| 1 |
Boda Boda Shade at Sigor (Pending Bill) |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
Weiwei |
Ksh. 499,999 |
Comment
|
| 2 |
Acaricides |
Agriculture and Irrigation |
2024-2025 |
Complete
|
Lomut |
Ksh. 1,000,000 |
Comment
|
| 3 |
CONSTRUCTION OF ECDE CLASS ROOMS AT SNUKUR PRIMARY-LOMUT WARD |
Education and Technical Training |
2024-2025 |
Complete
|
Lomut |
Ksh. 1,200,000 |
Comment
|
| 4 |
CONSTRUCTION OF ECDE CLASS ROOMS AT PARASONGA-LOMUT WARD |
Education and Technical Training |
2024-2025 |
Complete
|
Lomut |
Ksh. 1,100,000 |
Comment
|
| 5 |
CONSTRUCTION OF ECDE CLASS ROOMS AT APUK-LELAN WARD |
Education and Technical Training |
2024-2025 |
Complete
|
Lelan |
Ksh. 1,000,000 |
Comment
|
| 6 |
CONSTRUCTION OF SOKA DISPENSARY |
Health and Sanitation |
2024-2025 |
Complete
|
Weiwei |
Ksh. 5,000,000 |
Comment
|
| 7 |
COMPLETION OF STAFF QUATORS AT ONOCH DISPENSARY |
Health and Sanitation |
2024-2025 |
Complete
|
Weiwei |
Ksh. 799,977 |
Comment
|
| 8 |
COMPLETION OF TAKAR DISPENSARY IN WEIWEI WARD |
Health and Sanitation |
2024-2025 |
Complete
|
Weiwei |
Ksh. 1,999,950 |
Comment
|
| 9 |
CONSTRUCTION OF TOILET AT SOKA DISPENSARY WEIWEI WARD |
Health and Sanitation |
2024-2025 |
Complete
|
Weiwei |
Ksh. 599,758 |
Comment
|
| 10 |
MAINTAINANCE OF KAKRESS-PSERO-PTARAKON ROAD- TAPACH WARD |
Public Works, Transport and Infrastructure |
2024-2025 |
Complete
|
Tapach |
Ksh. 1,000,000 |
Comment
|
| 11 |
MAINTENANCE OF SINA -PTOP- TAPACH ROAD IN TAPACH WARD |
Public Works, Transport and Infrastructure |
2024-2025 |
Complete
|
Tapach |
Ksh. 1,500,000 |
Comment
|
| 12 |
MAINTENANCE OF KOKWOPSIS -KAIPAWIS - LOSA ROAD IN TAPACH WARD |
Public Works, Transport and Infrastructure |
2024-2025 |
Complete
|
Tapach |
Ksh. 2,000,000 |
Comment
|
| 13 |
MAINTENANCE OF TAPACH- CHEBON ROAD - TAPACH WARD |
Public Works, Transport and Infrastructure |
2024-2025 |
Complete
|
Tapach |
Ksh. 1,950,000 |
Comment
|
| 14 |
MAINTENANCE OF PARAYON DISPENSARY-CHELAL-KAIPANANER ROAD |
Public Works, Transport and Infrastructure |
2024-2025 |
Complete
|
Tapach |
Ksh. 2,949,796 |
Comment
|
| 15 |
COMPLETTION OF PERIMETER WALL AND GATE |
Finance and Economic Planning |
2024-2025 |
Complete
|
Kapenguria |
Ksh. 2,000,000 |
Comment
|
| 16 |
CONSTRUCTION OF RESIDENTIAL BUILDING(SPEAKER'S RESIDENCE) |
County Assembly |
2024-2025 |
Stalled
|
KAPENGURIA |
Ksh. 2,000 |
Comment
|
| 17 |
COUNTY ASSEMBLY RESTAURANT |
County Assembly |
2024-2025 |
Stalled
|
KAPENGURIA |
Ksh. 2,000 |
Comment
|
| 18 |
MODERN ASSEMBLY PORCH AND INTALLATION OF NEW ENTRY/EXIT GATE |
County Assembly |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 5,000,000 |
Comment
|
| 19 |
PURCHASE OF HANSARD AND MULTIMEDIA SYSTEMS |
County Assembly |
2024-2025 |
Ongoing
|
KAPENGURIA |
Ksh. 13,560,039 |
Comment
|
| 20 |
STEEL WATER TANK AND PLUMBING |
County Assembly |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 3,900,000 |
Comment
|
| 21 |
CCTV CAMERAS |
County Assembly |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 7,895,000 |
Comment
|
| 22 |
PURCHASE OF OFFICE FURNITURE AND FITTINGS WINDOW BLINDS |
County Assembly |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 2,500,000 |
Comment
|
| 23 |
PURCHASE OF LIFTS |
County Assembly |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 1,414,760 |
Comment
|
| 24 |
MARICH FRESH PRODUCE MARKET-COUNTY CONTRIBUTION |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Ongoing
|
SEKERR |
Ksh. 20,000,000 |
Comment
|
| 25 |
CONSTRUCTION OF GUARD HOUSE AT BENDERA FRESH PRODUCE MARKET |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 700,000 |
Comment
|
| 26 |
RENOVATION OF KATIKOMOR FRESH PRODUCE MARKET |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
RIWO |
Ksh. 500,000 |
Comment
|
| 27 |
CONSTRUCTION OF BODABODA SHADE AT NYARKULIAN TRADING CENTER(ROLL OVER) |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh. 499,999 |
Comment
|
| 28 |
RENOVATION OF TRADE AND COOPERATIVE OFFICES |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 1,499,938 |
Comment
|
| 29 |
CONSTRUCTION OF MOTOR VEHICLE SHADE AT COOPERATIVE OFFICE |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 999,963 |
Comment
|
| 30 |
CONSTRUCTION OF MODERN TOILET AT TRADE OFFICE |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 2,999,922 |
Comment
|
| 31 |
COMPLETION OF WEST POKOT MILK PROCESSING PLANT - WATER SUPPLY |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
LELAN |
Ksh. 2,999,506 |
Comment
|
| 32 |
CONSTRUCTION OF KONYAO MARKET TOILET BLOCK |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 999,950 |
Comment
|
| 33 |
PROPOSED RENOVATION OF MAKUTANO MARKET |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
MNAGEI |
Ksh. 2,999,991 |
Comment
|
| 34 |
