERIA |
Ksh 1,500,000 |
Comment
|
| 4917 |
KAPROMTIN PLELAKAN PSERUMKANYIKENY ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
CHEPARERIA |
Ksh 2,000,000 |
Comment
|
| 4918 |
CHEPARERIA WARD ROADS MAINTAINANCE |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 4919 |
CHEPARERIA-CHEMARMAR-KORELACH PARAK ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
CHEPARERIA |
Ksh 3,000,000 |
Comment
|
| 4920 |
CHEPTRAM-MOMORO ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ENDUGH |
Ksh 2,800,000 |
Comment
|
| 4921 |
PSAPAI-KRIICH-MOMOROWO ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ENDUGH |
Ksh 1,200,000 |
Comment
|
| 4922 |
LOKICHAR RERETIANG ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 500,000 |
Comment
|
| 4923 |
LOKELIAN LOKITEDEL ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 600,000 |
Comment
|
| 4924 |
CHEPSKIN-KALEMNGOROK ROAD DESTUMPING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 600,000 |
Comment
|
| 4925 |
CHEMATCHOR-KODICH ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 805,000 |
Comment
|
| 4926 |
MARICHORR-CHERANGAN ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 350,000 |
Comment
|
| 4927 |
MITINGI LOSILONG ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 4928 |
APIRKI-CHEPTUYIS ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 4929 |
LOMADA DYKE ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 4930 |
TOPULUL ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 4931 |
APINIPIN ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4932 |
MLIMANI ROAD MAITENANCE |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 4933 |
BUSH CLEARING OF MADING PRIMARYMAIN ROAD (NEW |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 398,000 |
Comment
|
| 4934 |
BUSH CLEARING AT KODERANGOTUTAMALER ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 300,000 |
Comment
|
| 4935 |
BUSH CLAERING AT KAA LOTAKA, KASES,MANAKRAR SUAM KAPCHOK ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 394,000 |
Comment
|
| 4936 |
BUSH CLEARING AT KAPLES TO KOTULPOGH (NEW |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 990,000 |
Comment
|
| 4937 |
DOZER WORKS AT NGOTUTAMALER ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 1,500,000 |
Comment
|
| 4938 |
BUSH CLEARING AT LOKWALOIKAMBI NDEGE ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 1,200,000 |
Comment
|
| 4939 |
ROAD CLEARING OF LOKITEDELDINGDINGA |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 358,000 |
Comment
|
| 4940 |
GRADING OF MOINOI CHUWAI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KIWAWA |
Ksh 1,000,000 |
Comment
|
| 4941 |
REMOVAL OF LOGS IN MOGENNGONGOSOWON ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KIWAWA |
Ksh 500,000 |
Comment
|
| 4942 |
BUSH CLEARING OF LOWOIKATUKURULOKITEDEL ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KIWAWA |
Ksh 900,000 |
Comment
|
| 4943 |
BUSH CLEARING OF PILILLOPET ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KIWAWA |
Ksh 500,000 |
Comment
|
| 4944 |
BUSH CLEARING OF KOSIRMIT SONGOLOL ROAD(ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KIWAWA |
Ksh 550,000 |
Comment
|
| 4945 |
BUSH CLEARING OF NANGOLESINYON AKORKEYA ROAD(ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KIWAWA |
Ksh 600,000 |
Comment
|
| 4946 |
PLALANGLINGAMOI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 200,000 |
Comment
|
| 4947 |
KAMONGES KAMURUKU ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 300,000 |
Comment
|
| 4948 |
MANUAL RESHAPING OF TACHIT KUDOKI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 100,000 |
Comment
|
| 4949 |
AUCTIONCHEPKOWOT |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 500,000 |
Comment
|
| 4950 |
TOROTWO - KAYEMIT ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 1,000,000 |
Comment
|
| 4951 |
KAKOKOYOSINGOROKOI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 200,000 |
Comment
|
| 4952 |
CHEPYECHMUTPTUNYONY ROAD LELAN ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 500,000 |
Comment
|
| 4953 |
KTOMWONY DISPCHEPTUPON K ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 200,000 |
Comment
|
| 4954 |
INSTALLATION OF CULVERTS AT KADEO KAMWINO ROAD (REPAIR) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MNAGEI |
Ksh 200,000 |
Comment
|
| 4955 |
GRAVELLING CHAPUCHAPUMATHARE ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MNAGEI |
