| 1 |
Chepkechir Dispensary Maternity Wing |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 500,000 |
Comment
|
| 2 |
Kaiwow Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,100,000 |
Comment
|
| 3 |
Komol Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,000,000 |
Comment
|
| 4 |
Kapkoris-Kaprom Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 500,000 |
Comment
|
| 5 |
Chesta TTC Dormitory Block |
Education and Technical Training |
2023-2024 |
Complete
|
Lomut |
Ksh. 37,400,536 |
Comment
|
| 6 |
Pkopoch Tourism and Hospitality Centre |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Ongoing
|
Riwo |
Ksh. 20,000,000 |
Comment
|
| 7 |
Kapkata-Tippet Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh. 4,000,000 |
Comment
|
| 8 |
Kotit-Motolong Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh. 2,000,000 |
Comment
|
| 9 |
Canaan-Tamarukwo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh. 3,000,000 |
Comment
|
| 10 |
Chemintril-Kapkewa Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kasei |
Ksh. 3,000,000 |
Comment
|
| 11 |
Too Sesen-Kamketo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kasei |
Ksh. 4,000,000 |
Comment
|
| 12 |
Lomut-Surumben Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lomut |
Ksh. 5,000,000 |
Comment
|
| 13 |
Apungura-Rumpot Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 1,000,000 |
Comment
|
| 14 |
Karas-Kakpaw Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,000,000 |
Comment
|
| 15 |
Chewoyet/Elgon View Estate Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 500,000 |
Comment
|
| 16 |
Putor-Chepkechir Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 1,000,000 |
Comment
|
| 17 |
Kapenguria Stream-Chesiam-AP Line Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 500,000 |
Comment
|
| 18 |
Kapkoris Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 500,000 |
Comment
|
| 19 |
Merur Dispensary (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Endugh |
Ksh. 1,494,818 |
Comment
|
| 20 |
Opol Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Kasei |
Ksh. 0 |
Comment
|
| 21 |
Kaptolomwo Dispensary Staff House (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Kasei |
Ksh. 369,618 |
Comment
|
| 22 |
One ECDE Classroom at Chepoghin |
Education and Technical Training |
2023-2024 |
Complete
|
Kasei |
Ksh. 659,580 |
Comment
|
| 23 |
One ECDE Classroom at Kotulpogh |
Education and Technical Training |
2023-2024 |
Complete
|
Kasei |
Ksh. 653,796 |
Comment
|
| 24 |
Makutano Market |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Ongoing
|
Mnagei |
Ksh. 3,000,000 |
Comment
|
| 25 |
Makutano Street Lights |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Mnagei |
Ksh. 621,000 |
Comment
|
| 26 |
Twin Staff House at Cheptram Dispensary |
Health and Sanitation |
2023-2024 |
Ongoing
|
Endugh |
Ksh. 1,499,047 |
Comment
|
| 27 |
Cuban Doctors House - Septic Tank, Pit Latrine and Guard House |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 5,000,000 |
Comment
|
| 28 |
Kamketo Field |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Ongoing
|
Kasei |
Ksh. 1,500,000 |
Comment
|
| 29 |
Treasury Building Parking |
Finance and Economic Planning |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 700,000 |
Comment
|
| 30 |
Perimeter Wall at County Treasury Headquarters |
Finance and Economic Planning |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 5,000,000 |
Comment
|
| 31 |
Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 15,000,000 |
Comment
|
| 32 |
New Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 40,000,000 |
Comment
|
| 33 |
New Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 4,000,000 |
Comment
|
| 34 |
Governors Office Complex Phase (2) |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 20,000,000 |
Comment
|
| 35 |
New Governors Residence Parking Shed |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,100,000 |
Comment
|
| 36 |
External Water Tanks at Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 4,000,000 |
Comment
|
| 37 |
Liaison Office Nairobi |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 5,000,000 |
Comment
|
| 38 |
New Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 15,000,000 |
Comment
|
| 39 |
Gym for Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 3,000,000 |
Comment
|
| 40 |
Power Supply at Governors Residence |
County Executive |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,000,000 |
Comment
|
| 41 |
Road Reserve Boundary Post within the Municipality |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh. 1,500,000 |
Comment
|
| 42 |
St. Marys Siyoi-Aringinyang-Soita Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Ongoing
|
Siyoi |
Ksh. 2,000,000 |
Comment
|
| 43 |
Talau-Bondeni Box Culvert |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 4,500,000 |
Comment
|
| 44 |
Kalas-Ngaina Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh. 2,000,000 |
Comment
|
| 45 |
Temoo-Psapai Junction Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Ongoing
|
Sekerr |
Ksh. 1,500,000 |
Comment
|
| 46 |
Sigor-Kadungdung Road (KRB) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Weiwei |
Ksh. 3,000,000 |
Comment
|
| 47 |
Chesta TTC-Kosioloi Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lomut |
Ksh. 2,000,000 |
Comment
|
| 48 |
Parking slots within Kapenguria Municipality access Roads |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Mnagei |
Ksh. 800,000 |
Comment
|
| 49 |
St. Annes ACK-Daraja Mungu-Litole Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 1,500,000 |
Comment
|
| 50 |
Chepnyal-Kola Road (KRB) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sook |
Ksh. 1,623,718 |
Comment
|
| 51 |
St. Francis school-Kapenguria Road (KRB) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,500,000 |
Comment
|
| 52 |
Kamelei-Kapusien- Kamolokon Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Tapach |
Ksh. 2,000,000 |
Comment
|
| 53 |
County Fire station |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 9,200,000 |
Comment
|
| 54 |
Tukumo- Centre Kwanza Road (KRB) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh. 1,500,000 |
Comment
|
| 55 |
Chemeliny- Kaparemba Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Tapach |
Ksh. 1,500,000 |
Comment
|
| 56 |
Karon-Kosia Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Suam |
Ksh. 2,000,000 |
Comment
|
| 57 |
Kamketo-Kasepa Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kasei |
Ksh. 2,000,000 |
Comment
|
| 58 |
Kokwoplekwa -Korengoi Road (3.5KM) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh. 2,000,000 |
Comment
|
| 59 |
Iyoon Suspended Footbridge |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Weiwei |
Ksh. 1,200,000 |
Comment
|
| 60 |
Shalpogh Footbridge |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh. 1,115,837 |
Comment
|
| 61 |
Kalapata-Lodwar-Apuke Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Alale |
Ksh. 4,000,000 |
Comment
|
| 62 |
Kacheliba-St. Bakhita Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Suam |
Ksh. 4,000,000 |
Comment
|
| 63 |
Kamla-Mbara-Kasei Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 4,000,000 |
Comment
|
| 64 |
Marich-Akiriamet Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sekerr |
Ksh. 4,000,000 |
Comment
|
| 65 |
Kasetiang-Dungdung Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Weiwei |
Ksh. 3,000,000 |
Comment
|
| 66 |
Moinoi-Chuwai Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 4,000,000 |
Comment
|
| 67 |
Seretow-Cheptya-Samor Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh. 4,000,000 |
Comment
|
| 68 |
Sebit-Dispensary Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh. 1,000,000 |
Comment
|
| 69 |
Kokwotendwo-Nyarpat Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Weiwei |
Ksh. 3,000,000 |
Comment
|
| 70 |
Weiwei Irrigation Project Road Network |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Weiwei |
Ksh. 3,000,000 |
Comment
|
| 71 |
Empough-Psapai Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh. 3,000,000 |
Comment
|
| 72 |
Parua-Chepokoriong Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh. 3,000,000 |
Comment
|
| 73 |
Parua-Chepokoriong Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh. 3,000,000 |
Comment
|
| 74 |
Kamerum-Kanasat-Kariamawoi Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 3,000,000 |
Comment
|
| 75 |
Ngotut-Kodera Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh. 2,000,000 |
Comment
|
| 76 |
Apuke-Loya Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Alale |
Ksh. 3,000,000 |
Comment
|
| 77 |
Kwa Chief-Tartar Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh. 1,500,000 |
Comment
|
| 78 |
Ombolion-Nakwomoru Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kasei |
Ksh. 4,000,000 |
Comment
|
| 79 |
Kriich-Reres Road - Allowances |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh. 1,100,000 |
Comment
|
| 80 |
Katiporot Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 600,000 |
Comment
|
| 81 |
Nyasi Moja Wooden Footbridge |
Public Works, Transport and Infrastructure |
2023-2024 |
Ongoing
|
Siyoi |
Ksh. 2,000,000 |
Comment
|
| 82 |
Emboghat Suspended Foot Bridge |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh. 500,000 |
Comment
|
| 83 |
AP Highway Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 800,000 |
Comment
|
| 84 |
Cheptongo-Letwa Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sook |
Ksh. 999,000 |
Comment
|
| 85 |
Chichia-Lotukum Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Alale |
Ksh. 5,000,000 |
Comment
|
| 86 |
Oron-Cherokogh-Lengorok Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Alale |
Ksh. 500,000 |
Comment
|
| 87 |
Amakuriat-Otuko-Alale Girls Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Alale |
Ksh. 1,000,000 |
Comment
|
| 88 |
Embosekerr-Chemurkai-Kutung Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh. 1,000,000 |
Comment
|
| 89 |
Ortum secondary-Marsitot-Muruny Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh. 2,500,000 |
Comment
|
| 90 |
Makutano Health Center |