RENOVATION OF KONYAO MARKET |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 35 |
COMPLETION OF SARAMEE COOLING PLANT |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
LELAN |
Ksh. 1,000,000 |
Comment
|
| 36 |
FENCING AND INSTALLATION OF TWO CONTAINERS AT BENDERA FRESH PRODUCE MARKET |
County Executive |
2024-2025 |
Complete
|
Alale |
Ksh. 3,200,000 |
Comment
|
| 37 |
CONSTRUCTION OF PIT LATRINE AT MURKWIJIT COOLING PLANT |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
MNAGEI |
Ksh. 700,000 |
Comment
|
| 38 |
INSTALLATION OF STREETLIGHTS AT MAKUTANO-MNAGEI WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
MNAGEI |
Ksh. 618,976 |
Comment
|
| 39 |
CONSTRUCTION OF BODA BODA SHADE AT CHEPKONDOL TRADING CENTRE- SEKERR WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
SEKERR |
Ksh. 700,000 |
Comment
|
| 40 |
CAPITAL TRANSFERS TO NON-PROFIT ORGANIZATIONS AND ASSOCIATIONS - KOKWOPSIS FCS LTD MILK COOLING PLANT- TAPACH WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh. 500,000 |
Comment
|
| 41 |
CAPITAL TRANSFERS TO NON - PROFIT ORGANIZATIONS AND ASSOCIATIONS COMPLETION OF SOKALE FCS LTD MILK COOLING PLANT- TAPACH WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh. 500,000 |
Comment
|
| 42 |
CAPITAL TRANSFERS TO NON - PROFIT ORGANIZATIONS AND ASSOCIATIONS OPERATIONALIZATION OF TAPACH FCS LTD MILK COOLING PLANT- TAPACH WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh. 500,000 |
Comment
|
| 43 |
CAPITAL TRANSFERS TO NON-PROFIT ORGANIZATIONS AND ASSOCIA TIONS - COMPLETION OF PTOP FCS LTD MILK COOLING PLANT- TAPACH WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh. 500,000 |
Comment
|
| 44 |
CAPITAL TRANFERS TO NON - PROFIT ORGANATIONS AND ASSOCIATIONS- COMPLETION OF SONDANY FCS LTD MILK COOLIN G PLANT- TAPACH WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh. 500,000 |
Comment
|
| 45 |
CAPITAL TRANSFER TO NON PROFIT ORGANIZATIONS ANDASSOCIATIONS-KARAS COOPERATIVE SOCIETY- KAPENGURIA- WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 2,000,000 |
Comment
|
| 46 |
CAPITAL TRANSFER OF FUNDS TO NON PROFIT ORGANIZATION AND ASSOCIATIONS - SONDANY FARMERS COOPERATIVE MILK COOLING PLANT |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
TAPACH |
Ksh. 500,000 |
Comment
|
| 47 |
CONSTRUCTION OF BODABODA SHADE AT WAKOR CENTRE-WEIWEI WARD |
Trade, Industrialization and Cooperative Development |
2024-2025 |
Complete
|
WEIWEI |
Ksh. 700,000 |
Comment
|
| 48 |
PURCHASE OF POTTING TUBES AND OTHER TREE NURSERIES MATERIALS TO SUPPORT YOUTH GROUPS WITHIN KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 700,000 |
Comment
|
| 49 |
PURCHASE AND DISTRIBUTION OF TREE SEEDLINGS TO FARMERS- TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
TAPACH |
Ksh. 1,500,000 |
Comment
|
| 50 |
PURCHASE OF TREE SEEDLINGS FOR SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SOOK |
Ksh. 2,500,000 |
Comment
|
| 51 |
INSTALLATION OF 10,000LTRS TANK,STRUCTURE,PIPING,MOTOR PUMP AND SOLAR WITH THREE WATER POINTS AT MADING BOREHOLE - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 3,000,000 |
Comment
|
| 52 |
REPAIR OF NYANG’AITA BOYS SEC. SCH. BOREHOLE- MASOL WARD- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh. 1,000,000 |
Comment
|
| 53 |
PURCHASE OF SOLAR PUMPS FOR REMOI BOREHOLE - ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 400,000 |
Comment
|
| 54 |
CONSTRUCTION OF A SAND DAM AT LOESEMUNY- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 1,500,000 |
Comment
|
| 55 |
COMPLETION OF OMORWO SAND DAM- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 800,000 |
Comment
|
| 56 |
PURCHASE OF WATER TANKS FOR HOUSEHOLDS ACROSS ENTIRE WARD - ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 1,200,000 |
Comment
|
| 57 |
REPAIR OF KOSITOT PRIMARY SCHOOL BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 1,000,000 |
Comment
|
| 58 |
REPAIR OF LOYEMAMOSIN, LODONY, KAPTUKEN, NAUYAPONG A AND B,ORON AND LOLEPON BOREHOLES- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 500,000 |
Comment
|
| 59 |
PURCHASE AND SUPPLY OF BORE HOLE REPAIR MATERIALS- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 1,500,000 |
Comment
|
| 60 |
REHABILITATION OF KATICH BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 840,500 |
Comment
|
| 61 |
REPAIR OF KAMURUNYANG SOLAR BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 699,800 |
Comment
|
| 62 |
COMPLETION OF LOTUPOGH – EMPOSIMOSTWO - GHAT WATER PROJECT- BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
BATEI |
Ksh. 1,000,000 |
Comment
|
| 63 |
PIPING OF KACHEPTARINY- SONGOWOT WATER SUPPLY-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh. 500,000 |
Comment
|
| 64 |
CONSTRUCTION OF WATER TANK AND PIPING OF KASONGWOR WATER SUPPLY- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh. 1,000,000 |