Ksh 250,000 |
Comment
|
| 4956 |
KANGLIKWAN ROAD BUSH CLEARING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MNAGEI |
Ksh 164,319 |
Comment
|
| 4957 |
GRAVELLING TOTUMTILAK ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MNAGEI |
Ksh 300,000 |
Comment
|
| 4958 |
GRAVELLING NDURURU ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MNAGEI |
Ksh 300,000 |
Comment
|
| 4959 |
B.C.F.C. LITYEI KIDE ROAD MANUAL WORK |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MNAGEI |
Ksh 200,000 |
Comment
|
| 4960 |
TOTUM LOKIRIMO ROAD MANUAL WORK |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MNAGEI |
Ksh 200,000 |
Comment
|
| 4961 |
NANGROTUM PSIRWO ROAD (1KM) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MNAGEI |
Ksh 200,000 |
Comment
|
| 4962 |
BUSH CLEARING CHEMERNYANG CARLOS ROAD MANUAL WORK |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MNAGEI |
Ksh 100,000 |
Comment
|
| 4963 |
BUSH CLEARING SURUMBEN KAMARIAN ROAD (ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MASOL |
Ksh 500,000 |
Comment
|
| 4964 |
LORACH KATANGUN BUSH CLEARINGMASOOL WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MASOL |
Ksh 594,000 |
Comment
|
| 4965 |
KIUSONPOTAKAL AKULO BUSH CLEARING MASOOL WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MASOL |
Ksh 300,000 |
Comment
|
| 4966 |
ROAD GRADING ATSIMBOOL SURUMBENMASSOL WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MASOL |
Ksh 500,000 |
Comment
|
| 4967 |
BUSH CLEARING RUNOSAMAKITUK MAS0L WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MASOL |
Ksh 540,000 |
Comment
|
| 4968 |
NYANGAITA SEKEROT BUSH CLEARINGMASOOL WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MASOL |
Ksh 500,000 |
Comment
|
| 4969 |
BUSH CLEARING CHENAMPAKOSHOLOI ROAD (ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MASOL |
Ksh 500,000 |
Comment
|
| 4970 |
BUSH CLEARING TAKAIYWA(ONGOING ) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MASOL |
Ksh 500,000 |
Comment
|
| 4971 |
TILAKAI - CHEMSTO ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LOMUT |
Ksh 500,000 |
Comment
|
| 4972 |
GRADING OF SITOTKACHUMAKINEI ROADSOOK WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SOOK |
Ksh 1,000,000 |
Comment
|
| 4973 |
MANUAL & RESHAPING OF KAPKOMOLOITOKWEN ROAD SOOK WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SOOK |
Ksh 300,000 |
Comment
|
| 4974 |
COMPLETION OF KAPOROSARMACH ROAD SEKERR WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SOOK |
Ksh 300,000 |
Comment
|
| 4975 |
MANUAL RESHAPING OF MARINYRUK ROAD SEKERR WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SEKEER |
Ksh 400,000 |
Comment
|
| 4976 |
OPENING OF ARAPMAKETKIPKORINYA ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SIYOI |
Ksh 2,500,000 |
Comment
|
| 4977 |
TALAU CHEPKOTI KAPLAIN TWO LINE CURLVERTS |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SIYOI |
Ksh 500,000 |
Comment
|
| 4978 |
TALAU CHEPKOTI KAPLAIN GRAVELLIN |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SIYOI |
Ksh 500,000 |
Comment
|
| 4979 |
ROAD MAINTENANCE ENTIRE WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SUAM |
Ksh 1,000,000 |
Comment
|
| 4980 |
NAKUYENLOYONG'ONGKOKWOCHAYA ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SUAM |
Ksh 800,000 |
Comment
|
| 4981 |
RESHAPING OF PCHOTOIPILIL ROAD (ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
TAPACH |
Ksh 400,000 |
Comment
|
| 4982 |
RESHAPING AND BUSH CLEARING OF KAMELEITOMKOSOEAN ROAD (ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
TAPACH |
Ksh 400,000 |
Comment
|
| 4983 |
RESHAPING OF CHELALSAWARITMWOTOT ROAD (ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
TAPACH |
Ksh 500,000 |
Comment
|
| 4984 |
RESHAPING OF KOKWOPSISMARANGARPTOP ROAD(ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
TAPACH |
Ksh 400,000 |
Comment
|
| 4985 |
RESHAPING OF AMSOSION NYARPAT(ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
TAPACH |
Ksh 200,000 |
Comment
|
| 4986 |
KAIPAWASLOSA CHONGIS |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
TAPACH |
Ksh 400,000 |
Comment
|
| 4987 |
KITAIMA ROAD MAINTENANCE |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
TAPACH |
Ksh 250,000 |
Comment
|
| 4988 |
SANGAT YAN YAN ROAD AT (ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 4989 |
KOKWOTENDWO KOLOU ROAD (ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 4990 |