Health and Sanitation |
2023-2024 |
Ongoing
|
Kapenguria |
Ksh. 33,000,000 |
Comment
|
| 91 |
Timorwo-Chepokoriong Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh. 1,000,000 |
Comment
|
| 92 |
Modern Mortuary at KCRH |
Health and Sanitation |
2023-2024 |
Ongoing
|
Kapenguria |
Ksh. 15,000,000 |
Comment
|
| 93 |
Chepokaratich-Ngasian Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh. 1,000,000 |
Comment
|
| 94 |
Male Wards in Kacheliba |
Health and Sanitation |
2023-2024 |
Ongoing
|
Suam |
Ksh. 10,000,000 |
Comment
|
| 95 |
Chesoton Foot Bridge |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh. 2,700,000 |
Comment
|
| 96 |
Kaapoyotwo-Kotulpogh-Kaporo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh. 500,000 |
Comment
|
| 97 |
Motokoron-Pusol Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Batei |
Ksh. 600,000 |
Comment
|
| 98 |
Two (2) Ablution blocks in Kacheliba Sub county Hospital |
Health and Sanitation |
2023-2024 |
Complete
|
Suam |
Ksh. 2,737,200 |
Comment
|
| 99 |
St. Cecilia-Marsitot-Simat-Kikas-Kashakat Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh. 600,000 |
Comment
|
| 100 |
Mongorion-Mokowon-Pserum Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh. 1,300,000 |
Comment
|
| 101 |
Toriapkoi-Pusian-Chepkopegh Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh. 1,300,000 |
Comment
|
| 102 |
Corner Mbaya-Tirir Primary Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh. 1,300,000 |
Comment
|
| 103 |
Chepkorniswo-Mongorion Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh. 1,200,000 |
Comment
|
| 104 |
Chepkorniswo-Kaghat Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh. 1,500,000 |
Comment
|
| 105 |
Ywalateke-Murombus- Chelakatet Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Chepareria |
Ksh. 2,400,000 |
Comment
|
| 106 |
Kopono-Tumoon-Tompul-Cheptram Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh. 2,000,000 |
Comment
|
| 107 |
Kapenguria County Hospital Water Supply Project/ Borehole Drilling |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 3,500,000 |
Comment
|
| 108 |
Kachaya-Kamokongwo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh. 500,000 |
Comment
|
| 109 |
Arkut-Kapsyoyowo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh. 2,500,000 |
Comment
|
| 110 |
Incinerator at Kacheliba Sub-County Hospital |
Health and Sanitation |
2023-2024 |
Complete
|
Suam |
Ksh. 5,000,000 |
Comment
|
| 111 |
Tunoyo-Kapedo- Lokna Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Endugh |
Ksh. 1,000,000 |
Comment
|
| 112 |
Ablution Block at KCRH |
Health and Sanitation |
2023-2024 |
Ongoing
|
Kapenguria |
Ksh. 3,000,000 |
Comment
|
| 113 |
Napitiro Dispensary (Painting, Floor tiles, Ceiling and Roof Repair) |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 630,000 |
Comment
|
| 114 |
Napitiro Dispensary (Fencing) |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 700,000 |
Comment
|
| 115 |
Pit Latrine Block for patients 4 Doors and Staff 3 Doors at Napitiro Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 1,000,000 |
Comment
|
| 116 |
Kodera-Nachukul Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh. 1,000,000 |
Comment
|
| 117 |
Office at Kacheliba Sub-county Hospital (Rollover) |
Health and Sanitation |
2023-2024 |
Complete
|
Suam |
Ksh. 1,598,610 |
Comment
|
| 118 |
Kodera-Makala Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh. 2,400,000 |
Comment
|
| 119 |
Tarmac Junction -Napitiro Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh. 2,400,000 |
Comment
|
| 120 |
Kopeyon- Kaliokon Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh. 1,500,000 |
Comment
|
| 121 |
Napitiro Staff House (Floor tiles, Plaster, Painting, Ceiling, Windows, Doors, Part Roof, Plumbing of Kitchen and Toilets) |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 999,755 |
Comment
|
| 122 |
Mading Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh. 700,000 |
Comment
|
| 123 |
Wasat Dispensary (Pit Latrine Block for Patients 4 Doors and Staff 3 Doors) |
Health and Sanitation |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 1,499,671 |
Comment
|
| 124 |
Doctors Lounge at KCRH |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 144,903 |
Comment
|
| 125 |
Dyke at Kodera-Kanyangareng River |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapchok |
Ksh. 2,000,000 |
Comment
|
| 126 |
Rain water at KCRH (Rollover) |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,362,784 |
Comment
|
| 127 |
Kapenguria Ward Town Roads |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 3,000,000 |
Comment
|
| 128 |
Blood Bank Phase I |
Health and Sanitation |
2023-2024 |
Complete
|
Mnagei |
Ksh. 113,036 |
Comment
|
| 129 |
Perimeter Wall at KCRH |
Health and Sanitation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,000,000 |
Comment
|
| 130 |
Kalemngorok Dispensary Staff Houses (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Suam |
Ksh. 200,000 |
Comment
|
| 131 |
Road at Roponywo-Kaprom |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 1,000,000 |
Comment
|
| 132 |
Staff House at Konyao Dispensary (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 402,900 |
Comment
|
| 133 |
Lemu Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 500,000 |
Comment
|
| 134 |
KFA Roads |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 1,500,000 |
Comment
|
| 135 |
Kruru Dispensary (Pending Bill) |
Health and Sanitation |
2023-2024 |
Ongoing
|
Riwo |
Ksh. 3,545,117 |
Comment
|
| 136 |
Pusol Dispensary (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Batei |
Ksh. 1,266,643 |
Comment
|
| 137 |
Chemurto-Takar Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 500,000 |
Comment
|
| 138 |
Cheptiyangwa Maternity (Pending Bill) |
Health and Sanitation |
2023-2024 |
Ongoing
|
Chepareria |
Ksh. 566,140 |
Comment
|
| 139 |
Emboghat Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 500,000 |
Comment
|
| 140 |
Embough Maternity (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Sook |
Ksh. 1,248,370 |
Comment
|
| 141 |
Kasak-Takar Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kasei |
Ksh. 2,000,000 |
Comment
|
| 142 |
Kamketo-Kasepa Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,000,000 |
Comment
|
| 143 |
Four (4) Pit Latrine at Senetwo Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Chepareria |
Ksh. 1,500,000 |
Comment
|
| 144 |
Katumale-Turtur Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 500,000 |
Comment
|
| 145 |
Propoi Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Chepareria |
Ksh. 1,000,000 |
Comment
|
| 146 |
Kopol-Chepsepin Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 500,000 |
Comment
|
| 147 |
Drift at Akiriamet Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 2,000,000 |
Comment
|
| 148 |
Ywalateke Maternity Ward |
Health and Sanitation |
2023-2024 |
Complete
|
Chepareria |
Ksh. 1,000,000 |
Comment
|
| 149 |
Wasat-Lotitien Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 500,000 |
Comment
|
| 150 |
Two (2) Pit Latrines at Ausukuyon Dispensary (Staff and Outpatient) |
Health and Sanitation |
2023-2024 |
Complete
|
Riwo |
Ksh. 1,000,000 |
Comment
|
| 151 |
Katikomor Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Riwo |
Ksh. 3,500,000 |
Comment
|
| 152 |
Chemakew Dispensary Staff House |
Health and Sanitation |
2023-2024 |
Complete
|
Riwo |
Ksh. 1,000,000 |
Comment
|
| 153 |
Lokna Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Riwo |
Ksh. 1,000,000 |
Comment
|
| 154 |
Kongelai Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Riwo |
Ksh. 1,000,000 |
Comment
|
| 155 |
Lodupup Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Riwo |
Ksh. 1,000,000 |
Comment
|
| 156 |
Akiriamet-Koput Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 500,000 |
Comment
|
| 157 |
Septic Tank, Installation of Elevated Tank and Plumbing at Paraywa Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Siyoi |
Ksh. 2,500,000 |
Comment
|
| 158 |
Nakwapuo-Songolol Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 2,500,000 |
Comment
|
| 159 |
Kamila-Abur Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 1,000,000 |
Comment
|
| 160 |
Staff Quarters at Onoch dispensary (Plaster, Flooring and Door/Window Glass) |
Health and Sanitation |
2023-2024 |
Complete
|
Weiwei |
Ksh. 800,000 |
Comment
|
| 161 |
Chiroyon-Katuda Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 500,000 |
Comment
|
| 162 |
Slab at Chemalangkawaw-Chemachor Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Kodich |
Ksh. 1,000,000 |
Comment
|
| 163 |
Takar Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Weiwei |
Ksh. 2,000,000 |
Comment
|
| 164 |
Toilet at Soka Dispensary |
Health and Sanitation |
2023-2024 |
Ongoing
|
Weiwei |
Ksh. 600,000 |
Comment
|
| 165 |
Ngotut Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 1,000,000 |
Comment
|
| 166 |
Shalpogh Community Dispensary Pit Latrine (Rollover) |
Health and Sanitation |
2023-2024 |
Complete
|
Chepareria |
Ksh. 500,000 |
Comment
|
| 167 |
Koishomu-Koruru-Manian Road at Kaalotwari |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh. 800,000 |
Comment
|
| 168 |
Akiriamet Dispensary Staff Houses |
Health and Sanitation |
2023-2024 |
Complete
|
Masol |
Ksh. 2,000,000 |
Comment
|
| 169 |
Kabichbich-Kadukunya-Ringring Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh. 2,000,000 |
Comment
|
| 170 |
Akiriamet Dispensary (Rollover) |
Health and Sanitation |
2023-2024 |
Complete
|
Masol |
Ksh. 892,976 |
Comment
|
| 171 |
Daraja Mungu-Lopsimoru Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh. 1,000,000 |
Comment
|
| 172 |
Maternity Wing at Parayon Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Tapach |
Ksh. 256,084 |
Comment
|
| 173 |
Dispensary at Soka |
Health and Sanitation |
2023-2024 |
Complete
|
Weiwei |
Ksh. 5,000,000 |
Comment
|
| 174 |
Kapchemuk Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh. 1,000,000 |
Comment
|
| 175 |
Chemworor Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Suam |
Ksh. 2,199,990 |
Comment
|
| 176 |
Lopunyale-Kapsait Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh. 2,000,000 |