Comment
|
| 65 |
MAINTENANCE OF TIRKEN SAFE WATER PROJECT- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh. 500,000 |
Comment
|
| 66 |
SUPPLY OF WATER TANK AT LOKWAPUO- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh. 500,000 |
Comment
|
| 67 |
CONSTRUCTION AND FENCING OF RIRIMPOI WATER INTAKE - CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh. 1,000,000 |
Comment
|
| 68 |
CONSTRUCTION OF INTAKE AND PIPING OF CHEMGHACH WATER PROJECT-ENDOUGH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ENDOUGH |
Ksh. 600,000 |
Comment
|
| 69 |
DRILLING OF BOREHOLE AT TUWIT -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 70 |
DRILLING OF BOREHOLE AT LOKITEDEL -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 71 |
DRILLING OF BOREHOLE AT CHEPTOKOL -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 72 |
PURCHASE AND SUPPLY OF BORE REPAIR MATERIALS -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 73 |
PURCHASE OF SOLAR PUMPS GUNFOS,6 SOLARS OF 275WATTS AND 3 CONTROLLERS LOBOK AND KARON - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 2,000,000 |
Comment
|
| 74 |
HAMDPUMBS INSTALLATION TO BOREHOLES IN ATEKER, CHEPTUMOT AND KOPEYON- KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 75 |
CONSTRUCTION OF ABEYON WATER PROJECT AND PIPING TO NAPITIRO DISPENSARY AND NAPITIRO PRIMARY SCHOOL- KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 1,999,999 |
Comment
|
| 76 |
RENOVATION AND PIPPING OF KOITOMO WATER PROJECT- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 1,000,000 |
Comment
|
| 77 |
UPGRADING OF KOMOL BOREHOLE TO SOLAR POWERED-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 2,000,000 |
Comment
|
| 78 |
PURCHASE OF WATER PIPES FOR BENDERA AND SAKAS-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 800,000 |
Comment
|
| 79 |
DRILLING OF BOREHOLE AT KALAS- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 2,000,000 |
Comment
|
| 80 |
PURCHASE AND SUPPLY OF WATER PIPES TANTANA AND SAKAS- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 1,000,000 |
Comment
|
| 81 |
PROTECTION OF BENDERA SPRING-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 500,000 |
Comment
|
| 82 |
PROTECTION OF CHEWOYET SPRING-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 500,000 |
Comment
|
| 83 |
DRILLING AND EQUIPING KONGAI BOREHOLE -KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KASEI |
Ksh. 2,000,000 |
Comment
|
| 84 |
PURCHASE AND SUPPLY OF BORE HOLE REPAIR MATERIALS - KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KASEI |
Ksh. 1,000,000 |
Comment
|
| 85 |
DRILLING OF BOREHOLE AT NAPEYELEL - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 2,000,000 |
Comment
|
| 86 |
DRILLING OF BOREHOLE AT NATIMERI - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 2,000,000 |
Comment
|
| 87 |
PURCHASE AND SUPPLY OF ASSORTED WATER PIPES - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 1,500,000 |
Comment
|
| 88 |
CONSTRUCTION OF SAND DAM AT KETII - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 1,000,000 |
Comment
|
| 89 |
CONSTRUCTION OF SAND DAM AT MORIONGWO - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 1,000,000 |
Comment
|
| 90 |
CONSTRUCTION OF SAND DAM AT LOMIROO - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 1,000,000 |
Comment
|
| 91 |
CONSTRUCTION OF SAND DAM AT NGORIAKAMAR - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 1,000,000 |
Comment
|
| 92 |
CONSTRUCTION OF SAND DAM AT EMPOGHAT - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 1,000,000 |
Comment
|
| 93 |
UPGRADING OF NAKWAPUO BOREHOLE TO SOLAR SYSTEM AND PIPING TO AMANI CENTRE- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh. 2,500,000 |
Comment
|
| 94 |
UPGRADING OF CHERANGAN BOREHOLE TO SOLAR SYSTEM- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh. 2,000,000 |
Comment
|
| 95 |
UPGRADING OF MOKONGWO TO SOLAR SYSTEM-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh. 2,000,000 |
Comment
|
| 96 |
DRILLING AND EQUIPING OF KADEKO- APONGOI BORE HOLE- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh. 2,500,000 |
Comment
|
| 97 |
SUPPLY OF BOREHOLE REPAIR MATERIALS AND REPAIR OF SOLAR POWERED AND HANDPUMPS ACROSS KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh. 900,000 |
Comment
|
| 98 |
CONSTRUCTION OF INTAKE AND PIPING OF WATER AT TRIK PRIMARY SCHOOL WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 500,000 |
Comment
|
| 99 |
CONSTRUCTION OF INTAKE AND PIPING OF MNOPOI WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 600,000 |
Comment
|
| 100 |
CONSTRUCTION INTAKE AND PIPING OF WATER AT MURUNY PRIMARY AND SECONDARY- LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 500,000 |
Comment
|
| 101 |