MAINTANANCE OF MAR SOKA ROAD (ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 4991 |
SOKA IYON ROAD (BUSH CLEARING AND RESHAPING) (ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 4992 |
ONOCH CHEPTONGOGHIO ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 4993 |
KALAM TAKAR ROAD (ONGOING) |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 4994 |
SKAK TOSUKNIO ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 4995 |
MNOKOKOWO NGAROR ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 4996 |
SASACH KOKWOSOSION ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 4997 |
SOLION POITO ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 4998 |
YAN YAN KAKAWA ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 4999 |
ROAD OPENING OF TOKOUGHKAPTARKACH TINGIRICH ROAD ONGOING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KASEI |
Ksh 1,500,000 |
Comment
|
| 5000 |
BUSH CLEARING OF NARIWOMORU KAPLON ROAD NEWKASE WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 5001 |
TOKOS KOTIT ROAD NEW |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KASEI |
Ksh 1,000,000 |
Comment
|
| 5002 |
MAINTENANCE OF KASAKATAKAR ROADKASEI |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KASEI |
Ksh 600,000 |
Comment
|
| 5003 |
ROAD OPENING OF CHEPTADAGH ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KASEI |
Ksh 1,202,282 |
Comment
|
| 5004 |
MISTIN TOO SESSEN ROAD ONGOING |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KASEI |
Ksh 250,000 |
Comment
|
| 5005 |
KAPSINTOI CHEPNYARAT ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KASEI |
Ksh 200,000 |
Comment
|
| 5006 |
KOKWO OROLWOKAMNONGOWO ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KASEI |
Ksh 400,000 |
Comment
|
| 5007 |
IMPROVEMENT AND MAINTENANCE WORKS AT SEBIT CHEPKORIONGKAPKAREMBA RDBATEI WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SEKEER |
Ksh 1,495,472 |
Comment
|
| 5008 |
IMPROVEMENT AND MAINTANANCE WORKS:PTARKONGPARUA ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
BATEI |
Ksh 998,420 |
Comment
|
| 5009 |
IMPROVEMENT AND MAINTANANCE WORKS KAPKATATIPETKUDUNGOLE ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
BATEI |
Ksh 3,000,166 |
Comment
|
| 5010 |
IMPROVEMENT / MAINTAINANCE WORKS AT KALUKUNATUWIT ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
ENDUGH |
Ksh 534,901 |
Comment
|
| 5011 |
PROVISION OF DOZER WORKS(MUNGATTEMOW ROAD,KODERAMARAKA ROAD,CHEMELINYSINA ROAD,SAMICH TEMURWO ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 4,709,470 |
Comment
|
| 5012 |
IMPROVEMENT AND MAINTANANCE WORKS: KAMLAAKIRIAMETROAD. |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KIWAWA |
Ksh 1,099,216 |
Comment
|
| 5013 |
IMPROVEMENT AND MAINTANANCE WORKS:AKIRIAMETMBARU ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KIWAWA |
Ksh 900,000 |
Comment
|
| 5014 |
IMPROVEMENT AND MAINTANANCE WORKS:KAINGENY ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KIWAWA |
Ksh 999,688 |
Comment
|
| 5015 |
GRADING AT AKIRIAMET MBARU ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KIWAWA |
Ksh 918,140 |
Comment
|
| 5016 |
IMPROVEMENT AND MAINTANANCE WORKS:OROLWOKOMPASS ROADKODICH WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 362,888 |
Comment
|
| 5017 |
IMPROVEMENT AND MAINTANANCE WORKS: LOKIKALAS ROAD. |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPCHOK |
Ksh 139,000 |
Comment
|
| 5018 |
IMPROVEMENT AND MAINTAINANCE WORKS AT SSCHEPKAPECHAKROADKAPENGURIA WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPENGURIA |
Ksh 999,768 |
Comment
|
| 5019 |
CULVERT INSTALLATION AND GABIONS AT ROPONYWOKAPENGURIA WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPENGURIA |
Ksh 999,006 |
Comment
|
| 5020 |
IMPROVEMENT AND MAINTENANCE WORKS AT KENDAGOR –KAPKAW ROADKAPENGURIA WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
KAPENGURIA |
Ksh 517,244 |
Comment
|
| 5021 |
IMPROVEMENT AND MAINTANANCE WORKS FOR SOWORWOCHOROK ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 493,232 |
Comment
|
| 5022 |
IMPROVEMENT AND MAINTANANCE WORKS:PSUKUNOCHESUSWON ROADLELAN WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 1,186,970 |
Comment
|
| 5023 |
IMPROVEMENT AND MAINTANANCE WORKS: KAPTABUKSINGOROKOIKAMKULROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
LELAN |
Ksh 1,999,654 |
Comment
|
| 5024 |