Comment
|
| 177 |
Staff Houses at Kiwakan Dispensary (Rollover) |
Health and Sanitation |
2023-2024 |
Ongoing
|
Sekerr |
Ksh. 1,076,462 |
Comment
|
| 178 |
Lotupale-Kamsa-Ywapar-Mukula-Kodek Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh. 1,000,000 |
Comment
|
| 179 |
Laboratory at Mbaru Dispensary |
Health and Sanitation |
2023-2024 |
Ongoing
|
Kiwawa |
Ksh. 700,000 |
Comment
|
| 180 |
Cheramba-Koruru-Manian-Mnus-Lomuke-ACK Chepkono-Cheptokoghogh-Chepkutuen-Kamoriom Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh. 1,300,000 |
Comment
|
| 181 |
5,000 Lts Water Tank each for Tuwit, Ngotut , Napitiro, Losam, Kalukuna and Mading Dispensaries |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 300,000 |
Comment
|
| 182 |
Chemokol-Kaptum Roads |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lelan |
Ksh. 2,000,000 |
Comment
|
| 183 |
Lomut Primary-Kokwositet Primary-Parkilaw Road (U-Road) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lomut |
Ksh. 3,000,000 |
Comment
|
| 184 |
New Road at Maros- Potiew Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Lomut |
Ksh. 4,000,000 |
Comment
|
| 185 |
Nyangaita-Nangironyang-Sekerot (Kerio river) Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh. 1,000,000 |
Comment
|
| 186 |
Laboratory Unit at Tapach Health Facility |
Health and Sanitation |
2023-2024 |
Complete
|
Tapach |
Ksh. 500,000 |
Comment
|
| 187 |
Senetwo Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Chepareria |
Ksh. 1,000,000 |
Comment
|
| 188 |
Mama Kits for Orolwo Dispensary, Karameri Dispensary and Katopoton Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Kodich |
Ksh. 1,400,000 |
Comment
|
| 189 |
Naramam Maternity Wing |
Health and Sanitation |
2023-2024 |
Complete
|
Chepareria |
Ksh. 1,000,000 |
Comment
|
| 190 |
Chemaltin Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Lelan |
Ksh. 800,000 |
Comment
|
| 191 |
Chepungon Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Lelan |
Ksh. 780,000 |
Comment
|
| 192 |
Akiriamet Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Masol |
Ksh. 700,000 |
Comment
|
| 193 |
Akiriamet Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Masol |
Ksh. 700,000 |
Comment
|
| 194 |
Tartar Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Mnagei |
Ksh. 800,000 |
Comment
|
| 195 |
Maternity Ward at Talau Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Siyoi |
Ksh. 1,000,000 |
Comment
|
| 196 |
Sorichon-Ngaina-Nyangaita Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh. 1,000,000 |
Comment
|
| 197 |
Chirkil-Takaywa-Nyangaita Road at Chepserum Sub-location |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh. 2,000,000 |
Comment
|
| 198 |
Tikit-Ngoriakes-Akiriamet Road at Tikit Sub-location |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh. 2,000,000 |
Comment
|
| 199 |
Chemoikut-Kakorosion-Amolem Road at Akiriamet Sub-location |
Public Works, Transport and Infrastructure |
2023-2024 |
Ongoing
|
Masol |
Ksh. 2,000,000 |
Comment
|
| 200 |
Chemoikut-Kakorosion-Amolem Road at Akiriamet Sub-location |
Public Works, Transport and Infrastructure |
2023-2024 |
Ongoing
|
Masol |
Ksh. 2,000,000 |
Comment
|
| 201 |
Chemwor Dispensary |
Health and Sanitation |
2023-2024 |
Complete
|
Suam |
Ksh. 800,000 |
Comment
|
| 202 |
Amolem-Kaduturai-Lotongot Road Amolem Sub-location |
Public Works, Transport and Infrastructure |
2023-2024 |
Ongoing
|
Masol |
Ksh. 1,000,000 |
Comment
|
| 203 |
Chelanket-Chirkil Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh. 500,000 |
Comment
|
| 204 |
Patients Bed, Mattresses, Maternity Beds for Napitiro, Kalukuna, Ngotut and Tuwit Dispensaries |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 1,200,000 |
Comment
|
| 205 |
Cheptamas-Chirkil Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh. 500,000 |
Comment
|
| 206 |
Nakipetot-Longuriareng-Chepaiywat Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh. 1,000,000 |
Comment
|
| 207 |
Mama Kits |
Health and Sanitation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 400,000 |
Comment
|
| 208 |
Kedinyang Bridge |
Public Works, Transport and Infrastructure |
2023-2024 |
Ongoing
|
Mnagei |
Ksh. 2,000,000 |
Comment
|
| 209 |
Medical Instruments for Rural Dispensaries (Pending Bill) |
Health and Sanitation |
2023-2024 |
Complete
|
Kodich |
Ksh. 1,999,900 |
Comment
|
| 210 |
Road at Kasangagh-Lemreng Kitalaposho Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh. 800,000 |
Comment
|
| 211 |
Kaplelachkoror-Chepunpun Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh. 1,000,000 |
Comment
|
| 212 |
Kiwanja Ndege-Masinyang-Kadingding River Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh. 1,000,000 |
Comment
|
| 213 |
Nasokol Primary, Nguriareng-Chepkemei Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh. 200,000 |
Comment
|
| 214 |
Culverts at Kakisaka along Murkwijit-Moseswo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh. 800,000 |
Comment
|
| 215 |
Lityei Centre-Limakori Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh. 500,000 |
Comment
|
| 216 |
Kamorow Primary-Dini ya Roho Mafuta Pole-Kangilikwan Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Mnagei |
Ksh. 2,000,000 |
Comment
|
| 217 |
Kamwotiny Primary-St. Comboni Catholic-Water Supply Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Masol |
Ksh. 1,000,000 |
Comment
|
| 218 |
Recreational Park |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Mnagei |
Ksh. 11,712,195 |
Comment
|
| 219 |
Non-Residential Buildings (Renovation of Ardhi House) |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 4,818,756 |
Comment
|
| 220 |
Feeder Road at Mariny-Kapunpun Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sekerr |
Ksh. 1,000,000 |
Comment
|
| 221 |
Kaachesoit-Kaachematai Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sekerr |
Ksh. 500,000 |
Comment
|
| 222 |
Pit Latrine at Ortum Market |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Batei |
Ksh. 1,062,282 |
Comment
|
| 223 |
Chepkoriong Public Toilet |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Batei |
Ksh. 599,778 |
Comment
|
| 224 |
Kokwo Masian-Lalwa Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sekerr |
Ksh. 300,000 |
Comment
|
| 225 |
Toilets at Makutano Soko |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Mnagei |
Ksh. 200,000 |
Comment
|
| 226 |
Feeder Road at Chesito |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sekerr |
Ksh. 400,000 |
Comment
|
| 227 |
Public Toilets at Naruoro Centre |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Ongoing
|
Alale |
Ksh. 500,000 |
Comment
|
| 228 |
Box Culverts at Katlal |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 4,700,000 |
Comment
|
| 229 |
Street Light for Konyao Centre |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Ongoing
|
Kapchok |
Ksh. 1,000,000 |
Comment
|
| 230 |
Kerengot-Joachim/Singoyei-Kamariny Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sekerr |
Ksh. 2,500,000 |
Comment
|
| 231 |
Single Line Culvert at Kamariny-Katlal Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 500,000 |
Comment
|
| 232 |
Street Lights in Town Estates |
Lands, Housing, Planning and Urban Development |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 1,000,000 |
Comment
|
| 233 |
Kopoya-Sikinin-Korbun-Sinenden Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 1,500,000 |
Comment
|
| 234 |
Siyoi-Kiptenten Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 1,250,000 |
Comment
|
| 235 |
Kaibos-Kaptoboswo-Kamariny Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 1,250,000 |
Comment
|
| 236 |
AIC Kipkorinya Junction-Kahawa- Prison Bridge Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 1,500,000 |
Comment
|
| 237 |
Kamoriom-Karandili Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 1,000,000 |
Comment
|
| 238 |
Two (2)-Line Culvert on Kipkorinya-Kaptuka Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 700,000 |
Comment
|
| 239 |
Tulwet-Kapsurum-Primary-Talau/Tomena Bridge Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 1,200,000 |
Comment
|
| 240 |
Talau-Tingiket-Chepkoti Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 1,300,000 |
Comment
|
| 241 |
Kipkorinya-Kaptuka Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 1,500,000 |
Comment
|
| 242 |
Kipkorinya Cattle Dip-GG Road-Kipsakas Primary Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Siyoi |
Ksh. 1,000,000 |
Comment
|
| 243 |
Parmechon-Priro Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sook |
Ksh. 1,500,000 |
Comment
|
| 244 |
Kaplelach-Kasilkach-Kadow Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sook |
Ksh. 1,500,000 |
Comment
|
| 245 |
Chepnyal-Chepokaliang-Mungit Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sook |
Ksh. 1,500,000 |
Comment
|
| 246 |
Partekwo-Chechokis-Pililai Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Sook |
Ksh. 1,500,000 |
Comment
|
| 247 |
Motany-Losiywat Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Suam |
Ksh. 500,000 |
Comment
|
| 248 |
Marich Fresh Produce Market (County Contribution Balance 40M) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Ongoing
|
Sekerr |
Ksh. 10,000,000 |
Comment
|
| 249 |
Modern Toilet at Trade HQ Office |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 3,000,000 |
Comment
|
| 250 |
Konyao Market Toilet Block |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kapchok |
Ksh. 1,000,000 |
Comment
|
| 251 |
West Pokot Milk Processing Plant (Water Supply) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Lelan |
Ksh. 3,000,000 |
Comment
|
| 252 |
Trade and Cooperative HQ offices |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 1,500,000 |
Comment
|
| 253 |
Motor Vehicle Shade at Cooperative HQ Office |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 1,000,000 |
Comment
|
| 254 |
Fencing of Milk Processing Plant at Kabichbich |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Lelan |
Ksh. 1,500,000 |
Comment
|
| 255 |
West Pokot County Milk Processing Plant at Lelan (Electricity Connectivity) |
Special Programmes |