PURCHASE AND SUPPLY OF WATER TANKS TO KIPAT, LOYAMURUK,LOMUKE PRI. AND RING RING COMMUNITY WATER POINTS - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 500,000 |
Comment
|
| 102 |
CONSTRUCTION OF INTAKE AND PIPING OF WATER AT CHEPARTEN-MURKISIAN WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 832,000 |
Comment
|
| 103 |
RENOVATION OF INTAKE AND PIPPING KSAI WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 1,000,000 |
Comment
|
| 104 |
RENOVATION OF INTAKE AND PIPING OF LUTIPOI-SIMOTWO WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 600,000 |
Comment
|
| 105 |
CHEPTORUK PYARUS KAPAKAI WATER SUPPLY-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 599,910 |
Comment
|
| 106 |
PIPING OF WUMBOGH-PITPAGH-WIYAN WATER PROJECT -LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LOMUT |
Ksh. 4,000,000 |
Comment
|
| 107 |
PIPING OF MALOS WATER PROJECT - LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LOMUT |
Ksh. 1,000,000 |
Comment
|
| 108 |
REPAIR OF KOGHIN-KLOLO WATER PROJECT-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LOMUT |
Ksh. 500,000 |
Comment
|
| 109 |
DE-SILTING OF CHEMURO WATER PAN.- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh. 3,000,000 |
Comment
|
| 110 |
DE-SILTING OF LOMORTOM WATER PAN.- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh. 3,000,000 |
Comment
|
| 111 |
DE-SILTING OF LOTULIANGIRO WATER PAN.- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh. 3,000,000 |
Comment
|
| 112 |
DRILLING A BORE HOLE AT CHELANGET- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh. 2,000,000 |
Comment
|
| 113 |
PURCHASE AND SUPPLY OF BOREHOLE MATERIALS- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh. 600,000 |
Comment
|
| 114 |
PURCHASE OF WATER PIPES FOR MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh. 2,000,000 |
Comment
|
| 115 |
MESHACK-FACTORY WATER SUPPLY- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh. 2,000,000 |
Comment
|
| 116 |
PROTECTION OF SPRING WATER AT MBOGHOU IN KANGILIKWAN- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh. 399,580 |
Comment
|
| 117 |
SUPPLY AND DELIVERYOF WATER CASINGS FORBMNAGEI WARD-MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh. 1,999,900 |
Comment
|
| 118 |
DRILLING OF BOREHOLE AT NAKTOPAR-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 2,000,000 |
Comment
|
| 119 |
DRILLING OF BOREHOLE AT LOKITEDEL- RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 2,000,000 |
Comment
|
| 120 |
DRILLING OF BOREHOLE AT KOPEMOI-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 2,000,000 |
Comment
|
| 121 |
DRILLING OF BOREHOLE AT SIMATWA - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 2,000,000 |
Comment
|
| 122 |
PURCHASE AND SUPPLY OF BORE-HOLE REPAIR MATERIAL ENTIRE WARD-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 1,500,000 |
Comment
|
| 123 |
WATER PIPING OF WATER FROM HILL TO VILLAGE POOLE - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 999,989 |
Comment
|
| 124 |
PROPOSED PIPING OF WATER FROM MAIN BOREHOLE- CENTRE KAITUKUM-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 999,920 |
Comment
|
| 125 |
PURCHASE AND SUPPLY OF WATER PIPES TO FARMERS - SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh. 800,000 |
Comment
|
| 126 |
PIPPING OF CHEPKOLOL-3G VILLAGE WATER PROJECT- SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh. 900,000 |
Comment
|
| 127 |
REPAIR OF PIPES OF SIMBOIYWO- CHOPOTWO WATER- SEKER WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh. 1,500,000 |
Comment
|
| 128 |
PURCHASE OF WATER BOOSTER- SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh. 1,000,000 |
Comment
|
| 129 |
PIPING OF MTELO- KACHESOIT WATER PROJECT- SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh. 2,000,000 |
Comment
|
| 130 |
COMPLETION OF MTELO KACHESOIT WATER PROJECT-SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh. 999,920 |
Comment
|
| 131 |
PIPING OF WATER FROM KAPCHILA TO THE TANK AT ASIWARENG, KAPCHILA CENTRE AND AIOC KAPCHILA-SIYOI |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 800,000 |
Comment
|
| 132 |
RENOVATION OF KAPKATET WATER SOURCE AND PIPPING TOKAPTOBOSWA,LOKAPEL PRIMARY ,KIPTENTEN AND KAP-NDEGE VILLAGE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 1,000,000 |
Comment
|
| 133 |
SPRING PROTECTION AT TENDWO IN ROROKET VILLAGE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 500,000 |
Comment
|
| 134 |
CONSTRUCTION OF WATER INTAKE AND PIPING AT KAPSIRPEI WATER PROJECT TO SERVE KAPRECH PRIMARY, SECONDARY AND ADJACENT VILLAGE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 1,000,000 |
Comment
|
| 135 |
DRILLING OF A BORE HOLE AT SIYOI CENTRE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 2,000,000 |
Comment
|
| 136 |
SOLAR INSTALLATION AND PIPING OF SIYOI CENTER BOREHOLE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 2,500,000 |