IMPROVEMENT AND MAINTAINANCE WORKS FOR CHEPOSAIT ROADMNAGEI WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MNAGEI |
Ksh 299,744 |
Comment
|
| 5025 |
IMPROVEMENT AND MAINTANANCE WORKS:PSIGIRIOTOMKOKALYA ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MNAGEI |
Ksh 443,816 |
Comment
|
| 5026 |
PROVISION OF DOZER WORKS AT MAKUTANOKISHAUNET ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
MNAGEI |
Ksh 899,455 |
Comment
|
| 5027 |
IMPROVEMENT AND MAINTAINANCE WORKS FOR RAILAMERIESE ROADRIWO WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
RIWO |
Ksh 1,399,939 |
Comment
|
| 5028 |
SLAB INSTALLATION AT SEKORIOT |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
RIWO |
Ksh 499,264 |
Comment
|
| 5029 |
IMPROVEMENT AND MAINTENANCE WORKS AT RAILACHEPKRAM ROADRIWO WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
RIWO |
Ksh 499,728 |
Comment
|
| 5030 |
ROAD MAINTANANCE OF KITALAKAPELLODUPUP ROADRIWO WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
RIWO |
Ksh 999,456 |
Comment
|
| 5031 |
IMPROVEMENT AND MAINTANANCE WORKS:SEREWO AMINITO ROADRIWO WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
RIWO |
Ksh 498,017 |
Comment
|
| 5032 |
IMPROVEMENT AND MAINTANACE WORKS FOR TAMUGH TOPTOLUM ROADSOOK WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SOOK |
Ksh 1,499,039 |
Comment
|
| 5033 |
IMPROVEMENT AND MAINTANANCE WORKS FOR PRIROPTAKACHTOPTOLUM ROADSOOK WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SOOK |
Ksh 2,498,930 |
Comment
|
| 5034 |
IMPROVEMENT AND MAINTANANCE WORKS: MUGHISKAPTEMOWROAD.SOOK WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SOOK |
Ksh 2,000,026 |
Comment
|
| 5035 |
IMPROVEMENT AND MAINTENANCE WORKS AT MISKWONYMOTPOKIRIKEMBOKECH ROADSOOK WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SOOK |
Ksh 1,999,347 |
Comment
|
| 5036 |
GRADING OF CHEPNYALMUNGIT ROADSOOK WARD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SOOK |
Ksh 1,998,196 |
Comment
|
| 5037 |
IMPROVEMENT AND MAINTANACE WORKS FOR ALIMARISSIYOI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SIYOI |
Ksh 499,728 |
Comment
|
| 5038 |
IMPROVEMENT AND MAINTANANCE WORKS AT MAYAKITKAITA FACTORY ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SIYOI |
Ksh 799,820 |
Comment
|
| 5039 |
INSTALLATION OF CULVERTS AT KAPLAINKAMAKETOI |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SIYOI |
Ksh 797,500 |
Comment
|
| 5040 |
IMPROVEMENT AND MAINTENANCE WORKS AT KAPLAIN –KAMAKETOI ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SIYOI |
Ksh 799,936 |
Comment
|
| 5041 |
OPENING AT KAPKECHALOSHAKOMOLKAISAKAT ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SIYOI |
Ksh 1,192,480 |
Comment
|
| 5042 |
IMPROVEMENT AND MAINTENANCE WORKS AT SITOTWOLOTEPA CURLVERT |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
SIYOI |
Ksh 1,498,926 |
Comment
|
| 5043 |
KATUW INTAKE ROAD |
ROADS PUBLIC WORKS TRANSPORT AND INFRASTRUCTURE |
2019-2020 |
|
WEIWEI |
Ksh 300,000 |
Comment
|
| 5044 |
TARMACKING OF ORTUM TOWNSHIP ROADS |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
BATEI |
Ksh 14,925,488 |
Comment
|
| 5045 |
PIT LATRINE AT TAPACH |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
TAPACH |
Ksh 249,863 |
Comment
|
| 5046 |
PIT LATRINE AT KERINGET |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
MNAGEI |
Ksh 499,087 |
Comment
|
| 5047 |
PIT LATRINE AT KAMELEI |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
TAPACH |
Ksh 499,237 |
Comment
|
| 5048 |
PIT LATRINE AT CHEPTUYA MARKET |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
MNAGEI |
Ksh 499,904 |
Comment
|
| 5049 |
PIT LATRINE AT KABICHBICH MARKET |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
LELAN |
Ksh 499,999 |
Comment
|
| 5050 |
PIT LATRINE AT KOKWORITIT TRADING CENTRE |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
LOMUT |
Ksh 499,425 |
Comment
|
| 5051 |
PIT LATRINES AT CHESEGON TRADING CENTRE |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
LOMUT |
Ksh 500,000 |
Comment
|
| 5052 |
PIT LATRINE AT MWOTOT MARKET |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
TAPACH |
Ksh 500,000 |
Comment
|
| 5053 |
PIT LATRINE AT TIKIT |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
MASOL |
Ksh 509,327 |
Comment
|
| 5054 |
CONTRUCTION OF PUBLIC TOILET AT KABICHBICH MARKET |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
LELAN |
Ksh 499,999 |
Comment
|
| 5055 |