2023-2024 |
Ongoing
|
Lelan |
Ksh. 1,000,000 |
Comment
|
| 256 |
Konyao Market |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Ongoing
|
Kapchok |
Ksh. 1,000,000 |
Comment
|
| 257 |
Land for Kamelei Market (Roll Over) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Ongoing
|
Tapach |
Ksh. 2,400,000 |
Comment
|
| 258 |
Land for Chepareria Market and Youth Empowerment Centre |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Ongoing
|
Chepareria |
Ksh. 5,000,000 |
Comment
|
| 259 |
Morwongor-Lokales Security Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Suam |
Ksh. 2,000,000 |
Comment
|
| 260 |
Sikowo-Ptop Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Tapach |
Ksh. 1,100,000 |
Comment
|
| 261 |
Land for Kacheliba Market (Pending Bill) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kapchok |
Ksh. 500,000 |
Comment
|
| 262 |
Feeder Roads in Tapach (Parayon Dispensary-Chelal Road-Mwotot Trading Center) |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Tapach |
Ksh. 2,950,000 |
Comment
|
| 263 |
Embolos-Telo-Tondow-Chemolo Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Tapach |
Ksh. 2,950,000 |
Comment
|
| 264 |
Capital Transfers to Individuals and Households (Support to Kamketo Bee Keepers Cooperative Society Ltd) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kasei |
Ksh. 1,000,000 |
Comment
|
| 265 |
Capital Transfers to Siyoi Dairy Cooperative Society Ltd |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Siyoi |
Ksh. 500,000 |
Comment
|
| 266 |
Sopowen-Kalitit Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Tapach |
Ksh. 2,000,000 |
Comment
|
| 267 |
Maar-Soka Road |
Public Works, Transport and Infrastructure |
2023-2024 |
Complete
|
Weiwei |
Ksh. 500,000 |
Comment
|
| 268 |
Bus/Car Shade at Tourism HQ Office |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,000,000 |
Comment
|
| 269 |
Makutano Stadium |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Mnagei |
Ksh. 5,000,000 |
Comment
|
| 270 |
Kaptabuk High Altitude Training Camp |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Lelan |
Ksh. 5,000,000 |
Comment
|
| 271 |
St. Catherine Girls Secondary School Chepnyal |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Sook |
Ksh. 1,000,000 |
Comment
|
| 272 |
Tamugh Primary School |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Sook |
Ksh. 1,000,000 |
Comment
|
| 273 |
Market Shade at Serewo Market (Rolllover) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Riwo |
Ksh. 999,943 |
Comment
|
| 274 |
Subukwo Field |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Batei |
Ksh. 1,000,000 |
Comment
|
| 275 |
Koposes Cultural Centre |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Lomut |
Ksh. 1,000,000 |
Comment
|
| 276 |
Street Lights at Orolwo and Karameri |
Special Programmes |
2023-2024 |
Complete
|
Kodich |
Ksh. 1,000,000 |
Comment
|
| 277 |
Beads Shade for Ushanga Women |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Chepareria |
Ksh. 500,000 |
Comment
|
| 278 |
Boda Boda Shed at Lowois |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 500,000 |
Comment
|
| 279 |
Iron Sheets to support 100 Households |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Alale |
Ksh. 2,500,000 |
Comment
|
| 280 |
Boda Boda Shed at Marich |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Sekerr |
Ksh. 600,000 |
Comment
|
| 281 |
Traditional Attire to Chipagh |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Batei |
Ksh. 300,000 |
Comment
|
| 282 |
Ushanga Initiative to Neema Women Group |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Batei |
Ksh. 300,000 |
Comment
|
| 283 |
Boda Boda Shed at Nakuyen Trading Centre |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Suam |
Ksh. 500,000 |
Comment
|
| 284 |
Iron Shets for Women Groups |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Kasei |
Ksh. 3,000,000 |
Comment
|
| 285 |
Boda Boda Shed at Morwongor Trading Centre |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Suam |
Ksh. 500,000 |
Comment
|
| 286 |
Land for Fresh Produce Market |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Ongoing
|
Kodich |
Ksh. 1,500,000 |
Comment
|
| 287 |
Iron Sheets to 150 Households |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Kodich |
Ksh. 1,300,000 |
Comment
|
| 288 |
Land for Tamugh Market |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Ongoing
|
Sook |
Ksh. 1,000,000 |
Comment
|
| 289 |
Iron Sheets for Vulnerable Families |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Lomut |
Ksh. 1,000,000 |
Comment
|
| 290 |
Three (3) Meter Iron sheets to Residents of Masol |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Masol |
Ksh. 3,000,000 |
Comment
|
| 291 |
Iron Sheets to Riwo Residents |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Riwo |
Ksh. 500,000 |
Comment
|
| 292 |
Capital Transfers to Non-profit Organizations and Associations (Narii FCS Ltd, Kaporowo Coffee Farmers) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Tapach |
Ksh. 500,000 |
Comment
|
| 293 |
Iron Sheets to Sekerr Residents (Ondoa Nyasi Initiative) |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Sekerr |
Ksh. 3,000,000 |
Comment
|
| 294 |
Capital Transfers to Non-profit Organizations and Associations (Construction of Milk Cooling Plant at Sondany FCS Ltd) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Tapach |
Ksh. 500,000 |
Comment
|
| 295 |
Ushanga Initiative to Sekerr Residents |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Sekerr |
Ksh. 1,000,000 |
Comment
|
| 296 |
Capital Transfers to Non-profit Organizations and Associations (Construction of Milk Cooling Plant at Ptop FCS Ltd) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Tapach |
Ksh. 500,000 |
Comment
|
| 297 |
Iron Sheets for Kapchok |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Kapchok |
Ksh. 1,000,000 |
Comment
|
| 298 |
Capital Transfers to Non-profit Organizations and Associations (Completion of Sokale FCS Ltd Milk Cooling Plant) |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Tapach |
Ksh. 500,000 |
Comment
|
| 299 |
Lorwas to Women Groups |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Sekerr |
Ksh. 1,000,000 |
Comment
|
| 300 |
Tapach FCS Ltd Milk Cooling Plant |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Tapach |
Ksh. 500,000 |
Comment
|
| 301 |
Sport Equipments |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Siyoi |
Ksh. 2,000,000 |
Comment
|
| 302 |
Iron sheets to Sook Residents |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Sook |
Ksh. 1,000,000 |
Comment
|
| 303 |
Iron Sheets for Old Aged and Disadvantaged in the society |
Tourism, Youths, Culture and Social Services |
2023-2024 |
Complete
|
Suam |
Ksh. 2,000,000 |
Comment
|
| 304 |
Store at HQ Office |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,500,000 |
Comment
|
| 305 |
Maize Seeds for Distribution throughout the County |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 60,000,000 |
Comment
|
| 306 |
Education Administration Block (Finishing of Main Works, Plaster, Floor Tiles, Ceiling, Window Panes, Windows, Ramp and Stairs, Painting, Mechanical Works, Toilets, Septic Tank, Access Stairs from Main Road to First Floor, Retaining Wall (Road Side) and Parking) |
Education and Technical Training |
2023-2024 |
Ongoing
|
Kapenguria |
Ksh. 36,064,564 |
Comment
|
| 307 |
Two (2) ECDE Classrooms and Pit Latrine at Tokos (Pending Bill) |
Education and Technical Training |
2023-2024 |
Complete
|
Kasei |
Ksh. 385,131 |
Comment
|
| 308 |
One (1) ECDE Classroom at Katumen (Pending Bill) |
Education and Technical Training |
2023-2024 |
Complete
|
Kasei |
Ksh. 627,700 |
Comment
|
| 309 |
Certified Maize Seeds (Pending Bill to Kenya Seed Company part Payment) |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 30,000,000 |
Comment
|
| 310 |
Mango Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 5,400,000 |
Comment
|
| 311 |
Coffee Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 4,500,000 |
Comment
|
| 312 |
Macadamia Nut Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 3,750,000 |
Comment
|
| 313 |
Avocado Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 4,750,000 |
Comment
|
| 314 |
One (1) ECDE Classroom at Otuko (Pending Bill) |
Education and Technical Training |
2023-2024 |
Complete
|
Alale |
Ksh. 584,280 |
Comment
|
| 315 |
Seed Nurseries |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 5,600,000 |
Comment
|
| 316 |
Onion Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,500,000 |
Comment
|
| 317 |
Kamwotogh Furrow |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lomut |
Ksh. 500,000 |
Comment
|
| 318 |
Apulia Furrow |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lomut |
Ksh. 500,000 |
Comment
|
| 319 |
Water Pumps and Pipe for Farmers of Akiriamet along River Malmaltu |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Masol |
Ksh. 2,400,000 |
Comment
|
| 320 |
One ECDE Classroom at Cheptamas (Pending Bill) |
Education and Technical Training |
2023-2024 |
Stalled
|
Masol |
Ksh. 680,728 |
Comment
|
| 321 |
Chain-link Materials for Kitchen Gardens |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Mnagei |
Ksh. 3,000,000 |
Comment
|
| 322 |
Chain-link Materials for Vegetable Gardens at Katuperot, Lotelemoi, Cheskirio and Lokarkar |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Suam |
Ksh. 700,000 |
Comment
|
| 323 |
Two ECDE Clasrooms at Sapulmoi (Pending Bill) |
Education and Technical Training |
2023-2024 |
Stalled
|
Masol |
Ksh. 1,249,624 |
Comment
|
| 324 |
Intake at Mrel Water Furrow |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Weiwei |
Ksh. 1,000,000 |
Comment
|
| 325 |
Knapsack Spray Pumps to Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Batei |
Ksh. 2,000,000 |
Comment
|
| 326 |
Knapsack Sprayers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Riwo |
Ksh. 2,000,000 |
Comment
|
| 327 |
Modern Toilets at Sina VTC |
Education and Technical Training |
2023-2024 |
Ongoing
|
Tapach |
Ksh. 2,000,000 |
Comment
|
| 328 |
Knapsacks |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sook |