Comment
|
| 137 |
DRILLING OF A BORE HOLE AT TALAU CENTER- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 2,000,000 |
Comment
|
| 138 |
SOLAR INSTALLATION AND PIPING OF TALAU CENTER BOREHOLE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 2,500,000 |
Comment
|
| 139 |
WATER PIPING FROM KAIBOS WATER TANK TO JUNCTION WATER TANK, KIPKORINYA PRIMARY AND CATTLE DIP, KAIBOS PRIMARY AND SECONDARY SCHOOL, MOYAKIT AND KIWANJA VILLAGES.- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 1,500,000 |
Comment
|
| 140 |
SPRING PROTECTION AT KAPSOKWO VILLAGE IN TALAU- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 500,000 |
Comment
|
| 141 |
SPRING PROTECTION AT TULWET VILLAGE IN TALAU- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 500,000 |
Comment
|
| 142 |
SPRING PROTECTION AT CHEMOSI VILLAGE IN TALAU- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 500,000 |
Comment
|
| 143 |
PURCHASE AND SUPPLY OF ASSORTED WATER PIPES TO KAPKECHA AND,CHEPORIOT VILLAGE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 700,000 |
Comment
|
| 144 |
RENOVATION OF WATER INTAKE AT KAPLAIN AND PIPPING TO KAPLAIN CENTER, KIPSAKAS PRI. SCHOOL AND ADJACENT VILLAGE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 1,000,000 |
Comment
|
| 145 |
INSTALLATION OF SOLAR AT CHEPO- ASACHA BOREHOLE - SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,300,000 |
Comment
|
| 146 |
CONSTRUCTION OF SUB-SURFACE DAM AT NAKARUKAI- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 500,000 |
Comment
|
| 147 |
CONSTRUCTION OF SUB-SURFACE DAM AT ANGAMIT- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 500,000 |
Comment
|
| 148 |
INSTALLATION OF SOLAR AT NAKUYEN BORE HOLE- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,300,000 |
Comment
|
| 149 |
DRILLING OF BORE HOLE AT TEPANYANG-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,000,000 |
Comment
|
| 150 |
DRILLING OF BORE HOLE AT KASIYOYOWO-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,000,000 |
Comment
|
| 151 |
DRILLING OF BORE HOLE AT NAUYAYELEL-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,000,000 |
Comment
|
| 152 |
CONSTRUCTION OF SAND DAM AT KALAS- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 500,000 |
Comment
|
| 153 |
UPGRADING OF KINGISIA- KOPULIO WARD BOREHOLE TO SOLAR POWERED-SUAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,299,990 |
Comment
|
| 154 |
UPGRADING OF KOKWOLIKWON- KARON BOREHOLE TO SOLAR POWERED-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,299,900 |
Comment
|
| 155 |
PURCHASE AND SUPPLY OF WATER PIPES - TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
TAPACH |
Ksh. 2,000,000 |
Comment
|
| 156 |
CONSTRUCTION OF FURROW AT SANGAT, OROLWO-WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
WEIWEI |
Ksh. 1,000,000 |
Comment
|
| 157 |
CONSTRUCTION OF KEWAMUNY – PAROO FURROW- WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
WEIWEI |
Ksh. 1,500,000 |
Comment
|
| 158 |
PURCHASE AND SUPPLY OF WATER PIPES FOR TANTAI WATER PROJECT- WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
WEIWEI |
Ksh. 1,200,000 |
Comment
|
| 159 |
PURCHASE OF PIPES AND POTTING TUBES FOR SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SOOK |
Ksh. 2,500,000 |
Comment
|
| 160 |
CONSTRUCTION OF WATER INTAKE AT KAPSAMBUL - SUKUT WATER PROJECT IN TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
TAPACH |
Ksh. 500,000 |
Comment
|
| 161 |
PURCHASE OF POTTING TUBES AND OTHER TREE NURSERIES MATERIALS TO SUPPORT YOUTH GROUPS WITHIN KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 700,000 |
Comment
|
| 162 |
PURCHASE AND DISTRIBUTION OF TREE SEEDLINGS TO FARMERS- TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
TAPACH |
Ksh. 1,500,000 |
Comment
|
| 163 |
PURCHASE OF TREE SEEDLINGS FOR SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SOOK |
Ksh. 2,500,000 |
Comment
|
| 164 |
INSTALLATION OF 10,000LTRS TANK,STRUCTURE,PIPING,MOTOR PUMP AND SOLAR WITH THREE WATER POINTS AT MADING BOREHOLE - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 3,000,000 |
Comment
|
| 165 |
REPAIR OF NYANG’AITA BOYS SEC. SCH. BOREHOLE- MASOL WARD- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh. 1,000,000 |
Comment
|
| 166 |
PURCHASE OF SOLAR PUMPS FOR REMOI BOREHOLE - ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 400,000 |
Comment
|
| 167 |
CONSTRUCTION OF A SAND DAM AT LOESEMUNY- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 1,500,000 |
Comment
|
| 168 |
COMPLETION OF OMORWO SAND DAM- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 800,000 |
Comment
|
| 169 |
PURCHASE OF WATER TANKS FOR HOUSEHOLDS ACROSS ENTIRE WARD - ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 1,200,000 |
Comment
|