INSTALLATION OF SECURITY LIGHTS AT LOMUT MARKET |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
LOMUT |
Ksh 300,000 |
Comment
|
| 5056 |
PUBLIC TOILETS CHEPARERIA WARD |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 5057 |
TOILET AT KATIKOMOR MARKET |
LANDS, HOUSING, PHYSICAL PLANNING AND URBAN DEVELOPMENT |
2019-2020 |
|
RIWO |
Ksh 300,000 |
Comment
|
| 5058 |
VETERINARY LABORATORY REPAIR |
PASTORAL ECONOMY |
2019-2020 |
|
KAPENGURIA |
Ksh 1,389,204 |
Comment
|
| 5059 |
CHEPNYAL CATTLE DIP REPAIR |
PASTORAL ECONOMY |
2019-2020 |
|
SOOK |
Ksh 850,000 |
Comment
|
| 5060 |
HATCHERY BUILDING FENCING |
PASTORAL ECONOMY |
2019-2020 |
|
KAPENGURIA |
Ksh 1,599,634 |
Comment
|
| 5061 |
SAHIWAL BULLS BREEDS |
PASTORAL ECONOMY |
2019-2020 |
|
ALL WARDS |
Ksh 4,000,000 |
Comment
|
| 5062 |
ENVIROMENTAL IMPACT ACCESSMENT |
PASTORAL ECONOMY |
2019-2020 |
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 5063 |
ENVIROMENTAL IMPACT ACCESSMENT |
PASTORAL ECONOMY |
2019-2020 |
|
VARIOUS WARDS |
Ksh 400,000 |
Comment
|
| 5064 |
BOMA RHODES PURCHASE |
PASTORAL ECONOMY |
2019-2020 |
|
CHEPARERIA |
Ksh 264,000 |
Comment
|
| 5065 |
ANIMALS AND BREEDING STOCK SUPPLY |
PASTORAL ECONOMY |
2019-2020 |
|
ALL WARDS |
Ksh 5,000,000 |
Comment
|
| 5066 |
ARTIFICIAL INSEMINATION PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
SIYOI |
Ksh 1,195,200 |
Comment
|
| 5067 |
FARM EQUIPMENT |
PASTORAL ECONOMY |
2019-2020 |
|
ENDUGH |
Ksh 500,000 |
Comment
|
| 5068 |
ARCARICIDE PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
TAPACH |
Ksh 250,000 |
Comment
|
| 5069 |
ARCARICIDE PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
LELAN |
Ksh 599,634 |
Comment
|
| 5070 |
ARCARICIDE PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
BATEI |
Ksh 300,000 |
Comment
|
| 5071 |
FARM EQUIPMENT |
PASTORAL ECONOMY |
2019-2020 |
|
KAPCHOK |
Ksh 400,000 |
Comment
|
| 5072 |
ROROK CATTLE DIP PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
BATEI |
Ksh 2,008,659 |
Comment
|
| 5073 |
NYARKULIAN CATTLE DIP PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
TAPACH |
Ksh 1,014,037 |
Comment
|
| 5074 |
KOKWOPTORIR CATTLE DIP PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
LOMUT |
Ksh 300,000 |
Comment
|
| 5075 |
KOROSWO METTALIC CRUSH PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
LOMUT |
Ksh 1,399,700 |
Comment
|
| 5076 |
ARCARICIDE PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
LOMUT |
Ksh 200,000 |
Comment
|
| 5077 |
ACARICIDE LAND PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
SIYOI |
Ksh 300,000 |
Comment
|
| 5078 |
KOKWOPSIS CATTLE DIP PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
TAPACH |
Ksh 2,400,000 |
Comment
|
| 5079 |
CHEPSURUM METTALIC CRUSH PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
MASOL |
Ksh 1,200,000 |
Comment
|
| 5080 |
KASITOT METTALIC CATTLE CRUSH PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
ALALE |
Ksh 1,195,038 |
Comment
|
| 5081 |
NAKUYEN CATTLE CRUSH PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
SUAM |
Ksh 400,000 |
Comment
|
| 5082 |
REHABILATION OF TAPADANY CATTLE DIPSUAM WARVD |
PASTORAL ECONOMY |
2019-2020 |
|
SUAM |
Ksh 90,000 |
Comment
|
| 5083 |
CHOROK,CHEPINAT AND SIMOTWO CATTLE DIPS REHABILATATION |
PASTORAL ECONOMY |
2019-2020 |
|
KAPENGURIA |
Ksh 201,732 |
Comment
|
| 5084 |
CHEPKECHIR CATTLE DIP PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
KAPENGURIA |
Ksh 426,163 |
Comment
|
| 5085 |
PAROO CATTLE DIP PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
WEIWEI |
Ksh 100,003 |
Comment
|
| 5086 |
CHELOPOY ECDE |
PASTORAL ECONOMY |
2019-2020 |
|
KIWAWA |
Ksh 470,000 |
Comment
|
| 5087 |
AKIRIAMET METALIC CRUSH PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
MASOL |
Ksh 1,119,000 |
Comment
|
| 5088 |
SAMAKITUK CRUSH PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
MASOL |
Ksh 75,000 |
Comment
|
| 5089 |
KAPUSIEN CATTLE DIP PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
TAPACH |
Ksh 1,297,000 |
Comment
|
| 5090 |
SONGOUT METALIC CRUSH PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
RIWO |
Ksh 75,000 |
Comment
|
| 5091 |
CHEPOKORO METALIC CRUSH PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
ALALE |
Ksh 371,748 |
Comment
|
| 5092 |
TAMPALAL CATTLE DIP PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
MNAGEI |
Ksh 2,000,000 |
Comment
|
| 5093 |