Ksh. 2,500,000 |
Comment
|
| 329 |
Generators to Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Endugh |
Ksh. 2,000,000 |
Comment
|
| 330 |
Generators to Farmers along Suam River |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kodich |
Ksh. 1,500,000 |
Comment
|
| 331 |
Generators for Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 2,000,000 |
Comment
|
| 332 |
Grant to Kapenguria VTC (Renovation of Chesupet VTC) |
Education and Technical Training |
2023-2024 |
Ongoing
|
Lelan |
Ksh. 2,000,000 |
Comment
|
| 333 |
High-Voltage Generators to Farmers along Kerio River Chepserum Sub-location |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Masol |
Ksh. 2,400,000 |
Comment
|
| 334 |
Workshop at Chepareria VTC |
Education and Technical Training |
2023-2024 |
Ongoing
|
Chepareria |
Ksh. 4,000,000 |
Comment
|
| 335 |
Generators for Farmers at Orwa |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sekerr |
Ksh. 500,000 |
Comment
|
| 336 |
Certified Maize Seeds |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Endugh |
Ksh. 2,000,000 |
Comment
|
| 337 |
Seeds to Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kasei |
Ksh. 2,000,000 |
Comment
|
| 338 |
Capitation Grants to Chepareria Polytechnic (Rollover) |
Education and Technical Training |
2023-2024 |
Ongoing
|
Chepareria |
Ksh. 379,478 |
Comment
|
| 339 |
Certified Maize Seeds for Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kodich |
Ksh. 3,000,000 |
Comment
|
| 340 |
Onion Seeds for Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lelan |
Ksh. 500,000 |
Comment
|
| 341 |
Certified Seeds (Onions and Tomatoes) |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sekerr |
Ksh. 1,000,000 |
Comment
|
| 342 |
Certified Onion Seeds to Farmers Groups |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Tapach |
Ksh. 1,500,000 |
Comment
|
| 343 |
Mango Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 1,000,000 |
Comment
|
| 344 |
Mango Seedlings for Chemwochoi Location |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 1,000,000 |
Comment
|
| 345 |
Grants to Kapenguria Vocational Training Centre (VTC) |
Education and Technical Training |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,000,000 |
Comment
|
| 346 |
High-Voltage Generators and Water Pipes to Farmers in Amolem |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Masol |
Ksh. 2,400,000 |
Comment
|
| 347 |
Mango Seedlings |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sook |
Ksh. 1,000,000 |
Comment
|
| 348 |
Multipurpose Hall at Chepkukuii |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh. 2,000,000 |
Comment
|
| 349 |
Onion Seedlings to Farmers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Weiwei |
Ksh. 1,000,000 |
Comment
|
| 350 |
One (1) ECDE Classroom at Solion |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh. 1,000,000 |
Comment
|
| 351 |
Pasture Seeds |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,500,000 |
Comment
|
| 352 |
One (1) ECDE Classroom at Kamoiben-Kokwongorwo |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh. 1,000,000 |
Comment
|
| 353 |
Vaccines |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,000,000 |
Comment
|
| 354 |
One (1) Classroom at Muino Youth Polytechnic |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh. 1,000,000 |
Comment
|
| 355 |
Range Cubes for Nasukuta Abattoir |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,000,000 |
Comment
|
| 356 |
Dewormers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,000,000 |
Comment
|
| 357 |
Assorted Seeds |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 5,000,000 |
Comment
|
| 358 |
Tombul Cattle Dip (Pending Bill) |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sook |
Ksh. 480,000 |
Comment
|
| 359 |
Buildings in Nasukuta LIC |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Chepareria |
Ksh. 3,200,000 |
Comment
|
| 360 |
Standard Gate LIC at Nasukuta with Extension of a Wall |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Chepareria |
Ksh. 3,000,000 |
Comment
|
| 361 |
An Apiary (Modern Bee Hive Yard) |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Chepareria |
Ksh. 2,000,000 |
Comment
|
| 362 |
ECDE Classroom at Selenga |
Education and Technical Training |
2023-2024 |
Ongoing
|
Batei |
Ksh. 800,000 |
Comment
|
| 363 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Batei |
Ksh. 1,000,000 |
Comment
|
| 364 |
Dormitory at Simatwa Primary School |
Education and Technical Training |
2023-2024 |
Ongoing
|
Riwo |
Ksh. 2,000,000 |
Comment
|
| 365 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 700,000 |
Comment
|
| 366 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 1,000,000 |
Comment
|
| 367 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kodich |
Ksh. 1,500,000 |
Comment
|
| 368 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lelan |
Ksh. 2,200,000 |
Comment
|
| 369 |
Dormitory at Riwo Secondary School |
Education and Technical Training |
2023-2024 |
Complete
|
Riwo |
Ksh. 1,000,000 |
Comment
|
| 370 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Riwo |
Ksh. 2,500,000 |
Comment
|
| 371 |
Vaccines |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Riwo |
Ksh. 1,000,000 |
Comment
|
| 372 |
ECDE Toilets at Tukumwok (Mtembur) |
Education and Technical Training |
2023-2024 |
Complete
|
Riwo |
Ksh. 500,000 |
Comment
|
| 373 |
Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sook |
Ksh. 2,500,000 |
Comment
|
| 374 |
Vaccines |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sook |
Ksh. 2,000,000 |
Comment
|
| 375 |
Acaricides for Cattle Dips |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Tapach |
Ksh. 1,500,000 |
Comment
|
| 376 |
Latrine at Mochowon ECDE |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh. 500,000 |
Comment
|
| 377 |
One (1) ECDE Classroom at Topongieny |
Education and Technical Training |
2023-2024 |
Ongoing
|
Weiwei |
Ksh. 1,000,000 |
Comment
|
| 378 |
Mbara Cattle Dip |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sekerr |
Ksh. 500,000 |
Comment
|
| 379 |
Chepkondol Cattle Dip |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Sekerr |
Ksh. 500,000 |
Comment
|
| 380 |
One (1) ECDE Classroom at Chilo |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh. 1,000,000 |
Comment
|
| 381 |
Pit Latrine at Chilo ECDE |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh. 600,000 |
Comment
|
| 382 |
Pit Latrine at Psimat ECDE |
Education and Technical Training |
2023-2024 |
Ongoing
|
Weiwei |
Ksh. 550,000 |
Comment
|
| 383 |
Two (2) Classrooms at Kaporon Primary School |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh. 400,000 |
Comment
|
| 384 |
Sangat ECDE Classrooms |
Education and Technical Training |
2023-2024 |
Stalled
|
Weiwei |
Ksh. 700,000 |
Comment
|
| 385 |
Perkau ECDE Classrooms |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh. 600,000 |
Comment
|
| 386 |
Chepkukuii Multipurpose Hall |
Education and Technical Training |
2023-2024 |
Complete
|
Weiwei |
Ksh. 3,000,000 |
Comment
|
| 387 |
Ywalateke Cattle Dip |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Chepareria |
Ksh. 700,000 |
Comment
|
| 388 |
ECDE Chairs |
Education and Technical Training |
2023-2024 |
Ongoing
|
Alale |
Ksh. 800,000 |
Comment
|
| 389 |
Furnitures |
Education and Technical Training |
2023-2024 |
Complete
|
Kodich |
Ksh. 2,400,000 |
Comment
|
| 390 |
ECDE Tables and Chairs to all ECDES |
Education and Technical Training |
2023-2024 |
Complete
|
Mnagei |
Ksh. 600,000 |
Comment
|
| 391 |
Cattle Dip at Rotin |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Chepareria |
Ksh. 500,000 |
Comment
|
| 392 |
Land for Chepkono Cattle Dip |
Agriculture and Irrigation |
2023-2024 |
Ongoing
|
Lelan |
Ksh. 1,000,000 |
Comment
|
| 393 |
Galla Goats |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Suam |
Ksh. 700,000 |
Comment
|
| 394 |
Karokony Cattle Dip |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lelan |
Ksh. 350,000 |
Comment
|
| 395 |
Improved Local Goat Breeds |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Riwo |
Ksh. 1,000,000 |
Comment
|
| 396 |
Korosion Cattle Dip |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lelan |
Ksh. 350,000 |
Comment
|
| 397 |
Goats to Fifty (50) Households at Lokichar Location |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kodich |
Ksh. 2,000,000 |
Comment
|
| 398 |
Kokwo Ptorir Cattle Dip |
Agriculture and Irrigation |
2023-2024 |
Ongoing
|
Lomut |
Ksh. 1,000,000 |
Comment
|
| 399 |
Artificial Insemination (AI) Materials |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Siyoi |
Ksh. 500,000 |
Comment
|
| 400 |
Cattle Crush at Lokichar |
Agriculture and Irrigation |
2023-2024 |
Ongoing
|
Kodich |
Ksh. 1,500,000 |
Comment
|
| 401 |
Knapsack Sprayers |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Lomut |
Ksh. 1,000,000 |
Comment
|
| 402 |
Cattle Crush at Kanasat (Rollover) |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 1,200,000 |
Comment
|
| 403 |
Knapsack Spray Pumps |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kapchok |
Ksh. 1,000,000 |
Comment
|
| 404 |
Cattle Crush at Nasuret |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Alale |
Ksh. 1,700,000 |
Comment
|
| 405 |
Spray Pumps and Acaricides |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Endugh |
Ksh. 2,900,000 |
Comment
|
| 406 |
Cattle Crush at Kpomot Village |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Alale |
Ksh. 1,700,000 |
Comment
|
| 407 |
Cattle Crush at Shongen Village |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Suam |
Ksh. 1,300,000 |
Comment
|
| 408 |
Cattle Dip at Kaptum |
Agriculture and Irrigation |
2023-2024 |
Ongoing
|
Lelan |
Ksh. 1,988,000 |
Comment
|
| 409 |
Metallic Crush at Lolepon |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 1,300,000 |
Comment
|
| 410 |
Cattle Crush at Kalas in Krimti |
Agriculture and Irrigation |
2023-2024 |
Complete
|
Kodich |
Ksh. 1,500,000 |
Comment
|
| 411 |
Generator for Modern County Assembly Building |