| 170 |
REPAIR OF KOSITOT PRIMARY SCHOOL BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 1,000,000 |
Comment
|
| 171 |
REPAIR OF LOYEMAMOSIN, LODONY, KAPTUKEN, NAUYAPONG A AND B,ORON AND LOLEPON BOREHOLES- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 500,000 |
Comment
|
| 172 |
PURCHASE AND SUPPLY OF BORE HOLE REPAIR MATERIALS- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 1,500,000 |
Comment
|
| 173 |
REHABILITATION OF KATICH BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 840,500 |
Comment
|
| 174 |
REPAIR OF KAMURUNYANG SOLAR BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ALALE |
Ksh. 699,800 |
Comment
|
| 175 |
COMPLETION OF LOTUPOGH – EMPOSIMOSTWO - GHAT WATER PROJECT- BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
BATEI |
Ksh. 1,000,000 |
Comment
|
| 176 |
PIPING OF KACHEPTARINY- SONGOWOT WATER SUPPLY-CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh. 500,000 |
Comment
|
| 177 |
CONSTRUCTION OF WATER TANK AND PIPING OF KASONGWOR WATER SUPPLY- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh. 1,000,000 |
Comment
|
| 178 |
MAINTENANCE OF TIRKEN SAFE WATER PROJECT- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh. 500,000 |
Comment
|
| 179 |
SUPPLY OF WATER TANK AT LOKWAPUO- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh. 500,000 |
Comment
|
| 180 |
CONSTRUCTION AND FENCING OF RIRIMPOI WATER INTAKE - CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
CHEPARERIA |
Ksh. 1,000,000 |
Comment
|
| 181 |
CONSTRUCTION OF INTAKE AND PIPING OF CHEMGHACH WATER PROJECT-ENDOUGH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
ENDOUGH |
Ksh. 600,000 |
Comment
|
| 182 |
DRILLING OF BOREHOLE AT TUWIT -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 183 |
DRILLING OF BOREHOLE AT LOKITEDEL -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 184 |
DRILLING OF BOREHOLE AT CHEPTOKOL -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 185 |
PURCHASE AND SUPPLY OF BORE REPAIR MATERIALS -KAPCHOCK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 186 |
PURCHASE OF SOLAR PUMPS GUNFOS,6 SOLARS OF 275WATTS AND 3 CONTROLLERS LOBOK AND KARON - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 2,000,000 |
Comment
|
| 187 |
HAMDPUMBS INSTALLATION TO BOREHOLES IN ATEKER, CHEPTUMOT AND KOPEYON- KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 188 |
CONSTRUCTION OF ABEYON WATER PROJECT AND PIPING TO NAPITIRO DISPENSARY AND NAPITIRO PRIMARY SCHOOL- KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPCHOK |
Ksh. 1,999,999 |
Comment
|
| 189 |
RENOVATION AND PIPPING OF KOITOMO WATER PROJECT- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 1,000,000 |
Comment
|
| 190 |
UPGRADING OF KOMOL BOREHOLE TO SOLAR POWERED-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 2,000,000 |
Comment
|
| 191 |
PURCHASE OF WATER PIPES FOR BENDERA AND SAKAS-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 800,000 |
Comment
|
| 192 |
DRILLING OF BOREHOLE AT KALAS- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 2,000,000 |
Comment
|
| 193 |
PURCHASE AND SUPPLY OF WATER PIPES TANTANA AND SAKAS- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 1,000,000 |
Comment
|
| 194 |
PROTECTION OF BENDERA SPRING-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 500,000 |
Comment
|
| 195 |
PROTECTION OF CHEWOYET SPRING-KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KAPENGURIA |
Ksh. 500,000 |
Comment
|
| 196 |
DRILLING AND EQUIPING KONGAI BOREHOLE -KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KASEI |
Ksh. 2,000,000 |
Comment
|
| 197 |
PURCHASE AND SUPPLY OF BORE HOLE REPAIR MATERIALS - KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KASEI |
Ksh. 1,000,000 |
Comment
|
| 198 |
DRILLING OF BOREHOLE AT NAPEYELEL - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 2,000,000 |
Comment
|
| 199 |
DRILLING OF BOREHOLE AT NATIMERI - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 2,000,000 |
Comment
|
| 200 |
PURCHASE AND SUPPLY OF ASSORTED WATER PIPES - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 1,500,000 |
Comment
|
| 201 |
CONSTRUCTION OF SAND DAM AT KETII - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 1,000,000 |
Comment
|
| 202 |
CONSTRUCTION OF SAND DAM AT MORIONGWO - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 1,000,000 |
Comment
|
| 203 |
CONSTRUCTION OF SAND DAM AT LOMIROO - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 1,000,000 |
Comment
|
| 204 |
CONSTRUCTION OF SAND DAM AT NGORIAKAMAR - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 1,000,000 |
Comment
|
| 205 |
CONSTRUCTION OF SAND DAM AT EMPOGHAT - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KIWAWA |
Ksh. 1,000,000 |
Comment
|
| 206 |