KARAMERI CATTLE CRUSH PROJECT |
PASTORAL ECONOMY |
2019-2020 |
|
KAPCHOK |
Ksh 485,000 |
Comment
|
| 5094 |
AKIRIAMET CATTLE DIP RENOVATION |
PASTORAL ECONOMY |
2019-2020 |
|
BATEI |
Ksh 241,000 |
Comment
|
| 5095 |
CHEPANGANG CATTLE DIP RENOVATION |
PASTORAL ECONOMY |
2019-2020 |
|
MNAGEI |
Ksh 104,400 |
Comment
|
| 5096 |
LITYEI CATTLE DIP RENOVATION |
PASTORAL ECONOMY |
2019-2020 |
|
MNAGEI |
Ksh 81,281 |
Comment
|
| 5097 |
BOMA RHODES PURCHASE |
PASTORAL ECONOMY |
2019-2020 |
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 5098 |
BOMA RHODES PURCHASE |
PASTORAL ECONOMY |
2019-2020 |
|
WEIWEI |
Ksh 500,000 |
Comment
|
| 5099 |
LACTATING GOATS PURCHASE |
PASTORAL ECONOMY |
2019-2020 |
|
KAPCHOK |
Ksh 600,000 |
Comment
|
| 5100 |
GALLA GOATS |
PASTORAL ECONOMY |
2019-2020 |
|
SUAM |
Ksh 1,000,000 |
Comment
|
| 5101 |
MASOL WARD OFFICE PROJECT |
PUBLIC SERVICE MANAGEMENT, ICT AND DEVOLVED UNITS |
2019-2020 |
|
MASOL |
Ksh 600,000 |
Comment
|
| 5102 |
GOVERNORS OFFICE PUBLIC TOILET PROJECTS |
PUBLIC SERVICE MANAGEMENT, ICT AND DEVOLVED UNITS |
2019-2020 |
|
KAPENGURIA |
Ksh 2,099,449 |
Comment
|
| 5103 |
CHEPARERIA TANNERY REFURBISHMENT |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
CHEPARERIA |
Ksh 1,972,028 |
Comment
|
| 5104 |
CHEPARERIA SALE YARD PROJECT |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
CHEPARERIA |
Ksh 657,394 |
Comment
|
| 5105 |
FEASIBILITY AND APPRAISAL STUDIES |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
LOMUT AND LELAN |
Ksh 5,600,000 |
Comment
|
| 5106 |
BENDERA MARKET PROJECT |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
KAPENGURIA |
Ksh 3,415,768 |
Comment
|
| 5107 |
KACHELIBA MARKET PROJECT |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
SUAM |
Ksh 1,822,072 |
Comment
|
| 5108 |
KONYAO MARKET PROJECT |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
KAPCHOK |
Ksh 146,805 |
Comment
|
| 5109 |
AMAKURIAT MARKET FENCING |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
ALALE |
Ksh 151,000 |
Comment
|
| 5110 |
MAKUTANO CLOTH MARKET PROJECT |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
MNAGEI |
Ksh 5,959,291 |
Comment
|
| 5111 |
KACHELIBA MARKET LAND PURCHASE |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
SUAM |
Ksh 770,000 |
Comment
|
| 5112 |
ENVIRONMENTAL IMPACT ASSESMENT |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
KAPENGURIA, KAPCHOK, LOMUT AND BATEI |
Ksh 1,013,478 |
Comment
|
| 5113 |
KANYARKWAT BODABODA SHADE |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
RIWO |
Ksh 498,916 |
Comment
|
| 5114 |
AMALER MARKET BODABODA SHADE |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
MASOL |
Ksh 499,148 |
Comment
|
| 5115 |
ORTUM BODABODA SHADE |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
BATEI |
Ksh 599,500 |
Comment
|
| 5116 |
KAPSANGAR BODABODA SHADE |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
LELAN |
Ksh 499,450 |
Comment
|
| 5117 |
KONYAO BODABODA SHADE |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
KAPCHOK |
Ksh 499,954 |
Comment
|
| 5118 |
TIKIT MARKET PROJECT |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
MASOL |
Ksh 3,900,000 |
Comment
|
| 5119 |
AMAKURIAT MARKET FENCING |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
ALALE |
Ksh 151,000 |
Comment
|
| 5120 |
SAFARI HOTEL BODABODA SHADE |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
KAPENGURIA |
Ksh 500,000 |
Comment
|
| 5121 |
CHEPKONO BODABODA SHADE |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
LELAN |
Ksh 500,000 |
Comment
|
| 5122 |
CHEPKOPEGH BODA BODA SHED |
TRADE, INDUSTRIALIZATION, INVESTMENT AND CO-OPERATIVES DEVELOPMENT |
2019-2020 |
|
CHEPARERIA |
Ksh 500,000 |
Comment
|
| 5123 |
CHEPARERIA YOUTH EMPOWERMENT CENTER PROJECT |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
CHEPARERIA |
Ksh 1,130,677 |
Comment
|
| 5124 |
KAPTABUK ECD CLASSROOM |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
LELAN |
Ksh 891,705 |
Comment
|
| 5125 |
SINTAGH CULTURAL CENTRE PROJECT |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
WEIWEI |
Ksh 159,854 |
Comment
|
| 5126 |
KONYAO SOCIAL HALL RENOVATION |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
KAPCHOK |
Ksh 200,000 |
Comment
|
| 5127 |
YOUTH EMPOWERMENT CENTRE FENCING |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
MNAGEI |
Ksh 1,889,164 |
Comment
|
| 5128 |