County Assembly |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 9,900,000 |
Comment
|
| 412 |
Lift for Modern County Assembly Building |
County Assembly |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 14,147,600 |
Comment
|
| 413 |
New County Assembly Building |
County Assembly |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 1,600,000 |
Comment
|
| 414 |
Multimedia for Modern County Assembly Building |
County Assembly |
2023-2024 |
Ongoing
|
Kapenguria |
Ksh. 34,489,000 |
Comment
|
| 415 |
County Assembly Restaurant |
County Assembly |
2023-2024 |
Stalled
|
Kapenguria |
Ksh. 200,000 |
Comment
|
| 416 |
New County Assembly |
County Assembly |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 56,442,172 |
Comment
|
| 417 |
One (1) Motor Vehicle |
County Assembly |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 11,666,161 |
Comment
|
| 418 |
County Water HQ Office |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 748,000 |
Comment
|
| 419 |
Alale Gravity Water Supply Project (Rollover) |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Alale |
Ksh. 1,406,624 |
Comment
|
| 420 |
Empoghat-Porowo Water Supply Project (Rollover) |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Siyoi |
Ksh. 4,997,484 |
Comment
|
| 421 |
Borehole Repair Materials for Sigor Subcounty |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Weiwei |
Ksh. 3,000,000 |
Comment
|
| 422 |
Borehole Repair Materials for North Pokot |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Alale |
Ksh. 3,000,000 |
Comment
|
| 423 |
KAPILAT-TORION-NYARPAT WATER PROJECT |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Tapach |
Ksh. 4,000,000 |
Comment
|
| 424 |
Kamasat water project in Weiwei and Tapach ward |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Weiwei |
Ksh. 3,000,000 |
Comment
|
| 425 |
Certified Tree Seeds for County Tree Nurseries and Support 100 Youth and Women Groups |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 200,000 |
Comment
|
| 426 |
Potting Tubes to Support Tree Nurseries and for Youth, Women, & Green Champion Groups |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 500,000 |
Comment
|
| 427 |
Tree Seedlings to Farmers in West Pokot Subcounty |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 900,000 |
Comment
|
| 428 |
Borehole at Nagwoilap Village |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Alale |
Ksh. 2,000,000 |
Comment
|
| 429 |
Kapanyirit Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapchok |
Ksh. 500,000 |
Comment
|
| 430 |
Apliep Solar Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 1,000,000 |
Comment
|
| 431 |
County Roads Headquarters Office (Ujenzi House) |
CPSM, ICT and Decentralized Units |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,500,000 |
Comment
|
| 432 |
Cheporon Borehole (Rollover) |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 2,000,000 |
Comment
|
| 433 |
Local Area Network (LAN) and Work Station for Kapenguria Youth VTC LAB-Jitume Programme |
CPSM, ICT and Decentralized Units |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 2,500,000 |
Comment
|
| 434 |
KDSP Level II Grant-Completion of MRI Unit (Rollover) |
Finance and Economic Planning |
2023-2024 |
Complete
|
Kapenguria |
Ksh. 25,377,012 |
Comment
|
| 435 |
Revenue Barriers at Kapsait, Kamelei, Kanyarkwat, Kacheliba Sale Yard, Chorwai and Kanyerus |
Finance and Economic Planning |
2023-2024 |
Complete
|
Kapchok |
Ksh. 2,000,000 |
Comment
|
| 436 |
Clamps and Road Spikes for all Revenue Collection Barriers |
Finance and Economic Planning |
2023-2024 |
Complete
|
Mnagei |
Ksh. 2,300,000 |
Comment
|
| 437 |
Poghogh Water Point |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Weiwei |
Ksh. 500,000 |
Comment
|
| 438 |
Water Trough at Sokopet Water Point |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Weiwei |
Ksh. 500,000 |
Comment
|
| 439 |
Lutupoi Water Intake and Water Tank |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lelan |
Ksh. 500,000 |
Comment
|
| 440 |
Water Tank for Manian Primary School 10,000 Ltrs (Rolover) |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lelan |
Ksh. 100,000 |
Comment
|
| 441 |
Kachambilwa Sub-surface Dam |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Riwo |
Ksh. 600,000 |
Comment
|
| 442 |
Katukuri Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Alale |
Ksh. 1,200,000 |
Comment
|
| 443 |
Piped Water at Lutupogh-Takar Dispensary |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Weiwei |
Ksh. 500,000 |
Comment
|
| 444 |
Solar at Nagwoilap Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Alale |
Ksh. 2,200,000 |
Comment
|
| 445 |
Water Pipes for Rosoma Water Project, St. Padua Sina Secondary School and Lulwoi ECDE Water Project |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Tapach |
Ksh. 2,500,000 |
Comment
|
| 446 |
Water Supply to Tapach Health Facility, Tapach Secondary School, Tapach Primary and Tapach Market |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Tapach |
Ksh. 1,500,000 |
Comment
|
| 447 |
Kamurunyang Solar Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Alale |
Ksh. 400,000 |
Comment
|
| 448 |
Kingisia-Kopulio Borehole to Solar Powered |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Suam |
Ksh. 2,300,000 |
Comment
|
| 449 |
Solar at Cheposekogh Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Alale |
Ksh. 2,000,000 |
Comment
|
| 450 |
Kokwolikwon-Karon Borehole to Solar Powered |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Suam |
Ksh. 2,300,000 |
Comment
|
| 451 |
Boreholes (Lolepon, Lodony, Nauyapong 1 & 2, Oron and Kaptuken) |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Alale |
Ksh. 500,000 |
Comment
|
| 452 |
Lokii-Losiywat Borehole to Solar Powered |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Suam |
Ksh. 2,300,000 |
Comment
|
| 453 |
Akiriamet Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Alale |
Ksh. 1,000,000 |
Comment
|
| 454 |
Potting Tubes for Lopoin-Kasimotwo Tree Nursery |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Sook |
Ksh. 1,500,000 |
Comment
|
| 455 |
Remoi Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Alale |
Ksh. 700,000 |
Comment
|
| 456 |
Water Intake at Kwa Wanyonyi Spring in Chorok |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Siyoi |
Ksh. 500,000 |
Comment
|
| 457 |
Water Intake at Kaibos Secondary School |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Siyoi |
Ksh. 500,000 |
Comment
|
| 458 |
Tree Seedlings from Chemngoror Tree Nursery |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Batei |
Ksh. 500,000 |
Comment
|
| 459 |
Ortum Girls Primary School Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Batei |
Ksh. 300,000 |
Comment
|
| 460 |
Sub-surface Dam at Sukut |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Batei |
Ksh. 1,000,000 |
Comment
|
| 461 |
Abeyon Water Project and Pipping to Napitiro Dispensary and Napitiro Primary School |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Kapchok |
Ksh. 2,000,000 |
Comment
|
| 462 |
Mading Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapchok |
Ksh. 2,000,000 |
Comment
|
| 463 |
Ateker Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kapchok |
Ksh. 2,000,000 |
Comment
|
| 464 |
Solar Pump and Controllers |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Kapchok |
Ksh. 1,000,000 |
Comment
|
| 465 |
Chepkechir Borehole to Solar Powered |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Ongoing
|
Kapenguria |
Ksh. 2,000,000 |
Comment
|
| 466 |
Solar Panels and Pipping of Water to Siyoi Secondary School, Primary School and Siyoi Centre |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Siyoi |
Ksh. 2,000,000 |
Comment
|
| 467 |
Solar Panels, Water Tank and Piping of Water to Kapchila Primary School |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Siyoi |
Ksh. 2,000,000 |
Comment
|
| 468 |
Borehole at Nasolot |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Sekerr |
Ksh. 2,200,000 |
Comment
|
| 469 |
Kasei Borehole to Solar Powered |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kasei |
Ksh. 2,000,000 |
Comment
|
| 470 |
Sand Dam at Kaingeny |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kiwawa |
Ksh. 500,000 |
Comment
|
| 471 |
Sand Dam at Kaibong |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Kiwawa |
Ksh. 800,000 |
Comment
|
| 472 |
Lokichar , Nakwapuo , Lomada, Adadat Borehole |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kodich |
Ksh. 600,000 |
Comment
|
| 473 |
Sand Dam at Adadat |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Kodich |
Ksh. 700,000 |
Comment
|
| 474 |
Water Pan at Reretiang |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Kodich |
Ksh. 3,000,000 |
Comment
|
| 475 |
Orolwo Dam |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Kodich |
Ksh. 1,500,000 |
Comment
|
| 476 |
Sand Dam at Kapul River |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Kodich |
Ksh. 700,000 |
Comment
|
| 477 |
Lulunga Borehole and Purchase of Borehole Repair Materials |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Kodich |
Ksh. 800,000 |
Comment
|
| 478 |
Water Intake and Pipping of Plalang Water Project |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lelan |
Ksh. 700,000 |
Comment
|
| 479 |
Cheptoruk-Pyapus-Kapkai Water Supply |
Water, Environment and Natural Resources |
2023-2024 |
Ongoing
|
Lelan |
Ksh. 600,000 |
Comment
|
| 480 |
Kachepket Water Supply |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lelan |
Ksh. 1,000,000 |
Comment
|
| 481 |
Songwo-Chepaywat-Korora-Chesta-Parkino Water Project |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lomut |
Ksh. 2,000,000 |
Comment
|
| 482 |
Water at Maransa-Kauk Water Supply |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lomut |
Ksh. 2,000,000 |
Comment
|
| 483 |
Water Project at Empogh-Kasamugh-Sukuk |
Trade, Industrialization and Cooperative Development |
2023-2024 |
Complete
|
Lomut |
Ksh. 1,000,000 |
Comment
|
| 484 |
Water Project at Chemurlokotyo-Tanyingwan |
Water, Environment and Natural Resources |