UPGRADING OF NAKWAPUO BOREHOLE TO SOLAR SYSTEM AND PIPING TO AMANI CENTRE- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh. 2,500,000 |
Comment
|
| 207 |
UPGRADING OF CHERANGAN BOREHOLE TO SOLAR SYSTEM- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh. 2,000,000 |
Comment
|
| 208 |
UPGRADING OF MOKONGWO TO SOLAR SYSTEM-KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh. 2,000,000 |
Comment
|
| 209 |
DRILLING AND EQUIPING OF KADEKO- APONGOI BORE HOLE- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh. 2,500,000 |
Comment
|
| 210 |
SUPPLY OF BOREHOLE REPAIR MATERIALS AND REPAIR OF SOLAR POWERED AND HANDPUMPS ACROSS KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
KODICH |
Ksh. 900,000 |
Comment
|
| 211 |
CONSTRUCTION OF INTAKE AND PIPING OF WATER AT TRIK PRIMARY SCHOOL WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 500,000 |
Comment
|
| 212 |
CONSTRUCTION OF INTAKE AND PIPING OF MNOPOI WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 600,000 |
Comment
|
| 213 |
CONSTRUCTION INTAKE AND PIPING OF WATER AT MURUNY PRIMARY AND SECONDARY- LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 500,000 |
Comment
|
| 214 |
PURCHASE AND SUPPLY OF WATER TANKS TO KIPAT, LOYAMURUK,LOMUKE PRI. AND RING RING COMMUNITY WATER POINTS - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 500,000 |
Comment
|
| 215 |
CONSTRUCTION OF INTAKE AND PIPING OF WATER AT CHEPARTEN-MURKISIAN WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 832,000 |
Comment
|
| 216 |
RENOVATION OF INTAKE AND PIPPING KSAI WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 1,000,000 |
Comment
|
| 217 |
RENOVATION OF INTAKE AND PIPING OF LUTIPOI-SIMOTWO WATER PROJECT - LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 600,000 |
Comment
|
| 218 |
CHEPTORUK PYARUS KAPAKAI WATER SUPPLY-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LELAN |
Ksh. 599,910 |
Comment
|
| 219 |
PIPING OF WUMBOGH-PITPAGH-WIYAN WATER PROJECT -LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LOMUT |
Ksh. 4,000,000 |
Comment
|
| 220 |
PIPING OF MALOS WATER PROJECT - LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LOMUT |
Ksh. 1,000,000 |
Comment
|
| 221 |
REPAIR OF KOGHIN-KLOLO WATER PROJECT-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
LOMUT |
Ksh. 500,000 |
Comment
|
| 222 |
DE-SILTING OF CHEMURO WATER PAN.- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh. 3,000,000 |
Comment
|
| 223 |
DE-SILTING OF LOMORTOM WATER PAN.- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh. 3,000,000 |
Comment
|
| 224 |
DE-SILTING OF LOTULIANGIRO WATER PAN.- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh. 3,000,000 |
Comment
|
| 225 |
DRILLING A BORE HOLE AT CHELANGET- MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MASOL |
Ksh. 2,000,000 |
Comment
|
| 226 |
PURCHASE AND SUPPLY OF BOREHOLE MATERIALS- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh. 600,000 |
Comment
|
| 227 |
PURCHASE OF WATER PIPES FOR MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh. 2,000,000 |
Comment
|
| 228 |
MESHACK-FACTORY WATER SUPPLY- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh. 2,000,000 |
Comment
|
| 229 |
PROTECTION OF SPRING WATER AT MBOGHOU IN KANGILIKWAN- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh. 399,580 |
Comment
|
| 230 |
SUPPLY AND DELIVERYOF WATER CASINGS FORBMNAGEI WARD-MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
MNAGEI |
Ksh. 1,999,900 |
Comment
|
| 231 |
DRILLING OF BOREHOLE AT NAKTOPAR-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 2,000,000 |
Comment
|
| 232 |
DRILLING OF BOREHOLE AT LOKITEDEL- RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 2,000,000 |
Comment
|
| 233 |
DRILLING OF BOREHOLE AT KOPEMOI-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 2,000,000 |
Comment
|
| 234 |
DRILLING OF BOREHOLE AT SIMATWA - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 2,000,000 |
Comment
|
| 235 |
PURCHASE AND SUPPLY OF BORE-HOLE REPAIR MATERIAL ENTIRE WARD-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 1,500,000 |
Comment
|
| 236 |
WATER PIPING OF WATER FROM HILL TO VILLAGE POOLE - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 999,989 |
Comment
|
| 237 |
PROPOSED PIPING OF WATER FROM MAIN BOREHOLE- CENTRE KAITUKUM-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
RIWO |
Ksh. 999,920 |
Comment
|
| 238 |
PURCHASE AND SUPPLY OF WATER PIPES TO FARMERS - SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh. 800,000 |
Comment
|
| 239 |
PIPPING OF CHEPKOLOL-3G VILLAGE WATER PROJECT- SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh. 900,000 |
Comment
|
| 240 |
REPAIR OF PIPES OF SIMBOIYWO- CHOPOTWO WATER- SEKER WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh. 1,500,000 |
Comment
|
| 241 |