NYARKULIAN PRIMARY SCHOOL FIELD LEVELING |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
TAPACH |
Ksh 2,000,000 |
Comment
|
| 5129 |
MAKUTANO STADIUM(PHASE 11) PROJECT |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
MNAGEI |
Ksh 687,637 |
Comment
|
| 5130 |
TAPACH AND SINA PLAYING FIELD LEVELLING |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
TAPACH |
Ksh 405,079 |
Comment
|
| 5131 |
HEAVY MACHINARY PURCHASE |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
KAPENGURIA |
Ksh 35,100,000 |
Comment
|
| 5132 |
ENVIRONMENTAL IMPACT ASSESSMENT |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
RIWO |
Ksh 1,050,000 |
Comment
|
| 5133 |
TOTUM PRIMARY SCHOOL LEVELLING |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 5134 |
GALIB PRIMARY SCHOOL PLAYGROUND LEVELLING |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
MNAGEI |
Ksh 500,000 |
Comment
|
| 5135 |
AMANGORA PLAYING FIELD LEVELING |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
ALALE |
Ksh 500,000 |
Comment
|
| 5136 |
NYARKULIAN PRIMARY AND TANGASIA PRIMARY SPORTS FIELDS GRADING AND LEVELLING |
YOUTH, SPORTS, TOURISM, CULTURE, GENDER AND SOCIAL SERVICES |
2019-2020 |
|
TAPACH |
Ksh 1,299,200 |
Comment
|
| 5137 |
NAMORU WATER PAN |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KAPCHOK |
Ksh 17,000,000 |
Comment
|
| 5138 |
AROR WATER PAN |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
MASOL |
Ksh 17,000,000 |
Comment
|
| 5139 |
KITALAKAPEL BOREHOLE UPGRADING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
RIWO |
Ksh 2,000,000 |
Comment
|
| 5140 |
KAMUNONO GIRLS BOREHAOLE UPGRADING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KASEI |
Ksh 2,000,000 |
Comment
|
| 5141 |
KIWAWA BOYS BOREHAOLE UPGRADING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KIWAWA |
Ksh 2,000,000 |
Comment
|
| 5142 |
CHEBONGBONG BOREHAOLE UPGRADING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KAPCHOK |
Ksh 2,000,000 |
Comment
|
| 5143 |
LOPUNG'O BOREHOLE UPGRADING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
SUAM |
Ksh 2,000,000 |
Comment
|
| 5144 |
CHEBUKAT WATER INTAKE PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
LELAN |
Ksh 1,465,000 |
Comment
|
| 5145 |
TARTAR - KERINGET - KAMOINO EXTENSIONWATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
MNAGEI |
Ksh 2,578,110 |
Comment
|
| 5146 |
MOGHO WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
LOMUT |
Ksh 1,232,790 |
Comment
|
| 5147 |
NASAL WATER PAN DISTILATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
ALALE |
Ksh 1,604,021 |
Comment
|
| 5148 |
BOREHOLE REPAIR MATERIALS |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
ALALE |
Ksh 500,000 |
Comment
|
| 5149 |
LOKICHAR AND KOYOLO BOREHOLES REHABILATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KAPCHOK |
Ksh 1,000,000 |
Comment
|
| 5150 |
CHEPKONO KSAI WATER PROJECT RENOVATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
LELAN |
Ksh 300,000 |
Comment
|
| 5151 |
LOKORNOI WATER SUPPLY PROJECT EXTENSION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
MNAGEI |
Ksh 400,000 |
Comment
|
| 5152 |
MURKWIJIT WATER SPRINGS |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
MNAGEI |
Ksh 250,000 |
Comment
|
| 5153 |
MOSESWO WATER SPRING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
MNAGEI |
Ksh 300,000 |
Comment
|
| 5154 |
SITIT BOREHOLE TO SOLAR POWER UPGRADING PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
SUAM |
Ksh 1,700,000 |
Comment
|
| 5155 |
RUKEI BOREHOLE TO SOLAR UPGRADING PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
ENDUGH |
Ksh 42,000 |
Comment
|
| 5156 |
CHELAGET BOREHOLE PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
MASOL |
Ksh 81,870 |
Comment
|
| 5157 |
LOKITANYALA BOREHOLE TO SOLAR POWERED AND PIPING SYSTEM UPGRADING PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
ALALE |
Ksh 3,000,000 |
Comment
|
| 5158 |
ALALE BOREHALL REPAIR |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
ALALE |
Ksh 599,000 |
Comment
|
| 5159 |
SAND DAM AT SASAK |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
ALALE |
Ksh 699,845 |
Comment
|
| 5160 |
AKWANGA SUBSURFACE DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
ALALE |
Ksh 698,352 |
Comment
|
| 5161 |
LOKITELAUYAN WATER TANKS REPAIR PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
ALALE |
Ksh 495,900 |
Comment
|
| 5162 |