2023-2024 |
Complete
|
Lomut |
Ksh. 1,000,000 |
Comment
|
| 485 |
CONSTRUCTION OF RESIDENTIAL BUILDING(SPEAKER'S RESIDENCE) |
County Assembly |
2023-2024 |
Stalled
|
KAPENGURIA |
Ksh. 200,000 |
Comment
|
| 486 |
CONSTRUCTION OF NEW COUNTY ASSEMBLY |
County Assembly |
2023-2024 |
Ongoing
|
KAPENGURIA |
Ksh. 1,600,000 |
Comment
|
| 487 |
PURCHASE OF ONE (1) MOTOR VEHICLE |
County Assembly |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 11,666,161 |
Comment
|
| 488 |
EQUIPING OF NEW COUNTY ASSEMBLY |
County Assembly |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 56,442,172 |
Comment
|
| 489 |
PURCHASE OF MULTIMEDIA MORDERN COUNTY ASSEMBLY BUILDING |
County Assembly |
2023-2024 |
Ongoing
|
KAPENGURIA |
Ksh. 34,489,000 |
Comment
|
| 490 |
PURCHASE AND INSTALLATION OF LIFT MORDERN COUNTY ASSEMBLY BUILDING |
County Assembly |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 1,414,760 |
Comment
|
| 491 |
PURCHASE OF GENERATOR-MORDERN COUNTY ASSEMBLY BUILDING |
County Assembly |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 9,900,000 |
Comment
|
| 492 |
CONSTRUCTION OF MODERN TOILET AT TRADE OFFICE |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 3,000,000 |
Comment
|
| 493 |
CONSTRUCTION OF KONYAO MARKET TOILET BLOCK |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 494 |
COMPLETION OF WEST POKOT MILK PROCESSING PLANT - WATER SUPPLY |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
LELAN |
Ksh. 3,000,000 |
Comment
|
| 495 |
RENOVATION OF TRADE AND COOPERATIVE COOPERATIVE OFFICES |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 1,500,000 |
Comment
|
| 496 |
CONSTRUCTION OF MOTOR VEHICLE SHADE AT COOPERATIVE OFFICE |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 1,000,000 |
Comment
|
| 497 |
COMPLETION OF FENCING OF MILK PROCESSING PLANT - LELAN WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
LELAN |
Ksh. 1,500,000 |
Comment
|
| 498 |
CONSTRUCTION OF WEST POKOT COUNTY MILK PROCEESSING PLANT AT LELAN - ELECTRICAL CONNECTIVITY, |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Ongoing
|
LELAN |
Ksh. 1,000,000 |
Comment
|
| 499 |
RENOVATION OF MAKUTANO MARKET |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Ongoing
|
MNAGEI |
Ksh. 3,000,000 |
Comment
|
| 500 |
RENOVATION OF KONYAO MARKET |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Ongoing
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 501 |
PURCHASE OF LAND FOR KAMELEI MARKET -ROLL OVER |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Ongoing
|
TAPACH |
Ksh. 2,400,000 |
Comment
|
| 502 |
PURCHASE OF LAND FOR CHEPARERIA MARKET AND YOUTH EMPOWEREMENT CENTRE |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Ongoing
|
CHEPARERIA |
Ksh. 5,000,000 |
Comment
|
| 503 |
PURCHASE OF MURKWIJIT COOLING PLANT |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Ongoing
|
MNAGEI |
Ksh. 500,000 |
Comment
|
| 504 |
PURCHASE OF LAND FOR KACHELIBA MARKET (PENDING BILL) |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KAPCHOK |
Ksh. 500,000 |
Comment
|
| 505 |
PROPOSED CONSTRUCTION OF BODA BODA SHADE AT SIGOR(PENDING BILL) |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
WEIWEI |
Ksh. 499,999 |
Comment
|
| 506 |
CAPITAL TRANSFERS TO INDIVIDUALS AND HOUSEHOLDS -SUPPORT TO KAMKETO BEE KEEPERS COOPERATIVE SOCIETY LTD - KASEI WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KASEI |
Ksh. 1,000,000 |
Comment
|
| 507 |
SUPPORT TO SIYOI DAIRY COOPERATIVE SOCIETY - SIYOI WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
SIYOI |
Ksh. 500,000 |
Comment
|
| 508 |
CAPITAL TRANSFERS TO NON PROFIT ORGANISATION AND ASSOCIATIONS - SUPPORT TO NARII FCS LTD KAPOROWO COFFEE FARMERS -TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
TAPACH |
Ksh. 500,000 |
Comment
|
| 509 |
CAPITAL TRANSFERS TO NON PROFIT ORGANISATION AND ASSOCIATIONS -CONSTRUCTION OF MILK COOLING PLANT AT SONDANY FCS LTD -TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
TAPACH |
Ksh. 500,000 |
Comment
|
| 510 |
CAPITAL TRANSFERS TO NON PROFIT ORGANISATION AND ASSOCIATIONS - CONSTRUCTION OF MILK COOLING PLANT AT PTOP FCS LTD -TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
TAPACH |
Ksh. 500,000 |
Comment
|
| 511 |
CAPITAL TRANSFERS TO NON PROFIT ORGANISATION AND ASSOCIATIONS - COMPLETION OF SOKALE FCS LTD MILK COOLING PLANT -TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
TAPACH |
Ksh. 500,000 |
Comment
|
| 512 |
COMPLETION AND OPERATIONALIZATION OF TAPACH FCS LTD COOLING PLANT FOR MILK -TAPACH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
TAPACH |
Ksh. 500,000 |
Comment
|
| 513 |
CONSTRUCTION OF MARKET SHADE AT SEREWO MARKET -RIWO WARD(ROLL OVER) |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
RIWO |
Ksh. 999,943 |
Comment
|
| 514 |
INSTALLATION OF STREET LIGHTS AT MAKUTANO-MNAGEI WARD (ROLL OVER) |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
MNAGEI |
Ksh. 621,000 |
Comment
|
| 515 |
INSTALATION OF STREET LIGHTS AT OROLWO AND KARAMERI -KODICH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KODICH |
Ksh. 1,000,000 |
Comment
|
| 516 |
CONSTRUCTION OF BODA BODA SHED AT LOWOIS IN KIWAWA WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KIWAWA |
Ksh. 500,000 |
Comment
|
| 517 |
CONSTRUCTION OF BODA BODA SHED AT MARICH IN SEKKER WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
SEKKER |
Ksh. 600,000 |
Comment
|
| 518 |
CONSTRUCTION OF BODABODA SHED AT NAKUYEN TRADING CENTRE - SUAM WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
SUAM |
Ksh. 500,000 |
Comment
|
| 519 |
CONSTRUCTION OF BODABODA SHED AT MORWONGOR TRADING CENTRE - SUAM WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
SUAM |
Ksh. 500,000 |
Comment
|
| 520 |
PURCHASE OF LAND FOR FRESH PRODUCE MARKET-KODICH WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
KODICH |
Ksh. 1,500,000 |
Comment
|
| 521 |
PURCHASE OF LAND FOR TAMUGH MARKET IN SOOK WARD |
TRADE INDUSTRIALIZATION AND COOPERATIVE DEVELOPMENT |
2023-2024 |
Complete
|
SOOK |
Ksh. 1,000,000 |
Comment
|
| 522 |
FENCING OF COUNTY WATER HQ OFFICE |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 748,000 |
Comment
|
| 523 |
ALALE GRAVITY WATER SUPPLY PROJECT(ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
ALALE |
Ksh. 1,406,624 |
Comment
|
| 524 |
EMPOHAT-POROWO WATER SUPPLY PROJECT(ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SIYOI |
Ksh. 4,997,484 |
Comment
|
| 525 |
SIGOR GRAVITY WATER SUPPLY PROJECT(ROLL OVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
WEI WEI |
Ksh. 14,000,000 |
Comment
|
| 526 |
PURCHASE OF BOREHOLE REPAIR MATERIALS FOR SIGOR SUB COUNTY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
WEI WEI |
Ksh. 3,000,000 |
Comment
|
| 527 |
PURCHASE OF BOREHOLE REPAIR MATERIALS FOR NORTH POKOT |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
ALALE |
Ksh. 3,000,000 |
Comment
|
| 528 |
KAPILAT – TORION – NYARPAT WATER PROJECT IN TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
TAPACH |
Ksh. 4,000,000 |
Comment
|
| 529 |
KAMASAT WATER PROJECT IN WEI WEI AND TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
WEIWEI |
Ksh. 3,000,000 |
Comment
|
| 530 |
DRILLING OF BOREHOLE IN KAIWOW - KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 2,100,000 |
Comment
|
| 531 |
PURCHASE AND SUPPLY OF TANKS(5000LTRS) FOR SCHOOLS IN CHEPTULEL,MASOL AND PORKOYO LOCATION |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LOMUT, MASOL, SEKERR |
Ksh. 1,500,000 |
Comment
|
| 532 |
RAISING OF BAMBOO SEEDLINGS AT OFFICE TREE NURSERY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 300,000 |
Comment
|
| 533 |
PURCHASE OF CERTIFIED TREE SEEDS FOR COUNTY TREE NURSERIES AND SUPPORT 100 YOUTH AND WOMEN GROUPS |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 200,000 |
Comment
|
| 534 |
PURCHASING OF POTTING TUBES TO SUPPORT TREE NURSERIES AND FOR YOUTH, WOMEN, & GREEN CHAMPION GROUPS |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 500,000 |
Comment
|
| 535 |
PURCHASE OF TREE SEEDLINGS AND DISTRIBUTED TO FARMERS IIN WEST POKOT SUB-COUNTY |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 900,000 |
Comment
|
| 536 |
DRILLING OF BOREHOLE AT NAGWOILAP VILLAGE -ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
ALALE |
Ksh. 2,000,000 |
Comment
|
| 537 |
INSTALATION OF KAPANYIRIT BOREHOLE - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPCHOK |
Ksh. 500,000 |
Comment
|
| 538 |
REPAIR OF APLIEP SOLAR BOREHOLE-KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh. 1,000,000 |
Comment
|
| 539 |
DRILLING OF CHEPORON BOREHOLE - KIWAWA WARD (ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh. 2,000,000 |
Comment
|
| 540 |
CONSTRUCTION OF LUTUPOI WATER INTAKE AND WATER TANK-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LELAN |
Ksh. 500,000 |
Comment
|
| 541 |
PURCHASE AND SUPPLY OF WATER TANK FOR MANIAN PRIMARY SCHOOL 10,000LTRS-LELAN WARD(ROLLOVER) |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LELAN |
Ksh. 100,000 |
Comment
|
| 542 |
DRILLING OF BOREHOLE AT LOCHIO-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
RIWO |
Ksh. 2,000,000 |
Comment
|
| 543 |
SPRING PROTECTION AT BAPTIST AREA -MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
MNAGEI |
Ksh. 499,900 |
Comment
|
| 544 |
REHABILITATION OF ORWA WATER PROJECT - SEKERR |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SEKERR |
Ksh. 500,000 |
Comment
|
| 545 |
KONGOT TREE NURSERY - SOOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SOOK |
Ksh. 500,000 |
Comment
|
| 546 |
KACHAMBILWA SUB-SURFACE DAM-RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
RIWO |
Ksh. 600,000 |
Comment
|
| 547 |
DRILLING OF KATUKURI BOREHOLE -ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
ALALE |
Ksh. 1,200,000 |
Comment
|
| 548 |
INSTALLATION OF SOLAR AT NAGWOILAP BOREHOLE - ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
ALALE |
Ksh. 2,200,000 |
Comment
|
| 549 |
REPAIR OF LOKITONYALA SOLAR BOREHOLE AND PURCHASE OF 10,000 LTRS WATER TANK - ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
ALALE |
Ksh. 500,000 |
Comment
|
| 550 |