PURCHASE OF WATER BOOSTER- SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh. 1,000,000 |
Comment
|
| 242 |
PIPING OF MTELO- KACHESOIT WATER PROJECT- SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh. 2,000,000 |
Comment
|
| 243 |
COMPLETION OF MTELO KACHESOIT WATER PROJECT-SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SEKERR |
Ksh. 999,920 |
Comment
|
| 244 |
PIPING OF WATER FROM KAPCHILA TO THE TANK AT ASIWARENG, KAPCHILA CENTRE AND AIOC KAPCHILA-SIYOI |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 800,000 |
Comment
|
| 245 |
RENOVATION OF KAPKATET WATER SOURCE AND PIPPING TOKAPTOBOSWA,LOKAPEL PRIMARY ,KIPTENTEN AND KAP-NDEGE VILLAGE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 1,000,000 |
Comment
|
| 246 |
SPRING PROTECTION AT TENDWO IN ROROKET VILLAGE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 500,000 |
Comment
|
| 247 |
CONSTRUCTION OF WATER INTAKE AND PIPING AT KAPSIRPEI WATER PROJECT TO SERVE KAPRECH PRIMARY, SECONDARY AND ADJACENT VILLAGE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 1,000,000 |
Comment
|
| 248 |
DRILLING OF A BORE HOLE AT SIYOI CENTRE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 2,000,000 |
Comment
|
| 249 |
SOLAR INSTALLATION AND PIPING OF SIYOI CENTER BOREHOLE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 2,500,000 |
Comment
|
| 250 |
DRILLING OF A BORE HOLE AT TALAU CENTER- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 2,000,000 |
Comment
|
| 251 |
SOLAR INSTALLATION AND PIPING OF TALAU CENTER BOREHOLE - SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 2,500,000 |
Comment
|
| 252 |
WATER PIPING FROM KAIBOS WATER TANK TO JUNCTION WATER TANK, KIPKORINYA PRIMARY AND CATTLE DIP, KAIBOS PRIMARY AND SECONDARY SCHOOL, MOYAKIT AND KIWANJA VILLAGES.- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 1,500,000 |
Comment
|
| 253 |
SPRING PROTECTION AT KAPSOKWO VILLAGE IN TALAU- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 500,000 |
Comment
|
| 254 |
SPRING PROTECTION AT TULWET VILLAGE IN TALAU- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 500,000 |
Comment
|
| 255 |
SPRING PROTECTION AT CHEMOSI VILLAGE IN TALAU- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 500,000 |
Comment
|
| 256 |
PURCHASE AND SUPPLY OF ASSORTED WATER PIPES TO KAPKECHA AND,CHEPORIOT VILLAGE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 700,000 |
Comment
|
| 257 |
RENOVATION OF WATER INTAKE AT KAPLAIN AND PIPPING TO KAPLAIN CENTER, KIPSAKAS PRI. SCHOOL AND ADJACENT VILLAGE- SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SIYOI |
Ksh. 1,000,000 |
Comment
|
| 258 |
INSTALLATION OF SOLAR AT CHEPO- ASACHA BOREHOLE - SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,300,000 |
Comment
|
| 259 |
CONSTRUCTION OF SUB-SURFACE DAM AT NAKARUKAI- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 500,000 |
Comment
|
| 260 |
CONSTRUCTION OF SUB-SURFACE DAM AT ANGAMIT- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 500,000 |
Comment
|
| 261 |
INSTALLATION OF SOLAR AT NAKUYEN BORE HOLE- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,300,000 |
Comment
|
| 262 |
DRILLING OF BORE HOLE AT TEPANYANG-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,000,000 |
Comment
|
| 263 |
DRILLING OF BORE HOLE AT KASIYOYOWO-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,000,000 |
Comment
|
| 264 |
DRILLING OF BORE HOLE AT NAUYAYELEL-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,000,000 |
Comment
|
| 265 |
CONSTRUCTION OF SAND DAM AT KALAS- SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 500,000 |
Comment
|
| 266 |
UPGRADING OF KINGISIA- KOPULIO WARD BOREHOLE TO SOLAR POWERED-SUAM |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,299,990 |
Comment
|
| 267 |
UPGRADING OF KOKWOLIKWON- KARON BOREHOLE TO SOLAR POWERED-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SUAM |
Ksh. 2,299,900 |
Comment
|
| 268 |
PURCHASE AND SUPPLY OF WATER PIPES - TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
TAPACH |
Ksh. 2,000,000 |
Comment
|
| 269 |
CONSTRUCTION OF FURROW AT SANGAT, OROLWO-WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
WEIWEI |
Ksh. 1,000,000 |
Comment
|
| 270 |
CONSTRUCTION OF KEWAMUNY – PAROO FURROW- WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
WEIWEI |
Ksh. 1,500,000 |
Comment
|
| 271 |
PURCHASE AND SUPPLY OF WATER PIPES FOR TANTAI WATER PROJECT- WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
WEIWEI |
Ksh. 1,200,000 |
Comment
|
| 272 |
PURCHASE OF PIPES AND POTTING TUBES FOR SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
SOOK |
Ksh. 2,500,000 |
Comment
|
| 273 |
CONSTRUCTION OF WATER INTAKE AT KAPSAMBUL - SUKUT WATER PROJECT IN TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2024-2025 |
Complete
|
TAPACH |
Ksh. 500,000 |
Comment
|