NABWELANGAPERU SAND DAM REHABILITATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
ALALE |
Ksh 399,499 |
Comment
|
| 5163 |
LOWASILE SUBSURFACE DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
ALALE |
Ksh 699,700 |
Comment
|
| 5164 |
SERETOW WATER SUPPLY PROJECT REPAIR |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
ALALE |
Ksh 297,475 |
Comment
|
| 5165 |
CHEPKOTI WATER INTAKE AND PIPING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
SIYOI |
Ksh 849,500 |
Comment
|
| 5166 |
CHEPYOMOT WATER INTAKE PROTECTION PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
SIYOI |
Ksh 199,100 |
Comment
|
| 5167 |
KAPRECH WATER PROJECT RENOVATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
SIYOI |
Ksh 399,930 |
Comment
|
| 5168 |
KONGAI SAND DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KASEI |
Ksh 999,978 |
Comment
|
| 5169 |
NACHECHEYAT RIVER SAND DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KASEI |
Ksh 799,936 |
Comment
|
| 5170 |
MOKONGWO SUB SURFACE DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
SUAM |
Ksh 795,760 |
Comment
|
| 5171 |
KANYALTIN WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
LELAN |
Ksh 1,477,906 |
Comment
|
| 5172 |
REMAA WATER SUPPLY RENOVATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
LELAN |
Ksh 399,120 |
Comment
|
| 5173 |
AMKONGIS SUB SURFACE DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
RIWO |
Ksh 997,000 |
Comment
|
| 5174 |
LOBOK BOREHOLE AND SOLAR PANEL INTSALLATION PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KAPCHOK |
Ksh 1,998,000 |
Comment
|
| 5175 |
KODOMUCH BOREHOLE AND SOLAR PANEL PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KAPCHOK |
Ksh 1,699,900 |
Comment
|
| 5176 |
NASAKAM BOREHOLE SOLAR PANEL INSTALLATION PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KAPCHOK |
Ksh 1,995,000 |
Comment
|
| 5177 |
CHESTA WATER TO CENTRE PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
LOMUT |
Ksh 499,900 |
Comment
|
| 5178 |
MOGHO WATER PIPING AND SUPPLY PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
LOMUT |
Ksh 499,990 |
Comment
|
| 5179 |
KOGHIN WATER INTAKE PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
LOMUT |
Ksh 599,970 |
Comment
|
| 5180 |
ILAKO CHEPOY CHERERIO WATER SUPPLY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
LOMUT |
Ksh 2,500,000 |
Comment
|
| 5181 |
ERELSISIT WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
WEIWEI |
Ksh 1,498,750 |
Comment
|
| 5182 |
NAKWIJIT WATER SUPPLY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KAPCHOK |
Ksh 800,000 |
Comment
|
| 5183 |
CHEMAKEU WATER PAN SHALLOW WELL PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KAPCHOK |
Ksh 800,000 |
Comment
|
| 5184 |
KOMPAS(TUTURIAMOI)BOREHOLE UPGRADING |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KAPCHOK |
Ksh 800,000 |
Comment
|
| 5185 |
KRESS SHALLOW DAM PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KAPCHOK |
Ksh 829,050 |
Comment
|
| 5186 |
OROLWO WATER SUPPLY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KAPCHOK |
Ksh 800,000 |
Comment
|
| 5187 |
CHEPTANY WATER SUPPLY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KAPCHOK |
Ksh 400,000 |
Comment
|
| 5188 |
KAPOROWO WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
TAPACH |
Ksh 499,770 |
Comment
|
| 5189 |
LOKORNOY PIPE EXTENSION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
MNAGEI |
Ksh 497,900 |
Comment
|
| 5190 |
LOMIRO SAND DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KIWAWA |
Ksh 699,927 |
Comment
|
| 5191 |
TILAK/CHEPONGALIT WATER INTAKE WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
KAPENGURIA |
Ksh 499,600 |
Comment
|
| 5192 |
AMKONGIS SUB SURFACE DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
CHEPARERIA |
Ksh 1,000,000 |
Comment
|
| 5193 |
MOINO WATER FURROW REHABILITATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
LOMUT |
Ksh 552,130 |
Comment
|
| 5194 |
KALALAKATUT REHABITATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
LOMUT |
Ksh 310,000 |
Comment
|
| 5195 |
CHEMOLO WATER PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
TAPACH |
Ksh 49,500 |
Comment
|
| 5196 |
PTOP WATER SUPPLY PROJECT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
TAPACH |
Ksh 221,610 |
Comment
|
| 5197 |
KAMENEYONCHESRA SAND DAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2019-2020 |
|
CHEPARERIA |
Ksh 529,540 |
Comment
|