REPAIR OF KAMURUNYANG SOLAR BOREHOLE - ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
ALALE |
Ksh. 400,000 |
Comment
|
| 551 |
SOLAR INSTALLATION AT CHEPOSEKOGH BOREHOLE- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
ALALE |
Ksh. 2,000,000 |
Comment
|
| 552 |
REPAIR OF BOREHOLES(LOLEPON,LODONY,NAUYAPONG 1 & 2,ORON AND KAPTUKEN)- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
ALALE |
Ksh. 500,000 |
Comment
|
| 553 |
REPAIR AND FENCING AT AKIRIAMET BOREHOLE IN- ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
ALALE |
Ksh. 1,000,000 |
Comment
|
| 554 |
REPAIR OF REMOI BOREHOLE-ALALE WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
ALALE |
Ksh. 700,000 |
Comment
|
| 555 |
PURCHASE OF TREE SEEDLINGS FROM CHEMNGOROR TREE NURSERY- BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
BATEI |
Ksh. 500,000 |
Comment
|
| 556 |
REPAIR OF ORTUM GIRLS PRIMARY BOREHOLE-BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
BATEI |
Ksh. 300,000 |
Comment
|
| 557 |
CONSTRUCTION OF SUB-SURFACE DAM AT SUKUT- BATEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
BATEI |
Ksh. 1,000,000 |
Comment
|
| 558 |
PLELAKAN PIPING OF WATER KINDO – LILIMARENG TO SCHOOLS-- CHEPARERIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
CHEPARERIA |
Ksh. 1,000,000 |
Comment
|
| 559 |
CONSTRUCTION OF ABEYON WATER PROJECT AND PIPING TO NAPITIRO DISPENSARY AND NAPITIRO PRI. SCHOOL - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
KAPCHOK |
Ksh. 2,000,000 |
Comment
|
| 560 |
DRILLING OF MADING BOREHOLE - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPCHOK |
Ksh. 2,000,000 |
Comment
|
| 561 |
DRILLING OF ATEKER BOREHOLE - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPCHOK |
Ksh. 2,000,000 |
Comment
|
| 562 |
PURCHASE OF SOLAR PUMP AND CONTROLLERS - KAPCHOK WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPCHOK |
Ksh. 1,000,000 |
Comment
|
| 563 |
UPGRADING CHEPKECHIR TO SOLAR BORE HOLE - KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
KAPENGURIA |
Ksh. 2,000,000 |
Comment
|
| 564 |
DRILLING OF BORE HOLE AT KOMOL- KAPENGURIA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KAPENGURIA |
Ksh. 2,000,000 |
Comment
|
| 565 |
UPGRADING OF KASEI BOREHOLE TO SOLAR POWERED -KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
KASEI |
Ksh. 2,000,000 |
Comment
|
| 566 |
SUPPLY OF BOREHOLE DRILLING MATERIALS FOR KONGAI BOREHOLE-KASEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KASEI |
Ksh. 1,000,000 |
Comment
|
| 567 |
CONSTRUCTION OF SAND DAM AT KACHARETA-KIWAWA WARD- KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh. 500,000 |
Comment
|
| 568 |
CONSTRUCTION OF SAND DAM AT KAINGENY- KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh. 500,000 |
Comment
|
| 569 |
DRILLING OF BOREHOLE AND INSTALLATION OF HAND PUMP AT NAKUSE - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh. 2,500,000 |
Comment
|
| 570 |
DRILLING OF BOREHOLE AND INSTALLATION OF HAND PUMP AT KALODEKE- KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh. 2,500,000 |
Comment
|
| 571 |
CONSTRUCTION OF SAND DAM AT KAIBONG - KIWAWA WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KIWAWA |
Ksh. 800,000 |
Comment
|
| 572 |
REPAIR OF LOKICHAR ,NAKWAPUO ,LOMADA,ADADAT BOREHOLE- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KODICH |
Ksh. 600,000 |
Comment
|
| 573 |
CONSTRUCTION OF SAND DAM AT ADADAT -KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
KODICH |
Ksh. 700,000 |
Comment
|
| 574 |
CONSTRUCTION OF WATER PAN AT RERETIANG- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
KODICH |
Ksh. 3,000,000 |
Comment
|
| 575 |
DRILLING OF BOREHOLE AT APRIKI- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
KODICH |
Ksh. 2,800,000 |
Comment
|
| 576 |
DESILTING OF OROLWO DAM- KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
KODICH |
Ksh. 1,500,000 |
Comment
|
| 577 |
CONSTRUCTION OF SAND DAM AT KAPUL RIVER - KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
KODICH |
Ksh. 700,000 |
Comment
|
| 578 |
EQUIPING OF LULUNGA BOREHOLE AND PURCHASE OF BOREHOLE REPAIR MATERIALS - KODICH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
KODICH |
Ksh. 800,000 |
Comment
|
| 579 |
REPAIR OF WATER INTAKE AND PIPING PLALANG WATER PROJECT- LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LELAN |
Ksh. 700,000 |
Comment
|
| 580 |
CONSTRUCTION OF CHEPTORUK-PYAPUS- KAPKAI WATER SUPPLY IN LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
LELAN |
Ksh. 600,000 |
Comment
|
| 581 |
CONSTRUCTION AND PIPING OF KACHEPKET WATER SUPPLY-LELAN WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
LELAN |
Ksh. 1,000,000 |
Comment
|
| 582 |
CONSTRUCTION OF SONGWO-CHEPAYWAT-KORORA-CHESTA-PARKINO WATER PROJECT -LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LOMUT |
Ksh. 2,000,000 |
Comment
|
| 583 |
CONSTRUCTION AND PIPING OF WATER AT MARANSA-KAUK WATER SUPPLY -LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LOMUT |
Ksh. 2,000,000 |
Comment
|
| 584 |
CONSTRUCTION AND PIPING OF WATER PROJECT AT EMPOGH- KASAMUGH - SUKUK-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LOMUT |
Ksh. 1,000,000 |
Comment
|
| 585 |
CONSTRUCTION AND PIPING OF WATER PROJECT AT CHEMURLOKOTYO-TANYINGWAN-LOMUT WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
LOMUT |
Ksh. 1,000,000 |
Comment
|
| 586 |
EXTENSION OF PIPED WATER FROM KANGORIA VILLAGE TO ORON ECDE - MASOL WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
MASOL |
Ksh. 300,000 |
Comment
|
| 587 |
INSTALLATION OF SOLAR PANEL FOR KISHAUNET CENTRE BOREHOLE -MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
MNAGEI |
Ksh. 2,000,000 |
Comment
|
| 588 |
KERINGET WATER PIPING PROJECT-MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
MNAGEI |
Ksh. 2,000,000 |
Comment
|
| 589 |
SUPPLY OF WATER PIPES TO MNAGEI WATER PROJECTS - MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
MNAGEI |
Ksh. 1,000,000 |
Comment
|
| 590 |
INTAKE PROTECTION WORKS FOR CHEPOSAIT WATER PROJECT - MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
MNAGEI |
Ksh. 400,000 |
Comment
|
| 591 |
PURCHASE OF BORE HOLE REPAIR TOOLS- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
MNAGEI |
Ksh. 400,000 |
Comment
|
| 592 |
PURCHASE AND SUPPLY OF BOREHOLE MATERIALS- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
MNGAEI |
Ksh. 900,000 |
Comment
|
| 593 |
PROTECTION OF SPRING WATER AT MBOGHOU IN KANGILIKWAN- MNAGEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
MNAGEI |
Ksh. 400,000 |
Comment
|
| 594 |
PIPING OF WATER FROM MAIN BOREHOLE -CENTRE-KAITUKUM -RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
RIWO |
Ksh. 1,000,000 |
Comment
|
| 595 |
WATER PIPING OF WATER FROM MAIN TO LOKNA CENTRE - RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
RIWO |
Ksh. 1,000,000 |
Comment
|
| 596 |
WATER PIPING OF WATER FROM THE HILL TO VILLAGE POOLE- RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
RIWO |
Ksh. 1,000,000 |
Comment
|
| 597 |
CONSTRUCTIONOF SUBSURFACE DAM NAPWANGITIANG- RIWO WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
RIWO |
Ksh. 1,000,000 |
Comment
|
| 598 |
PURCHASE AND SUPPLY OF WATER TANKS ACROSS THE WARD - SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SEKERR |
Ksh. 1,000,000 |
Comment
|
| 599 |
PIPING OF TAMAKARU WATER PROJECT FROM COSATAL TO TAMAKRAU - SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
SEKERR |
Ksh. 1,500,000 |
Comment
|
| 600 |
COMPLETION OF MTELO - KACHESOIT WATER PROJECT - SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SEKERR |
Ksh. 1,000,000 |
Comment
|
| 601 |
SUPPLY OF TREE SEEDLINGS AND POTTING TUBES TO SUPPORT YOUTH,WOMEN,SCHOOLS AND PWD - SEKERR WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SEKERR |
Ksh. 1,700,000 |
Comment
|
| 602 |
DRILLING OF A BORE HOLE AT NASOLOT- SEKKER WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
SEKERR |
Ksh. 2,200,000 |
Comment
|
| 603 |
INSTALLATION OF SOLAR PANELS, WATER TANK AND PIPING OF WATER TO KAPCHILA PRIMARY SCHOOL-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
SIYOI |
Ksh. 2,000,000 |
Comment
|
| 604 |
INSTALLATION OF SOLAR PANELS AND PIPING OF WATER TO SIYOI SECONDARY, PRIMARY AND SIYOI CENTRE-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
SIYOI |
Ksh. 2,000,000 |
Comment
|
| 605 |
CONSTRUCTION OF WATER INTAKE AT KAIBOS SECONDARY SCHOOL-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
SIYOI |
Ksh. 500,000 |
Comment
|
| 606 |
COMPLETION OF KIPKORINYA WATER PROJECT-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
SIYOI |
Ksh. 0 |
Comment
|
| 607 |
CONSTRUCTION OF WATER INTAKE AT KWA WANYONYI SPRING IN CHOROK ‘A’-SIYOI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
SIYOI |
Ksh. 500,000 |
Comment
|
| 608 |
UPGRADING OF LOKII-LOSIYWAT BOREHOLE TO SOLAR POWERED-SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
SUAM |
Ksh. 2,300,000 |
Comment
|
| 609 |
UPGRADING OF KOKWOLIKWON -KARON BOREHOLE TO SOLAR POWERED -SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
SUAM |
Ksh. 2,300,000 |
Comment
|
| 610 |
UPGRADING OF KINGISIA-KOPULIO BOREHOLE TO SOLAR POWERED - SUAM WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
SUAM |
Ksh. 2,300,000 |
Comment
|
| 611 |
CONSTRUCTION OF WATER SUPPLY TO TAPACH HEALTH FACILITY,TAPACH SECONDARY SCHOOL ,TAPACH PRIMARY AND TAPACH MARKET -TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Ongoing
|
TAPACH |
Ksh. 1,500,000 |
Comment
|
| 612 |
PURCHASE AND SUPPLY OF WATER PIPES TO ROSOMA WATER PROJECT, ST. PADUA SINA SECONDARY SCHOOL AND LULWOI ECDE WATER PROJECT-TAPACH WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
TAPACH |
Ksh. 2,500,000 |
Comment
|
| 613 |
REPAIR AND MAINTAINANCE OF PIPED WATER AT LUTUPOGH- TAKAR DISPENSARY- WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
WEIWEI |
Ksh. 500,000 |
Comment
|
| 614 |
FENCING AND CONSTRUCTION OF WATER TROUGH AT SOKOPET WATER POINT -WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
WEIWEI |
Ksh. 500,000 |
Comment
|
| 615 |
DESILTING AND FENCING OF POGHOGH WATER POINT -WEIWEI WARD |
WATER, ENVIRONMENT AND NATURAL RESOURCES |
2023-2024 |
Complete
|
WEIWEI |
Ksh. 500,000 |
Comment
|